Sie sind auf Seite 1von 5

Gulf of Mexico Riser Based Plug and Abandon Well History

Tree Type &


Location Water SITHP Diver/ Service
Client Intervention Intervention Description Intervention Services
Block/Well Depth(ft) (psi) WROV Vessel
System
FMC Tree Thru Tubing Subsea Well
HI A-373 Diver/ Slickline, E-line, cementing, fluid services, and wellhead
Enron 360 3,500 FMC Riser Decommission FlowLine Pigging and Uncle John
#1 WROV explosive severance.
System Decommission

EI 364 Vetco Tree Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
Burlington 346 4,200 WROV Uncle John
#3 Vetco Riser System Decommission and wellhead explosive severance.

EW 914 Vetco Tree Thru Tubing Subsea Well Slickline, E-line, cementing, fluid services, and wellhead
Tatham 984 4,000 WROV Uncle John
#2 Vetco Riser System Decommission explosive severance.

EW 915 Vetco Tree Thru Tubing Subsea Well Slickline, E-line, cementing, fluid services, and wellhead
Tatham 945 4,200 WROV Uncle John
#1 Vetco Riser System Decommission explosive severance.

Cameron Subsea Well SCSSV lock out and


EC 378
Sonat 486 1,600 WROV Subsea Lubricator installation of wire line retrievable Uncle John Slickline and pumping services.
#1
System SCSSV.

VK 697 Diver/ Dril-Quip Wellhead Subsea Well Decommission of a TA EZSV services, cementing, TCP gun system and
Amerada Hess 689 900 Uncle John
#1 WROV EZSV Riser System well. wellhead explosive severance.

VK 740 Dril-Quip Wellhead Subsea Well Decommission of a TA EZSV services, cementing, TCP gun system and
Amerada Hess 936 600 WROV Uncle John
#1 EZSV Riser System well. wellhead explosive severance.

Cameron Spool
GB 387 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 2,750 WROV Tree Uncle John
SB-1 Decommission and wellhead explosive severance.
FMC Riser System
Cameron Spool
GB 387 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 3,594 WROV Tree Uncle John
SB-2 Decommission and wellhead explosive severance.
FMC Riser System
Cameron Spool
GB 387 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 6,212 WROV Tree Uncle John
SB-3 Decommission and wellhead explosive severance.
FMC Riser System
Cameron Spool
GB 388 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 1,463 WROV Tree Uncle John
SA-1 Decommission and wellhead explosive severance.
FMC Riser System
Cameron Spool
GB 388 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 1,617 WROV Tree Uncle John
SA-2 Decommission and wellhead explosive severance.
FMC Riser System
Cameron Spool
GB 388 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 2,955 WROV Tree Uncle John
SA-3 Decommission and wellhead explosive severance.
FMC Riser System
Cameron Spool
GB 388 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 3,089 WROV Tree Uncle John
A-2 Decommission and wellhead explosive severance.
FMC Riser System
Cameron Spool
GB 388 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 1,100 WROV Tree Uncle John
A-1 Decommission and wellhead explosive severance.
FMC Riser System
FMC Tree
MP 145 Diver/ Set isolation sleeve, Flow or P&A, Slickline, E-line, cementing, coiled tubing, fluid services
Conoco 210 200 Tubing riser W Uncle John
#5 WROV result P&A and wellhead explosive severance.
SenTree 3
FMC Tree
GB 70 #1 Diver/ Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
Newfield 750 3,500 FMC Riser Uncle John
Sea Star WROV Decommission and wellhead explosive severance.
System
FMC Tree
GB 71 #2 Diver/ Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
Newfield 750 489 FMC Riser Uncle John
Sea Star WROV Decommission and wellhead explosive severance.
System
FMC Tree Tubing hanger & tree transfer from
GB 70 #2 Diver/ Slickline, E-line, cementing, coiled tubing, fluid services
Newfield 750 0 FMC Riser previous well, Subsea Well Uncle John
Sea Star WROV and wellhead explosive severance.
System Decommission of a TA well.
National Tree
EHI 327 Diver/ Thru Tubing Subsea Well Slickline, E-line, cementing, fluid services and wellhead
Kerr McGee 211 330 Tubing riser W Uncle John
#4 WROV Decommission explosive severance.
SenTree 3
Permanent abandonment of
18-3/4" W/Head
ST 316 temporarily abandoned well required
Petrobras 550 0 WROV Tubing riser W Uncle John E-line, cementing, coiled tubing, fluid services
#1 drilling 115 feet top cement plug with
SenTree 3
Coil tubing
Subsea Well SCSSV lock out and
VK 783 Vetco Tree
Shell 1,475 2,900 WROV installation of wire line retrievable Uncle John Slickline and pumping services.
Tahoe #4 Vetco Riser System
SCSSV
FMC Tree Thru Tubing Subsea Well
HI A-373 Diver/ Slickline, E-line, cementing, fluid services, and wellhead
Enron 360 3,500 FMC Riser Decommission FlowLine Pigging and Uncle John
#1 WROV explosive severance.
System Decommission

VK 697 Diver/ Dril-Quip Wellhead Subsea Well Decommission of a TA EZSV services, cementing, TCP gun system and
Amerada Hess 689 900 Uncle John
#1 WROV EZSV Riser System well. wellhead explosive severance.

VK 740 Dril-Quip Wellhead Subsea Well Decommission of a TA EZSV services, cementing, TCP gun system and
Amerada Hess 936 600 WROV Uncle John
#1 EZSV Riser System well. wellhead explosive severance.

Cameron Spool
GB 387 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 2,750 WROV Tree Uncle John
SB-1 Decommission and wellhead explosive severance.
FMC Riser System
Cameron Spool
GB 387 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 3,594 WROV Tree Uncle John
SB-2 Decommission and wellhead explosive severance.
FMC Riser System

1
Gulf of Mexico Riser Based Plug and Abandon Well History

Tree Type &


Location Water SITHP Diver/ Service
Client Intervention Intervention Description Intervention Services
Block/Well Depth(ft) (psi) WROV Vessel
System
Cameron Spool
GB 387 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 6,212 WROV Tree Uncle John
SB-3 Decommission and wellhead explosive severance.
FMC Riser System
Cameron Spool
GB 388 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 1,463 WROV Tree Uncle John
SA-1 Decommission and wellhead explosive severance.
FMC Riser System
Cameron Spool
GB 388 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 1,617 WROV Tree Uncle John
SA-2 Decommission and wellhead explosive severance.
FMC Riser System
Cameron Spool
GB 388 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 2,955 WROV Tree Uncle John
SA-3 Decommission and wellhead explosive severance.
FMC Riser System
Cameron Spool
GB 388 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 3,089 WROV Tree Uncle John
A-2 Decommission and wellhead explosive severance.
FMC Riser System
Cameron Spool
GB 388 Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
EEX Corp 2,200 1,100 WROV Tree Uncle John
A-1 Decommission and wellhead explosive severance.
FMC Riser System
FMC Tree
MP 145 Diver/ Set isolation sleeve, Flow or P&A, Slickline, E-line, cementing, coiled tubing, fluid services
Conoco 210 200 Tubing riser W Uncle John
#5 WROV result P&A and wellhead explosive severance.
SenTree 3
FMC Tree
GB 70 #1 Diver/ Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
Newfield 750 3,500 FMC Riser Uncle John
Sea Star WROV Decommission and wellhead explosive severance.
System
FMC Tree
GB 71 #2 Diver/ Thru Tubing Subsea Well Slickline, E-line, cementing, coiled tubing, fluid services
Newfield 750 489 FMC Riser Uncle John
Sea Star WROV Decommission and wellhead explosive severance.
System
FMC Tree Tubing hanger & tree transfer from
GB 70 #2 Diver/ Slickline, E-line, cementing, coiled tubing, fluid services
Newfield 750 0 FMC Riser previous well, Subsea Well Uncle John
Sea Star WROV and wellhead explosive severance.
System Decommission of a TA well.
National Tree
EHI 327 Diver/ Thru Tubing Subsea Well Slickline, E-line, cementing, fluid services and wellhead
Kerr McGee 211 330 Tubing riser W Uncle John
#4 WROV Decommission explosive severance.
SenTree 3
Permanent abandonment of
18-3/4" W/Head
ST 316 temporarily abandoned well required
Petrobras 550 0 WROV Tubing riser W Uncle John E-line, cementing, coiled tubing, fluid services
#1 drilling 115 feet top cement plug with
SenTree 3
Coil tubing
Previous Operations Performed from vessel Uncle John - Subsequent Operations Performed from Q4000

MC 400 Cameron Horizontal Install and test isolation sleeve


Anadarko 1134 0 WROV Q4000 Drill pipe, Cameron and Vetco tools
Pardner Tree Install and test Cameron Tree

FMC Tree
HI 370 Subsea well decommissioning tree E-line, cementing, Slickline, fluid services, Coil tubing,
Kerr McGee 380 0 WROV FMC Riser Q4000
#1 recovery and flowline abandonment well head explosives
System
Vetco Tree
HI 378 Subsea well decommissioning tree E-line, cementing, Slickline, fluid services, Coil tubing,
Kerr McGee 330 0 WROV Vetco Riser Q4000
#1 recovery and flowline abandonment well head explosives
System

EI 309C Re-entry of platform P&A wells to E-line, cementing, Slickline, fluid services, Coil tubing,
Forest Oil 350 0 WROV Drill Pipe Riser Q4000
(6 wells) carry out final isolation of the wells. well head explosives
7-3/8 Intervention Subsea well decommissioning tree Slickline, E-line, cementing, coiled tubing, fluid services,
Chevron GC 136#7
1100 1000 WROV Riser System recovery, installation of EZSV and Q4000 EZSV c/w TCP gun and wellhead severance
Texaco Shasta
Cameron Spool mechanical cutting of wellhead. w/mechanical cutting.
Ewing Bank Vetco Wellhead Re-enter subsea well, complete upper Perforating, cementing, mechanical and explosive
EOG 380 0 WROV Q4000
827#1 EZSV Riser System P&A cut and remove wellhead cutting.
7-3/8 Intervention
GC 516#1 Secure lower zone, open upper zone Slickline, pumping and testing services, with coil tubing
ENI 3815 7000 WROV Riser System Q4000
Yosemite by manipulation of sliding sleeves and e-line as standby.
Cameron Spool
7-3/8 Intervention
GC 472 Secure lower zone, open upper zone Slickline, pumping and testing services, with coil tubing
ENI 3815 7000 WROV Riser System Q4000
King Kong by manipulation of sliding sleeves and e-line as standby.
Cameron Spool
Dril Quip subsea
EB 114 Abandon well and remove PLET. Slickline, eline, pumping cementing EZSV and wellhead
Unocal 712 650 WROV tree with drillpipe tie Q4000
#4 Production zone already isolated cutting. CT annulus hook up for circulation
back riser

Chevron VK 864 DrilQuip Wellhead Final abandonment of T&A wells Well head tooling, EZSV and drill guns, Slickline, E-
850 0 WROV Q4000
Texaco #1 EZSV Riser System including wellhead removal 15 bml Line, pumping

Chevron GB 191 Vetco Wellhead Final abandonment of T&A well Well head tooling, EZSV and drill guns, Slickline, E-
660 0 WROV Q4000
Texaco #1 EZSV Riser System including wellhead removal 15 BML Line, pumping

Removal of 4 guide posts and


Chevron GB 237 corrosion cap, recover dropped 30
680 0 WROV NA Q4000 Diamond Saw, Dredging Equip. pumping
Texaco #2 conductor, cut and recover 30
conductor and stuck drilling BHA

MC 667 Re-enter subsea well, perforate


Anadarko 2934 0 WROV NA Q4000 EZSV Drill Gun, Cement equip.
annulus and cement

Recover Insert valve, exercise


7-3/8 Intervention Well head tooling, slickline, pumping and testing
VK 689 SCSSV, repair velocity valve as
Kerr McGee 2100 5600 WROV Riser System Q4000 services, with coil tubing and e-line as standby.
#2 required. Flow test repair max. 50
FMC Tree Downhole camera.
mmcfpd

2
Gulf of Mexico Riser Based Plug and Abandon Well History

Tree Type &


Location Water SITHP Diver/ Service
Client Intervention Intervention Description Intervention Services
Block/Well Depth(ft) (psi) WROV Vessel
System
7-3/8 Intervention Final abandonment of completed well,
Well head tooling, EZSV and drill guns, Slickline, E-
GC 472 Riser System recovery of tree for reuse, recovery of
ENI 3850 2300 WROV Q4000 Line, pumping, testing, coil tubing, control umbilical and
#2 Cameron Spool jumper, plug and burial of flowline,
IWOCS
Tree recovery of 6,000 ft chrome tubing
7-3/8 Intervention
E-Line, Slick Line, Coil Tubing, Halliburton drill guns,
GC 110 Riser System Plug & Abandon, remove and recover
Shell 1800 1500 WROV Q4000 pumping, Testing, Fluid clean-up, Cameron Personnel
"Rocky" Cameron Vertical tree, Cut & pull tubing, install 2 EZSV
and specialized tooling
Tree
7-3/8 Intervention
Plug & Abandon, remove and recover E-Line, Slick Line, Coil Tubing, Halliburton drill guns,
MC441 Riser System
W&T Offshore 1600 1000 WROV tree, Cut & pull tubing, install EZSV, Q4000 pumping, Testing, Fluid clean-up, Cameron Personnel
A1 Cameron Vertical
surface cement plug and specialized tooling
Tree
7-3/8 Intervention
E-Line, Slick Line, Coil Tubing, Halliburton drill guns,
MC441 Riser System Plug & Abandon, remove and recover
W&T Offshore 1600 1000 WROV Q4000 pumping, Testing, Fluid clean-up, Cameron Personnel
A4 Cameron Vertical tree, Cut & pull tubing, install 2 EZSV
and specialized tooling
Tree
7-3/8 Intervention
E-Line, Slick Line, Coil Tubing, Halliburton drill guns,
MC441 Riser System Plug & Abandon, remove and recover
W&T Offshore 1600 1000 WROV Q4000 pumping, Testing, Fluid clean-up, Cameron Personnel
A9 Cameron Vertical tree, Cut & pull tubing, install 2 EZSV
and specialized tooling
Tree
7-3/8 Intervention
E-Line, Slick Line, Coil Tubing, Halliburton drill guns,
MC441 Riser System Plug & Abandon, remove and recover
W&T Offshore 1600 1000 WROV Q4000 pumping, Testing, Fluid clean-up, Cameron Personnel
B6 Cameron Vertical tree, Cut & pull tubing, install 2 EZSV
and specialized tooling
Tree
7-3/8 Intervention
E-Line, Slick Line, Coil Tubing, Halliburton drill guns,
MC441 Riser System Plug & Abandon, remove and recover
W&T Offshore 1600 1000 WROV Q4000 pumping, Testing, Fluid clean-up, Cameron Personnel
B7 Cameron Vertical tree, Cut & pull tubing, install 2 EZSV
and specialized tooling
Tree
7-3/8 Intervention
E-Line, Slick Line, Coil Tubing, Halliburton drill guns,
MC441 Riser System Plug & Abandon, remove and recover
W&T Offshore 1600 1000 WROV Q4000 pumping, Testing, Fluid clean-up, Cameron Personnel
B8 Cameron Vertical tree, Cut & pull tubing, install 2 EZSV
and specialized tooling
Tree
Cameron Wellhead
Devon EW919 1800 1000 WROV Final abandonment of T&A well Q4000 Well head tooling, EZSV and drill guns, pumping
EZSV Riser System
DrilQuip Wellhead
Hess EW922 1800 1000 WROV Final abandonment of T&A well Q4000 Well head tooling, EZSV and drill guns, pumping
EZSV Riser System
P&A subsea well with EZSV
7-3/8 Intervention
operations and cutting to isolate E-Line, Slick Line, Coil Tubing, Halliburton drill guns,
GC177 Riser System Q4000
Spinnaker 1700 3700 WROV zones. CT used to place bottom pumping, Testing, Fluid clean-up, DrilQuip personnel
"Sangria" DrilQuip Vertical 2007
cement plugs. Flowline attempted and specialized tooling
Tree
cleaned out with CT
7-3/8 Intervention P&A subsea well with EZSV
E-Line, Slick Line, Coil Tubing, Halliburton drill guns,
GC136 #6 Riser System operations and cutting to isolate Q4000
Chevron 860 1100 WROV pumping, Testing, Fluid clean-up, Cameron personnel
"Shasta" Cameron Vertical zones. CT used to place bottom 2007
and specialized tooling
Tree cement plugs. Flowline cleaned out
P&A subsea well with EZSV E-Line, Slick Line, Coil Tubing, Halliburton drill guns,
7-3/8 Intervention
GC136 #8 operations and cutting to isolate Q4000 pumping, Testing, Fluid clean-up, Vetco personnel and
Chevron 950 1100 WROV Riser System
"Shasta" zones. CT used to place bottom 2007 specialized tooling. Well Ops 7 3/8" Intervention Riser
Vetco Vertical Tree
cement plugs. Flowline cleaned out System
E-Line, Slick Line, Coil Tubing, Testing, Fluid clean-up,
MC807 #4 Plug and temporarily abandon Q4000
Shell 2950 3400 WROV FMC tree Shell IRS Cameron Personnel and specialized tooling Shell 5"
"Mars" wellbore leaving subsea tree in place. 2007
Monobore riser system
E-Line, Slick Line, EZSV drill guns, pumping, Testing,
FMC & Cameron P&A including wellhead removal Q4000 Fluid clean-up, Vetco, Cameron and FMC personnel
Plains Petroleum MC 661 & 705 834 2400 WROV
Well Ops 7 3/8" IRS below mudline 2008 and specialized tooling. Casing cutting tools. Well Ops 7
3/8" Intervention Riser System
E-Line, Slick Line, EZSV drill guns, pumping, Testing,
FMC Well Ops 7 P&A including wellhead removal Q4000 Fluid clean-up, Vetco, Cameron and FMC personnel
W&T Offshore GB 235, 279, 197 860 1500 WROV
3/8" IRS below mudline 2008 and specialized tooling. Casing cutting tools. Well Ops 7
3/8" Intervention Riser System
E-Line, Slick Line, EZSV drill guns, pumping, Testing,
FMC 4/2 10k & Well P&A including wellhead removal Q4000 coil tubing, Fluid clean-up, tree personnel and
ERT EC 374 375 500 Diver/WROV
Ops 7 3/8" IRS below mudline 2008 specialized tooling. Casing cutting tools. Well Ops 7 3/8"
Intervention Riser System
Q4000
Shell TA 8 (Troika) 2672 WROV FMC tree Shell IRS P&A As above
2008
Q4000
Shell TA 7 (Troika) 2672 0 WROV FMC tree Shell IRS Tubing recovery P&A As above
2008
E-Line, Slick Line, EZSV drill guns, pumping, Testing,
Vetco & Well Ops 7 Q4000
Deep Gulf Energy GC 195 (Tiger) 1850 8500 WROV P&A, Remove well head coil tubing, Fluid clean-up, tree personnel and
3/8" IRS 2009
specialized tooling. Baker cutting and CUT diamond wire

E-Line, Slick Line, EZSV drill guns, pumping, Dril Quip


Drill Quip wellhead, Permanent abandonment of a T&A Q4000
Anadarko EWB 658 #1 495 0 WROV personnel and specialized tooling.Weatherford Casing
Well Ops 7 3/8" IRS well 2009
cutting tools. Well Ops 7 3/8" Intervention Riser System

E-Line, Slick Line, pumping, Prodcution Test spread, coil


Cameron horizontal, P&A with wellhead in place, recover Q4000 tubing, Fluid clean-up, nitrogen, flare boom & burner,
Marubeni EB 759 4114 2000 WROV
Well Ops 7 3/8" IRS jumper 2009 water curtain, tree personnel and specialized tooling.
Well Ops 7 3/8" Intervention Riser System w 6 5/8" riser
E-Line, Slick Line, pumping, coil tubing, water curtain,
Dril Quip Well Ops Q4000
Chevron EB 205 1100 1400 WROV P&A Well head explosively severed tree personnel and specialized tooling. Well Ops 7 3/8"
7 3/8" IRS 2009
Intervention Riser System w 6 5/8" riser
E-Line, Slick Line, pumping, coil tubing, tree personnel
Dril Quip TRT & Q4000
Walter O&G MC 837 1100 650 WROV P&A and specialized tooling. Well Ops 7 3/8" Intervention
Well Ops 7 3/8" IRS 2009
Riser System w 6 5/8" riser
Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
ERT EC 377 425 1600 2 WROV FMC, TRT P&A
2009 and specialized tooling.
E-Line, Slick Line, pumping, coil tubing, tree personnel
FMC Tree w/tooling, Q4000
Shell MC 686 Mensa 5300 7300 2 WROV P&A and specialized tooling. Well Ops 7 3/8" Intervention
Well Ops 7 3/8" IRS 2009
Riser System w 6 5/8" riser

3
Gulf of Mexico Riser Based Plug and Abandon Well History

Tree Type &


Location Water SITHP Diver/ Service
Client Intervention Intervention Description Intervention Services
Block/Well Depth(ft) (psi) WROV Vessel
System
P&A and flowline E-Line, Slick Line, pumping, coil tubing, tree personnel
FMC Tree w/tooling, Q4000
Shell VK 872 Einset 3463 5400 2 WROV displacement/temporary and specialized tooling. Well Ops 7 3/8" Intervention
Well Ops 7 3/8" IRS 2009
abandonement Riser System w 6 5/8" riser
E-Line, Slick Line, pumping, coil tubing, tree personnel
FMC Tree w/tooling, Q4000
Shell VK 783 Tahoe 1414 6000 2 WROV P&A and specialized tooling. Well Ops 7 3/8" Intervention
Well Ops 7 3/8" IRS 2010
Riser System w 6 5/8" riser
T&A to P&A Drill top plug w/Coil
MC 849 Slam Vetco wellhead Well Q4000 Coil tubing drilling spread, Slickline, E Line, pumping,
Noble Energy 3660 3700 2 WROV perforate, squeeze annuli and set top
Dunk Ops 7 3/8" IRS 2010 wellhead personnel
plug
Full abandonement of partially E-Line, Slick Line, pumping, coil tubing, tree personnel
Cameron Spool tree Q4000
Mariner EB 464 Lost Ark 2400 2800 2 WROV abandoned well. Dual lateral plugs in and specialized tooling. Well Ops 7 3/8" Intervention
Well Ops 7 3/8" IRS 2010
upper annuli Riser System w 6 5/8" riser
E-Line, Slick Line, pumping, coil tubing, tree personnel
Cameron Spool tree Full abandonement and wellhead Q4000
Mariner EB 464 Lost Ark 750 1200 2 WROV and specialized tooling. Well Ops 7 3/8" Intervention
Well Ops 7 3/8" IRS removal 2010
Riser System w 6 5/8" riser
E-Line, Slick Line, pumping, coil tubing, tree personnel
Vetco well head Well Full abandonement and wellhead Q4000
Mariner EB 164 #2 508 3200 2 WROV and specialized tooling. Well Ops 7 3/8" Intervention
Ops 7 3/8" IRS removal 2010
Riser System w 6 5/8" riser
E-Line, Slick Line, pumping, coil tubing, tree personnel
Cameron Spool tree Full abandonement, casing cutting Q4000
WT GC 178 1401 1230 2 WROV and specialized tooling. Well Ops 7 3/8" Intervention
Well Ops 7 3/8" IRS and cap installatoin 2010
Riser System w 6 5/8" riser
E-Line, Slick Line, pumping, coil tubing, tree personnel
Cameron Spool tree Full abandonement, casing cutting Q4000
WT EwB 949 600 1510 2 WROV and specialized tooling. Well Ops 7 3/8" Intervention
Well Ops 7 3/8" IRS and cap installatoin 2010
Riser System w 6 5/8" riser
E-Line, Slick Line, pumping, coil tubing, tree personnel
Cameron Spool tree Full abandonement, casing cutting Q4000
WT EwB 977 580 2110 2 WROV and specialized tooling. Well Ops 7 3/8" Intervention
Well Ops 7 3/8" IRS and wellhead removal 2011
Riser System w 6 5/8" riser
Cameron vertical
GC 200 TA2 Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Shell 2100 2 WROV tree Shell 5" T&A
(Troika) 2011 and specialized tooling. Shell 5" MonoboreSystem
Monobore system
FMC vertical trees,
GB 516 /472 Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Shell 3400 2 WROV Shell 5" Monobore T&A operations
(Serrano) 2011 and specialized tooling. Shell 5" MonoboreSystem
system
Cameron HXT Well Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Apache MC 66 1144 2 WROV P&A
Ops 7 3/8" IRS 2011 and specialized tooling.
FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Anadarko EB 646 #6 3600 2 WROV P&A
7 3/8" IRS 2011 and specialized tooling.
EB 686 Joe FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Anadarko 3700 2 WROV P&A
Jackson 7 3/8" IRS 2011 and specialized tooling.
FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Anadarko EB 558 Nansen 3600 2 WROV P&A
7 3/8" IRS 2011 and specialized tooling.
FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Anadarko GB 877 Redhawk 5325 2 WROV P&A
7 3/8" IRS 2011 and specialized tooling.
FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Anadarko GC 355 3930 2 WROV P&A
7 3/8" IRS 2011 and specialized tooling.
Slick Line, pumping, coil tubing, tree personnel,
Q4000
ERT GB 346 2275 2 WROV open water T&A to P&A & wellhead removal Weatherford MOST cutting system and specialized
2012
tooling.
Slick Line, E Line, pumping, coil tubing, tree personnel,
Cameron TRT & Q4000
ERT SS 322 #1 315 2 WROV P&A w well head removal Weatherford MOST cutting system, TRT and specialized
Well Ops 7 3/8" IRS 2012
tooling.
FMC vertical tree Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Shell GB 602 Macaroni 3610 2 WROV T&A
Well Ops 7 3/8" IRS 2012 and specialized tooling.
E-Line, Slick Line, pumping, coil tubing, tree personnel,
Vetco wellhead Well Q4000
Devon Energy GC 114 2650 2 WROV T&A to P&A CT drilling tools, EZSV packers, Casing cutting
Ops 7 3/8" IRS 2012
equipment
FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Shell GC 200 #1 Troika 2600 2 WROV Decommission
7 3/8" IRS 2012 and specialized tooling.

FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Shell GC 200 #4 Troika 2600 2 WROV Analysis and Decommission
7 3/8" IRS 2012 and specialized tooling.
Cameron HXT Well Q4000 Slick Line, pumping, coil tubing, coil tubing fishing and
ERT GC 237 T 3 2060 2 WROV Casing Pressure /T&A
Ops 7 3/8" IRS 2012 milling tools, tree personnel and specialized tooling.
FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Shell GB 341 Habanero 2015 2 WROV Decommission
7 3/8" IRS 2012 and specialized tooling.
FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Anadarko EB 688 #7 3795 2 WROV P&A
7 3/8" IRS 2012-2013 and specialized tooling.
FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Anadarko EB 688 #6 3788 2 WROV P&A
7 3/8" IRS 2013 and specialized tooling.

FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Anadarko EB 688 #8 3786 2 WROV P&A
7 3/8" IRS 2013 and specialized tooling.

FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Anadarko AT 37 7919 2 WROV P&A
7 3/8" IRS 2013 and specialized tooling.

FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Shell MC 810 UI 2 3943 2 WROV T&A
7 3/8" IRS 2013 and specialized tooling.

FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Shell MC 810 PI 1 3853 2 WROV T&A
7 3/8" IRS 2013 and specialized tooling.

FMC Tree, Custom Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Shell GC 20 Gyrfalcon 880 2 WROV T&A
TRT 2013 and specialized tooling.

MC 899 A5 FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
Shell 4393 2 WROV P&A
Crosby 7 3/8" IRS 2013 and specialized tooling.

4
Gulf of Mexico Riser Based Plug and Abandon Well History

Tree Type &


Location Water SITHP Diver/ Service
Client Intervention Intervention Description Intervention Services
Block/Well Depth(ft) (psi) WROV Vessel
System
Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
LLOG MC 489 SS06 2160 2 WROV Well Ops 7 3/8" IRS TA to PA
2013 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


LLOG GB 378 SS01 2038 2 WROV Well Ops 7 3/8" IRS TA to PA
2013 and specialized tooling.

FMC HXT Well Ops Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel
LLOG GB 378 SS03 2045 2 WROV P&A
7 3/8" IRS 2013 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


LLOG EB 197 SS01 1250 2 WROV Well Ops 7 3/8" IRS TA to PA
2013 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


Marubeni EB 668 Raptor 3710 2 WROV Well Ops 7 3/8" IRS P&A
2013 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


Noble Energy VK 961 4677 2 WROV Well Ops 7 3/8" IRS P&A
2013 and specialized tooling.

Q4000
MC 810 P7 E-Line, Slick Line, pumping, coil tubing, tree personnel
Shell 3645 2 WROV Well Ops 7 3/8" IRS P&A 2013 /
Princess and specialized tooling.
2014

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


Shell MC 810 UI3 Ursa 3645 2 WROV Well Ops 7 3/8" IRS P&A
2014 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


Shell MC 687 A2 Mensa 5292 2 WROV Well Ops 7 3/8" IRS P&A
2014 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


Shell MC 687 A5 Mensa 5292 2 WROV Well Ops 7 3/8" IRS P&A
2014 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


Shell MC 687 A6 Mensa 5290 2 WROV Well Ops 7 3/8" IRS P&A
2014 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


Anadarko LL 5 #1 8807 2 WROV Well Ops 7 3/8" IRS P&A
2014 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


Anadarko LL 50 #1 8953 2 WROV Well Ops 7 3/8" IRS P&A
2014 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


Anadarko LL 399 #1 8960 2 WROV Well Ops 7 3/8" IRS P&A
2014 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


Anadarko LL 399 #2 8960 2 WROV Well Ops 7 3/8" IRS P&A
2014 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


Anadarko LL 399 #3 8948 2 WROV Well Ops 7 3/8" IRS P&A
2014 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


Anadarko LL 309 #1 8774 2 WROV Well Ops 7 3/8" IRS P&A
2014 and specialized tooling.

Q4000 E-Line, Slick Line, pumping, coil tubing, tree personnel


Anadarko AT 261 #1st1 8353 2 WROV Well Ops 7 3/8" IRS P&A
2014 and specialized tooling.

E-Line, Slick Line, pumping, coil tubing, tree personnel


ENI GC 516 3800' WROV Well Ops 7 3/8" IRS P&A H534 2014
and specialized tooling.

E-Line, Slick Line, pumping, coil tubing, tree personnel


Anadarko VK 825 #4 1713 WROV Well Ops 7 3/8" IRS P&A H534 2014
and specialized tooling.

E-Line, Slick Line, pumping, coil tubing, tree personnel


Anadarko VK 869 #2 2433 WROV Well Ops 7 3/8" IRS P&A H534 2014
and specialized tooling.

E-Line, Slick Line, pumping, coil tubing, tree personnel


Anadarko VK 869 #1 2033 WROV Well Ops 7 3/8" IRS P&A H534 2014
and specialized tooling.
E-Line, Slick Line, pumping, coil tubing, tree personnel
Anadarko VK 825 #5 1711 WROV Well Ops 7 3/8" IRS P&A H534 2014
and specialized tooling.
E-Line, Slick Line, pumping, coil tubing, tree personnel
Anadarko EB 602 #9 3450 WROV Well Ops 7 3/8" IRS P&A H534 2014
and specialized tooling.

Das könnte Ihnen auch gefallen