Beruflich Dokumente
Kultur Dokumente
15
15
14
14
13
13
1,49m 1,49m
1,80m
1,80m
1,50m 1,50m 1,50m 1,50m 1,50m 1,50m
1,49m
1,49m
1,49m
1,49m
1,49m
1,49m
12
12
1,49m 1,49m
1,80m
1,80m
1,50m 1,50m 1,50m 1,50m 1,50m 1,50m 1,50m 1,50m 1,50m
1,49m
1,49m
1,49m
1,49m
1,49m
1,49m
1,49m
1,49m
1,49m
3,45m
1,19m
1,20m
1,70m
1,70m
4,03m
HALA 1
1,69m
11
11
1,49m 1,49m 1,50m
3,93m
1,50m
1,80m
1,80m
1,19m
1,20m 1,50m
1,75m 1,75m
1,70m
1,50m
1,70m
1,20m
1,20m
4,19m
4,03m
1,49m 1,49m
10
10
1,80m
1,80m
1,80m
1,70m
09
09
2,60m
0,99m
2,60m
0,83m 0,85m
1,19m
1,49m 1,49m 1,20m
1,75m 1,75m
1,70m
1,80m
1,80m
1,70m
1,20m
1,20m
4,97m
0,32m 0,87m
2,11m
4,03m
08
08
LEGEND
1,00m 1,02m 1,00m 0,44m 1,15m 1,16m
ROOF OUTLINE
METEO
0,83m 0,85m
0,83m 0,85m
0,83m 0,85m
PURLIN AXIS
SENSOR
MS
MS METEOR SENSOR 500 x 500mm
CABLE TRAY
2,11m
2,11m
2,11m
07
07
12,69m 12,00m 12,00m 14,53m 16,69m 19,05m
0,97m
0,99m
0,97m
0,99m
06
06
05
05
04
04
CONTRACTOR CONSULTANT DESIGN CATEGORY PROJECT CODE
16018 - HNKN
DESIGN STAGE
DER
REVISION NO REVISION DATE DESCRIPTION PREP CHECK APPR
R04 02.12.2016 INITIAL LAYOUT AGT GSK KIK
R03 29.09.2016 INITIAL LAYOUT AGT GSK KIK
03
03
R02 27.09.2016 INITIAL LAYOUT AGT GSK KIK
R01 21.09.2016 INITIAL LAYOUT AGT GSK KIK
R00 01.09.2016 INITIAL LAYOUT AIZ AGT VIK
02
02
ISSUED FOR PLANT PROJECT
HEINEKEN FACTORY - 400 KWp - PV PLANT
PV SCHEMATIC LAYOUT
Supporting Structures Layout
01
01
CODE
TYPE ISSUER COUNTRY TEC. PLANT SYSTEM PROGRESSIVE REVISION
ENGINEERING & CONSTRUCTION
This document is property of ots respective owners and in accordance to legislation in force, hence unothorised reproduction, publication, disclosure etc. restrictions apply.
A B C D E F G H I J K L M N O P Q R S T U V W X Y