Sie sind auf Seite 1von 2

HollySys (Asia Pacific) Pte Ltd

200 Pandan Loop, #08-01


Pantech 21, Singapore 128388

Tel: +65 6777 0950


Fax: +65 6777 2730

rail-sales@hollysys.com.sg

MACS-SCADA
All Rights Reserved. Copyright 2014 by HollySys International.
MACS-SCADA MACS-SCADA PROJECTS
460km route length, 540 sets of Train, 29 Depots and 274 Stations of safe and reliable operation.
MACS-SCADA is a software platform which is applied to developing large
Revenue
scale SCADA Systems. It provides all kinds of infrastructure for general Project Name Interface Systems
Service
KEY BENEFITS
distributed SCADA systems, including RTDB, general HMI, Commanding
Line 13 of Beijing Urban Railroad PSCADA / ECS / LNE / CIVIL Jan, 2003
System, Alarm/Event System, Log System, HTDB, Report and Trend Full-featured SCADA platform
for ISCS
System, Authority System, Redundancy and Diagnosis Mechanism, Time
Phase 1 of Line 1 of Shenzhen Metro PSCADA / ECS / PSD / LNE / FPS / CIVIL Dec, 2004
System, etc. The software is based on an open extensible architecture Supported Industry Open
Standards Line 4 of Guangzhou Metro (Segment PSCADA / ECS / TVS / SIG / PSD / TRAIN
and a set of development tools (SDK) that can support further software Dec, 2006
between Huangzhou and Huangge) COMMS / LNE / COMMS / FPS / CIVIL
development. High Performance Dynamic
Human Machine Interface PSCADA / ECS / TVS / SIG / PSD / TRAIN
Line 3 of Guangzhou Rail Transportation Jun, 2007
COMMS / LNE / COMMS / FPS / CIVIL
MACS-SCADA software platform is elaborately developed by HollySys and Adaptation of multiple
Line 10 of Beijing Metro including the PSCADA / ECS / TVS / SIG / PSD / TRAIN
software design patterns Jul, 2008
proven in practical engineering applications. The platform uses the latest Olympic Dedicated Line (Phase 1) COMMS / LNE / COMMS / FPS / CIVIL

technology available in the software industry to make the system modular, High reusable abilities for Line 5 of Guangzhou Metro (Phase 1 - PSCADA / ECS / TVS / SIG / PSD / TRAIN
Dec, 2009
Object-Oriented process Segment between Jiaokou and Wenchong) COMMS / LNE / COMMS / FPS / CIVIL
standardized and practical, which is better integrated to monitor software
in the aspects of reliability, security and openness. Transportation Hub of Tianjin Railway Station PSCADA / ECS / LNE / COMMS / FPS / CIVIL Jun, 2010

PSCADA / ECS / TVS / SIG / PSD / TRAIN


Line 1 of Shenzhen Metro (Phase 2) Dec, 2010
COMMS / LNE / COMMS / FPS / CIVIL
MULTI-TIER ARCHITECTURE PSCADA / ECS / TVS / SIG / PSD / TRAIN
MCC for Shenzhen Metro (Phase 1 and 2) Dec, 2010
COMMS / LNE / COMMS / FPS / CIVIL
The MACS SCADA System is a three-level control and monitoring system,
which includes the following: Line 4 of Guangzhou Metro (Northward PSCADA / ECS / TVS / SIG / PSD / TRAIN
Dec, 2010
KEY FEATURES & Southward Chehuang Segment) COMMS / LNE / COMMS / FPS / CIVIL

Multi-master redundancy PSCADA / ECS / TVS / SIG / PSD / TRAIN


Yizhuang Line of Beijing Metro Dec, 2010
COMMS / LNE / COMMS / FPS / CIVIL
Object-Oriented Real-time
Line 3 of Guangzhou Metro PSCADA / ECS / TVS / SIG / PSD / TRAIN
Database (OORTDB) Dec, 2010
(Northward Extension Segment) COMMS / LNE / COMMS / FPS / CIVIL
Field devices and subsystem
PSCADA / ECS / TVS / SIG / PSD / TRAIN
monitoring and supervision Line 4 of Shenzhen Metro (Phase 2) May, 2011
COMMS / LNE / COMMS / FPS / CIVIL

Alarm management MCC for Line 2 of Shenzhen Metro PSCADA / ECS / TVS / SIG / PSD / TRAIN
Jun, 2011
(Eastward Extension) COMMS / LNE / COMMS / FPS / CIVIL
Analog and digital trending
PSCADA / ECS / TVS / SIG / PSD / TRAIN
Line 10 of Beijing Metro (Phase 2) Dec, 2012
Data historian and archiving COMMS / LNE / COMMS / FPS / CIVIL

Real-time/historical trending PSCADA / ECS / TVS / SIG / PSD / TRAIN


Line 8 of Beijing Metro (Phase 2) Dec, 2013
COMMS / LNE / COMMS / FPS / CIVIL
SOE (Sequence of Events)
PSCADA / ECS / TVS / SIG / PSD / TRAIN
support Contract 853 of Express Rail Link May, 2015
COMMS / LNE / COMMS / FPS / CIVIL
Parameter and event logging
PSCADA / ECS / TVS / SIG / PSD / TRAIN
Line 14 of Beijing Metro Dec, 2016
COMMS / LNE / COMMS / FPS / CIVIL
User and role assignment

Excel report generation

Web-enabled, thin client

Das könnte Ihnen auch gefallen