Beruflich Dokumente
Kultur Dokumente
Activity : Casting of Parapet Wall (P1-4) Activity : P2 & 3 Brushing Rebars in Parapet Wall
1 Location : ACCESS ROAD TO CHANGI NORTH INDUSTRIAL 2
Location : ACCESS ROAD TO CHANGI NORTH INDUSTRIAL PARK
PARK
Date: 05/06/2012 Date: 17/06/2012
Activity :Installation Formworks for Parapet Wall (P4-9) Activity : Parapet Wall Surface touch-up(P 10-11)
3 Location : ACCESS ROAD TO CHANGI NORTH INDUSTRIAL 4
Location : ACCESS ROAD TO CHANGI NORTH INDUSTRIAL PARK
PARK
Date : 21/06/2012 Date : 21/06/2012
Activity : (P1-6) Casting of Parapet Wall Activity : P9 -11 Deck slab 50 mm topping up @ Crosshead 3-4
5 Activity : ACCESS ROAD TO CHANGI NORTH INDUSTRIAL 6
Activity : ACCESS ROAD TO CHANGI NORTH INDUSTRIAL PARK
PARK
Date : 25/06/2012 Date : 30/06/2012
Activity : (P1-11) Casting of Parapet Wall Activity : P1-8 Portal Frame 2A-Carbpshine Final Coat Painting
7 Location : ACCESS ROAD TO CHANGI NORTH INDUSTRIAL 8
Location : ACCESS ROAD TO CHANGI NORTH INDUSTRIAL PARK
PARK
Date : 12/06/2012 Date : 28/06/2012
APPENDIX 9A - PROGRESS PHOTOGRAPHS JUNE 2012 FOR PROJECT - ER356QP
Activity : Installation Formwork for Parapet Wall (P7-10) Activity : P8 . Parapet Wall Curing
Activity : Realign of Parapet Wall and Installation Starter Bars Activity : P7. Structure Surface Touch-up at Portal Frame 1A
13 Location : ACCESS ROAD TO CHANGI NORTH INDUSTRIAL 14
Location : ACCESS ROAD TO CHANGI NORTH INDUSTRIAL PARK
PARK
Date: 30/06/2012 Date : 30/06/2012