Beruflich Dokumente
Kultur Dokumente
DEMO 3
UPGRADING OF
MULTI-TERMINAL
INTERCONNECTORS
Diego Cirio
RSE
Submarine
Submarine cables
cables
Converters NEXANS
TOSHIBA
EUROPE
System
RSE TERNA
1967: Sardinia-
TERNA Mainland
DE ANGELI
Overhead
Overhead RSE
1987: 50 MW tap station in
lines//
lines TERNA
Corsica
insulation
Insulation
Land cables
NEXANS
2
DEMO 3: ACTIVITIES
HVDC CONVERTERS
Toshiba Europe
3
Converter technology Toshiba T&D Europe
Focus on DC fault on OHL section
SACOI-II
upgrade to
Bipolar
HVDC/VSC
Link
4
Converter technology Toshiba T&D Europe
DEMO Work - Circuit-topology VSC-converter developed by Toshiba
5
Converter technology Toshiba T&D Europe
DEMO Work - Circuit-topology VSC-converter developed by Toshiba
DC power of the full DC Current
12 MW, +10 kVdc, 1200 Adc
6
Converter technology Toshiba T&D Europe
DEMO Work - Circuit-topology VSC-converter developed by Toshiba
7
DEMO 3: ACTIVITIES
HVDC CABLES
Land & Submarine
Nexans
8
HVDC XLPE Submarine Cable
400 kV
1600 mm2 Cu
Compact conductor
to minimize overall
dimensions
Minimized weight
to allow deep sea Test loop energized June 2016
installation with
reduced axial tension
Successfully produced a prototype length
9
HVDC XLPE Land Cable Test loop energized April 2016
Successfully produced a prototype length
2500 mm2 Al Conductor (Milliken)
21 mm XLPE Insulation
Metallic screen, Al laminated
Outer protective jacket,
HDPE/HFFR + SC skin
10
HVDC Extruded Repair Joint Cutaway
Design is identical to Land Field Joint
Additional features: external Steel case to withstand deep sea Laying tension
Bend stiffeners to avoid excessive bending (exactly like in phone charger)
The Mechanical Preconditioning for 500m depth
DEMO 3: ACTIVITIES
CONDUCTORS
for HVDC overhead lines
De Angeli Prodotti
RSE
TERNA
13
ACFR Conductor
Kevlar Fibres
Core
Kevlar Rope
Structural Applications
Aberfeldys bridge,
Scotland
Built in 1992, total length 113 m
with a span of 63 m
Carbon Multistrand
Aluminium
Alloy wires
Tape
Extruded
tube
Carbon core
multistrand
RECAP:
Identified reliable Kevlar/carbon
suppliers with good production capacity
Realized first conductor prototype
(~300m) for both ACFR & Carbon
ACFR: Developed special fittings for the
core material
Carbon:
Finished aging test
Stranded multi-strand carbon core
NEXT STEPS:
Carbon: Stranding conductor
prototype Installation test
Characterizations test @RSE lab Installation pilot line
ADVANTAGES
INSULATION
of HVDC overhead lines
RSE
TERNA
20
Insulation of overhead DC lines
21
Insulation of
overhead DC lines
Design and realization of the test
set-up for carrying out
long duration, multi-stress
(sun, rain, salt fog) ageing test on
6 RTV covered insulator chains
(fully and partially coated)
Innovative
Multiscale approach -
small & large scale solver
small scale simulation
computes the ion emission
and electric field on the
conductor
A set of 56 chemical
species and over 600
reactions is involved
The net production of O3
is included as well
Large scale solver gives a picture
of the ions currents and the
electric field around the
conductors (relevant for corona)
and on the ground (disturbances
on humans)
DEMO 3: ACTIVITIES
SYSTEM ASPECTS
RSE
TERNA
24
Context
SACOI connects 2 (or 3) electrical AC islands
Sardinia and Corsica have weak grids
Large RES penetration and stability issues in Sardinia
Another HVDC (LCC) from Sardinia to
mainland Italy
Objectives
Stable operation with the new
SACOI VSC
Restoration of Sardinia via SACOI
Aspects of SACOI as embedded
HVDC
Evaluation of the renewable
penetration increase thanks to
new SACOI
Contingencies
Time [s]
P Pref
Restoration:
SACOI VSC as
1. Black start unit
2. STATCOM
27
Techno-economic evaluations of
three-terminal HVDC systems
Ongoing activities:
Presented by
Diego Cirio
diego.cirio@rse-web.it
www.bestpaths-project.eu
Follow us on Twitter: @BestPaths_eu
29