Sie sind auf Seite 1von 2

Ref no.

FCC/D17/IS/FB/MM/6/17
Date: 1.7.2017
FUEL CONTROL CHART WITH LOGS OF D-17 BUILDING MPPL

135 kVA(108kW) 350 kVA(280kW) Total fuel Balance Total


Fuel Total
S.no Date Received Previous Fuel (liters) Fuel fuel Fuel fuel
consumed Rate of Total cost of Fuel (Liters) Load Fuel cost per Nature of Mains
(liters) (Liters) "R" Previous Current Run. Previous Current (liters) fuel fuel (Rs./day) at day end Shedding hour (Rs/hr) failure
%load Run kW (Hrs) (Hrs) hours Status consumption consumed %load Run kW (Hrs) (Hrs) Run. hours Status consumption consumed "C=A+B" "G=R-C" Hours
(Lit/hr) "A" (Lit/Hr) "B"
31 Wednesday, May 31, 2017 0 3323 3323 69 75 4805.5 4809.5 4 In-Operation 15 60 31.4 88 486 489 3 In-Operation 34 102 162 82 13,284 3161 7 1897.7 Load shedding
1 Thursday, June 01, 2017 0 3161 3161 68 73 4809.5 4815.5 6 In-Operation 15 90 29.6 83 489 493 4 In-Operation 29 116 206.00 82 16,892 2955 10 1689.2 HT fault
2 Friday, June 02, 2017 300 2955 3255 69 74 4815.5 4820.5 5 In-Operation 15 75 30.0 84 493 494.5 1.5 In-Operation 29 43.5 118.5 82 9,717 3136.5 6.5 1494.9 Load shedding
3 Saturday, June 03, 2017 0 3136.5 3136.5 70 76 4820.5 4829 8.5 In-Operation 17 144.5 27.1 76 494.5 495.5 1 In-Operation 26 26 170.5 82 13,981 2966 9.5 1471.7 HT fault
4 Sunday, June 04, 2017 0 2966 2966 66 71 4829 4830 1 In-Operation 15 15 0.0 0 495.5 495.5 0 Stand-by 0 0 15 82 1,230 2951 1 1230.0 Load shedding
5 Monday, June 05, 2017 0 2951 2951 68 73 4830 4835.5 5.5 In-Operation 15 82.5 27.5 77 495.5 497.5 2 In-Operation 28 56 138.5 82 11,357 2812.5 7.5 1514.3 Load shedding
6 Tuesday, June 06, 2017 0 2812.5 2812.5 69 75 4835.5 4842 6.5 In-Operation 17 110.5 29.6 83 497.5 500 2.5 In-Operation 29 72.5 183 82 15,006 2629.5 9 1667.3 HT fault
7 Wednesday, June 07, 2017 0 2629.5 2629.5 68 73 4842 4845 3 In-Operation 15 45 27.5 77 500 502.5 2.5 In-Operation 28 70 115 82 9,430 2514.5 5.5 1714.5 Load shedding
8 Thursday, June 08, 2017 3000 2514.5 5514.5 70 76 4845 4850.5 5.5 In-Operation 17 93.5 29.6 83 502.5 508 5.5 In-Operation 29 159.5 253 82 20,746 5261.5 11 1886.0 HT fault
9 Friday, June 09, 2017 0 5261.5 5261.5 70 76 4850.5 4853.5 3 In-Operation 17 51 26.8 75 508 510 2 In-Operation 28 56 107 82 8,774 5154.5 5 1754.8 Load shedding
10 Saturday, June 10, 2017 0 5154.5 5154.5 70 76 4853.5 4859.5 6 In-Operation 17 102 26.8 75 510 510.5 0.5 In-Operation 28 14 116 82 9,512 5038.5 6.5 1463.4 Load shedding
11 Sunday, June 11, 2017 0 5038.5 5038.5 69 75 4859.5 4865 5.5 In-Operation 17 93.5 0.0 0 510.5 510.5 0 Stand-by 0 0 93.5 82 7,667 4945 5.5 1394.0 Load shedding
12 Monday, June 12, 2017 0 4945 4945 70 76 4865 4869.5 4.5 In-Operation 17 76.5 26.4 74 510.5 512.5 2 In-Operation 28 56 132.5 82 10,865 4812.5 6.5 1671.5 Load shedding
13 Tuesday, June 13, 2017 0 4812.5 4812.5 70 76 4869.5 4872 2.5 In-Operation 17 42.5 30.0 84 512.5 516 3.5 In-Operation 30 105 147.5 82 12,095 4665 6 2015.8 Load shedding
14 Wednesday, June 14, 2017 0 4665 4665 68 73 4872 4877 5 In-Operation 15 75 0.0 0 516 516 0 Stand-by 0 0 75 82 6,150 4590 5 1230.0 Load shedding
15 Thursday, June 15, 2017 0 4590 4590 0 0 4877 4877 0 Stand-by 0 0 36.8 103 516 517 1 In-Operation 33 33 33 82 2,706 4557 1 2706.0 Load shedding
16 Friday, June 16, 2017 0 4557 4557 0 0 4877 4877 0 Stand-by 0 0 29.6 83 517 518 1 In-Operation 29 29 29 82 2,378 4528 1 2378.0 Load shedding
17 Saturday, June 17, 2017 0 4528 4528 0 0 4877 4877 0 Stand-by 0 0 0.0 0 518 518 0 Stand-by 0 0 0 82 - 4528 0 0.0 N/A
18 Sunday, June 18, 2017 0 4528 4528 68 73 4877 4877.5 0.5 In-Operation 15 7.5 28.6 80 518 520.5 2.5 In-Operation 28 70 77.5 82 6,355 4450.5 3 2118.3 Load shedding
19 Monday, June 19, 2017 0 4450.5 4450.5 0 0 4877.5 4877.5 0 Stand-by 0 0 27.9 78 520.5 522 1.5 In-Operation 28 42 42 82 3,444 4408.5 1.5 2296.0 Load shedding
20 Tuesday, June 20, 2017 0 4408.5 4408.5 0 0 4877.5 4877.5 0 Stand-by 0 0 28.2 79 522 524.5 2.5 In-Operation 28 70 70 82 5,740 4338.5 2.5 2296.0 Load shedding
21 Wednesday, June 21, 2017 0 4338.5 4338.5 0 0 4877.5 4877.5 0 Stand-by 0 0 0.0 0 524.5 524.5 0 Stand-by 0 0 0 82 - 4338.5 0 0.0 N/A
22 Thursday, June 22, 2017 0 4338.5 4338.5 0 0 4877.5 4877.5 0 Stand-by 0 0 28.9 81 524.5 528.5 4 In-Operation 28 112 112 82 9,184 4226.5 4 2296.0 Load shedding
23 Friday, June 23, 2017 0 4226.5 4226.5 0 0 4877.5 4877.5 0 Stand-by 0 0 27.1 76 528.5 529 0.5 In-Operation 28 14 14 82 1,148 4212.5 0.5 2296.0 Load shedding
24 Saturday, June 24, 2017 0 4212.5 4212.5 0 0 4877.5 4877.5 0 Stand-by 0 0 28.2 79 529 530.5 1.5 In-Operation 28 42 42 82 3,444 4170.5 1.5 2296.0 Load shedding
25 Sunday, June 25, 2017 0 4170.5 4170.5 0 0 4877.5 4877.5 0 Stand-by 0 0 27.1 76 530.5 531 0.5 In-Operation 28 14 14 82 1,148 4156.5 0.5 2296.0 Load shedding
26 Monday, June 26, 2017 0 4156.5 4156.5 0 0 4877.5 4877.5 0 Stand-by 0 0 0.0 0 531 531 0 Stand-by 0 0 0 82 - 4156.5 0 0.0 N/A
27 Tuesday, June 27, 2017 0 4156.5 4156.5 68 73 4877.5 4880 2.5 In-Operation 15 37.5 27.1 76 531 532 1 In-Operation 28 28 65.5 82 5,371 4091 3.5 1534.6 Load shedding
28 Wednesday, June 28, 2017 0 4091 4091 72 78 4880 4886 6 In-Operation 17 102 27.1 76 532 536.5 4.5 In-Operation 28 126 228 82 18,696 3863 10.5 1780.6 HT fault
29 Thursday, June 29, 2017 0 3863 3863 80 86 4886 4889 3 In-Operation 20 60 33.6 94 536.5 553 16.5 In-Operation 30 495 555 82 45,510 3308 19.5 2333.8 HT fault
30 Friday, June 30, 2017 0 3308 3308 70 76 4889 4891.5 2.5 In-Operation 17 42.5 33.6 94 553 556 3 In-Operation 30 90 132.5 82 10,865 3175.5 5.5 1975.5 Load shedding
82 67 149
Holiday
SAT,SUN

Summary
Contribution of DGSETS Gensets running status
ANALYSIS June 2017 135 kVA 82 Hours 55% Due to Load shedding hours #VALUE!

Total Running Hours of Genset till date 149 350 kVA 67 Hours 45% Due to HT hours #VALUE!
Total Available hours till date 720 Fault/Transmission fault
Genset utilization till date 20.69%
Total Fuel consumed till date 3285.50
Rate of Fuel(Rs/Liter) 82
Total cost of Fuel Till date(Rs) 269,411.00
Total KWhr of Genset till date 8605.8787879
Cost of Electrictiy produced by genset Rs/unit 31.31
Gensets Running Hours in 2017 Weekdays & Weekends/Holidays
25

19.5 20

15

11 10.5
10 9.5 9 10
7.5 Week days
6.5 6.5 6.5 6 Weekends/Holiday
5.5 5 5.5 5 5.5
4 3.5 5
3 2.5
1 1 1 1.5 1.5
0.5 0.5
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Cost Analysis per Day


50,000 45510
45,000 Thursday, June 01, 2017 Friday, June 02, 2017
40,000 Saturday, June 03, 2017 Sunday, June 04, 2017
35,000 Monday, June 05, 2017 Tuesday, June 06, 2017
30,000 Wednesday, June 07, 2017 Thursday, June 08, 2017
25,000 Friday, June 09, 2017 Saturday, June 10, 2017
20746
Sunday, 18696 June 11, 2017 Monday, June 12, 2017
20,000 16892
13981 15006 Tuesday, June 13, 2017 Wednesday, June 14, 2017
15,000 11357 10865 12095 10865
9717 9430 8774 9512 9184 Thursday, June 15, 2017 Friday, June 16, 2017
10,000 7667 6150 6355 5740 5371 Saturday, June 17, 2017 Sunday, June 18, 2017
2706 2378 3444 3444
5,000 1230 1148 1148
0 0 0 Monday, June 19, 2017 Tuesday, June 20, 2017
-
Wednesday, June 21, 2017 Thursday, June 22, 2017
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
01 01 01 01 01 01 01 01 01 01 01 01 01 01 Friday, June 23, 22017 01 Saturday, June 24, 2017
1 ,2 3 ,2 5 ,2 7 ,2 9 ,2 1 ,2 3 ,2 5 ,2 7 ,2 9 ,2 1 ,2 3 ,2 5 ,2 7,
2
9, 2017
Sunday, June225, Monday, June 26, 2017
e0 e0 e0 e0 e0 e1 e1 e1 e1 e1 e2 e2 e2 e 2 e
un un un un Jun un un un Jun un un Jun un un Tuesday, June un 27, 2017 Wednesday, June 28, 2017
,J , J
y,
J ,J y, ,J ,J ,J , y,
J ,J y, ,J ,J ,J
ay ay da ay da ay ay ay ay da ay da ay ay Thursday, ay June 29, 2017 Friday, June 30, 2017
s d rd sd i d
es
d s d rd s d i d
es
d s d
ur tu on e Fr Su
n
ur tu on ne Fr Su
n
ur
Th Sa M ed
n Tu Th Sa M ed Tu Th
W W
Days

Contribution Of DGsets
135 kVA Genset Running Status
350 kVA Due to Load shedding
Due to HT Fault/Transmission
fault

44.97%
55.03%