Sie sind auf Seite 1von 5

DOTACION TUBO DE REBOSE

PISOS DORMITORIOS DOTACION Segn tabla seria :


1 3 1200 Diametro 2"
2 4 1350
3 4 1350
4 4 1350

TOTAL (lts) 5250


(m3) 5.25

VOLUMEN CISTERNA

Vc = 3937.5 litros
3.9375 4 m3

VOLUMEN TANQUE ELEVADO

Vte = 1750 litros


1.75 2 m3

DIMENSION DE CISTERNA

A L Hu Vc
1 2 2 4

Vc = A x L x Hu

Hu = 2
DATOS

Hs = 2.5 m
Ht = 14.85 m
n 0.6
L= 8.35 m
Vte= 2 m3

QB = Vc / t

QB = 0.56 l/s

De la tabla para QB = 0.56 l/s :

Impulsion Diametro 1"


Succion Diametro 11/4"

HDT = Hs + HT + Hf

Hfs = 10^7*(1.1*L/1000)*0.56^1.85 0.11


5.813*(100)^1.85*P^4.87

Hf = 10^7*(1.25*L/1000)*0.56^1.85 2.15
5.813*(100)^1.85*P^4.87

HDT = Hs + HT + Hf
HDT = 2.5 + 0.11 + 2.15 + 14.85 = 19.61

POTENCIA

HP = QB x HDT 0.24 HP
76 (n)

Entonces escogemos bomba de 1/4 HP


DATOS

PM = 50 psi 20 mca
Ps = 2 mca
Ht = 1 m
t= 1 h
L= 8.35 m
Vc = 4 m3

PM = Hf + Ps + Ht

Hf = 17 mca
24.31 psi

Q = Vc / t

Q= 1.11 l/s

CALCULO DEL MEDIDOR

Hfm = 0.5 x 24.31 12.16 psi


Q= 1.11 x 15.8 17.56 gpm

En la tabla para :

Diame 1" Hfm = 2.50 psi


Diame 3/4" Hfm = 6.30 psi
Diame 5/8" Hfm = 16.00 psi

Por lo tanto : Hfm = 6.30 psi


Diametro 3/4"

Hf = 17.56 - 6.30 11.26 psi


7.88 m

Seleccin de la Tuberia de Alimentacion

Asumimos diametro = 3/4"


Caudal (Q) = 1.11 l/s
Longitudes equivalentes :

2 Valvula de compuerta 0.2


1 Valvula de paso 0.4
01 Codo de 90 0.6
Total = 1.2
Lt = 8.35 + 1.2 9.55 m

Hf = 10^7*(L/1000)*1.1^1.85 8.68 < 9.55


5.813*(140)^1.85*P^4.87
ESTA MAL

Replanteamos :
Asumimos Diametro = 1"

2 Valvula de compuerta 0.4


1 Valvula de paso 0.5
01 Codo de 90 0.7
Total = 1.6

Lt = 8.35 + 1.6 9.95 m

Hf = 10^7*(L/1000)*1.1^1.85 2.23 < 9.95


5.813*(140)^1.85*P^4.87
ESTA BIEN

TUBERIA ALIMENTACION L Q Hf Presion


Medidor-Cisterna 9.95 1.11 2.23 50

Das könnte Ihnen auch gefallen