Internship Report: Oil & Gas Development Company Limited and


Olympia Chemical limited

Dildar Ahmed

August 2017

DEPARTMENT OF ELECTRICAL TECHNOLOGY


UNIVERSITY OF SARGODHA

1
10

Internship Report: Oil & Gas Development Company Limited and


Olympia Chemical limited

Dildar Ahmed

A dissertation submitted to the

DEPARTMENT OF TECHINICAL EDUCATION


UNIVERSITY OF SARGODHA
SARGODHA-PAKISTAN

In partial fulfillment of the requirements for the degree of

Bachelor of Sciences

In

Electrical Technology
(2013-2017)

2
10

University College of Engineering and Technology


Department of Technical Education
Supervised Industrial Training

It is submitted that I have completed the supervised industrial training in Oil & Gas
Development Company Limited and Olympia Chemical limited

Learning Outcomes:
During OGDCL internship I practically observe electrical system and understand the
electrical work on rig. I observe generator, control room ,transformer, silicon control
rectifier, variable frequency drive, mud of rig where motor is lying, and top floor of rig
where drilling .the work done in internship is operating generator, note load of generator
,new connection light .lubrication of motor and changing bearing of motor.

During OCL my internship duration, I observe thermal power plant, switch gear panel of
thermal power plant, substation, transformer, motor and VFD. I practically work on
removing VFD, motor rewinding, on/off of motor and taking load current of motor and
changing bearing of motor. There I improve my knowledge about electrical system.

Signature: _________________
Name of Student: Dildar Ahmed
Registration No: BETF13E055

Signature: _________________________
Name of Supervisor: ________________
Dated: ____________________________

______________________
Head of Department
3
10

Dedication
This internship report is dedicated to all of my parents and my friends for being with me
and helping me in each and every difficulty I face in this report completion and to my
teachers and all those who thought me, trained me and polished my ability at UCET, UOS,
Sargodha.

4
10

Acknowledgment

All prayers to ALLAH ALMIGHTY the most Gracious and the most Beneficent. We are
deeply grateful and humble to Him for blessing us this opportunity of learning. All
respects and honors for the Holy Prophet MUHAMMAD (S.A.W.W), who forever is a
torch of knowledge and symbol of guidance for humanity.
I complete my internship in Olympia chemical limited. I am very thankful of electrical
manager Mr.s kabir khan, deputy manager Mr.s Aqeel qaisar. Who had contributed to
the successful completion of Internship, I would also like to express gratitude to our loving
parents who have consistently prayed for us to successfully complete this final year
internship.
I am also thankful to Staff at OGDCL who gave me their precious time and entertained my
queries with full concentration, despite constant daily routine office work.
Specially, I would like to thanks Mr.s Shoqat khan who help me to avail this
opportunity.

5
10

Summary
I did my internship in Olympia chemical limited. My internship period in Olympia
chemical limited is 6 week. The OCL is located in warcha 13km away from quaidabad.
OCL is the second largest factory in Pakistan. OCL is own electricity power plant. The
total capacity of electrical power production is 18MW, but they produce 10MW.which
fulfill factory demand, Remaining 3MW and 5MW turbine is standby condition

In my internship I practically observe how thermal power plant work, control system,
sub-station, transformer, motor and electrical workshop. In internship I gain practical
knowledge about production of electricity, control room, switch gear, sub-station, and
transformer, motor. During internship I work with electrical department supervisor on
motor rewinding, changing bearing of motor, on/off motor. There I improve my
knowledge about electrical system.

The Oil and Gas Development Company Limited which have a vision to be a leading
Energy and Petroleum Industry recognized by its people partnerships and its performance.
During internship work in electrical department. I work and observe the diesel generator,
transformer and its protective device, silicon control rectifier, variable frequency drive and
different motor sued on rig .during my internship I work with supervisor on motor
maintains and changing bearing of motor and on/off motor. I work as a generator
operator and changing engine oil of generator after completed hundred hours on running
there I observe and understand the working related electrical on rig. There I can improve
my knowledge about electrical system.

6
10

Training schedule

The following table contains my training schedule in OGDCL


My internship started at 22-02-2017 to 20-04-2017.

Date Division Time Instructor


22-02-2017 Introduction of Rig 8am to 2pm Engr. Shoqat Khan
To
24-02-2017
25-02-2017 Generator 8am to 2pm Engr. Asmat Ullah
To
03-03-2017
04-03-2017 Control panel 8am to 2pm Engr. Najam Abbas
To
12-03-2017
13-03-2017 Mud 8am to 2pm Sub Engr. Manzor Elahe
To
20-03-2017
21-03-2017 Rig Top Floor 8am to 2pm Engr. M Lateef Khan
To
28-03-2017
29-03-2017 Routine Work 8am to 2pm Engr. Nasir Marwat
To
20-04-2017
Table no. 1
The following table contains my training schedule in OCL.
My internship started at 26-04-2017 to 08-06-2017

26-04-2017 Introduction of OCL 8am to 4pm Engr. Sheikh Hamad


To
28-04-2017
29-04-2017 Thermal Power Plant 8am to 4pm Asmat
To
06-05-2017 Supervisor
07-05-2017 Control Panel 8am to 4pm Nadeem
To
12-05-2017 Senior Electrician
13-05-2017 Sub Station and Transformer 8am to 4pm Nasir
To
20-05-2017 Supervisor
21-05-2017 Work Shop 8am to 4pm Khalid
To
25-05-2017 Supervisor
26-05-2017 Motor Invertor 8am to 4pm Mushtaq
To
30-05-2017 Supervisor
01-06-2017 Routine work 8am to 4pm Abbas Ahmed
To
08-06-2017 Supervisor
Table no. 2

7
10

Table of Content

Title Page No.

CH # 01 Introduction to Company

1.1 Introduction to Company Plant.11


1.2 Back Ground of Company Plant...11
1.3 Company Objective ..12
1.4 Objective of Internship..12
1.5 Future Project of Company/ Plant.12
CH # 02 Internship Experience in OGDCL
2.1 Generation of Electricity...13
2.2 Control panel.....13
2.2.1 Bus bar13
2.2.2 Silicon control rectifier (SCR.13
2.2.3 Fuse....14
2.2.4 Circuit breaker...14
2.2.5 Relay .14
2.2.6 Outgoing line from control panel..14
2.3 Different portion of rig 15
2.4 Mud..15
2.5 Feed water pump..15
2.6 Top floor of rig.15
2.7 Motor control Centre on rig floor 15
2.8 Variable Frequency Drives...16
2.9 Transformer..16
2.10 Practical Works Done During Internship17
CH#03 Internship Experience in OCL
Observation of thermal power plant during internship.18
3.1 One line diagram..18
3.2 Thermal power plant 19
3.2Typical Layout and Working of Thermal Power .19
3.2.1 Coal19
3.2.2 Boiler.20
3.2.3 Super heater20
3.2.4 Economizer....20
3.2.4Air pre-heater .20
3.2.5 Steam turbine.....20
3.2.6 Condenser..20
3.2.7 Feed water pump21
3.2.8 Alternator21
8
10

3.3 Observation of control panel21


3.3.1 Bus bar..21
3.3.2 Main control panel....21
3.3.3 Circuit Breaker......22
3.3.4 Relay......22
3.3.5 Fuse...22
3.3.6 Natural ground resistance......23
3.4 Observation of sub station....23
3.5 Transformer...23
3.5.1 Core........23
3.5.2 Primary side.......24
3.5.3 Secondary side.......24
3.5.4 Conservator tank ...24
3.5.5 Buchholz relay ..24
3.5.6 Oil gauge ...24
3.5.7 Temperature meter.24
3.6Motor.24
3.7 Workshop .24
3.8 Practical work done during internship..25
3.8.1 Work on removing inverter ..25
3.8.2 Work did in workshop...25
3.8.3 Changing bearing of motor ..25
3.8.4 ON/OFF different motor and taking reading of load current25
CH # 04 Conclusions
4.1 My Objectives.....26
4.2 Problem faced.....26
4.3 Recommendations..26
4.4 Discussion..26
4.5 References..27

9
10

List of Abbreviations

OGDCL Oil and Gas Development Company


OCL Olympia Chemical Limited
CT Current Transformer
PT Potential Transformer
PPL Pakistan Petroleum Limited
POL Pakistan Oilfields Ltd
UAE United Arab Emirate
LPG liquid Petroleum Gas
SCR Silicon control rectifier
AC Alternator Current
DC Direct Current
MW Mega Watt
KW Kilo Watt

List of Figure
\Figure No. Title Page No.
2.1 Control panel 13
2.2 Silicon control rectifier (SCR) 14
2.3 Top floor of rig 15
2.4 Motor control Centre on rig floor 16
2.5 Variable Frequency Drives 16
3.1 Thermal power plant 19
3.2 Alternator 20
3.3 Main control panel 22
3.4 Circuit Breaker 22
3.5 Transformer 23

List of Table

Table 17
Table 2....7

10
10

CH # 01 Introduction to Company

1.1 Introduction of OGDCL

Nashpa-Mela fields are located in Karak & Kohat Districts of KPK province. OGDCL is
the operator of these fields while other Partners include Pakistan Petroleum Limited (PPL)
and GHPL. Development of both the projects is under implementation phase. As per
development plan, a centralized gas processing & LPG plant will be installed at Nashpa
field. The crude stabilization and gas compressor will be installed at Mela. The gas of
Mela will also be transported to Nashpa for extraction of LPG.

The contract has been signed on EPCC basis with M/s Hong Kong Hui Hua design/
supply/ installation and commissioning of Gas Processing & LPG Recovery Plants, Sales
Gas Compressors and Allied Facilities at Nashpa Field. The expected incremental
Production upon the completion from Nashpa & Mela will be: Gas: 10 MMscfd,
Condensate: 1120 bbls/day and 370 Mton/Day of LPG.

Shakaradara is a village in district Kohat, Khyber Pakhtunkhwa, Pakistan. It is renowned


for its oil and gas reservoirs.
INTRODUCTION OF OCL
Olympia chemical limited is a Chemical Company. Which is located in warcha 13km
away from quaidabad. The core business of company is manufacturing and marketing of
Soda Ash and Sodium Bicarbonate. OCL is the second largest producer of Soda Ash and
Sodium Bicarbonate in Pakistan.
1.2Back Ground of OGDCL
Prior to OGDCL's emergence, exploration activities in the country were carried out by
Pakistan Petroleum Ltd. (PPL) and Pakistan Oilfields Ltd. (POL). In 1952, PPL discovered
a giant gas field at Sui in Baluchistan. This discovery generated immense interest in
exploration and five major foreign oil companies entered into concession agreements with
the Government.
During the 1950s, these companies carried out extensive geological and geophysical
surveys and drilled 47 exploratory wells. As a result, a few small gas fields were
discovered. Despite these gas discoveries, exploration activity after having reached its
peak in mid-1950s, declined in the late fifties. Private Companies whose main objective
was to earn profit were not interested in developing the gas discoveries especially when
infrastructure and demand for gas was non-existent. With exploration activity at its lowest
ebb several foreign exploration contracting companies terminated their operation and
either reduced or relinquished land holdings in 1961.
To revive exploration in the energy sector the Government of Pakistan signed a long-term
loan Agreement on 04 March 1961 with the USSR, whereby Pakistan received 27 million
Robles to finance equipment and services of Soviet experts for exploration. Pursuant to the

11
10

Agreement, OGDC was created under an Ordinance dated 20th September 1961. The
Corporation was charged with responsibility to undertake a well thought out and
systematic exploratory programmer and to plan and promote Pakistan's oil and gas
prospects.
As an instrument of policy in the oil and gas sector, the Corporation followed the
Government instructions in matters of exploration and development.
Back Ground of OCL
OCL is part of Olympia group of companies each owned by a member of the Monnoo
family. The industrial group has been a success in Pakistan for more than 40 years, today
boasting combined annual revenue of $300 million. It has started commercial production
in 2000 with approximately 50,000 Tons annually and now he is reached a production
capacity of 150,000 tons of Soda Ash and 15,000 tons of Sodium Bicarbonate annually.
OCL is a Public Limited Company that employees 1200 people. It has a distribution
network spread throughout Pakistan. The majority of OCL customers are glass, paper,
soap and detergent manufactures. They are also exporting to UAE, South Africa, India, Sri
Lanka and Bangladesh
1.3 Company Objective of OGDCL
To be a leading multinational Exploration and Production Company.
OCL objective
The objective of OCL is:
A Company built on sound financial footings that achieve excellent operating
results through efficiency and cost control.
A Company that consistently benefits its stakeholders through enhanced quality
and profitability.
A Company that achieves a high level of customer care service by providing
quality products and positive feedback.
A Company that provides excellent working environment to its employees that
assists in enhancing their strengths and abilities create cultures that foster
motivation and promote individual growth.
A Company that contributes towards a good corporate citizenship and sets highest
standards in serving the society.
1.4 Objective of Internship
The main goal of this internship is to gather practical knowledge and experience about
power station. In this internship report, we focused on generation process, Introduction of
Rig, Control Panel, Study of Generator, pumps, Thermal Power Plants, and maintenance
of individual section of OGDCL and OCL Ltd. We tried to give a complete overview of
OGDCL and OCL in this report.
1.5 Future Project of Company/ Plant
To installed the new plant of OCL in near Future, for the purpose of increase the Product
capacity to fill full the customer needs.
OGDCL very fast working about search out the oil and gas to fill full the demand of the
country.
CH # 02 Internship Experience
12
10

Internship Experience in OGDCL Rig N5


2.1 Generation of Electricity
OGDCL produce his own electrical power on rig side. They used diesel generator for
production of electricity. In rig N5 lying total four generator. Three generators used for rig
operation and one generator use for residence of worker and officers. The rating of one
generator is 1457KVA and 1020KW.The three generator of rig side is connected parallel
load is above 80% then start another generator. The voltage produce one generator is 700V
and current is 1443A.
2.2 Control panel
After the production of electricity, the main purpose is to control and regular supply to the
factory. This purpose many switch gears is used. Which control electricity and supply
regular supply. This is the following.

Fig 2.1
2.2.1 Bus bar
Bus bar is strip of copper wire where the main supply line is connected. On bus bar, the
main line is divided into two line. One is go to SCR and other line is go to AC control
panel.
2.2.2 Silicon control rectifier (SCR)
SCR is device which convert AC into control DC. On rig many DC motor is used

therefore SCR is used. The is a three terminal semiconductor switching device which can

be used as a controlled switch to perform various functions such as rectification, inversion

and regulation of power flow.

13
10

An SCR can handle currents upto several thousand amperes and voltages upto more than

1kV.

Fig2.2
2.2.3 Fuse
On the main transmission line fuse is lying .The fuse used for protection of electrical
system .HRC fuse is used in control panel which rating is 2500A.
2.2.4 Circuit breaker
Electrical circuit breaker is a switching device which can be operated manually and
automatically for controlling and protection of electrical power system. As the modern
power system deals with huge currents, the special attention should be given during
designing of circuit breaker for safe interruption of arc produced during the operation of
circuit breaker
2.2.5 Relay
In main control panel many relay is used for protection of electrical equipment. Each relay
give protection of one fault therefore different relay is used. Such as short circuit relay,
earth fault relay, differential relay. Relay monitor the supply if fault is occur then they trip
the main breaker and protect the electrical equipment.
2.2.6 Outgoing line from control panel
There is two types of line go out from main control panel. One is AC line and other is
DC. Because both AC and DC supply is used on rig.

14
10

2.3 Different portion of rig


2.3.1Mud
Mud is the combination of different water tank where the different chemical is mix with
water. In rig N5 four water tank is used where the different chemical is mix with water.On
mud four motor is used for this propose which is DC motor. The rating of one motor is
18KW. Four other motor is use on mud which feed this mixture on drilling point. The
rating of that motor is 15KW of one motor.

2.3.2 Feed water pump


Feed water pump is consist of two motor which feed water form pound. That motor supply
water pound to mud. The rating of these motor is 20KW.

2.3.3 Top floor of rig


This is main portion of rig. Through which drilling is doing. This portion is consist of five
motor one motor is 11HP tow motor of 5HP and two of 400HP.the depth of drilling is
increase then high power motor is on. First time the drilling depth is low then one motor is
used but the depth is increase start high power motor. These all motor is AC motor which
is drive with variable frequency driver which control the speed of motor. The control
1r.p.m to 200 r.p.m.

Fig 2.3

2.3.4 Motor control Centre on rig floor


Motor control Centre control the motor of rig floor .these motor on/off from MCC.
Because main control panel supply is ON every time .then electrical engineer give as own
control system to drilling engineer.

15
10

Fig 2.4
2.3.5 Variable Frequency Drives

Variable frequency drive is change the frequency of supply. Through changing frequency
change the speed of motor. On rig six VFD is used the changing frequency capacity is 0 to
62 Hz. Motor is speed is move from 1 r.p.m to 200 r.p.m. but on rig frequency is set 32 Hz
and motor speed is 100 r.p.m

Fig2.5
2.9 Transformer
On rig one step down transformer is used for supply to office, ac, fans, and lighting
system. The transformer converts the 700V into 415 V. The transformer rating is 1000
KVA.

16
10

2.10 Practical Works Done During Internship


In internship I practically work with electrical supervisor. I work as a generator operator
note the load of generator if the load is reach to 80% then start the another generator
changing the engine oil of generator if hundred hour of generator is completed. I also work
with supervisor changing light and lying new light connection. Note the total running of
generators. Chang the bearing of motor and lubrication of motor.

17
10

CHAPTER #03
OLYMPIA INTERNSHIP EXPERIENCE
Observation of thermal power plant during internship
OLC produce electric power through thermal power plant. The total capacity of electric
power production is 18MW there is three turbines 10,5,3 MW but only 10MW turbine is in
running Condition \remaining two is on standby condition. Because that is fulfill the
demand of factory.
3.1 One Line Diagram of Company

18
10

3.2 Thermal power plant


In thermal power station steam is produced by burning some fossil fuel (e.g. coal, gas,
furnace oil) and then used to run a steam turbine. In OCL coal is used as fuel. Thus, a
thermal power station may sometimes called as a Steam Power Station. After the steam
passes through the steam turbine, it is condensed in a condenser and again fed back into
the boiler to become steam. This is known as ranking cycle. This article explains how
electricity is generated in thermal power plants.
Typical Layout and Working of Thermal Power

Fig 3.1

3.2.1 Coal
In a coal based thermal power plant, coal is transported from coal mines to the generating
station. Generally, bituminous coal or brown coal is used as fuel. The coal is stored in
either 'dead storage' or in 'live storage'. Dead storage is generally 40 days backup coal
storage which is used when coal supply is unavailable. Live storage is a raw coal bunker in
boiler house. The coal is cleaned in a magnetic cleaner to filter out if any iron particles are
present which may cause wear and tear in the equipment. The coal from live storage is
first crushed in small particles and then taken into pulverizer to make it in powdered form.
Fine powdered coal undergoes complete combustion, and thus pulverized coal improves
efficiency of the boiler. The ash produced after the combustion of coal is taken out of the
boiler furnace and then properly disposed. Periodic removal of ash from the boiler furnace
is necessary for the proper combustion.

19
10

3.2.2 Boiler
The mixture of pulverized coal and air (usually preheated air) is taken into boiler and then
burnt in the combustion zone. On ignition of fuel a large fireball is formed at the center of
the boiler and large amount of heat energy is radiated from it. The heat energy is utilized
to convert the water into steam at high temperature and pressure. Steel tubes run along the
boiler walls in which water is converted in steam. The flue gases from the boiler make
their way through super heater, economizer, and air preheater and finally get exhausted to
the atmosphere from the chimney.
3.2.3 Super heater
The super heater tubes are hanged at the hottest part of the boiler. The saturated steam
produced in the boiler tubes is superheated to about 540 C in the super heater. The
superheated high pressure steam is then fed to the steam turbine.
3.2. 4Economizer
An economizer is essentially a feed water heater which heats the
water before supplying to the boiler.
3.2.4 Air pre-heater
The primary air fan takes air from the atmosphere and it is the warmed in the air pre-
heater. Pre-heated air is injected with coal in the boiler. The advantage of pre-heating the
air is that it improves the coal combustion.
3.2.5 Steam turbine
High pressure super-heated steam is fed to the steam turbine which causes turbine blades
to rotate. Energy in the steam is converted into mechanical energy in the steam turbine
which acts as the prime mover. The pressure and temperature of the steam falls to a lower
value and it expands in volume as it passes through the turbine. The expanded low
pressure steam is exhausted in the condenser.
3.2.6 Condenser
The exhausted steam is condensed in the condenser by means of cold water circulation.
Here, the steam loses its pressure as well as temperature and it is converted back into
water. Condensing is essential because, compressing a fluid which is in gaseous state
requires a huge amount of energy with respect to the energy required in compressing
liquid. Thus, condensing increases efficiency of the cycle.

20
10

3.2.7 Feed water pump


The condensed water is again fed to the boiler by a feed water pump. Some water may be
lost during the cycle, which is suitably supplied from an external water source.
3.2.8 Alternator
The steam turbine is coupled to an alternator. When the turbine rotates the alternator,
electrical energy is generated. This generated electrical voltage is then stepped down with
the help of a transformer and then transmitted where it is to be utilized.

Fig3.2

3.3 Observation of control panel


After the production of electricity the main purpose is to control and regular supply to the
factory. This purpose many switch gear is used. Which control electricity and supply
regular supply. Which is the following.
3.3.1 Bus bar
In electrical power distribution, a bus bar is a strip or bar of copper, brass or aluminum
that conducts electricity form turbine and supply to main control panel.
3.3.2Main control panel
The main electrical power is come to control panel. The voltage rating is 6300v and
current is422.3A.the different types of protective device is lying in control panel .which is
given below.

21
10

Fig2.3
3.3.3 Circuit Breaker
Electrical circuit breaker is a switching device which can be operated manually and
automatically for controlling and protection of electrical power system respectively. As the
modern power system deals with huge currents, the special attention should be given
during designing of circuit breaker for safe interruption of arc produced during the
operation of circuit breaker. In OCL main breaker rating is 3200A.

ss
22
10

Fig 3.4
3.3.4 Relay
In main control panel many relay is used for protection of electrical equipment. Each relay
give protection of one fault therefore different relay is used. Such as short circuit relay,
earth fault relay, differential relay. Relay monitor the supply if fault is occur then they trip
the main breaker and protect the electrical equipment.
3.3.5 Fuse
In OCL on main transmission line fuse is lying .The fuse used in OCL is HRC (high
reaching capacity) and fuse load break switch. HRC fuse is 3200A rating .FLBS is used
for open or close on load condition.
One another protective device which is used for alternator protection is NGR.

3.3.6 Natural ground resistance


NGR Neutral Grounding Resistors are used in industrial power systems for resistance
grounding of wye- connected generators and transformers. A neutral grounding resistor
limits the fault current to a value which is sufficient enough to operate protective relays,
yet prevent unwanted fault damage. The NGR in OCL power house is 20.8 Ohm.
3.4 Observation of sub station

23
10

A substation is a part of an electrical generation, transmission, and distribution system.


Substations transform voltage from high to low, or the reverse, or perform any of several
other important functions. In OCL 12 substation each substation is consist of one step
down transformer. The rating of transformer is 2000KVA.the primary side voltage is
6300V and current is 183.3A .that convert these high voltage into low voltage 415V and
step up the current into2783.5A.main circuit breaker and relay is connected on both side of
transformer which protect it from fault. Volt meter and ampere meter is connected on both
side which measure voltage and current. The transformer is lying near the load because
losses is directly depend on length of conductor.
3.5 Transformer
Transformer is electrostatic device which convert voltage one level to another level but
take frequency constant. Transformer work on mutual induction rule.it is consist of two
winding primary and secondary. In OCL 12 transformer is lying. Each transformer is
2000KVA.The all transformers is step down. Which convert 6300V to 415V. The
connection is primary side delta and secondary side is star. The part of transformer is
following.

Fig 3.5

3.5.1 Core
Core is the main body of transformer. Winding is lying inside the core. Core is consist of
winding and oil.
3.5.2 Primary side
Primary side that which is connected with supply incoming side which also called high
voltage side. Which is connected in delta connection. Primary side voltage is 6300V and
current is 183.3A.
3.5.3 Secondary side
Secondary side is that which is supply to load. It is low voltage side 415V
24
10

3.5.4 Conservator tank


Conservative tank is play a vital role because we know that oil is present in transformer.
So when it became hot then oil expand so it take space so the expand oil is come in
conservative tank.
3.5.5 Buchholz relay
Buchholz relay is lying between the core and conservator tank. Buchholz relay is give
protection to transformer. If fault is occur in transformer buchholz relay off the main
breaker on primary side .Main fault of transformer is short circuit of winding and
temperature of winding increase.
3.5.6 Oil gauge
Oil is very important role in transformer. Oil is used for insulation and cooling propose
.The oil gauge is lying on the body of transformer which show the level of oil.
3.5.7 Temperature meter
Temperature meter is also lying on transformer body which show the temperature of
winding and oil .the maximum temperature of transformer is 50C.the cooling method
used in OCL transformer is oil natural air natural.(ONAN)
3.6 Motor
Motor is a machine which convert electrical energy into mechanical energy. Motor is two
main part stator and rotor. Many motor is used in factory for different propose. Which i see
and supervisor tell me about them. These motor is very high rating power. Maximum
motor used in factory is AC motor. In factory require different speed of motor .Speed can
be change by changing pole and frequency. The pole changing is not possible in factory.
So they change the frequency of supply. For changing frequency the inverter is use which
is also called variable frequency drive .which I observe nearly.
3.7 Workshop
Electrical workshop is place where all fluted electrical machinery is come here. In OCL as
own electrical workshop where well skill technician is doing work .all small and large
rating motor large and other electrical equipment prepare and it maintains. In workshop all
types of motor is rewind and it annual maintain take.
3.8 Practical work done during internship
2.8.1 Work on removing inverter
One inverter is damage in my internship period and I work with supervisor when they
removing it from it place. I open the main supply wire and help that in removing it place
and get it work shop.
3.8.2Work did in workshop
25
10

I my internship duration one 450KW motor winding is burn. I did work with motor
winding supervisor sir mushtaq. First we remove the rotor with help of hoist crane and
then remove the burn winding of stator .then we clean the slot of stator and start
installation of new winding. The motor is 24 pole and 48 slot.
3.8.3Changing bearing of motor
I work in maintain workshop in my internship duration. Change the bearing of motor first
we remove the old bearing which lying on shaft motor. Then we heated the new bearing
with the help of induction heater motor which soft the new bearing. Then inter new
bearing in shaft.
3.8.4ON/OFF different motor and taking reading of load current
In my internship duration I work with supervisor on /off different motor and note take
reading. How many current it takes. Current reading is take from ampere meter which is
lying with breaker. Where meter is not connected there use clamp meter is use for taking
reading.

CH # 04 Conclusions

4.1 My Objectives
My achievements before internship I knew many theories and working principles of power
system and related equipments but from internship I acquired practical knowledge about

26
10

power system engineering and its equipment. Here, I always tried to relate my academic
courses with practical participation of power generation process. Beside I also faced some
practical problems which was not taught in my academic courses. My communication skill
also improved through communication with different instructor. Therefore, I made good
achievements with my industrial training which will help me in my future.
4.2 Problem faced
There are some problems which I faced during internship period. The problems are given
below
My instructor at OGDCL and OCL showed me every equipment practically but did not
relate with theory most of the times.
Practical participation in different works of OGDCL & OCl would give more experience
but practical participation was not allowed for internship student.
Company did not provide me enough data for security purpose.
4.3 Recommendations
Some recommendations are given below for the students to do their internship program in
a better way
The internship program should be scheduled in such a way so that it does not clash with
the university classes.
More theoretical knowledge about power generation, power equipments should be learnt
before going for internship. Hence students must complete the related courses to their
internship before joining the program. Taking the courses before the internship helps the
students understand the topic much better.
4.4 Discussion
In case of power generation, OCL is chemical plant and OGDCL is the company of
Production of oil and gas. Last 20-02-2017 I went to OGDCL Company, for my internship
program. I visited the Rig, I observed how rig is working. There are several switch gear
and control rooms to control the overall system of sreaching Oil and gas. Various types of
relays used for protective purposes that are also controlled in control room. I visited
Diesel generator of OGDCl. I visited the control panel and how to control the various
component. I visited the distribution section of OGDCL. OGDCL (Oil and gas
Development Company limited) is a petroleum company. I completed my internship of 9
week in OGDCL rig N5. There I work in electrical department. I work and observe the
diesel generator, transformer and its protective device, silicon control rectifier, variable
frequency drive and different motor sued on rig .during my internship I work with
27
10

supervisor on motor maintains and changing bearing of motor and on/off motor. I work
as a generator operator and changing engine oil of generator after completed hundred
hours on running .there I observe and understand the working related electrical on rig.
There I can improve my knowledge about electrical system.
Last 26-04-2017 I went to OCL, I work in electrical department. I work and observe the
powerhouse, transformer and its protective device, substation, electrical workshop and
other electrical system .during my internship work with supervisor on motor rewinding
and changing bearing of motor and on/off motor and taking read of load current. I
practically observe thermal power plant and it control panel. I work with supervisor
remove inverter and changing bearing of motor. Where I can improve my knowledge
about electrical system.
4.5 References
Data Collecting From Olympia Staff
Data Collecting From OGDCL Staff
http://www.ogdcl.com/ProjectDetail?id=Y7Ubn6c7hvLjihiwyLyQ/w
https://books.google.com.pk/books?id=0XaPbz3fBJUC
http://www.ogdcl.com
www.informationvine.com/Plant+Chemical
https://en.wikipedia.org/wiki/Thermal_power_station

28