Name of work: Consultancy Services for Structural & Architectural design of all
buildings and utilizes including 2D,3D and BOQ (As per accord Electrical SLD, piping
(Air, steam, water), plumbing & sanitary design, Surface drainage system, fire
hydrant layout, internal road design, Main gate design, Master plan layout, & other
related services for the Construction of factory buildings.)
KEY INFORMATION:
6
Procurement Method : QCBS (Quality & Cost Based Selection)
FUNDING INFORMATION:
7 Budget & Source of
: Own Fund
Fund
PARTICULAR INFORMATION:
8
Name of work: Consultancy Services for Structural &
Architectural design, drawing, electrical SLD, Utility
Name of the Project : piping, plumbing, drainage system fire hydrant
layout, internal road, main gate design, sanitary &
other related services for the Construction of factory
buildings.
9
Place of EOI : Office of the (Maintenance & Utility)
Submission
10
EOI Closing Date & : Date:26th September, 2016 Time:5:00 PM
Time
11
EOI Opening Date & : Date: August, 17th , 2016 Time:10:00 AM
Time
Page 1 of 4
(iv) Developed details design & drawings
(Architectural, Structural, Plumbing, Electro-
Mechanical, Communication, design, Technical
Specifications and all other related works/service)
including Model of Building.
(v) Supervision by qualified by B.Sc Engineer ( IEB
membership required for engineer)
(vi) All structure should be according to BNBC,
ACI,AISC ,ACCORD/ALLIENCE standard.
EXPERIENCE, RESOURCE AND DELIVERY CAPACITY REQUIRED:
Page 2 of 4
PROCURING ENTITY DETAILS:
16
Name of the official
inviting Expression of : Masahiro Shindo
Interest
17
Designation of official
inviting Expression : Managing Director
of Interest
18
Address of official : Kashor,Hobibary, Bhaluka, Mymensingh, Bangladesh.
inviting EOI
19
Contract Detail of
official inviting :
Expression of
Interest
The Procuring entity reserves the right to accept or reject any or all EOI without
showing any reason.
Page 3 of 4
Master layout 2D 3D and print copy
Fire hydrant layout in all areas
Plumbing design and layout
Total factory sewerage design &
layout
Rain water drainage system design
Page 4 of 4