Sie sind auf Seite 1von 39

Sno Location Description Description Unit Nos L B H Qty Qty in Sft

C-201
1 Living Vitrified Flooring Sq.m 1 1.340 1.420 1.903 20.47
Vitrified Flooring Sq.m 1 5.470 3.080 16.848 181.28
Vitrified Flooring Sq.m 1 0.170 2.075 0.353 3.80
Vitrified Flooring Sq.m 1 1.220 2.730 3.331 35.84
1 M.B.R Vitrified Flooring Sq.m 1 3.330 3.910 13.020 140.10
1 C.B.R Vitrified Flooring Sq.m 1 3.330 3.330 11.089 119.32
Vitrified Flooring Sq.m 1 0.120 0.810 0.097 1.05
1 Kitchen Vitrified Flooring Sq.m 1 2.580 2.540 6.553 70.51
Vitrified Flooring Sq.m 1 0.865 0.140 0.121 1.30
Vitrified Flooring Sq.m 1 0.865 0.150 0.130 1.40
546.31 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 1.285 2.440 3.135 33.74


Ceramic Flooring Sq.m 1 0.760 0.110 0.084 0.90
2 M.B.R toilet Ceramic Flooring Sq.m 1 2.390 1.835 4.386 47.19
Ceramic Flooring Sq.m 1 0.140 0.755 0.106 1.14
2 Utility Ceramic Flooring Sq.m 1 2.090 1.250 2.613 28.11
2 Blacony Ceramic Flooring Sq.m 1 2.230 1.390 3.100 33.35
Ceramic Flooring Sq.m 1 0.820 0.300 0.246 2.65
139.72 Sf

3 Kichen Ceramic Dado Sq.m 1 0.000 0.000 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 5.790 0.910 5.269 56.69

3 C.B.R Ceramic Dado Sq.m 1 6.660 2.170 14.452 155.51


Ceramic Dado Sq.m 1 0.765 0.170 0.130 1.40
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.580 0.880 -0.510 -5.49

3 M.B.R Ceramic Dado Sq.m 1 7.650 2.170 16.601 178.62


Ceramic Dado Sq.m 1 0.770 0.170 0.131 1.41
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.580 0.880 -0.510 -5.49
363.51 Sf

4 Living Vitrified Skirting Rmt 1 52.795 52.795 173.17 Rf


4 Blacony Ceramic Skirting Rmt 1 5.690 5.690 18.66 Rf
C-202
1 Living Vitrified Flooring Sq.m 1 1.340 1.420 1.903 20.47
Vitrified Flooring Sq.m 1 5.470 3.080 16.848 181.28
Vitrified Flooring Sq.m 1 0.170 2.075 0.353 3.80
Vitrified Flooring Sq.m 1 1.220 2.730 3.331 35.84
1 M.B.R Vitrified Flooring Sq.m 1 3.330 3.910 13.020 140.10
1 C.B.R Vitrified Flooring Sq.m 1 3.330 3.330 11.089 119.32
Vitrified Flooring Sq.m 1 0.120 0.810 0.097 1.05
1 Kitchen Vitrified Flooring Sq.m 1 2.580 2.540 6.553 70.51
Vitrified Flooring Sq.m 1 0.865 0.140 0.121 1.30
Vitrified Flooring Sq.m 1 0.865 0.150 0.130 1.40
546.31 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 1.285 2.440 3.135 33.74


Ceramic Flooring Sq.m 1 0.760 0.110 0.084 0.90
2 M.B.R toilet Ceramic Flooring Sq.m 1 2.390 1.835 4.386 47.19
Ceramic Flooring Sq.m 1 0.140 0.755 0.106 1.14
2 Utility Ceramic Flooring Sq.m 1 2.090 1.250 2.613 28.11
2 Blacony Ceramic Flooring Sq.m 1 2.230 1.390 3.100 33.35
Ceramic Flooring Sq.m 1 0.820 0.300 0.246 2.65
139.72 Sf

3 Kichen Ceramic Dado Sq.m 1 0.000 0.000 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 5.790 0.910 5.269 56.69

3 C.B.R Ceramic Dado Sq.m 1 6.660 2.170 14.452 155.51


Ceramic Dado Sq.m 1 0.765 0.170 0.130 1.40
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.580 0.880 -0.510 -5.49

3 M.B.R Ceramic Dado Sq.m 1 7.650 2.170 16.601 178.62


Ceramic Dado Sq.m 1 0.770 0.170 0.131 1.41
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.580 0.880 -0.510 -5.49
363.51 Sf

4 Living Vitrified Skirting Rmt 1 52.795 52.795 173.17 Rf


4 Blacony Ceramic Skirting Rmt 1 5.690 5.690 18.66 Rf
C-203
1 Living Vitrified Flooring Sq.m 1 1.440 1.310 1.886 20.30
Vitrified Flooring Sq.m 1 5.300 3.350 17.755 191.04
Vitrified Flooring Sq.m 1 1.720 1.080 1.858 19.99
1 M.B.R Vitrified Flooring Sq.m 1 1.650 1.600 2.640 28.41
Vitrified Flooring Sq.m 1 4.580 3.000 13.740 147.84
Vitrified Flooring Sq.m 1 0.540 1.300 0.702 7.55
1 C.B.R Vitrified Flooring Sq.m 1 3.350 3.060 10.251 110.30
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
1 Kitchen Vitrified Flooring Sq.m 1 2.580 2.470 6.373 68.57
Vitrified Flooring Sq.m 1 0.200 0.888 0.178 1.91
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
566.12 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 2.370 1.470 3.484 37.49


Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
2 M.B.R toilet Ceramic Flooring Sq.m 1 2.250 2.080 4.680 50.36
Ceramic Flooring Sq.m 1 0.110 0.740 0.081 0.88
2 Utility Ceramic Flooring Sq.m 1 1.240 2.240 2.778 29.89
2 Blacony Ceramic Flooring Sq.m 1 1.570 2.920 4.584 49.33
Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
159.54 Sf

3 Kitchen Ceramic Dado Sq.m 1 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 4.240 0.900 3.816 41.06

3 C.B.R Ceramic Dado Sq.m 1 6.880 2.250 15.480 166.56


Ceramic Dado Sq.m 1 0.760 0.210 0.160 1.72
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.750 0.900 -0.675 -7.26

3 M.B.R Ceramic Dado Sq.m 1 7.860 2.230 17.528 188.60


Ceramic Dado Sq.m 1 0.760 0.190 0.144 1.55
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.580 0.880 -0.510 -5.49
367.40 Sf
4 Living Vitrified Skirting Rmt 1 52.855 52.855 173.36 Rf
4 Blacony Ceramic Skirting Rmt 1 6.445 6.445 21.14 Rf

C-204
1 Living Vitrified Flooring Sq.m 1 1.440 1.310 1.886 20.30
Vitrified Flooring Sq.m 1 5.300 3.350 17.755 191.04
Vitrified Flooring Sq.m 1 1.720 1.080 1.858 19.99
1 M.B.R Vitrified Flooring Sq.m 1 1.650 1.600 2.640 28.41
Vitrified Flooring Sq.m 1 4.580 3.000 13.740 147.84
Vitrified Flooring Sq.m 1 0.540 1.300 0.702 7.55
1 C.B.R Vitrified Flooring Sq.m 1 3.350 3.060 10.251 110.30
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
1 Kitchen Vitrified Flooring Sq.m 1 2.580 2.470 6.373 68.57
Vitrified Flooring Sq.m 1 0.200 0.888 0.178 1.91
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
566.12 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 2.370 1.470 3.484 37.49


Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
2 M.B.R toilet Ceramic Flooring Sq.m 1 2.250 2.080 4.680 50.36
Ceramic Flooring Sq.m 1 0.110 0.740 0.081 0.88
2 Utility Ceramic Flooring Sq.m 1 1.240 2.240 2.778 29.89
2 Blacony Ceramic Flooring Sq.m 1 1.570 2.920 4.584 49.33
Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
159.54 Sf

3 Kitchen Ceramic Dado Sq.m 1 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 4.240 0.900 3.816 41.06

3 C.B.R Ceramic Dado Sq.m 1 6.880 2.250 15.480 166.56


Ceramic Dado Sq.m 1 0.760 0.210 0.160 1.72
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.750 0.900 -0.675 -7.26

3 M.B.R Ceramic Dado Sq.m 1 7.860 2.230 17.528 188.60


Ceramic Dado Sq.m 1 0.760 0.190 0.144 1.55
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.580 0.880 -0.510 -5.49
367.40 Sf

4 Living Vitrified Skirting Rmt 1 52.855 52.855 173.36 Rf


4 Blacony Ceramic Skirting Rmt 1 6.445 6.445 21.14 Rf

C-205
1 Living Vitrified Flooring Sq.m 1 1.460 1.335 1.949 20.97
Vitrified Flooring Sq.m 1 5.440 4.085 22.222 239.11
Vitrified Flooring Sq.m 1 0.170 2.095 0.356 3.83
Vitrified Flooring Sq.m 1 1.220 2.700 3.294 35.44
1 M.B.R Vitrified Flooring Sq.m 1 3.355 3.342 11.212 120.65
1 C.B.R Vitrified Flooring Sq.m 1 3.320 3.310 10.989 118.24
Vitrified Flooring Sq.m 1 0.120 0.855 0.103 1.10
1 Kitchen Vitrified Flooring Sq.m 1 2.540 2.575 6.541 70.38
Vitrified Flooring Sq.m 1 0.865 0.140 0.121 1.30
Vitrified Flooring Sq.m 1 0.860 0.150 0.129 1.39
581.80 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 1.365 2.435 3.324 35.76


Ceramic Flooring Sq.m 1 0.770 0.120 0.092 0.99
2 M.B.R toilet Ceramic Flooring Sq.m 1 1.830 2.380 4.355 46.86
Ceramic Flooring Sq.m 1 0.120 0.765 0.092 0.99
2 Utility Ceramic Flooring Sq.m 1 1.240 2.115 2.623 28.22
Sq.m 1 0.900 0.050 0.045 0.48
2 Blacony Ceramic Flooring Sq.m 1 2.285 1.390 3.176 34.18
Ceramic Flooring Sq.m 1 0.830 0.270 0.224 2.41
142.40 Sf

3 Kichen Ceramic Dado Sq.m 1 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 5.770 0.910 5.251 56.50

3 C.B.R Ceramic Dado Sq.m 1 6.800 2.230 15.164 163.16


Ceramic Dado Sq.m 1 0.770 0.180 0.139 1.49
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.570 0.870 -0.496 -5.34
0.000 0.00
3 M.B.R Ceramic Dado Sq.m 1 7.620 2.220 16.916 182.02
Ceramic Dado Sq.m 1 0.775 0.220 0.171 1.83
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.570 0.870 -0.496 -5.34
374.62 Sf

4 Living Vitrified Skirting Rmt 1 52.354 52.354 171.72 Rf


4 Blacony Ceramic Skirting Rmt 1 5.690 5.690 18.66 Rf

C-206
1 Living Vitrified Flooring Sq.m 1 1.460 1.335 1.949 20.97
Vitrified Flooring Sq.m 1 5.440 4.085 22.222 239.11
Vitrified Flooring Sq.m 1 0.170 2.095 0.356 3.83
Vitrified Flooring Sq.m 1 1.220 2.700 3.294 35.44
1 M.B.R Vitrified Flooring Sq.m 1 3.355 3.342 11.212 120.65
1 C.B.R Vitrified Flooring Sq.m 1 3.320 3.310 10.989 118.24
Vitrified Flooring Sq.m 1 0.120 0.855 0.103 1.10
1 Kitchen Vitrified Flooring Sq.m 1 2.540 2.575 6.541 70.38
Vitrified Flooring Sq.m 1 0.865 0.140 0.121 1.30
Vitrified Flooring Sq.m 1 0.860 0.150 0.129 1.39
581.80 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 1.365 2.435 3.324 35.76


Ceramic Flooring Sq.m 1 0.770 0.120 0.092 0.99
2 M.B.R toilet Ceramic Flooring Sq.m 1 1.830 2.380 4.355 46.86
Ceramic Flooring Sq.m 1 0.120 0.765 0.092 0.99
2 Utility Ceramic Flooring Sq.m 1 1.240 2.040 2.530 27.22
Sq.m 1 0.520 1.175 0.611 6.57
2 Blacony Ceramic Flooring Sq.m 1 2.285 1.390 3.176 34.18
Ceramic Flooring Sq.m 1 0.830 0.270 0.224 2.41
147.24 Sf

3 Kichen Ceramic Dado Sq.m 1 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 6.710 0.940 6.307 67.87

3 C.B.R Ceramic Dado Sq.m 1 6.800 2.230 15.164 163.16


Ceramic Dado Sq.m 1 0.770 0.180 0.139 1.49
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.570 0.870 -0.496 -5.34
0.000 0.00
3 M.B.R Ceramic Dado Sq.m 1 7.620 2.220 16.916 182.02
Ceramic Dado Sq.m 1 0.775 0.220 0.171 1.83
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.570 0.870 -0.496 -5.34
385.42 Sf

4 Living Vitrified Skirting Rmt 1 52.354 52.354 171.72 Rf


4 Blacony Ceramic Skirting Rmt 1 5.690 5.690 18.66 Rf

C-207
1 Living Vitrified Flooring Sq.m 1 1.450 1.330 1.929 20.75
Vitrified Flooring Sq.m 1 5.440 4.065 22.114 237.94
Vitrified Flooring Sq.m 1 2.070 0.120 0.248 2.67
Vitrified Flooring Sq.m 1 1.100 1.300 1.430 15.39
1 M.B.R Vitrified Flooring Sq.m 1 4.000 3.295 13.180 141.82
Vitrified Flooring Sq.m 1 0.150 0.855 0.128 1.38
1 C.B.R Vitrified Flooring Sq.m 1 3.300 3.390 11.187 120.37
Vitrified Flooring Sq.m 1 0.120 0.870 0.104 1.12
1 Kitchen Vitrified Flooring Sq.m 1 2.540 2.550 6.477 69.69
Vitrified Flooring Sq.m 1 0.190 0.850 0.162 1.74
Vitrified Flooring Sq.m 1 0.860 0.140 0.120 1.30
583.46 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 1.470 2.220 3.263 35.11


Ceramic Flooring Sq.m 1 0.140 0.760 0.106 1.14
2 M.B.R toilet Ceramic Flooring Sq.m 1 2.500 1.780 4.450 47.88
Ceramic Flooring Sq.m 1 0.140 0.760 0.106 1.14
2 Utility Ceramic Flooring Sq.m 1 1.740 1.250 2.175 23.40
Ceramic Flooring Sq.m 1 1.200 0.800 0.960 10.33
2 Blacony Ceramic Flooring Sq.m 1 2.225 1.460 3.249 34.95
Ceramic Flooring Sq.m 1 0.890 0.310 0.276 2.97
149.09 Sf

3 Kichen Ceramic Dado Sq.m 1 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 6.655 0.915 6.089 65.52

3 C.B.R Ceramic Dado Sq.m 1 6.580 2.180 14.344 154.35


Ceramic Dado Sq.m 1 0.770 0.170 0.131 1.41
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.550 0.860 -0.473 -5.09

3 M.B.R Ceramic Dado Sq.m 1 7.760 2.220 17.227 185.36


Ceramic Dado Sq.m 1 0.760 0.195 0.148 1.59
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.600 0.875 -0.525 -5.65
377.62 Sf

4 Living Vitrified Skirting Rmt 1 52.470 52.470 172.10 Rf


4 Blacony Ceramic Skirting Rmt 1 5.845 5.845 19.17 Rf

C-208
1 Living Vitrified Flooring Sq.m 1 1.450 1.330 1.929 20.75
Vitrified Flooring Sq.m 1 5.440 4.065 22.114 237.94
Vitrified Flooring Sq.m 1 2.070 0.120 0.248 2.67
Vitrified Flooring Sq.m 1 1.100 1.300 1.430 15.39
1 M.B.R Vitrified Flooring Sq.m 1 4.000 3.295 13.180 141.82
Vitrified Flooring Sq.m 1 0.150 0.855 0.128 1.38
1 C.B.R Vitrified Flooring Sq.m 1 3.300 3.390 11.187 120.37
Vitrified Flooring Sq.m 1 0.120 0.870 0.104 1.12
1 Kitchen Vitrified Flooring Sq.m 1 2.540 2.550 6.477 69.69
Vitrified Flooring Sq.m 1 0.190 0.850 0.162 1.74
Vitrified Flooring Sq.m 1 0.860 0.140 0.120 1.30
583.46 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 1.470 2.220 3.263 35.11


Ceramic Flooring Sq.m 1 0.140 0.760 0.106 1.14
2 M.B.R toilet Ceramic Flooring Sq.m 1 2.500 1.780 4.450 47.88
Ceramic Flooring Sq.m 1 0.140 0.760 0.106 1.14
2 Utility Ceramic Flooring Sq.m 1 1.740 1.250 2.175 23.40
Ceramic Flooring Sq.m 1 1.200 0.800 0.960 10.33
2 Blacony Ceramic Flooring Sq.m 1 2.225 1.460 3.249 34.95
Ceramic Flooring Sq.m 1 0.890 0.310 0.276 2.97
149.09 Sf

3 Kichen Ceramic Dado Sq.m 1 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 6.655 0.915 6.089 65.52

3 C.B.R Ceramic Dado Sq.m 1 6.580 2.180 14.344 154.35


Ceramic Dado Sq.m 1 0.770 0.170 0.131 1.41
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.550 0.860 -0.473 -5.09

3 M.B.R Ceramic Dado Sq.m 1 7.760 2.220 17.227 185.36


Ceramic Dado Sq.m 1 0.760 0.195 0.148 1.59
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.600 0.875 -0.525 -5.65
377.62 Sf

4 Living Vitrified Skirting Rmt 1 52.470 52.470 172.10 Rf


4 Blacony Ceramic Skirting Rmt 1 5.845 5.845 19.17 Rf

B-201
1 Living Vitrified Flooring Sq.m 1 5.400 3.330 17.982 193.49
Vitrified Flooring Sq.m 1 1.260 1.460 1.840 19.79
Vitrified Flooring Sq.m 1 1.040 1.670 1.737 18.69
1 M.B.R Vitrified Flooring Sq.m 1 3.330 4.530 15.085 162.31
Vitrified Flooring Sq.m 1 1.530 1.580 2.417 26.01
Vitrified Flooring Sq.m 1 1.000 0.530 0.530 5.70
1 C.B.R Vitrified Flooring Sq.m 1 3.000 3.330 9.990 107.49
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
1 Kitchen Vitrified Flooring Sq.m 1 2.560 2.470 6.323 68.04
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
559.42 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 2.250 1.500 3.375 36.32


Ceramic Flooring Sq.m 1 0.110 0.740 0.081 0.88
2 M.B.R toilet Ceramic Flooring Sq.m 1 2.160 1.800 3.888 41.83
Ceramic Flooring Sq.m 1 0.110 0.740 0.081 0.88
2 Utility Ceramic Flooring Sq.m 1 1.200 2.100 2.520 27.12
2 Blacony Ceramic Flooring Sq.m 1 1.400 2.900 4.060 43.69
Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
143.17 Sf
3 Kitchen Ceramic Dado Sq.m 1 0.000 0.00
3 Utility Ceramic Dado Sq.m 1 4.200 0.900 3.780 40.67

3 C.B.R Ceramic Dado Sq.m 1 6.700 2.250 15.075 162.21


Ceramic Dado Sq.m 1 0.760 0.210 0.160 1.72
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.750 0.900 -0.675 -7.26

3 M.B.R Ceramic Dado Sq.m 1 7.120 2.230 15.878 170.84


Ceramic Dado Sq.m 1 0.760 0.190 0.144 1.55
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.580 0.880 -0.510 -5.49
346.03 Sf

4 Living Vitrified Skirting Rmt 1 54.870 54.870 179.97 Rf


4 Blacony&Utilty Ceramic Skirting Rmt 1 6.195 6.195 20.32 Rf

B-202
1 Living Vitrified Flooring Sq.m 1 5.400 3.300 17.820 191.74
Vitrified Flooring Sq.m 1 1.250 1.470 1.838 19.77
Vitrified Flooring Sq.m 1 1.360 1.000 1.360 14.63
1 M.B.R Vitrified Flooring Sq.m 1 3.300 4.530 14.949 160.85
Vitrified Flooring Sq.m 1 1.540 1.600 2.464 26.51
Vitrified Flooring Sq.m 1 1.000 0.530 0.530 5.70
1 C.B.R Vitrified Flooring Sq.m 1 3.330 3.000 9.990 107.49
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
1 Kitchen Vitrified Flooring Sq.m 1 2.570 2.460 6.322 68.03
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
553.10 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 2.300 1.500 3.450 37.12


Ceramic Flooring Sq.m 1 0.110 0.740 0.081 0.88
2 M.B.R toilet Ceramic Flooring Sq.m 1 2.250 2.100 4.725 50.84
Ceramic Flooring Sq.m 1 0.110 0.740 0.081 0.88
2 Utility Ceramic Flooring Sq.m 1 1.200 2.100 2.520 27.12
2 Blacony Ceramic Flooring Sq.m 1 1.400 2.880 4.032 43.38
Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
152.20 Sf
3 Kitchen Ceramic Dado Sq.m 1 0.000 0.00
3 Utility Ceramic Dado Sq.m 1 4.240 0.900 3.816 41.06

3 C.B.R Ceramic Dado Sq.m 1 6.800 2.170 14.756 158.77


Ceramic Dado Sq.m 1 0.760 0.210 0.160 1.72
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.750 0.900 -0.675 -7.26

3 M.B.R Ceramic Dado Sq.m 1 7.900 2.170 17.143 184.46


Ceramic Dado Sq.m 1 0.760 0.190 0.144 1.55
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.580 0.880 -0.510 -5.49
356.07 Sf

4 Living Vitrified Skirting Rmt 1 54.870 54.870 179.97 Rf


4 Blacony&Utilty Ceramic Skirting Rmt 1 6.180 6.180 20.27 Rf

B-203
1 Living Vitrified Flooring Sq.m 1 5.440 4.140 22.522 242.33
Vitrified Flooring Sq.m 1 1.230 1.460 1.796 19.32
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
1 M.B.R Vitrified Flooring Sq.m 1 3.900 3.350 13.065 140.58
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
1 C.B.R Vitrified Flooring Sq.m 1 3.300 3.300 10.890 117.18
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
1 Kitchen Vitrified Flooring Sq.m 1 2.540 2.600 6.604 71.06
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
560.95 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 2.400 1.320 3.168 34.09


Ceramic Flooring Sq.m 1 0.110 0.740 0.081 0.88
2 M.B.R toilet Ceramic Flooring Sq.m 1 2.400 1.860 4.464 48.03
Ceramic Flooring Sq.m 1 0.110 0.740 0.081 0.88
2 Utility Ceramic Flooring Sq.m 1 1.200 2.100 2.520 27.12
2 Blacony Ceramic Flooring Sq.m 1 1.370 2.400 3.288 35.38
Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
139.05 Sf

3 Kitchen Ceramic Dado Sq.m 1 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 4.240 0.900 3.816 41.06

3 C.B.R Ceramic Dado Sq.m 1 6.640 2.250 14.940 160.75


Ceramic Dado Sq.m 1 0.760 0.210 0.160 1.72
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.750 0.900 -0.675 -7.26

3 M.B.R Ceramic Dado Sq.m 1 7.720 2.230 17.216 185.24


Ceramic Dado Sq.m 1 0.760 0.190 0.144 1.55
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.580 0.880 -0.510 -5.49
358.69 Sf

4 Living Vitrified Skirting Rmt 1 54.953 54.953 180.24 Rf


4 Blacony&Utilty Ceramic Skirting Rmt 1 6.665 6.665 21.86 Rf

B-204
1 Living Vitrified Flooring Sq.m 1 4.470 4.150 18.551 199.60
Vitrified Flooring Sq.m 1 2.520 1.170 2.948 31.72
Vitrified Flooring Sq.m 1 1.330 1.390 1.849 19.89
1 M.B.R Vitrified Flooring Sq.m 1 3.900 3.350 13.065 140.58
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
1 C.B.R Vitrified Flooring Sq.m 1 3.300 3.300 10.890 117.18
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
1 Kitchen Vitrified Flooring Sq.m 1 2.580 2.540 6.553 70.51
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
550.51 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 2.440 1.300 3.172 34.13


Ceramic Flooring Sq.m 1 0.110 0.740 0.081 0.88
2 M.B.R toilet Ceramic Flooring Sq.m 1 2.400 1.860 4.464 48.03
Ceramic Flooring Sq.m 1 0.110 0.740 0.081 0.88
2 Utility Ceramic Flooring Sq.m 1 1.200 2.100 2.520 27.12
2 Blacony Ceramic Flooring Sq.m 1 1.370 2.400 3.288 35.38
Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
139.09 Sf

3 Kitchen Ceramic Dado Sq.m 1 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 4.240 0.900 3.816 41.06

3 C.B.R Ceramic Dado Sq.m 1 6.680 2.170 14.496 155.97


Ceramic Dado Sq.m 1 0.760 0.210 0.160 1.72
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.750 0.900 -0.675 -7.26

3 M.B.R Ceramic Dado Sq.m 1 7.720 2.170 16.752 180.26


Ceramic Dado Sq.m 1 0.760 0.190 0.144 1.55
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.580 0.880 -0.510 -5.49
349.41 Sf

4 Living Vitrified Skirting Rmt 1 53.424 53.424 175.23 Rf


4 Blacony&Utilty Ceramic Skirting Rmt 1 6.670 6.670 21.88 Rf

B 205
1 Living Vitrified Flooring Sq.m 1 1.270 1.460 1.854 19.95
Vitrified Flooring Sq.m 1 5.400 3.000 16.200 174.31
Vitrified Flooring Sq.m 1 1.400 1.670 2.338 25.16
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
1 M.B.R Vitrified Flooring Sq.m 1 4.540 3.300 14.982 161.21
Vitrified Flooring Sq.m 1 1.570 1.530 2.402 25.85
Vitrified Flooring Sq.m 1 0.900 0.500 0.450 4.84
1 C.B.R Vitrified Flooring Sq.m 1 3.000 3.300 9.900 106.52
Vitrified Flooring Sq.m 1 0.120 0.855 0.103 1.10
1 Kitchen Vitrified Flooring Sq.m 1 2.480 2.460 6.101 65.64
Vitrified Flooring Sq.m 1 0.765 0.140 0.107 1.15
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
556.45 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 2.280 1.470 3.352 36.06


Ceramic Flooring Sq.m 1 0.770 0.120 0.092 0.99
2 M.B.R toilet Ceramic Flooring Sq.m 1 2.250 2.100 4.725 50.84
Ceramic Flooring Sq.m 1 0.120 0.765 0.092 0.99
2 Utility Ceramic Flooring Sq.m 1 1.200 2.100 2.520 27.12
Sq.m 1 0.000 0.000 0.000 0.00
2 Blacony Ceramic Flooring Sq.m 1 2.850 1.500 4.275 46.00
Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
153.90 Sf

3 Kichen Ceramic Dado Sq.m 1 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 4.200 0.900 3.780 40.67

3 C.B.R Ceramic Dado Sq.m 1 6.700 2.230 14.941 160.77


Ceramic Dado Sq.m 1 0.770 0.180 0.139 1.49
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.570 0.870 -0.496 -5.34
0.000 0.00
3 M.B.R Ceramic Dado Sq.m 1 7.900 2.220 17.538 188.71
Ceramic Dado Sq.m 1 0.775 0.170 0.132 1.42
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.570 0.870 -0.496 -5.34
363.26 Sf

4 Living Vitrified Skirting Rmt 1 53.270 53.270 174.73 Rf


4 Blacony Ceramic Skirting Rmt 1 6.350 6.350 20.83 Rf

B -206
1 Living Vitrified Flooring Sq.m 1 3.320 5.400 17.928 192.91
Vitrified Flooring Sq.m 1 1.270 1.460 1.854 19.95
Vitrified Flooring Sq.m 1 1.200 1.560 1.872 20.14
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
1 M.B.R Vitrified Flooring Sq.m 1 4.500 3.250 14.625 157.37
Vitrified Flooring Sq.m 1 1.590 1.560 2.480 26.69
1 C.B.R Vitrified Flooring Sq.m 1 3.300 3.000 9.900 106.52
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
1 Kitchen Vitrified Flooring Sq.m 1 2.450 2.460 6.027 64.85
Vitrified Flooring Sq.m 1 0.140 0.785 0.110 1.18
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
560.13 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 2.400 1.320 3.168 34.09


Ceramic Flooring Sq.m 1 0.140 0.760 0.106 1.14
2 M.B.R toilet Ceramic Flooring Sq.m 1 2.400 1.860 4.464 48.03
Ceramic Flooring Sq.m 1 0.140 0.760 0.106 1.14
2 Utility Ceramic Flooring Sq.m 1 1.200 2.100 2.520 27.12
Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
2 Blacony Ceramic Flooring Sq.m 1 1.370 2.900 3.973 42.75
Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
146.56 Sf

3 Kichen Ceramic Dado Sq.m 1 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 4.200 0.900 3.780 40.67

3 C.B.R Ceramic Dado Sq.m 1 6.640 2.180 14.475 155.75


Ceramic Dado Sq.m 1 0.770 0.170 0.131 1.41
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.550 0.860 -0.473 -5.09

3 M.B.R Ceramic Dado Sq.m 1 7.720 2.170 16.752 180.26


Ceramic Dado Sq.m 1 0.760 0.170 0.129 1.39
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.600 0.875 -0.525 -5.65
350.30 Sf

4 Living Vitrified Skirting Rmt 1 54.392 54.392 178.41 Rf


4 Blacony Ceramic Skirting Rmt 1 6.840 6.840 22.44 Rf

B-207
1 Living Vitrified Flooring Sq.m 1 5.330 3.300 17.589 189.26
Vitrified Flooring Sq.m 1 1.280 1.302 1.667 17.93
Vitrified Flooring Sq.m 1 1.660 1.050 1.743 18.75
1 M.B.R Vitrified Flooring Sq.m 1 3.300 3.530 11.649 125.34
Vitrified Flooring Sq.m 1 1.600 1.600 2.560 27.55
Vitrified Flooring Sq.m 1 0.900 0.500 0.450 4.84
1 C.B.R Vitrified Flooring Sq.m 1 3.000 3.300 9.900 106.52
1 Kitchen Vitrified Flooring Sq.m 1 2.560 2.470 6.323 68.04
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
530.33 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 1.050 2.300 2.415 25.99


Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
2 M.B.R toilet Ceramic Flooring Sq.m 1 2.100 2.275 4.778 51.41
Ceramic Flooring Sq.m 1 0.110 0.740 0.081 0.88
2 Utility Ceramic Flooring Sq.m 1 1.200 2.100 2.520 27.12
2 Blacony Ceramic Flooring Sq.m 1 2.830 1.500 4.245 45.68
Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
143.51 Sf

3 Kitchen Ceramic Dado Sq.m 1 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 4.200 0.900 3.780 40.67

3 C.B.R Ceramic Dado Sq.m 1 5.900 2.250 13.275 142.84


Ceramic Dado Sq.m 1 0.760 0.210 0.160 1.72
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.750 0.900 -0.675 -7.26

3 M.B.R Ceramic Dado Sq.m 1 7.950 2.230 17.729 190.76


Ceramic Dado Sq.m 1 0.760 0.190 0.144 1.55
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.580 0.880 -0.510 -5.49
346.55 Sf

4 Living Vitrified Skirting Rmt 1 53.209 53.209 174.53 Rf


4 Blacony Ceramic Skirting Rmt 1 6.330 6.330 20.76 Rf

B-208
1 Living Vitrified Flooring Sq.m 1 5.320 3.320 17.662 190.05
Vitrified Flooring Sq.m 1 1.262 1.262 1.593 17.14
Vitrified Flooring Sq.m 1 1.380 1.302 1.797 19.33
1 M.B.R Vitrified Flooring Sq.m 1 4.200 3.800 15.960 171.73
Vitrified Flooring Sq.m 1 1.400 1.570 2.198 23.65
Vitrified Flooring Sq.m 1 0.900 0.150 0.135 1.45
1 C.B.R Vitrified Flooring Sq.m 1 3.000 3.300 9.900 106.52
1 Kitchen Vitrified Flooring Sq.m 1 2.450 2.500 6.125 65.91
Vitrified Flooring Sq.m 1 0.800 0.140 0.112 1.21
Vitrified Flooring Sq.m 1 0.000 0.000 0.000 0.00
567.14 Sf

2 C.B.R toilet Ceramic Flooring Sq.m 1 1.050 2.300 2.415 25.99


Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
2 M.B.R toilet Ceramic Flooring Sq.m 1 1.816 2.300 4.177 44.94
Ceramic Flooring Sq.m 1 0.110 0.740 0.081 0.88
2 Utility Ceramic Flooring Sq.m 1 1.200 2.100 2.520 27.12
2 Blacony Ceramic Flooring Sq.m 1 2.830 1.500 4.245 45.68
Ceramic Flooring Sq.m 1 0.000 0.000 0.000 0.00
137.37 Sf

3 Kitchen Ceramic Dado Sq.m 1 0.000 0.00


3 Utility Ceramic Dado Sq.m 1 4.200 0.900 3.780 40.67

3 C.B.R Ceramic Dado Sq.m 1 5.900 2.250 13.275 142.84


Ceramic Dado Sq.m 1 0.760 0.170 0.129 1.39
3 C.B.R Ceramic Dado(Ventilation) Sq.m -1 0.750 0.900 -0.675 -7.26

3 M.B.R Ceramic Dado Sq.m 1 7.432 2.230 16.573 178.33


Ceramic Dado Sq.m 1 0.760 0.190 0.144 1.55
3 M.B.R Ceramic Dado(Ventilation) Sq.m -1 0.580 0.880 -0.510 -5.49
334.43 Sf

4 Living Vitrified Skirting Rmt 1 55.529 55.529 182.14 Rf


4 Blacony Ceramic Skirting Rmt 1 6.580 6.580 21.58 Rf
Sno Location Description Description Unit Nos L B H Qty
Tower C-Common Area Flooring
1 Flat's (1,2,3,4) Terracotta Flooring Sq.m 1 7.356 7.356
Flat's (5,6,7,8) Terracotta Flooring Sq.m 1 8.167 8.167
Staircase Side Terracotta Flooring Sq.m 1 1.080 1.080
Lift Side Terracotta Flooring Sq.m 1 1.080 1.080
Center Area Terracotta Flooring Sq.m 1 3.199 3.199

2 Flat's (1,2,3,4) Ivory Flooring Sq.m 1 21.690 21.690


Flat's (5,6,7,8) Ivory Flooring Sq.m 1 24.130 24.130
Center Area Ivory Flooring Sq.m 2 1.599 3.198

4 Total Terracotta Skerting Rmt 1 83.881 83.881


deductions MD Rmt -8 1.050 -8.400
Staircase Opening Rmt -1 1.200 -1.200
Lift Opening Rmt -2 1.300 -2.600
71.681
7.168
Qty in Sft

79.15
87.88
11.62
11.62
34.42
224.69 Sf

233.38
259.64
34.41
527.43 Sf

275.13
-27.55
-3.94
-8.53
235.11 Rf
77.12876 301.82
829.25
L/c for Laying of Vitrified tiles for L/c for Laying of antiskid ceramic tiles
flooring L/c for Fixing vitrified wall tiles for skirting or Dadooing for flooring
Sno Location L/c for Dadooing with first quality Remarks
glazed tiles
For living /dining/bed rooms/kitchen/ For living dining, bed rooms /kitchen / Balcony Skirting Toilets, utility and balcony- flooring for toilet- upto 2.1m ht,
passage passage
Completion Handing over Completion Handing over Completion Handing over Completion Handing over Completion Handing over
Total Qty Total Qty Total Qty Total Qty Total Qty
80% 20% 80% 20% 80% 20% 80% 20% 80% 20%
Sf Rf Rf Sf Sf
TOWER-B 6th Floor
1 B 601 559.42 447.54 179.97 143.98 20.32 16.26 143.17 114.53 346.03 276.82
2 B 602 Billed Billed Billed Billed Billed
3 B 603 560.95 448.76 180.24 144.20 21.86 17.49 180.24 144.20 358.69 286.95
4 B 604 550.51 440.41 175.23 140.18 21.88 17.50 139.09 111.27 349.41 279.53
5 B 605 Billed Billed Billed Billed Billed
6 B 606 Billed Billed Billed Billed Billed
7 B 607 530.33 424.26 174.53 139.62 20.76 16.61 143.51 114.80 346.55 277.24
8 B 608 567.14 453.71 182.14 145.71 21.58 17.27 137.37 109.89 334.43 267.54

TOWER-B 7th Floor


1 B 701 559.42 447.54 179.97 143.98 20.32 16.26 143.17 114.53 346.03 276.82
2 B 702 553.10 442.48 179.97 143.98 20.27 16.22 152.20 121.76 356.07 284.86
3 B 703 560.95 448.76 180.24 144.20 21.86 17.49 180.24 144.20 358.69 286.95
4 B 704 550.51 440.41 175.23 140.18 21.88 17.50 139.09 111.27 349.41 279.53
5 B 705 556.45 445.16 174.73 139.78 20.83 16.66 153.90 123.12 363.26 290.61
6 B 706 560.13 448.10 178.41 142.72 22.44 17.95 146.56 117.25 350.30 280.24
7 B 707 530.33 424.26 174.53 139.62 20.76 16.61 143.51 114.80 346.55 277.24
8 B 708 567.14 453.71 182.14 145.71 21.58 17.27 137.37 109.89 334.43 267.54

TOWER-B 8th Floor


1 B 801 Pending Pending Pending Pending Pending
2 B 802 Pending Pending Pending Pending Pending
3 B 803 560.95 448.76 180.24 144.20 21.86 17.49 180.24 144.20 358.69 286.95
4 B 804 550.51 440.41 175.23 140.18 21.88 17.50 139.09 111.27 349.41 279.53
5 B 805 556.45 445.16 174.73 139.78 20.83 16.66 153.90 123.12 363.26 290.61
6 B 806 560.13 448.10 178.41 142.72 22.44 17.95 146.56 117.25 350.30 280.24
7 B 807 Pending Pending Pending Pending Pending
8 B 808 Pending Pending Pending Pending Pending

TOWER-C 11th Floor


1 C 1101 546.31 437.05 173.17 138.53 18.66 14.93 139.72 111.78 363.51 290.81
2 C 1102 546.31 437.05 173.17 138.53 18.66 14.93 139.72 111.78 363.51 290.81
3 C 1103 566.12 452.89 173.36 138.69 21.14 16.91 159.54 127.63 367.40 293.92
4 C 1104 566.12 452.89 173.36 138.69 21.14 16.91 159.54 127.63 367.40 293.92
5 C 1105 581.80 465.44 171.72 137.38 18.66 14.93 147.24 117.79 385.42 308.34
6 C 1106 581.80 465.44 171.72 137.38 18.66 14.93 147.24 117.79 385.42 308.34
7 C 1107 583.46 466.77 172.10 137.68 19.17 15.34 149.09 119.28 377.62 302.10
8 C 1108 583.46 466.77 172.10 137.68 19.17 15.34 149.09 119.28 377.62 302.10

TOTAL 11191.82 3525.31 414.89 3000.31 7159.56


Bhuvana Infra Projects Pvt Ltd
RAB-01
Project : Commune1
Contractor Name : Mr.Sandesh prasad nigam
Date Period : 16.07.16 to 31.08.116
WO Previous Present Cumulative
Sno Unit
Description Rate Qty Amount Qty Amount Qty Amount Qty Amount Remarks
Tiles Laying Works

1 L/c for Laying of Vitrified tiles for flooring


for lift lobby and corridor area flooring Sft 11.50 12,823.20 147,466.80

2 L/C for Fixing vitrified wall tiles for skirting or Dadooing


for lift lobby and corridor area flooring Rft 10.00 3,709.68 37,096.80

3 L/c for Laying of Vitrified tiles for flooring


For living /dining/bed rooms/ kitchen/ passage Sft 11.50 18,205.78 209,366.47 - -
80% for Completion of work Sft 11.50 11191.82 128,705.97 11,191.82 128,705.97
20% for Handing over
4 L/c for Fixing vitrified wall tiles for skirting or Dadooing
For living /dining/bed rooms/ kitchen/ passage Rft 10.00 6,117.22 61,172.20 - -
80% for Completion of work Rft 10.00 3525.31 35,253.12 3,525.31 35,253.12
20% for Handing over
Balcony Skirting Rft 10.00 513.84 5,138.40 - -
80% for Completion of work Rft 10.00 414.89 4,148.94 414.89 4,148.94
20% for Handing over
5 L/c for Laying of antiskid ceramic tiles for flooring
Toilets, utility and balcony- flooring Sft 11.50 4,374.04 50,301.46 - -
80% for Completion of work Sft 11.50 3000.31 34,503.54 3,000.31 34,503.54
20% for Handing over
6 L/c for Dadooing with first quality glazed tiles
for toilet- upto. .2 .1m ht, Sft 12.00 10,417.97 125,015.64 - -
80% for Completion of work Sft 12.00 7159.56 85,914.73 7,159.56 85,914.73
20% for Handing over

Extra rate over existing rate to complete the Tilling activity as per schedule for Tower B & C

L/c for Laying of Vitrified tiles for flooring


For living /dining/bed rooms/ kitchen/ passage Sft 1.00 43,981.92 43,981.92 - -
80% for Completion of work Sft 1.00 - - -
20% for Handing over
L/c for Laying of antiskid ceramic tiles for flooring
Toilets, utility and balcony- flooring Sft 1.00 11,410.47 11,410.47 - -
80% for Completion of work Sft 1.00 - - -
20% for Handing over
L/c for Dadooing with first quality glazed tiles
for toilet- upto. .2 .1m ht, Sft 1.00 28,479.12 28,479.12 - -
80% for Completion of work Sft 1.00 - - -
20% for Handing over

719,429.28 - 288,526.30 288,526.30 417,613.38

Site QS HO QS DGM Accounts HOD QS


Bhuvana Infra Projects Pvt Ltd
RAB-09
Date : 01.09.16
From Project : CMN1
To : Accounts
Nature of the work : Flooring Works
Contractor name : Mr.Sandesh Prasad Nigam
Work-order No. and date : BIPPL/CMN/Flooring/16-17/155
Work-order Expiry date : 6/29/2017
Work order amount : Rs. 7,19,429/-
VAT : NA
Service tax : NA

Up to
% This Bill Total
1 Value of work-Done Previous Bill
1.01 Value of Tendered/contract Items : (A) 288526 288526
1.02 Value of Non-tendered items : (C)
1.03 Gross value of work till date,excluding taxes [ (B)+(C) ] : (D)
1.04 VAT/COT (E)
1.05 Service tax (From 01-06-2014 to upto 14-11-2016) 14.00% (F) 0
1.06 Service tax (From 15-11-2016 to till date) 14.50% (F)
1.07 Gross value of work till date,including taxes [ (D)+(E)+(F) ] : (G) 288526 288526

2.00 DEDUCTION FOR MATERIALS SUPPLIED BY CLIENTS(IF AN %


2.01 cement :
2.02 RMC :
2.03 Steel :
2.04 Tiles :
2.05 Wood :
2.06 Others :
2.07 Total Deductions on account of material supplied : (H) - 0 0.00
2.08 Gross value of work done [(G)-(H)] : (I) 288526 288526

3.00 DEDUCTIONS / RECOVERIES %


3.01 Retention amount 5% 14,426 14426
3.02 Mobilisation advance 20%
3.03 TDS 1.00% 2,885 2885
3.04 Labor Colony Maintenance 1.00% 2,885 2885
3.05 PF : -
3.06 ST RCM 75% - 0
3.07 ST RCM 25% - 0
3.08 Advance Paid in last week if any -
3.09 Debit notes : -
3.10 Any Other Deductions :
3.11 Total Deductions : (J) 20,197 20197
3.12 Net Amount Payable [(I) -(J)] : 268,329 268329
4.00 DEDUCTIONS / RECOVERIES
Net Payable Amount 268,329
Advance Paid in last week if any
Amount Payable 268,329

Site QS HO QS DGM Accounts HO QS Authorized Signature

Note: Subject to verification of amount paid till date & tax deductions
L/C for Laying of Vitrified tiles for L/C for Fixing vitrified wall tiles for skirting or Dadooing L/C for Laying of antiskid ceramic tiles L/C for Dadooing with first quality
Sno Location flooring for flooring glazed tiles Remarks
For living /dining/bed rooms/kitchen/ For living dining, bed rooms / kitchen /
passage passage Balcony Skirting Toilets, utility and balcony- flooring for toilet- upto 2.1m ht,
Completion Handing over Completion Handing over Completion Handing over Completion Handing over Completion Handing over
Total Qty Total Qty Total Qty Total Qty Total Qty
80% 20% 80% 20% 80% 20% 80% 20% 80% 20%
Sf Rf Rf Sf Sf
1 B 601 559.42 447.54 179.97 143.98 20.32 16.26 143.17 114.53 346.03 276.82
2 B 602 Billed Billed Billed Billed Billed Vendor 1
3 B 603 Pending
4 B 604 Pending
5 B 605 Billed Billed Billed Billed Billed Vendor 1
6 B 606 Billed Billed Billed Billed Billed Vendor 1
7 B 607 530.33 424.26 174.53 139.62 20.76 16.61 143.51 114.80 346.55 277.24
8 B 608 567.14 453.71 182.14 145.71 21.58 17.27 137.37 109.89 334.43 267.54

TOWER-B 7th Floor


1 B 701 559.42 447.54 179.97 143.98 20.32 16.26 143.17 114.53 346.03 276.82
2 B 702 553.10 442.48 179.97 143.98 20.27 16.22 152.20 121.76 356.07 284.86
3 B 703 560.95 448.76 180.24 144.20 21.86 17.49 180.24 144.20 358.69 286.95
4 B 704 550.51 440.41 175.23 140.18 21.88 17.50 139.09 111.27 349.41 279.53
5 B 705 556.45 445.16 174.73 139.78 20.83 16.66 153.90 123.12 363.26 290.61
6 B 706 560.13 448.10 178.41 142.72 22.44 17.95 146.56 117.25 350.30 280.24
7 B 707 530.33 424.26 174.53 139.62 20.76 16.61 143.51 114.80 346.55 277.24
8 B 708 567.14 453.71 182.14 145.71 21.58 17.27 137.37 109.89 334.43 267.54

TOWER-B 8th Floor


1 B 801 Pending Pending Pending Pending Pending
2 B 802 553.10 442.48 179.97 143.98 20.27 16.22 152.20 121.76 356.07 284.86
3 B 803 560.95 448.76 180.24 144.20 21.86 17.49 180.24 144.20 358.69 286.95
4 B 804 550.51 440.41 175.23 140.18 21.88 17.50 139.09 111.27 349.41 279.53
5 B 805 556.45 445.16 174.73 139.78 20.83 16.66 153.90 123.12 363.26 290.61
6 B 806 Pending Pending Pending Pending Pending
7 B 807 Pending Pending Pending Pending Pending
8 B 808 Pending Pending Pending Pending Pending

1 C 1201 546.31 437.05 173.17 138.53 18.66 14.93 139.72 111.78 363.51 290.81
2 C 1202 546.31 437.05 173.17 138.53 18.66 14.93 139.72 111.78 363.51 290.81
3 C 1203 566.12 452.89 173.36 138.69 21.14 16.91 159.54 127.63 367.40 293.92
4 C 1204 566.12 452.89 173.36 138.69 21.14 16.91 159.54 127.63 367.40 293.92
5 C 1205 581.80 465.44 171.72 137.38 18.66 14.93 147.24 117.79 385.42 308.34
6 C 1206 581.80 465.44 171.72 137.38 18.66 14.93 147.24 117.79 385.42 308.34
7 C 1207 583.46 466.77 172.10 137.68 19.17 15.34 149.09 119.28 377.62 302.10
8 C 1208 583.46 466.77 172.10 137.68 19.17 15.34 149.09 119.28 377.62 302.10

1 C 1301 546.31 437.05 173.17 138.53 18.66 14.93 139.72 111.78 363.51 290.81
2 C 1302 546.31 437.05 173.17 138.53 18.66 14.93 139.72 111.78 363.51 290.81
3 C 1303 566.12 452.89 173.36 138.69 21.14 16.91 159.54 127.63 367.40 293.92
4 C 1304 566.12 452.89 173.36 138.69 21.14 16.91 159.54 127.63 367.40 293.92
5 C 1305 581.80 465.44 171.72 137.38 18.66 14.93 147.24 117.79 385.42 308.34
6 C 1306 581.80 465.44 171.72 137.38 18.66 14.93 147.24 117.79 385.42 308.34
7 C 1307 583.46 466.77 172.10 137.68 19.17 15.34 149.09 119.28 377.62 302.10
8 C 1308 583.46 466.77 172.10 137.68 19.17 15.34 149.09 119.28 377.62 302.10

Total Qty 13941.33 4346.75 502.39 3702.30 8988.02


L/C for Laying of Terracotta ceramic
L/C for Laying of Ivory ceramic flooring L/C for Laying of Terracotta ceramic flooring
Sno Location Skerting Remarks
For Corridor area and passage For Corridor area and passage For Corridor area and passage
Completion Handing over Completion Handing over Completion Handing over
Total Qty Total Qty Total Qty
90% 10% 90% 10% 90% 10%
Sf Sf Rf
1 3rd Floor 527.43 474.69 224.69 202.22 235.11 211.60
2 4th Floor 527.43 474.69 224.69 202.22 235.11 211.60
3 5th Floor 527.43 474.69 224.69 202.22 235.11 211.60

Total 1424.07 606.66 634.81


Bhuvana Infra Projects Pvt Ltd
RAB-02
Project : Commune1
Contractor Name : Mr.Sandesh prasad nigam
Date Period : 01-03-2017 to 30-04-2017
WO Previous Present Cumulative
Sno Unit
Description Rate Qty Amount Qty Amount Qty Amount Qty Amount Remarks
Tiles Laying Works
1 L/c for Laying of Vitrified tiles for flooring
for lift lobby and corridor area flooring Sft 11.50 12,823.20 147,466.80

2 L/C for Fixing vitrified wall tiles for skirting or Dadooing


for lift lobby and corridor area flooring Rft 10.00 3,709.68 37,096.80

3 L/c for Laying of Vitrified tiles for flooring


For living /dining/bed rooms/ kitchen/ passage Sft 11.50 18,205.78 209,366.47
80% for Completion of work Sft 11.50 11191.82 128,705.97 2749.51 31,619.33 13,941.33 160,325.30
20% for Handing over
4 L/c for Fixing vitrified wall tiles for skirting or Dadooing
For living /dining/bed rooms/ kitchen/ passage Rft 10.00 6,117.22 61,172.20
80% for Completion of work Rft 10.00 3525.31 35,253.12 821.44 8,214.42 4,346.75 43,467.54
20% for Handing over
Balcony Skirting Rft 10.00 513.84 5,138.40
80% for Completion of work Rft 10.00 414.89 4,148.94 87.50 874.97 502.39 5,023.91
20% for Handing over
5 L/c for Laying of antiskid ceramic tiles for flooring
Toilets, utility and balcony- flooring Sft 11.50 4,374.04 50,301.46
80% for Completion of work Sft 11.50 3000.31 34,503.54 701.99 8,072.94 3,702.30 42,576.48
20% for Handing over
6 L/c for Dadooing with first quality glazed tiles
for toilet- upto. .2 .1m ht, Sft 12.00 10,417.97 125,015.64
80% for Completion of work Sft 12.00 7159.56 85,914.73 1828.46 21,941.51 8,988.02 107,856.24
20% for Handing over

Extra rate over existing rate to complete the Tilling activity as per schedule for Tower B & C

L/c for Laying of Vitrified tiles for flooring


For living /dining/bed rooms/ kitchen/ passage Sft 1.00 43,981.92 43,981.92
80% for Completion of work Sft 1.00 13941.33 13,941.33 13,941.33 13,941.33
20% for Handing over
L/c for Laying of antiskid ceramic tiles for flooring
Toilets, utility and balcony- flooring Sft 1.00 11,410.47 11,410.47
80% for Completion of work Sft 1.00 3702.30 3,702.30 3,702.30 3,702.30
20% for Handing over
L/c for Dadooing with first quality glazed tiles
for toilet- upto. .2 .1m ht, Sft 1.00 28,479.12 28,479.12
80% for Completion of work Sft 1.00 8988.02 8,988.02 8,988.02 8,988.02
20% for Handing over

Corridor Area
L/C for Laying of Ivory ceramic flooring
90% for Completion of work Sft 12.50 1424.07 17,800.89 1,424.07 17,800.89
10% for Handing over Sft 12.50

L/C for Laying of Terracotta ceramic flooring


90% for Completion of work Sft 12.50 606.66 7,583.30 606.66 7,583.30
10% for Handing over Sft 12.50

L/C for Laying of Terracotta ceramic Skerting


90% for Completion of work Sft 10.00 634.81 6,348.07 634.81 6,348.07
10% for Handing over Sft 10.00

719,429.28 288,526.30 129,087.08 417,613.38

Site QS HO QS Manger Accounts HOD QS

Mr.Sandesh prasad nigam


(Contrac.Sign)
Bhuvana Infra Projects Pvt Ltd
RAB-02
Date : 08.05.17
From Project : CMN1
To : Accounts
Nature of the work : Flooring Works
Contractor name : Mr.Sandesh Prasad Nigam
Work-order No. and date : BIPPL/CMN/Flooring/16-17/155
Work-order Expiry date : 6/29/2017
Work order amount : Rs. 7,19,429/-
VAT : NA
Service tax : NA

Up to
% This Bill Total
1 Value of work-Done Previous Bill
1.01 Value of Tendered/contract Items : (A) 288526 129087 417613
1.02 Value of Non-tendered items : (C)
1.03 Gross value of work till date,excluding taxes [ (B)+(C) ] : (D)
1.04 VAT/COT (E)
1.05 Service tax (From 01-06-2014 to upto 14-11-2016) 14.00% (F) 0 0
1.06 Service tax (From 15-11-2016 to till date) 14.50% (F)
1.07 Gross value of work till date,including taxes [ (D)+(E)+(F) ] : (G) 288526 129087 417613

2.00 DEDUCTION FOR MATERIALS SUPPLIED BY CLIENTS(IF AN %


2.01 cement :
2.02 RMC :
2.03 Steel :
2.04 Tiles :
2.05 Wood :
2.06 Others :
2.07 Total Deductions on account of material supplied : (H) - 0 0.00
2.08 Gross value of work done [(G)-(H)] : (I) 288,526.30 129087 417613

3.00 DEDUCTIONS / RECOVERIES %


3.01 Retention amount 5% 14,426.31 6,454 20881
3.02 Mobilisation advance 20%
3.03 TDS 1.00% 2,885 1,291 4176
3.04 Labor Colony Maintenance 1.00% 2,885 1,291 4176
3.05 PF : - -
3.06 ST RCM 75% - - 0
3.07 ST RCM 25% - - 0
3.08 Advance Paid in last week if any - -
3.09 Debit notes : - -
3.10 Any Other Deductions :
3.11 Total Deductions : (J) 20,197 9,036 29233
3.12 Net Amount Payable [(I) -(J)] : 268,329 120,051 388380
4.00 DEDUCTIONS / RECOVERIES
Net Payable Amount 120,051
Advance Paid in last week if any
Amount Payable 120,051

Site QS HO QS Manger Accounts HO QS Authorized Signature

Note: Subject to verification of amount paid till date & tax deductions
L/C for Laying of Vitrified tiles for L/C for Laying of antiskid ceramic tiles L/C for Dadooing with first quality
flooring L/C for Fixing vitrified wall tiles for skirting or Dadooing for flooring glazed tiles
Sno Location Remarks
For living /dining/bed rooms/kitchen/ For living dining, bed rooms / kitchen / Balcony Skirting Toilets, utility and balcony- flooring for toilet- upto 2.1m ht,
passage passage
Completion Handing over Completion Handing over Completion Handing over Completion Handing over Completion Handing over
Total Qty Total Qty Total Qty Total Qty Total Qty
80% 20% 80% 20% 80% 20% 80% 20% 80% 20%
Sf Rf Rf Sf Sf
1 B 801 559.41915 447.54 179.974 143.98 20.320 16.26 143.1673 114.53 346.027 276.82
2 B 802 Billed
3 B 803 Billed
4 B 804 Billed
5 B 805 Billed
6 B 806 560.12982 448.10 178.405 142.72 22.435 17.95 146.561 117.25 350.3049 280.24
7 B 807 530.32513 424.26 174.526 139.62 20.762 16.61 143.5056 114.80 346.5473 277.24
8 B 808 567.135 453.71 182.135 145.71 21.582 17.27 137.3653 109.89 334.4287 267.54

Total Qty 1773.61 572.03 68.08 456.48 1101.85


L/C for Laying of Terracotta ceramic
L/C for Laying of Ivory ceramic flooring L/C for Laying of Terracotta ceramic flooring
Sno Location Skerting Remarks
For Corridor area and passage For Corridor area and passage For Corridor area and passage
Completion Handing over Completion Handing over Completion Handing over
Total Qty Total Qty Total Qty
90% 10% 90% 10% 90% 10%
Sf Sf Rf
4 6th Floor 527.43 474.69 224.69 202.22 235.11 211.60
5 7th Floor 527.43 474.69 224.69 202.22 235.11 211.60

Total 949.38 404.44 423.20


Bhuvana Infra Projects Pvt Ltd
RAB-03
Project : Commune1
Contractor Name : Mr.Sandesh prasad nigam
Date Period : 01-03-2017 to 30-04-2017
WO Previous Present Cumulative
Sno Unit
Description Rate Qty Amount Qty Amount Qty Amount Qty Amount Remarks
Tiles Laying Works
1 L/c for Laying of Vitrified tiles for flooring
for lift lobby and corridor area flooring Sft 11.50 12,823.20 147,466.80

2 L/C for Fixing vitrified wall tiles for skirting or Dadooing


for lift lobby and corridor area flooring Rft 10.00 3,709.68 37,096.80

3 L/c for Laying of Vitrified tiles for flooring


For living /dining/bed rooms/ kitchen/ passage Sft 11.50 18,205.78 209,366.47
80% for Completion of work Sft 11.50 13941.33 160,325.30 1773.61 20,396.48 15,714.94 180,721.79
20% for Handing over
4 L/c for Fixing vitrified wall tiles for skirting or Dadooing
For living /dining/bed rooms/ kitchen/ passage Rft 10.00 6,117.22 61,172.20
80% for Completion of work Rft 10.00 4346.75 43,467.54 572.03 5,720.31 4,918.79 49,187.86
20% for Handing over
Balcony Skirting Rft 10.00 513.84 5,138.40
80% for Completion of work Rft 10.00 502.39 5,023.91 68.08 680.80 570.47 5,704.71
20% for Handing over
5 L/c for Laying of antiskid ceramic tiles for flooring
Toilets, utility and balcony- flooring Sft 11.50 4,374.04 50,301.46
80% for Completion of work Sft 11.50 3702.30 42,576.48 456.48 5,249.51 4,158.78 47,825.99
20% for Handing over
6 L/c for Dadooing with first quality glazed tiles
for toilet- upto. .2 .1m ht, Sft 12.00 10,417.97 125,015.64
80% for Completion of work Sft 12.00 8988.02 107,856.24 1101.85 13,222.15 10,089.87 121,078.39
20% for Handing over

Extra rate over existing rate to complete the Tilling activity as per schedule for Tower B & C

L/c for Laying of Vitrified tiles for flooring


For living /dining/bed rooms/ kitchen/ passage Sft 1.00 43,981.92 43,981.92
80% for Completion of work Sft 1.00 13941.3307 13,941.33 1773.61 1,773.61 15,714.94 15,714.94
20% for Handing over
L/c for Laying of antiskid ceramic tiles for flooring
Toilets, utility and balcony- flooring Sft 1.00 11,410.47 11,410.47
80% for Completion of work Sft 1.00 3702.30249 3,702.30 456.48 456.48 4,158.78 4,158.78
20% for Handing over
L/c for Dadooing with first quality glazed tiles
for toilet- upto. .2 .1m ht, Sft 1.00 28,479.12 28,479.12
80% for Completion of work Sft 1.00 8988.01995 8,988.02 1101.85 1,101.85 10,089.87 10,089.87
20% for Handing over

Corridor Area
L/C for Laying of Ivory ceramic flooring
90% for Completion of work Sft 12.50 1424.07094 17,800.89 949.38 11,867.26 2,373.45 29,668.14
10% for Handing over Sft 12.50

L/C for Laying of Terracotta ceramic flooring


90% for Completion of work Sft 12.50 606.663864 7,583.30 423.20 5,290.06 1,029.87 12,873.36
10% for Handing over Sft 12.50

L/C for Laying of Terracotta ceramic Skerting


90% for Completion of work Sft 10.00 634.806936 6,348.07 404.44 4,044.43 1,039.25 10,392.50
10% for Handing over Sft 10.00

719,429.28 417,613.38 69,802.94 487,416.32

Site QS HO QS Manger Accounts HOD QS

Mr.Sandesh prasad nigam


(Contrac.Sign)
Bhuvana Infra Projects Pvt Ltd
RAB-03
Date : 23.05.17
From Project : CMN1
To : Accounts
Nature of the work : Flooring Works
Contractor name : Mr.Sandesh Prasad Nigam
Work-order No. and date : BIPPL/CMN/Flooring/16-17/155
Work-order Expiry date : 6/29/2017
Work order amount : Rs. 7,19,429/-
VAT : NA
Service tax : NA 230 3 690
239 4 956
Up to
% This Bill Total
1 Value of work-Done Previous Bill 1646
1.01 Value of Tendered/contract Items : (A) 417613 69803 487416 15
1.02 Value of Non-tendered items : (C) 109.73333
1.03 Gross value of work till date,excluding taxes [ (B)+(C) ] : (D) 3.6577778
1.04 VAT/COT (E)
1.05 Service tax (From 01-06-2014 to upto 14-11-2016) 14.00% (F) 0 0
1.06 Service tax (From 15-11-2016 to till date) 14.50% (F)
1.07 Gross value of work till date,including taxes [ (D)+(E)+(F) ] : (G) 417613 69803 487416

2.00 DEDUCTION FOR MATERIALS SUPPLIED BY CLIENTS(IF AN %


2.01 cement :
2.02 RMC :
2.03 Steel :
2.04 Tiles :
2.05 Wood :
2.06 Others :
2.07 Total Deductions on account of material supplied : (H) - 0 0.00
2.08 Gross value of work done [(G)-(H)] : (I) 417,613.38 69803 487416

3.00 DEDUCTIONS / RECOVERIES %


3.01 Retention amount 5% 20,880.67 3,490 24371
3.02 Mobilisation advance 20%
3.03 TDS 1.00% 4,176 698 4874
3.04 Labor Colony Maintenance 1.00% 4,176 698 4874
3.05 PF : - -
3.06 ST RCM 75% - - 0
3.07 ST RCM 25% - - 0
3.08 Advance Paid in last week if any - -
3.09 Debit notes : - -
3.10 Any Other Deductions :
3.11 Total Deductions : (J) 29,233 4,886 34119
3.12 Net Amount Payable [(I) -(J)] : 388,380 64,917 453297
4.00 DEDUCTIONS / RECOVERIES
Net Payable Amount 64,917
Advance Paid in last week if any
Amount Payable 64,917

Site QS HO QS Manger Accounts HO QS Authorized Signature

Note: Subject to verification of amount paid till date & tax deductions
L/C for Laying of Terracotta ceramic
L/C for Laying of Ivory ceramic flooring L/C for Laying of Terracotta ceramic flooring
Sno Location Skerting Remarks
For Corridor area and passage For Corridor area and passage For Corridor area and passage
Completion Handing over Completion Handing over Completion Handing over
Total Qty Total Qty Total Qty
90% 10% 90% 10% 90% 10%
Sf Sf Rf
1 Tower C 8th Floor 527.43 474.69 224.69 202.22 235.11 211.60
2 Tower C 9th Floor 527.43 474.69 224.69 202.22 235.11 211.60
3 Tower C 10th Floor 527.43 474.69 224.69 202.22 235.11 211.60
4 Tower C 11th Floor 527.43 474.69 224.69 202.22 235.11 211.60

Total 1898.76 808.89 846.41


Bhuvana Infra Projects Pvt Ltd
RAB-04
Project : Commune1
Contractor Name : Mr.Sandesh prasad nigam
Date Period : 16-05-17 TO 31-05-17
WO Previous Present Cumulative
Sno Unit
Description Rate Qty Amount Qty Amount Qty Amount Qty Amount Remarks
Tiles Laying Works
1 L/c for Laying of Vitrified tiles for flooring
for lift lobby and corridor area flooring Sft 11.50 12,823.20 147,466.80

2 L/C for Fixing vitrified wall tiles for skirting or Dadooing


for lift lobby and corridor area flooring Rft 10.00 3,709.68 37,096.80

3 L/c for Laying of Vitrified tiles for flooring


For living /dining/bed rooms/ kitchen/ passage Sft 11.50 18,205.78 209,366.47
80% for Completion of work Sft 11.50 15714.94 180,721.79 - 15,714.94 180,721.79
20% for Handing over
4 L/c for Fixing vitrified wall tiles for skirting or Dadooing
For living /dining/bed rooms/ kitchen/ passage Rft 10.00 6,117.22 61,172.20
80% for Completion of work Rft 10.00 4918.79 49,187.86 - 4,918.79 49,187.86
20% for Handing over
Balcony Skirting Rft 10.00 513.84 5,138.40
80% for Completion of work Rft 10.00 570.47 5,704.71 - 570.47 5,704.71
20% for Handing over
5 L/c for Laying of antiskid ceramic tiles for flooring
Toilets, utility and balcony- flooring Sft 11.50 4,374.04 50,301.46
80% for Completion of work Sft 11.50 4158.78 47,825.99 - 4,158.78 47,825.99
20% for Handing over
6 L/c for Dadooing with first quality glazed tiles
for toilet- upto. .2 .1m ht, Sft 12.00 10,417.97 125,015.64
80% for Completion of work Sft 12.00 10089.87 121,078.39 - 10,089.87 121,078.39
20% for Handing over

Extra rate over existing rate to complete the Tilling activity as per schedule for Tower B & C

L/c for Laying of Vitrified tiles for flooring


For living /dining/bed rooms/ kitchen/ passage Sft 1.00 43,981.92 43,981.92
80% for Completion of work Sft 1.00 15714.938 15,714.94 - 15,714.94 15,714.94
20% for Handing over
L/c for Laying of antiskid ceramic tiles for flooring
Toilets, utility and balcony- flooring Sft 1.00 11,410.47 11,410.47
80% for Completion of work Sft 1.00 4158.78185 4,158.78 - 4,158.78 4,158.78
20% for Handing over
L/c for Dadooing with first quality glazed tiles
for toilet- upto. .2 .1m ht, Sft 1.00 28,479.12 28,479.12
80% for Completion of work Sft 1.00 10089.8662 10,089.87 - 10,089.87 10,089.87
20% for Handing over

Corridor Area
L/C for Laying of Ivory ceramic flooring
90% for Completion of work Sft 12.50 2373.45156 29,668.14 1898.76 23,734.52 4,272.21 53,402.66
10% for Handing over Sft 12.50

L/C for Laying of Terracotta ceramic flooring


90% for Completion of work Sft 12.50 1029.86849 12,873.36 808.89 10,111.06 1,838.75 22,984.42
10% for Handing over Sft 12.50

L/C for Laying of Terracotta ceramic Skerting


90% for Completion of work Sft 10.00 1039.24951 10,392.50 846.41 8,464.09 1,885.66 18,856.59
10% for Handing over Sft 10.00

719,429.28 487,416.32 42,309.67 529,725.99

Site QS HO QS Manger Accounts HOD QS

Mr.Sandesh prasad nigam


(Contrac.Sign)
Bhuvana Infra Projects Pvt Ltd
RAB-04
Date : 03.06.17
From Project : CMN1
To : Accounts
Nature of the work : Flooring Works
Contractor name : Mr.Sandesh Prasad Nigam
Work-order No. and date : BIPPL/CMN/Flooring/16-17/155
Work-order Expiry date : 6/29/2017
Work order amount : Rs. 7,19,429/-
VAT : NA
Service tax : NA

Up to
% This Bill Total
1 Value of work-Done Previous Bill
1.01 Value of Tendered/contract Items : (A) 487416 42310 529726
1.02 Value of Non-tendered items : (C)
1.03 Gross value of work till date,excluding taxes [ (B)+(C) ] : (D)
1.04 VAT/COT (E)
1.05 Service tax (From 01-06-2014 to upto 14-11-2016) 14.00% (F) 0 0
1.06 Service tax (From 15-11-2016 to till date) 14.50% (F)
1.07 Gross value of work till date,including taxes [ (D)+(E)+(F) ] : (G) 487416 42310 529726

2.00 DEDUCTION FOR MATERIALS SUPPLIED BY CLIENTS(IF AN %


2.01 cement :
2.02 RMC :
2.03 Steel :
2.04 Tiles :
2.05 Wood :
2.06 Others :
2.07 Total Deductions on account of material supplied : (H) - 0 0.00
2.08 Gross value of work done [(G)-(H)] : (I) 487,416.32 42310 529726

3.00 DEDUCTIONS / RECOVERIES %


3.01 Retention amount 5% 24,370.82 2,115 26486
3.02 Mobilisation advance 20%
3.03 TDS 1.00% 4,874 423 5297
3.04 Labor Colony Maintenance 1.00% 4,874 423 5297
3.05 PF : - -
3.06 ST RCM 75% - - 0
3.07 ST RCM 25% - - 0
3.08 Advance Paid in last week if any - -
3.09 Debit notes : - -
3.10 Any Other Deductions :
3.11 Total Deductions : (J) 34,119 2,962 37081
3.12 Net Amount Payable [(I) -(J)] : 453,297 39,348 492645
4.00 DEDUCTIONS / RECOVERIES
Net Payable Amount 39,348
Advance Paid in last week if any
Amount Payable 39,348

Site QS HO QS Manger Accounts HO QS Authorized Signature

Note: Subject to verification of amount paid till date & tax deductions
L/C for Laying of Vitrified tiles for L/C for Laying of antiskid ceramic tiles L/C for Dadooing with first quality
flooring L/C for Fixing vitrified wall tiles for skirting or Dadooing for flooring glazed tiles
Sno Location Remarks
For living /dining/bed rooms/kitchen/ For living dining, bed rooms / kitchen / Balcony Skirting Toilets, utility and balcony- flooring for toilet- upto 2.1m ht,
passage passage
Completion Handing over Completion Handing over Completion Handing over Completion Handing over Completion Handing over
Total Qty Total Qty Total Qty Total Qty Total Qty
80% 20% 80% 20% 80% 20% 80% 20% 80% 20%
Sf Rf Rf Sf Sf
1 B 901
2 B 902 553.10 442.48 179.97 143.98 20.27 16.22 152.20 121.76 356.07 284.86
3 B 903 560.95 448.76 180.24 144.20 21.86 17.49 180.24 144.20 358.69 286.95
4 B 904 550.51 440.41 175.23 140.18 21.88 17.50 139.09 111.27 349.41 279.53
5 B 905 556.45 445.16 174.73 139.78 20.83 16.66 153.90 123.12 363.26 290.61
6 B 906
7 B 907 530.33 424.26 174.53 139.62 20.76 16.61 143.51 114.80 346.55 277.24
8 B 908 567.14 453.71 182.14 145.71 21.58 17.27 137.37 109.89 334.43 267.54

1 B 1001 559.42 447.54 179.97 143.98 20.32 16.26 143.17 114.53 346.03 276.82
1 B 1004 550.51 440.41 175.23 140.18 21.88 17.50 139.09 111.27 349.41 279.53
2 B 1005 556.45 445.16 174.73 139.78 20.83 16.66 153.90 123.12 363.26 290.61
3 B 1006 560.13 448.10 178.41 142.72 22.44 17.95 146.56 117.25 350.30 280.24
4 B 1007 530.33 424.26 174.53 139.62 20.76 16.61 143.51 114.80 346.55 277.24
5 B 1008 567.14 453.71 182.14 145.71 21.58 17.27 137.37 109.89 334.43 267.54

2 B 1103 560.95 448.76 180.24 144.20 21.86 17.49 180.24 144.20 358.69 286.95
3 B 1105 556.45 445.16 174.73 139.78 20.83 16.66 153.90 123.12 363.26 290.61
4 B 1106 560.13 448.10 178.41 142.72 22.44 17.95 146.56 117.25 350.30 280.24
5 B 1107 530.33 424.26 174.53 139.62 20.76 16.61 143.51 114.80 346.55 277.24

Total Qty 7080.25 2271.79 272.70 1915.29 4493.77


L/C for Laying of Terracotta ceramic
L/C for Laying of Ivory ceramic flooring L/C for Laying of Terracotta ceramic flooring
Sno Location Skerting Remarks
For Corridor area and passage For Corridor area and passage For Corridor area and passage
Completion Handing over Completion Handing over Completion Handing over
Total Qty Total Qty Total Qty
90% 10% 90% 10% 90% 10%
Sf Sf Rf
1 Tower C 12th Floor 527.43 474.69 224.69 202.22 235.11 211.60
2 Tower C 13th Floor 527.43 474.69 224.69 202.22 235.11 211.60

Total 949.38 404.44 423.20


Bhuvana Infra Projects Pvt Ltd
RAB-05
Project : Commune1
Contractor Name : Mr.Sandesh prasad nigam
Date Period : 01-06-17 TO 30-07-17
WO Previous Present Cumulative
Sno Unit
Description Rate Qty Amount Qty Amount Qty Amount Qty Amount Remarks
Tiles Laying Works
1 L/c for Laying of Vitrified tiles for flooring
for lift lobby and corridor area flooring Sft 11.50 12,823.20 147,466.80

2 L/C for Fixing vitrified wall tiles for skirting or Dadooing


for lift lobby and corridor area flooring Rft 10.00 3,709.68 37,096.80

3 L/c for Laying of Vitrified tiles for flooring


For living /dining/bed rooms/ kitchen/ passage Sft 11.50 18,205.78 209,366.47
80% for Completion of work Sft 11.50 15714.94 180,721.79 7080.25 81,422.82 22,795.18 262,144.61
20% for Handing over
4 L/c for Fixing vitrified wall tiles for skirting or Dadooing
For living /dining/bed rooms/ kitchen/ passage Rft 10.00 6,117.22 61,172.20
80% for Completion of work Rft 10.00 4918.79 49,187.86 2271.79 22,717.87 7,190.57 71,905.73
20% for Handing over
Balcony Skirting Rft 10.00 513.84 5,138.40
80% for Completion of work Rft 10.00 570.47 5,704.71 272.70 2,726.99 843.17 8,431.70
20% for Handing over
5 L/c for Laying of antiskid ceramic tiles for flooring
Toilets, utility and balcony- flooring Sft 11.50 4,374.04 50,301.46
80% for Completion of work Sft 11.50 4158.78 47,825.99 1915.29 22,025.79 6,074.07 69,851.78
20% for Handing over
6 L/c for Dadooing with first quality glazed tiles
for toilet- upto. .2 .1m ht, Sft 12.00 10,417.97 125,015.64
80% for Completion of work Sft 12.00 10089.87 121,078.39 4493.77 53,925.24 14,583.64 175,003.63
20% for Handing over

Extra rate over existing rate to complete the Tilling activity as per schedule for Tower B & C

L/c for Laying of Vitrified tiles for flooring


For living /dining/bed rooms/ kitchen/ passage Sft 1.00 43,981.92 43,981.92
80% for Completion of work Sft 1.00 15714.938 15,714.94 -15714.94 (15,714.94) - -
20% for Handing over
L/c for Laying of antiskid ceramic tiles for flooring
Toilets, utility and balcony- flooring Sft 1.00 11,410.47 11,410.47
80% for Completion of work Sft 1.00 4158.78185 4,158.78 -4158.78 (4,158.78) - -
20% for Handing over
L/c for Dadooing with first quality glazed tiles
for toilet- upto. .2 .1m ht, Sft 1.00 28,479.12 28,479.12
80% for Completion of work Sft 1.00 10089.8662 10,089.87 -10089.87 (10,089.87) - -
20% for Handing over

Corridor Area
L/C for Laying of Ivory ceramic flooring
90% for Completion of work Sft 12.50 4272.21281 53,402.66 949.38 11,867.26 5,221.59 65,269.92
10% for Handing over Sft 12.50

L/C for Laying of Terracotta ceramic flooring


90% for Completion of work Sft 12.50 1838.75364 22,984.42 404.44 5,055.53 2,243.20 28,039.95
10% for Handing over Sft 12.50

L/C for Laying of Terracotta ceramic Skerting


90% for Completion of work Sft 10.00 1885.65876 18,856.59 423.20 4,232.05 2,308.86 23,088.63
10% for Handing over Sft 10.00

719,429.28 529,725.99 174,009.97 703,735.96

RAB 08 747,188.84
Diifference in amount 43,452.89
Site QS HO QS Manger Accounts HOD QS

Mr.Sandesh prasad nigam


(Contrac.Sign)
Bhuvana Infra Projects Pvt Ltd
RAB-05
Date : 21.06.17
From Project : CMN1
To : Accounts
Nature of the work : Flooring Works
Contractor name : Mr.Sandesh Prasad Nigam
Work-order No. and date : BIPPL/CMN/Flooring/16-17/155
Work-order Expiry date : 6/29/2017
Work order amount : Rs. 7,19,429/-
VAT : NA
Service tax : NA

Up to
% This Bill Total
1 Value of work-Done Previous Bill
1.01 Value of Tendered/contract Items : (A) 529726 174010 703736
1.02 Value of Non-tendered items : (C)
1.03 Gross value of work till date,excluding taxes [ (B)+(C) ] : (D)
1.04 VAT/COT (E)
1.05 Service tax (From 01-06-2014 to upto 14-11-2016) 14.00% (F) 0 0
1.06 Service tax (From 15-11-2016 to till date) 14.50% (F)
1.07 Gross value of work till date,including taxes [ (D)+(E)+(F) ] : (G) 529726 174010 703736

2.00 DEDUCTION FOR MATERIALS SUPPLIED BY CLIENTS(IF AN %


2.01 cement :
2.02 RMC :
2.03 Steel :
2.04 Tiles :
2.05 Wood :
2.06 Others :
2.07 Total Deductions on account of material supplied : (H) - 0 0.00
2.08 Gross value of work done [(G)-(H)] : (I) 529,725.99 174010 703736

3.00 DEDUCTIONS / RECOVERIES %


3.01 Retention amount 5% 26,486.30 8,700 35187
3.02 Mobilisation advance 20%
3.03 TDS 1.00% 5,297 1,740 7037
3.04 Labor Colony Maintenance 1.00% 5,297 1,740 7037
3.05 PF : - -
3.06 ST RCM 75% - - 0
3.07 ST RCM 25% - - 0
3.08 Advance Paid in last week if any - -
3.09 Debit notes : - -
3.10 Any Other Deductions :
3.11 Total Deductions : (J) 37,081 12,181 49262
3.12 Net Amount Payable [(I) -(J)] : 492,645 161,829 654474
4.00 DEDUCTIONS / RECOVERIES
Net Payable Amount 161,829
Advance Paid in last week if any
Amount Payable 161,829

Site QS HO QS Manger Accounts HO QS Authorized Signature

Note: Subject to verification of amount paid till date & tax deductions
Slno Date On Cheque Credit Debit Balance
1 3/13/2017 268,329 37500 230829.46
2 3/16/2017 37500 -37500
3 3/28/2017 25000 -25000
4 4/4/2017 25000 -25000
5 4/14/2017 50000 -50000
6 4/24/2017 30000 -30000
7 4/29/2017 20000 -20000
8 5/6/2017 120,051 30000 90050.99
9 5/15/2017 64,917 50000 14916.73
10 5/20/2017 50000 -50000.00
11 5/29/2017 75000 -75000.00
12 6/6/2017 39,348 23000 16348.00
13 19807 -19807.00
14 30000 -30000.00
15 25000 -25000.00
16 30000 -30000.00
17 20000 -20000.00
18 161,829 55000 106829.27
19 45000 -45000.00

- 654,474 677,807 (23,332.56)