TXN

RAC Planning
BSS Operations
RAN Flexi Abis
Responsible TXN Core
BSS Dynamic PD Fine Tuning Ideas Responsible
Departments Trials/Recommendations FOPs
Gb Link All Current BSCs Departments
PD on BCCH Expansions VAS
Dynamic MCS Adjustment
BSS Planning

RAN Planning

BSS HQ Responsible Gb Link Addition


Addition of DPUP board required on TXN
Vendor Departments all Huawei BSCs Addition of DPUP boards
BSS
TXN Core
Responsible
Upcoming BSCs at Korangi MSC FOPs
Gb over IP Departments
BSS 1804 Cells VAS
Responsible PD Addition
Department PD Allocation BSS Planning
4 Cells PD Deletion
Data Throughput RAN Planning

Enhancement
Project
34 Cells EGSM Sector Addition
220 Cells Criteria : Abis Congestion > = 80% and Unused TS >=100
P0 Cases
BSS 3 Cells DCS Sector Addition
RAN BSS
Responsible Criteria : 80% >Abis Congestion > = 50% and Unused TS <= 50 Responsible Department
Roll Out 155 Cells Idle TS Allocation P1 Cases 240 Cells
Departments New Site Required TRX Expansion
TXN
28 Cells Half Rate Modification Criteira : 50%>Abis Congestion >=10% and Unused TS > 0
P2 Cases 524 Cells

3 Cells Expansion Proposed

109 cells Criteria : Abis Congestion >=80% and E1 < 4 and, Unused TS=0
P0 Cases
BSC04 BSS
BSS HQ
Responsible BSC14 FOPs
Vendor Criteria : 80% >Abis Congestion >=40% and E1 < 4 ,Unused TS=0 Responsible Department
Departments BSCs for RPP Addition Criteria GSL Utilization >80% Abis Expansion P1 Cases 158 Cells TXN
BSC20 GSL Utilization
BSC35
87 Cells Criteria : 40% >Abis Congestion >=10% and E1 < 4, Unused TS=0
P2 Cases

Data Throughput Enhancement Project.mmap - 3/5/2013 - Mindjet