Cl.1.9 Drawings
Cl.2.1 Site
Cl.4.7 Setting Out
Cl.4.12 Unforeseeable
Cl.4.24 Fossils
Cl.7.4 Testing
Cl.8.4 EoT
Cl.8.4 Adverse Climatic Conditions
Cl.13.7 Legislation
Cl.13.8 Changes in Cost
Cl.14.8 Delayed payments
Cl.19.4 Force Majeure
Project Control Issues
Cl.1.9 Delay to details
Cl.2.4 Finance Details
Cl.2.5 Employers Claims
Cl.3.3 Instructions by Engineer
Cl.4.1 Method Statement
Cl.4.21 Reporting
Cl.8.3 Programme
Cl.12.1 Measurement
Cl.13 Variations & Value Engineering
Cl.14 Payments
Planning
Funding & Budget
Disbursement approval
Cl.18 Insurances
Cl.20 Contractors Claims / Records
THE FIRST 100 DAYS
Employers Risks
Right of Access - Cl 2.1
Contractors obligations
Performance Security Cl 4.2
Employers obligations
Obtaining planning, zoning etc permits for the Permanent Works Cl 1.13
Ensuring that the Contractor will have right of access to and possession of all parts of the
Site
Commencement Date to + 28
Employers Actions
Right of access & possession Cl 2.1
Engineers Responsibilities
Advising Contractor of Engineers Authority and Delegations Cl 3.2
Contractors Responsibilities
General obligations adequacy, stability & safety Cl 4.1
Make objections to any Nominated Sub-contractors who the Contractor does not wish to
employ
Submit detailed time programme within 28 days of receipt of the notice to commence Cl
8.3
Give notice of probable future events or circumstances which may increase price or delay
completion
Financial Arrangements
Notice of Claims
Engineer
Exercises stated authority
Cl.3
Cl.3
Instructions in writing
Determination
Give notice
Cl.12.1 Measurement
Cl.13.1 Variations
Contractor
Cl.4
Method Statement
Performance Bond
May delegate
Fluent in language
Quality Assurance
Details in Specification
Procedures
Compliance documents
Site data
Costs included
Risk
Inspections
Extension of time
Payment of cost
No profit
(as a general rule not included where risk is not the fault of either party)
Transport to site
Emissions
Surface discharges
Effluent
Local Law
Progress Report
Monthly 6 copies
Progress Report:
Charts
Photographs
Manufacturing report
Personnel
QA documents
Safety statistics
Progress
Security
Nominated Subcontractors
Clause 5
Payment Cl.5.3
Reasonable Objection
Supporting details
Clause 6
NO Poaching !! (Cl.6.3
Records
Cl.7
Proper facilities
Samples
For consent
Inspection:
Place of manufacture
Delay claim
Remedial works
Local law
When delivered
Royalties
COMMENCEMENT DELAYS & SUSPENSION
Contract becomes effective when Letter of Acceptance has been received by Contractor
Engineer SHALL
Contractor SHALL
COMPLETION
Cl.8.2 Fundamental obligation to complete within Time for Completion
See Cl.10.1
PROGRAMME
Programme of Works Cl.8.3
Within 28 days
Methods of execution
Revisions to programme
Extension of Time
Contractor SHALL be entitled
Variation
Employers delay
Cl.20.1
Cl.20.1 & 3.5 give time limits to Engineer to Determine or Cl.13 shall not be unreasonably
withheld or delayed
Delays by authorities
Rate of Progress
Engineer may instruct submission of revised programme
Delay Damages
Delay damages
Limit of damages
Tests on Completion
Cl.9
Certified report
Delayed tests
Retest
Cl.11.4
Final payment
Tests on Completion
Works completed
Tests completed
TO certificate issued
TO Certificate issued when works completed and ready for intended purpose
Contractor may apply for TOC within 14 days of Works being complete
Sectional Completion
Engineer may
Within 28 days
Tests
Contractor responsible to carry out repairs before end of Defects Notification Period
Defects Liability
Cl.11
Extension to DNP
Max 2 years, or
Failure to Remedy
Reasonable notice
Removal
Further Tests
Right of access
Contractor to search
Performance Certificate
Performance Certificate
Engineer to issue
Date
Variation
Not specified
No appropriate rate
Cl.12.4 Compensation
Cl.13.3 Determinations
Variations
Cl.13.1 Engineer has the right to vary
Savings 50/50
Variation Procedure
Description
Programme
Evaluation
Cl.20.1 claim
Extension of time
Payment of cost
Payment schedules
Disbursement approval
Particular Conditions
Budgeting
Funding availability
Advance payment
Design
Mobilisation
Funding facilitation
Interim payments
56 days
Final Payment
84 days
Authority approval
Timing
Variations
Financial planning:
Check funding
Budget Forecast
Engineer prepares for Employer
Regular intervals
Updated budget
Report of changes
Cl.2.4, 2.5, 3.5, 4.21, 8.3, 13.1, 13.3, 14.3, 13.8, 14.3, 14.6, 20.1, 20.4
Advance Payment
Cl.14.2 Advance payment
Guarantee
Application Cl.14.3
Repayment
Interim Payment
Cl.14.3 Application
6 copies
Cross guarantees
Milestones preferred
Cl.14.7 Payment
Non Payment
Cl.16.1 Suspension
Non payment
21 days notice
Cl.16.2 Termination
Contractor finance
Guarantee by Employer
Insurance
Cl.18
Agreed terms
Currency
Force Majeure
Basic Principles:
Exceptional event
Cl.19.1 Definitions
Cl.19.4 Consequences
EoT
Cl.19.6 Termination
CAUSES OF CLAIMS FOR CONTRACTORS
Unforeseeable ground conditions
Delayed drawings
Delayed payment
Consequence of risk
Suspension
Force Majeure
o Condition Precedent
o Within 28 days
o Supporting documents
After 42 days:
o Approval / Disapproval
o Detailed comments
Defective Materials
Failures of Tests
o As soon as practicable
o No obligation to respond
CONTEMPORARY RECORDS
Crucial for determination of claim
No definition of Dispute
o Rejection of Determination