Given:
Required:
Solutions:
Assumptions
4 2 4 (0.0032)(35.052)(7.26312 )
Fs = 2
= 2(0.0508)
= 232.955577 m2/s2
1hr
(52.9957653 /hr)( )
3600s
Velocity = Q/Area= = 7.2631 m/s
(0.0508)2
4
2 (7.2631/)2
hf= 6(kf 2
)= 6(0.75)( 2
) = 118.6933986 m2/s2
Ff = 3081.808154 m2/s2
F = 3314.763731 J/kg
F = 3314.76 J/kg
1
Hydraulic Power = Q = (52.995765 m3/hr)(3600)(9.81m/s2)(997.08 kg/m3)( 337.8964m)
Ph = 48654.3015 J/s
Ph = 48.654 KW
Ps = Ph/ = 48.654/0.84
Ps = 57.2403547 KW
57240.3547 J/s
Ws = =
(52.995765 m3/hr)( 1 )(997.08 kg )
3600 m3
Ws= 3899.721981 J/kg
Ws =3899.72 J/kg
2 273694
3899.721981 J/kg = (9.81m/s2)(9.7536m)+ 997.08 /3
+3314.763731 J/kg
P2 = 761.541 KPa
Electric cost
CEPALCO electric rate = Php 10.656 / KWhr