Work method statement for Servicing / Repair of Transformer at Water facilities IA
Scope of work:
This method statement covers all Servicing and Repairs activities.
S/N TASK STEPS STEPS DESCRIPTION REMARK
1 Mobilization to site Mobilization of personnel, Materials, Tools and Equipments to site 2 Open the LV and HV Use the correct tools to lose the termination Use complete PPEs termination point bolt and Nuts. Follow working procedure like Coverall, dotted hand gloves, Rubber Hand Gloves. 3 TESTING OF TRANSFORMER All test report shall 1. Winding Resistance - Ensure the contacts at bushings are be reported in the test. cleans. following report form number 34, - Hold the sensing probes across the form number conduct between which the contact 33,form number 9 resistance is to be measured (Test and form number 3 Current 10A DC).
- Observe the reading and record in the
test format.
2. Ratio Test. - Ensure that both the primary and
secondary windings are not connected to any cables/Bus bar
- Ensure the tap changer in lowest top
position
- Apply three phase supply voltage
(415V AC) across the primary termination of the transformer.
- Measure the secondary (LV) voltage at
the LV termination. Observe the reading and record in the test format.
- If the tap changer is Off load type,
switch of the power supply and rise one step and apply the Three phase 415V AC across the Secondary termination and measure the voltage at both secondary and primary side.
3. Insulation - Earth the primary winding and
Resistance For secondary winding. Primary and Secondary windings - Apply Voltage on the primary winding and secondary winding.
- Observe readings and record in the
test format. 4. Di Electric Test Collected oil sample from Transformer and Report of the test sample from drum to be tested with the Di- result shall be Electric test machine. provided. 5. Topping of oil Using one horse power pump to pump in oil Adequate into the transformer. Using DEP 63.10.08.11- supervision, Use of Gen standard method. Rubber Hand gloves,
Installation of transformer work method statement is not included
MATERIALS / EQUIPMENT
1. Simple Hand Tools
2. Digital Multimeter 3. Megger Tester 4. Hi Pot tester. 5. One horse power Pumps