Please project Template DCC 01. Please provide detail explanation of the following i. Engg points ii. Production i. Lifting in all phase ii. Fit up (method with sketch) 02. Please provide any precaution in order to HSE / Production prevent issue or problem caused by adverse weather conditions 03. Please provide the list of the Production equipments or facilities that shall be used for final weld and for handling. 04. Please specify the facility, Production painting & etc. 05. Please provide HSE devices. HSE Please provide organization Project Manager / Production chart for site activities Please provide construction Production chart Attachment No.1 comments Zamil to provide Engineering configuration on stools Scaffolding sketch to be HSE provided in order to allow saipem to prepare accordingly. Zamil to provide tolerances +/- 10mm (confirm by for leveling production) Zamil to provide how many Welding Engineer welder to be involved and schedule for each weld. Provide protection during Welding Engineer welding activities Clearly state that PWHT is Email from Saipem not required Lugs shall be removed after Compliance in method weld completion statement Job safety analysis shall be HSE / Production provided. In addition please verify that Welding Engineer if WPS shall be approved by our project and improved the quality of document attached. The document attached referred to other project. Please verify if the welder Welding Engineer shall be qualified for the project , in the final revision of the method statement Zamil shall include JCC cards for the welders. Saudi Aramco recommended Email from saipem (reference execution of PWHT on CWL- to add in method statement) 28 and whole skirt even if skirt is non pressure part. This is because of the skirt there are contribution of self weight of the column and affect of wind & earth quake, therefore request particular attention on the integrity of the welding & relax of residual stress, please advice. Please provide adequate Engineering sketch. Please indicate project To be added in method location statement (JAZAN Project) Please indicate number of To be added in method documents & revision statement Please clarify how stress To refer applicable WPS for Pre- residual will be eliminated. heating Reference: please add MR To be added in method document number. statement Please add ITP for site By welding engineer activities Please provide & indicate To be added in method document number of statement welding book & doc.number of WPS Please indicate document To be added in method number of painting statement procedure. Please provide reinforced To be added in sketch by stiffener for skirt & engineering protection for lower section. Please provide detail of By Welding Engineer CWL-28 tack welding condition Please provide calculation By Engineering reports & sketch. Complete welding of CWL- Email from saipem (reference 27, please provide PWHT. to add in method statement) Please provide dedicated To be added in sketch by para for marking position of Engineering axis & orientation of temporary stiffener. Details & sketch to be To be added in sketch by provided for jacking at site Engineering for column jacking. Please provide dedicated ITP By Welding Engineer for site activities. Please see comments on BY QA/QC painting procedure. Please indicated dedicated To be added in sketch by para with all load on the soil. Engineering