EN10095536 C711943A02 TRAY REF ASSLY (Lower shell) upper shell assly, Piping Assly, Hex assly
Lower Shell Assembly, Piping Assly, Purge Piping Assly, Smoke chamber
EN10096464 C801A03K01 assly
Find attached revised drawings & BOM for 2V 3L & 2V 3M Piping Assly,
Purge Piping Assly
Piping :- Control pannel back side pipe position changed & related
changes done.
Smoke chamber assly (exhust) :- coupling size changed.
Job:- Applicable from 2V 3L C/ 7 & Onwards, 2V 3L C/ 8 & Onwards,2V
3L C/10 & Onwards,2V 3L C/11 & Onwards, 2V 3M C/ 7 & Onwards SMJ
Pls find attached the revised part catalogues for ASME/PED material.
Reason : Code edition changed from 2013 to 2015 Applicable from ZJ32
onwards. RBP
Pls find attached the revised part catalogue for PED/ASME Plates and
components.
Reason : Updated to 2015 edition. RBP
Find revised Lower shell Base assly & Piping Assly drg for 2B 5N C/15,
OC No. ZJ45.
Change : Lifting jack arrangement changed in LS assly, Control valve
added in magnetic filter line in piping assly.
Reason : As per Customer requirement. SKP
OC No : JK84//SS 70 A Change : Gen Header Drawing revised Reason:
Wrong pdf replaced (for regularisation) HBJ
Revised Liquid BOM for this job.
Reason: By mistake JLP
Please find enclosed the Revised LTG Tube quantity for SD90B TP-
Silkeborg
Reason- As per final layout. Job- ZH91 PKT
Find the revised Parts Catalogue for Hot water Control valve. Positioner
changed to standard (Non explosion proof) after the mail confirmation
from Dinesh Kamath.
Reason : TCL mentioned that valve should be as per old job. SAA
Please find enclosed revised drg & bom for this unit. Description:-
Evaporator header partition plate relocated.
Reason:- Improvements JLP
As per MWO, revised name plate for this job. Also, attached Piping All
Assembly drawing for ZG36 job.(only BOM was revised so drawing was
not attached in earlier release.) JLP
Change- purge piping revised Reason- unit wason hold new drawing
made to incorporate changes in new 2B (Regularisation) RKW
As per customer comments, added anchor bolts in main SOS. SAA
Upper shell revised to include the welding details, PED name plate and
design data as per Module A2.
Reason : Missout.
Stage : Planning yet to give DRP SAA
Please find attched Revised drawing for Abso, Evap & Cond Nameplate.
Description : 1) "0038" added to CE nameplate due to vessel being
under module A2
2) Piping Assly :- sr no. 69 pipe size changed in bom RBP
Please find attched Revised drawing for Purge Piping Assly (Only
Bom),Upper Shell Assly, HR, HTG,Abso,Cond,Evap & LTG Nameplate.
Description : 1) "0038" added to CE nameplate due to vessel being
under module A2
2) Purge Piping Assly :- Only Service valve Part NO. Changed.
3) Upper Shell Assly - Desigen Data Changed. PKT
Description : 1. Stub pipe added between service valve and shell for
insulation 2. Plate added between cond and HTG tubesheets in
multipiece drawing. 3. Lashing hooks added to US/HTG Reason : 1.
Shop feedback 2. Missout 3. Shop feedback RBP
PKT
Please find attched Revised drawing for Nozzle Packing, Packing Frame
& Multiple Piece Shipment SD 90B TP Description : Abso Cond Hdr
Conn pipe Added in US+HTG Piece PKT
Find the revised name plates for this job. Tag no. added as per
customers requirement. JLP
NAME PLATE Year of mfg &sr no changed Regularisation RKW
As per customer comments, performance testing is required, so added
additional gasket assembly for this job. SAA
Please find the attached revised boms of Purge Tank Assly. Reason :-
Serivice valve changes done as per QC reuirement (Process Assurance).
Accordingly Tubing needs to be modified, so the same has been revised
as well. SMJ
Description : Painting qty updated as per C4 painting
Reason : Missout RBP
As per mail from planning, revised the Absorber tube for this job. JLP
OC NO ZJ35// 2D 3M CHANGE : GEN TEMP SENSOR ADDED IN SPARE
LIST REASON: MISS OUT HBJ
Find the drg & bom of Lower Shell & Piping Assly for ZJ56. Discription :-
Abso pump NPSH dimension increased & related changes done.(inputs
given by innovation team) SAA
JM 16 GEN HDR- NOZZLE POSITION REORIENTED. MKS
1. Float valve BOM structure rearranged. Reason: As per New BOM
structure required by planning SKP
Find revised Lower shell Base Saddle for 2B 5N C/15, OC No. ZJ45.
Change : Lifting jack quantity changed.
Reason : As per customer requirement. SKP
As per customer comments, revised assly of pipe, standard electric
auto purge called. SAA/JLP
OC NO JL22 CHANGE: BUTTERFLY VALVES REVISED REASONE: AS PER
CUSTOMER REQUIREMENT BSG/HBJ
Description: 1) 2B 5L & 2B 5N :- drain pipe assly- ball valve Part no.
corrected.
2) 2B 6L to 2B 8L :- LS mid tubesheet - bundi tube cut out position
changed.
3) 2B 7M :- Pipe connect assly - sr no.13 plate added. Piping
all assly :- sr no.59 elbow called in bom.
LS bot assly :- sr no.19 plate size corrected in bom. Planing has to
design SMJ
Please find enclosed Gasket drawing for SD90B TP.
Reason:- Gasket width updated. PKT
Description : Flange raw plate thk changed to 70 mm from 63 mm.
Reason : Ordered plate is 70mm thk instead of 63mm thk RBP
Revised GA IS ATTACHED CHANGE- As per latest changes in cute chill
Reason- Regularisation RKW
As per customer requirement, Hot water inlet & outlet nozzle size has
been changed. Therefore, revised Generator Header assembly for this
job. Also Mating flanges and nozzle packing revised. JLP
ZJ35/2D3MC Change -Htg Shell Assly Revised - Dump Cond Hole 'K'
Added. HBJ
Change- upper shell& MTG tube sheet changed lifting hole added.
Washer M16added in HR BOM . HTG Harrdware corrected Reason-
missout RKW
Find the parts catalogue revised for Stud/Bolts and Nuts, new standard
to be referred for PED jobs added. SAA
ENGG IMPRO
C-EnggImp
OrderSpec
OrderSpec
ENGG IMPRO
Engg Error
STD-CLG
OrderSpec
CUST COMM
Header manufacturing
Wrong PDF Attached to BOM completed Misc
Engg Error
OrderSpec
CUST COMM
OrderSpec
C-EnggImp
INPCHG
OrderSpec
CUST COMM
C-EnggErr
C-EnggErr
C-EnggErr
C-EnggErr
C-EnggMiss
C-CusReq-E
C-CusReq-I
C-CusReq-E
C-CusReq-I
C-CusReq-E
C-CusReq-I
C-EnggMiss
OrderSpec
C-EnggErr
C-EnggMiss
C-CusReq-I
C-EnggImp
C-EnggErr
C-CusReq-I
C-EnggErr
C-CusReq-E
As per customer requirement & input
received from proposal Job delivered at site C-CusReq-E
C-EnggErr
C-EnggMiss
C-CusReq-I
OrderSpec
C-CusReq-E
Job at vendor location.
No Hole for Dump Cond No rework done. C-EnggMiss
C-EnggErr
C-CusReq-E
C-CusReq-E
C-EnggErr
C-EnggMiss
C-CusReq-I
C-EnggMiss
C-EnggMiss
Item rev
C-EnggErr
C-EnggMiss