ECO Revised Item Description

EN10094630 CZZH8101L1 Liquids BOM

EN10095536 C711943A02 TRAY REF ASSLY (Lower shell) upper shell assly, Piping Assly, Hex assly

Lower Shell Assembly, Piping Assly, Purge Piping Assly, Smoke chamber
EN10096464 C801A03K01 assly

EN10096709 RP17P20001 STD. PART CATALOGUE

EN10096821 HFT201604P STD. PART CATALOGUE

EN10099745 C735S07L0A Upper Shell Tubesheet, Header Assly

EN10100155 CZZH901BG1 Header Assly , Gasket

EN10100268 P21OG10980 PART CATALOGUE

EN10100549 CZZJ635093 Upper sheLL TUBESHEET

EN10100550 CZZJ451A11 Lower Shell Bottom Assembly


EN10100614 CZJK845172 Generator Header Assly

EN10100665 CZJL6301L1 Liquids BOM

EN10100711 CZZH918811 SOS (ASSLY OF SHELL)

EN10100769 CZZH903261 HTG Assembly (Tube Side)

EN10100788 P34CT2070S STEAM CONTROL VALVE

EN10100822 CZJL8317E1 Evaporator Headers Assembly

EN10100823 CZZG368661 Piping All Assembly

EN10100834 CZJK738821 Assembly of Pipes (PURGE PIPING)


EN10100835 CZZJ560101 SOS

EN10100890 CZZJ567593 Upper shell Assly, PED Name Plate - LTG

EN10100964 CZZH908631 Piping All Assly, Name plate

EN10100965 CZZH915401 Upper Shell Assembly, piping assly, name plate

EN10100975 CZZH238821 SOS-Assemblyof Pipes


EN10100978 CZJL718831 SOS-Assembly of Unit

EN10101001 CZZH907362 HTG ASSLY, MULTIPIECE DRAWING


EN10101002 CZZH918652 STEAM DRAIN INST ASSLY

EN10101037 CZZH918634 Nozzle packing, packing frame, Multipiece Drawing

EN10101038 CZZJ098151 Name plate


EN10101083 CZJK178151 Name plate

EN10101086 CZZJ568831 SOS-Assembly of Unit

EN10101089 C808640004 Purge Piping Assembly

EN10101093 CZZH909181 PAINTING

EN10101096 P01R01117T PART CATALOGUE


EN10101097 C808633L03 Pipes Setfor Purge Piping Assly

EN10101103 CZZH919181 PAINTING

EN10101111 CZZJ608801 Main Unit Assembly

EN10101150 CZZJ3501S2 Spares BOM

EN10101181 CZZJ568634 Purge Piping Assly


EN10101192 CZJM165551 Generator Headers Assembly

EN10101238 CZJJ098111 Pipe Connect Assly MTG

EN10101242 CZZJ451A01 Lower Shell Assembly

EN10101244 CZZJ538801 SOS-Main Unit Assembly

EN10101266 CZJL220101 SOS-Main Unit Assembly


EN10101278 C801T06L06 Lower shell assly, piping assly , pipe connect assly

EN10101321 CZZH911BG1 Gasket - EVAP HDR

EN10101331 CZZJ445261 Generator Tube Side

EN10101339 CZJK739GA1 GADRAWING

EN10101340 CZJM308831 SOS- ASSLY OF UNITS, NOZZLE PACKING, MATING FLANGE

EN10101362 CZZJ354271 HTG ASSLY

EN10101368 CZJL693121 HTG Assembly - SJ50B THU-1

EN10101512 P21RG1017A MONOB. NG HI-LO BURNER-RS100 TC FS1, 415V, 50Hz


EN10101622 CZJL659FD1 Foundation DRAWING

EN10101634 CZJM348151 Name Plate

EN10101669 CZJL763A02 HTG Assembly, Upper shell, HR, MTG assly

EN10101700 HFT203302P PART CATALOGUE

EN10101717 CZZJ708801 Main Unit Assembly


EN10101741 CZZJ118151 Specification Plate-CE
EN10100568 CZJL198802 TUBE BUNDLE ASSEMBLY - R & D EVPORATIVE CONDENSER 100TR
EN10100830 CZJL198802 TUBE BUNDLE ASSEMBLY - R & D EVPORATIVE CONDENSER 100TR
SOS-CLOSED CIRCUIT COOLING TOWER, CCCT150/5,6 FOR REXAM
EN10101095 CZJM190101 Beverage Can (INDIA) Pvt Ltd
ECO Description ECN REUESTOR
Oc No. ZH81 Change: LiBr Qty revised.
Reason: as per testing HBJ

Please find enclosed the changes done for 5G 3A C.


1. Lower Shell- Lashing Hook & Locking Pin added in Tubesheet, Abso
and Ref Tray revised as per locking pin added in Tubesheet. 2. Upper
Shell- Shell Corrugation is removed and Stiffener is added on Upper
Shell Top, Lashing Hook added in Tubesheet.
3. Related changes done in HEX and Piping Assly as per changes done in
Lower Shell and Upper Shell.
Job:- Applicable from next job onward.
Reason:- Engg Improvement PKT

Find attached revised drawings & BOM for 2V 3L & 2V 3M Piping Assly,
Purge Piping Assly
Piping :- Control pannel back side pipe position changed & related
changes done.
Smoke chamber assly (exhust) :- coupling size changed.
Job:- Applicable from 2V 3L C/ 7 & Onwards, 2V 3L C/ 8 & Onwards,2V
3L C/10 & Onwards,2V 3L C/11 & Onwards, 2V 3M C/ 7 & Onwards SMJ

Pls find attached the revised part catalogues for ASME/PED material.
Reason : Code edition changed from 2013 to 2015 Applicable from ZJ32
onwards. RBP

Pls find attached the revised part catalogue for PED/ASME Plates and
components.
Reason : Updated to 2015 edition. RBP

5G 7K,7L,7M,8L,8M,8N STANDARD MODEL US TUBESHEET - EXTRA


HOLE IS REMOVED US GEN SHELL - WIDTH OF SHELL IS REDUCED
HEADER ASSLY - STUD SIZE CORRECTED FROM M16 TO M20
IMPLEMENTATION FROM - NO EFFECT ON ANY CURRENT JOBS. WILL
BE APPLICABLE FOR FUTURE JOBS MKS

Description : 1. Pulling screw threaded holes added to Abso/Cond cover


plates. Pulling screws added to Hdrs all assly.
2. Evaporator gaskets released. Reason : Missout RBP

Change- Hinges side changed ( on left side) Reason- as per supplier


confirmation for for GP 50 H model applicable from ZJ68 EDG20B TCU RKW
tube sheet cladding is changed from 3 mm to 4mm reason:
As required by planning dept. BAG

Find revised Lower shell Base assly & Piping Assly drg for 2B 5N C/15,
OC No. ZJ45.
Change : Lifting jack arrangement changed in LS assly, Control valve
added in magnetic filter line in piping assly.
Reason : As per Customer requirement. SKP
OC No : JK84//SS 70 A Change : Gen Header Drawing revised Reason:
Wrong pdf replaced (for regularisation) HBJ
Revised Liquid BOM for this job.
Reason: By mistake JLP

Please find enclosed the Revised LTG Tube quantity for SD90B TP-
Silkeborg
Reason- As per final layout. Job- ZH91 PKT

SS80D TP - HTG Assembly (Tube Side) Description : Drain pipe, flange


and associated hardware,gasket and blind flange added to HTG steam
inlet header.
Released : As per customer requirement RBP

Find the revised Parts Catalogue for Hot water Control valve. Positioner
changed to standard (Non explosion proof) after the mail confirmation
from Dinesh Kamath.
Reason : TCL mentioned that valve should be as per old job. SAA

Please find enclosed revised drg & bom for this unit. Description:-
Evaporator header partition plate relocated.
Reason:- Improvements JLP

As per MWO, revised name plate for this job. Also, attached Piping All
Assembly drawing for ZG36 job.(only BOM was revised so drawing was
not attached in earlier release.) JLP

Change- purge piping revised Reason- unit wason hold new drawing
made to incorporate changes in new 2B (Regularisation) RKW
As per customer comments, added anchor bolts in main SOS. SAA

Upper shell revised to include the welding details, PED name plate and
design data as per Module A2.
Reason : Missout.
Stage : Planning yet to give DRP SAA

Please find attched Revised drawing for Abso, Evap & Cond Nameplate.
Description : 1) "0038" added to CE nameplate due to vessel being
under module A2
2) Piping Assly :- sr no. 69 pipe size changed in bom RBP

Please find attched Revised drawing for Purge Piping Assly (Only
Bom),Upper Shell Assly, HR, HTG,Abso,Cond,Evap & LTG Nameplate.
Description : 1) "0038" added to CE nameplate due to vessel being
under module A2
2) Purge Piping Assly :- Only Service valve Part NO. Changed.
3) Upper Shell Assly - Desigen Data Changed. PKT

Rupture disc no. updated in SOS Reason: Missout / Regularisation


NOTE: NO PROCUREMENT ACTION NEEDED, THIS ECN IS TO CORRECT
BOM FOR FUTURE REFERENCE. SKP
Rupture disc assly no. changed in SOS. Reason: Required RD of 80NB,
called in SOS 50NB, Error due to copy of SOS templete from old job.
Action: RD & safety head is available in stock, Planning to allocate the
stock to this unit. Already called 50NB RD is standard, can be used for
other jobs. SKP

Description : 1. Stub pipe added between service valve and shell for
insulation 2. Plate added between cond and HTG tubesheets in
multipiece drawing. 3. Lashing hooks added to US/HTG Reason : 1.
Shop feedback 2. Missout 3. Shop feedback RBP
PKT

Please find attched Revised drawing for Nozzle Packing, Packing Frame
& Multiple Piece Shipment SD 90B TP Description : Abso Cond Hdr
Conn pipe Added in US+HTG Piece PKT
Find the revised name plates for this job. Tag no. added as per
customers requirement. JLP
NAME PLATE Year of mfg &sr no changed Regularisation RKW
As per customer comments, performance testing is required, so added
additional gasket assembly for this job. SAA

Please find the attached revised boms of Purge Tank Assly. Reason :-
Serivice valve changes done as per QC reuirement (Process Assurance).
Accordingly Tubing needs to be modified, so the same has been revised
as well. SMJ
Description : Painting qty updated as per C4 painting
Reason : Missout RBP

Please find attached revised part catalouge for Absobent and


Refrigerant Pump for Rapid- SS 80D TCU. Reason- Special Testing has
been added in Part catalouge. PKT
SMJ
Description : Painting qty updated as per C4 painting
Reason : Missout PKT

As per mail from planning, revised the Absorber tube for this job. JLP
OC NO ZJ35// 2D 3M CHANGE : GEN TEMP SENSOR ADDED IN SPARE
LIST REASON: MISS OUT HBJ

Find the drg & bom of Lower Shell & Piping Assly for ZJ56. Discription :-
Abso pump NPSH dimension increased & related changes done.(inputs
given by innovation team) SAA
JM 16 GEN HDR- NOZZLE POSITION REORIENTED. MKS
1. Float valve BOM structure rearranged. Reason: As per New BOM
structure required by planning SKP

Find revised Lower shell Base Saddle for 2B 5N C/15, OC No. ZJ45.
Change : Lifting jack quantity changed.
Reason : As per customer requirement. SKP
As per customer comments, revised assly of pipe, standard electric
auto purge called. SAA/JLP
OC NO JL22 CHANGE: BUTTERFLY VALVES REVISED REASONE: AS PER
CUSTOMER REQUIREMENT BSG/HBJ
Description: 1) 2B 5L & 2B 5N :- drain pipe assly- ball valve Part no.
corrected.
2) 2B 6L to 2B 8L :- LS mid tubesheet - bundi tube cut out position
changed.
3) 2B 7M :- Pipe connect assly - sr no.13 plate added. Piping
all assly :- sr no.59 elbow called in bom.
LS bot assly :- sr no.19 plate size corrected in bom. Planing has to
design SMJ
Please find enclosed Gasket drawing for SD90B TP.
Reason:- Gasket width updated. PKT
Description : Flange raw plate thk changed to 70 mm from 63 mm.
Reason : Ordered plate is 70mm thk instead of 63mm thk RBP
Revised GA IS ATTACHED CHANGE- As per latest changes in cute chill
Reason- Regularisation RKW

As per customer requirement, Hot water inlet & outlet nozzle size has
been changed. Therefore, revised Generator Header assembly for this
job. Also Mating flanges and nozzle packing revised. JLP
ZJ35/2D3MC Change -Htg Shell Assly Revised - Dump Cond Hole 'K'
Added. HBJ

Change- HTG tube no changed as per required landing Reason-


Mistake Existing tubes to be used in LTG . units we will confirm RKW
Find the revised parts catalogue for burner for this job. Reason : As per
Riello requirement/comment. SAA
Please find enclosed revised GA & Foundation drg for this unit. SAA
Find the revised name plate for this job. Added another serial no.Also
CHW and COW flow were interchanged. JLP

Change- upper shell& MTG tube sheet changed lifting hole added.
Washer M16added in HR BOM . HTG Harrdware corrected Reason-
missout RKW
Find the parts catalogue revised for Stud/Bolts and Nuts, new standard
to be referred for PED jobs added. SAA

1.Revised assembly of unit, added additional gasket assembly for JL65


job. (First Unit) 2.For ZJ70 job, revised Assly of pipes, Rupture disk with
DIN Flanges added.(Customer requirement) SAA
Country of destination has revised for this job. SAA
TUBE LENGTH REVISED RHM
TUBE QTY REVISED FROM 220 TO 230 RHM

Centrifugal pump with motor added in SOS RHM


REASON FOR ECN Job Status Reason
Machine is under
Performance Testing Misc

ENGG IMPRO

C-EnggImp

OrderSpec

OrderSpec

ENGG IMPRO

Engg Error

STD-CLG

OrderSpec

CUST COMM
Header manufacturing
Wrong PDF Attached to BOM completed Misc

Engg Error

OrderSpec

CUST COMM

OrderSpec

C-EnggImp

INPCHG

OrderSpec
CUST COMM

Planning yet to give DRP C-EnggMiss

C-EnggErr

C-EnggErr

C-EnggErr
C-EnggErr

C-EnggMiss
C-CusReq-E

C-CusReq-I

C-CusReq-E
C-CusReq-I

C-CusReq-E

C-CusReq-I

C-EnggMiss

OrderSpec
C-EnggErr

C-EnggMiss

C-CusReq-I

part no not added in bom-mistake Planning to raised PR C-EnggMiss

C-EnggImp
C-EnggErr

C-CusReq-I

C-EnggErr

C-CusReq-E
As per customer requirement & input
received from proposal Job delivered at site C-CusReq-E
C-EnggErr

C-EnggMiss

C-CusReq-I

OrderSpec

C-CusReq-E
Job at vendor location.
No Hole for Dump Cond No rework done. C-EnggMiss

C-EnggErr

C-CusReq-E
C-CusReq-E

C-EnggErr

C-EnggMiss

C-CusReq-I

C-EnggMiss
C-EnggMiss
Item rev
C-EnggErr

C-EnggMiss