AID120091-02

Sheraton Hotel Banani | Dhaka, Bangladesh

Project Wide: Ironmongery Specifications


AID120091-02_SC_TC_PW_HD_003_A

Rev Date Description By Checked

A 24 February 2017 Tender Issuance PB PB


REV.
PROJECT : Sheraton Hotel Dhaka PROJECT NO. : AID120091-02 -
DATE :

Project Wide
LOCATION : ISSUE DATE : 24 Feb 2017 24 Feb 2017 A
(PW)

HARDWARE & IRONMONGERY SCHEDULE

SUPPLIER
CODE ITEM DESCRIPTION PRODUCT ORDER REF. REMARKS
OR EQUIVALENT
Hfele International
HD-001 Hinges c/w Screwsv 341.18.431
Project Office - Singapore
Concealed overhead Hold Opening range
Hfele International
HD-002 Closer EN3-6 EN 1154 80-120degrees
Project Office - Singapore
for doors 950-1400mm 931.14.349
Euro Profile Hfele International
HD-003 911.02.145
Sashlock-PVD Brass Project Office - Singapore
Stainless Steel Euro Hfele International
HD-004 Profile Cycliner Turn c/w 916.95.326 Project Office - Singapore
3 keys
Stainless Steel Coloured 1023-E BR Hfele International
HD-005
Lever handle set Project Office - Singapore
Elite Builders & Supplies
HD-006 Toilet Cubicle System 1912 Floor Mounted Series
Pte Ltd
Stainless Steel matt Hfele International
HD-007 Wall Mounted Door 937.00.106 Project Office - Singapore
Stopper

15x4mm Dark brown fire


Hfele International
HD-008 seal, self adhesive 950.11.071
Project Office - Singapore
backed-2100mm
Hfele International
HD-009 1208mm drop down seal 950.05.515
Project Office - Singapore
Local Supplier
HD-010 Customized Door Handle Custom

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL

AID120091-02 _SC_TD_PW_HD_003_A
Page 1 of 4
REV.
PROJECT : Sheraton Hotel Dhaka PROJECT NO. : AID120091-02 -
DATE :

Project Wide
LOCATION : ISSUE DATE : 24 Feb 2017 24 Feb 2017 A
(PW)

HARDWARE & IRONMONGERY SCHEDULE

SUPPLIER
CODE ITEM DESCRIPTION PRODUCT ORDER REF. REMARKS
OR EQUIVALENT
Sliding door gear for 941.30.100
Hfele International
HD-011 doors upto 120kg with
Project Office - Singapore
soft close
Pivot Door Closer (Glass Arcos, Dorma Patch Fitting
HD-012 DORMA Far East Pte Ltd
to Glass)

HD-013 OPEN ITEM

Hfele International
HD-014 Soft close mechanism 941.30.082
Project Office - Singapore

3000mm Sliding door Hfele International


HD-015 940.67.830
track Project Office - Singapore

Acoustical Single Glazed


Glass Doors
Single Glazed Glass Avanti Systems
HD-016 3/8 Clear tempered,
Doors
Acoustic double glazed,
Locking lever handle
Push & Pull Plate 987.11.600 Hfele International
HD-017
987.11.500 Project Office - Singapore
Door Closer DCL. 51 Hfele International
HD-018 931.84.669
SILV Project Office - Singapore

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL

AID120091-02 _SC_TD_PW_HD_003_A
Page 2 of 4
REV.
PROJECT : Sheraton Hotel Dhaka PROJECT NO. : AID120091-02 -
DATE :

Project Wide
LOCATION : ISSUE DATE : 24 Feb 2017 24 Feb 2017 A
(PW)

HARDWARE & IRONMONGERY SCHEDULE

SUPPLIER
CODE ITEM DESCRIPTION PRODUCT ORDER REF. REMARKS
OR EQUIVALENT

Mushroom Knob,

Luna Collection Hfele International


HD-019 Cabinet Door Knob Diameter 36.0 mm Project Office - Singapore

Depth 28 mm
Material Zinc
Thread M4
Hfele International
HD-020 Cabinet soft closer 422.25.552
Project Office Singapore

HD-021 OPEN ITEM

Hfele International
HD-022 Magnetic Door Latch 246.26.341 (Pull 2.0Kg)
Project Office Singapore
Hfele International
HD-023 Hinges c/w Screws 312.28.510
Project Office Singapore

HD-024 OPEN ITEM

HD-025 OPEN ITEM

Silver, 50mm Diam, Hfele International


HD-026 Grommet /Cable outlet
428.95.800 Project Office Singapore
Hfele International
HD-027 Flap Hinge 342.66.730 (Dia 35mm)
Project Office Singapore

OPEN ITEM

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL

AID120091-02 _SC_TD_PW_HD_003_A
Page 3 of 4
REV.
PROJECT : Sheraton Hotel Dhaka PROJECT NO. : AID120091-02 -
DATE :

Project Wide
LOCATION : ISSUE DATE : 24 Feb 2017 24 Feb 2017 A
(PW)

HARDWARE & IRONMONGERY SCHEDULE

SUPPLIER
CODE ITEM DESCRIPTION PRODUCT ORDER REF. REMARKS
OR EQUIVALENT
Lever Handle Set @ Hfele International
HD-029 911.78.018
Disabled Toilet Project Office Singapore
903.00.070 (door thickness Hfele International
HD-030 Pull Handle
8-50mm) Project Office Singapore
Hfele International
HD-031 Sliding Door Lock 911.26.412
Project Office Singapore
Hfele International
HD-032 Indicator Lock 903.70.016
Project Office Singapore

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL

AID120091-02 _SC_TD_PW_HD_003_A
Page 4 of 4
Sheraton Hotel REV.
PROJECT : PROJECT NO. : AID120091-02 -
Dhaka DATE :

LOCATION : Project Wide ISSUE DATE : 24 Feb 2017 REV # : A

HARDWARE & IRONMONGERY SCHEDULE

HD-001 HD-002 HD-003


Hinges c/w Screws Concealed overhead Closer EN3-6 EN Euro Profile Sashlock-PVD Brass
1154 for doors 950-1400mm

HD-004 HD-005 HD-006


Brass Euro Profile Cylinder Turn c/w Coloured Lever Handle Set Toilet Cubicle System
3 keys

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL.

AID120091-02_SC_TD_PW_HD_003_A
Page 1 of 5
Sheraton Hotel REV.
PROJECT : PROJECT NO. : AID120091-02 -
Dhaka DATE :

LOCATION : Project Wide ISSUE DATE : 24 Feb 2017 REV # : A

HARDWARE & IRONMONGERY SCHEDULE

HD-007 HD-008 HD-009


Wall Mounted Door Stopper with 15x4mm Dark brown fire seal, self 1208mm drop down seal

rubber adhesive backed-2100mm

HD-010 HD-011 HD-012


Customized Door Handle Sliding door gear Pivot Door Closer (Glass to Glass)

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL.

AID120091-02_SC_TD_PW_HD_003_A
Page 2 of 5
Sheraton Hotel REV.
PROJECT : PROJECT NO. : AID120091-02 -
Dhaka DATE :

LOCATION : Project Wide ISSUE DATE : 24 Feb 2017 REV # : A

HARDWARE & IRONMONGERY SCHEDULE

HD-014 HD-015
Soft close mechanism 3000mm Sliding door track

OPEN ITEM

HD-016 HD-017 HD-018


Single Glazed Glass Doors Door Closer DCL. 51 SILV Door Closer DCL. 51 SILV

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL.

AID120091-02_SC_TD_PW_HD_003_A
Page 3 of 5
Sheraton Hotel REV.
PROJECT : PROJECT NO. : AID120091-02 -
Dhaka DATE :

LOCATION : Project Wide ISSUE DATE : 24 Feb 2017 REV # : A

HARDWARE & IRONMONGERY SCHEDULE

HD-019 HD-020 HD-022


Cabinet Door Knob Cabinet soft closer Magnetic Door Latch

HD-023 HD-026
Concealed Hinge Gomment Hole

OPEN ITEM

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL.

AID120091-02_SC_TD_PW_HD_003_A
Page 4 of 5
Sheraton Hotel REV.
PROJECT : PROJECT NO. : AID120091-02 -
Dhaka DATE :

LOCATION : Project Wide ISSUE DATE : 24 Feb 2017 REV # : A

HARDWARE & IRONMONGERY SCHEDULE

HD-027 HD-028 HD-029


Flap Hinge Lever Handle Set @ Disabled Toilet

OPEN ITEM

HD-030 HD-031 HD-032


Pull Handle Sliding Door Lock Indicator Lock

SAMPLES TO BE SUBMITTED BY CONTRACTOR FOR AEDAS INTERIORS APPROVAL.

AID120091-02_SC_TD_PW_HD_003_A
Page 5 of 5
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-001

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Hinges c/w Screws

Dimensions
Finishes & Content Stainless Steel Matt

Order Ref 341.18.431

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504
IMAGE FOR DESIGN INTENT ONLY
Contact Tel/Fax Timothy Perry
timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 1 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 2 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-002

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Concealed overhead Closer EN3-6 EN 1154 for


doors 950-1400mm
Dimensions Refer to drawings

Finishes & Content Stainless Steel

Order Ref Hold Opening range 80-120degrees IMAGE FOR DESIGN INTENT ONLY

931.14.349

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 3 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 4 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-003

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Euro Profile Sashlock-PVD Stainless Steel

Dimensions -

Finishes & Content -

Order Ref 911.02.145

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore IMAGE FOR DESIGN INTENT ONLY

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 5 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 6 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-004

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Stainless Steel Euro Profile Cylinder Turn c/w 3


keys
Dimensions -

Finishes & Content -

Order Ref 916.95.326

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504
IMAGE FOR DESIGN INTENT ONLY

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 7 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 8 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-005

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Stainless Steel Coloured Lever Handle Set

Dimensions -

Finishes & Content Silver

Order Ref 1023-E BR

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore


IMAGE FOR DESIGN INTENT ONLY

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 9 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 10 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-006

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Toilet Cubicle System

Dimensions -

Finishes & Content Refer to PL-201

Order Ref 1912 Floor Mounted Series

Manufacturer Elite Builders and Supplies Pte Ltd

Supplier Elite Builders and Supplies Pte Ltd

Address 25 Kaki Bukit Road 4 #03-49


Synergy @KB Singapore 417800

Contact Tel/Fax sales@elitebuilders.sg


T: +65 65099905 IMAGE FOR DESIGN INTENT ONLY
F: +65 65099395

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 11 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 12 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-007

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Wall Mounted Door Stopper with rubber

Dimensions -

Finishes & Content -

Order Ref Stainless Steel plated matt 937.00.106

Manufacturer Hfele International Project Office - Singapore

IMAGE FOR DESIGN INTENT ONLY


Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 13 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 14 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-008

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description 15x4mm Dark brown fire seal, self adhesive


backed-2100mm
Dimensions -

Finishes & Content -

Order Ref 950.11.071

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504 IMAGE FOR DESIGN INTENT ONLY

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 15 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 16 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-009

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description 1208mm drop down seal

Dimensions -

Finishes & Content -

Order Ref 950.05.515

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504 IMAGE FOR DESIGN INTENT ONLY

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 17 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 18 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-010

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Customized Door Handle

Dimensions 1200mm Height x 300mm Dia

Finishes & Content Black bead blast metal (MT 104) with WD-101
Timber Veneer

Order Ref Custom

Manufacturer Local Supplier

Supplier -

Address -

Contact Tel/Fax IMAGE FOR DESIGN INTENT ONLY

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 19 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 20 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-010

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Black Bead Blast Metal


MT-104
700mm

Dia 300mm
1200mm

Wood Veneer at lower portion


500mm
WD-101

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 21 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-011

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Sliding door gear

Dimensions -

Finishes & Content -

Order Ref 941.30.100

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre IMAGE FOR DESIGN INTENT ONLY
Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 22 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 23 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-012

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Pivot Door Closer (Glass to Glass)

Dimensions -

Finishes & Content Stainless Steel

Order Ref Arcos, Dorma Patch Fitting

Manufacturer DORMA Far East Pte Ltd

Supplier DORMA Far East Pte Ltd

Address DORMA Far East Pte Ltd


31 Gul Lane
Singapore 629425

Contact Tel/Fax T: (65) 6415 1759


M: (65) 9234 9309
E: eugene.lim@dorma.com

IMAGE FOR DESIGN INTENT ONLY

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 24 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 25 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-014

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Soft close mechanism

Dimensions -

Finishes & Content -

Order Ref 941.30.082

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore


IMAGE FOR DESIGN INTENT ONLY

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 26 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 27 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-015

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description 3000mm Sliding door track

Dimensions -

Finishes & Content -

Order Ref 940.67.830

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

IMAGE FOR DESIGN INTENT ONLY


Address 68 Sungei Kadut Loop #03-00 Nutzcentre
Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 28 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 29 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-016

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Single Glazed Glass Doors

Dimensions -

Finishes & Content Acoustic performance up to 35 (db) with frame work


included, Self-closing options

Order Ref Acoustical Single Glazed Glass Doors


3/8 Clear tempered, Acoustic double glazed,
Locking lever handle

Manufacturer Avanti Systems

Supplier Avanti Systems

Address 200 Pemberwick Rd


Greenwich, CT 06831 IMAGE FOR DESIGN INTENT ONLY
Contact Tel/Fax T: 877-282-6843
F: 914-934-5992
E: sales@avantisystemsusa.com

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 30 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 31 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-016

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 32 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-017

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Push & Pull Plate

Dimensions -

Finishes & Content -

Order Ref 987.11.600, 987.11.500

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504 IMAGE FOR DESIGN INTENT ONLY

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 33 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 34 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-018

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Door Closer DCL. 51 SILV

Dimensions -

Finishes & Content -

Order Ref 931.84.669

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

IMAGE FOR DESIGN INTENT ONLY


Address 68 Sungei Kadut Loop #03-00 Nutzcentre
Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 35 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 36 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-019

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Cabinet Door Knob


Dimensions -

Finishes & Content -

Mushroom Knob, Stainless Steel Knob


Order Ref
Luna Collection
Diameter 36.0 mm
Depth 28 mm
Material Zinc
Thread M4
Manufacturer Hfele International Project Office - Singapore
IMAGE FOR DESIGN INTENT ONLY

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 37 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 38 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-020

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Cabinet soft closer

Dimensions -

Finishes & Content -

Order Ref 422.25.552

Manufacturer Hfele International Project Office - Singapore

IMAGE FOR DESIGN INTENT ONLY


Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 39 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 40 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-022

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Magnetic Door Latch

Dimensions -

Finishes & Content -

Order Ref 246.26.341 (Pull 2.0Kg)

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre IMAGE FOR DESIGN INTENT ONLY
Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 41 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 42 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-023

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Concealed Hinge

Dimensions -

Finishes & Content -

Order Ref 312.28.510

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore IMAGE FOR DESIGN INTENT ONLY

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 43 of 56
Notes

16. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


17. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
18. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
19. Supplier/ Manufacturer to confirm with contractor on all site measurements.
20. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
21. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
22. All material must meet with all applicable local government regulations and all other safety requirements on
site.
23. All material must be rust & stain resistant.
24. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
25. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
26. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
27. Product must be contract quality and suitable for commercial use.
28. Contractor to submit sample for designers approval prior to ordering.
29. Contractor to ensure all accessories and fitments provided with the product are supplied.
30. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 44 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-026

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Gomment Hole

Dimensions 200X19X17MM

Finishes & Content ST.ST.MATT

Order Ref Silver, 50mm Diam, 428.95.800

IMAGE FOR DESIGN INTENT ONLY


Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 45 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 46 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-027

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Flap Hinge

Dimensions -

Finishes & Content -

IMAGE FOR DESIGN INTENT ONLY


Order Ref 342.66.730 (Dia 35mm)

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 47 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 48 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-029

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Lever Handle Set @ Disabled Toilet

Dimensions -

Finishes & Content -

Order Ref 911.78.018

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504 IMAGE FOR DESIGN INTENT ONLY

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 49 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 50 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-030

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Pull Handle

Dimensions -

Finishes & Content -

Order Ref 903.00.070 (door thickness 8-50mm)

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

IMAGE FOR DESIGN INTENT ONLY


Address 68 Sungei Kadut Loop #03-00 Nutzcentre
Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 51 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 52 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-031

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Sliding Door Lock

Dimensions -

Finishes & Content -

Order Ref 911.26.412

Manufacturer Hfele International Project Office - Singapore

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


IMAGE FOR DESIGN INTENT ONLY
Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 53 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 54 of 56
Sheraton Hotel PROJECT ITEM
PROJECT :
Dhaka NO. :
AID120091-02
CODE HD-032

Project Wide ISSUE REV


LOCATION : 24 Feb 2017 - REV. # : A
(PW) DATE : DATE

IRONMONGERY SPECIFICATION SHEET

Item Description Indicator Lock

Dimensions -

Finishes & Content Anodized Aluminum And Silicon

Order Ref 903.70.016

Manufacturer Hfele International Project Office - Singapore IMAGE FOR DESIGN INTENT ONLY

Supplier Hfele International Project Office - Singapore

Address 68 Sungei Kadut Loop #03-00 Nutzcentre


Singapore 729504

Contact Tel/Fax Timothy Perry


timothy.perry@hafele.com
Mobile +65 9815 0421

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 55 of 56
Notes

1. All items shall be read in conjunction with AID120091-02 _SC_TD_PRM_01.


2. Refer to preface General Conditions for warranty requirements, environmental guidelines and
care/maintenance instructions. Refer to corresponding sections of the preface for performance specifications
relating to fabrication, quality control, etc.
3. Supplier/ Manufacturer to confirm all details, requirements, specifications, quantities & field conditions with
contractor prior to manufacture and installation.
4. Supplier/ Manufacturer to confirm with contractor on all site measurements.
5. If manufacturer other than specified source is used, refer to the Preface referencing copyright issues.
6. Supplier/ Manufacturer to submit an actual sample for Aedas Interiors approval prior to ordering/production.
7. All material must meet with all applicable local government regulations and all other safety requirements on
site.
8. All material must be rust & stain resistant.
9. Installer must refer to manufacturers technical specification, manual & guidelines for detailed information and
installation instructions.
10. Wherever ironmongery is fixed to a fire rated door, all pieces must meet the necessary ASTM standards and
UL listed ratings. Refer to separate door schedule for fire rated door locations.
11. All items are equaled and approved. The proposed material is indicative, alternatives may be proposed
providing they are of similar appearance and performance to the satisfaction of the Consultant/ Client.
12. Product must be contract quality and suitable for commercial use.
13. Contractor to submit sample for designers approval prior to ordering.
14. Contractor to ensure all accessories and fitments provided with the product are supplied.
15. Refer to drawings for exact locations and/or mounting heights.

In the event of a discrepancy between drawings and specifications, please contact AEDAS Interiors immediately for
written clarification.

AID120091-02 _SC_TD_PW_HD_003_A

PLEASE REFER TO PREAMBLE FOR GENERAL CONDITIONS


Page 56 of 56