Beruflich Dokumente
Kultur Dokumente
Inspection during
operation and standstill
Training session
In addition to the cooler
inspection, we also offer a
two-day training session for
predictive maintenance on
the cooler, including trouble-
shooting and operation of
the hydraulic system.
During the inspection the cooler inlet is The cooler inspection is carried out in cold To maintain overall performance and
checked for heat damages as well as the condition during a shutdown of the kiln optimal production capacity, it is
air blaster system and mechanical flow installation. The inspection includes an important to check and if necessary
regulators are examined. Our inspection examination of wear on the bars, retainer adjust the hydraulic system regularly.
gives you all information necessary to brackets, U-profiles, C-profiles and trays. During the inspection measurements and
conduct full maintenance and repairs Visual inspection of cylinder and linear data logging of the hydraulic system are
according to FLSmidth recommendations. bearings and lubrication is conducted carried out during operation.
together with an adjustment of the
mechanical zero point including length
transducer and inter-modular straps.
Final report
When inspections of cooler components The report covers the condition
have been carried out, all data collected of all cooler components: Recommendations
during the inspection are evaluated for action
and our specialists will provide a final - Wear parts
evaluation and analysis report as well - Hydraulic systems - Actions at scheduled
as recommendations for repairs, spare - Mechanical components maintenance stop
parts and adjustments.
- Modification of the
The report will include suggestions cooler maintenance
for optimisations to obtain better program
performance and be an essential
document to assist your maintenance - Evaluation of spare parts
department plan future maintenance
- Suggestions for optimi-
activities, such as ensuring that the right
spare parts are available and most
sation of the cooler
importantly avoiding unscheduled,
costly shutdowns.
C 07-13 400-23-ENG V2
Copyright 2013 FLSmidth A/S. ALL RIGHTS RESERVED. FLSmidth and Cross-Bar are (registered) trademarks of FLSmidth A/S. This brochure makes no
offers, representations or warranties (express or implied), and information and data contained in this brochure are for general reference only and
may change at any time. www.flsmidth.com
Contact information