Tower site information

a) Restrictions on points of entry to tower site


b) Equipment limitations on site
c) Underground and overhead utilities
d) Existing structures on site
e) Clearing restrictions
f) Presence of surface water
g) Environmental restrictions

Tower foundation construction survey


The tower foundation construction survey establishes the foundation center hub, reference hubs, elevations,
and required depth of excavation.

Foundation site information


a) Access to foundation sites
b) Foundation assembly site
c) Spoil pile management
d) Erosion control measures
Access to the foundation sites, and the sequence of excavating each foundation
area to assemble
spoil pile management plan
this spoil pile must be
restrained from sliding down the slope. This spoil pile also must be protected from wind or water erosion.
During heavy rains, the backfill material needs to be covered to control the moisture content, within
allowable limits, to ensure proper compaction.
ub, reference hubs, elevations,

rom wind or water erosion.


isture content, within
Templates
a) Batter
b) Working point elevation
c) Horizontal or A distance
d) Transverse location or B distance
e) Twist