SIM KUI HUA CONSTRUCTION SDN. BHD. Periodical Review (by SSS) Revision No.

Date Acknowledge by Prepared by

Date Signature PM SSS

Prepared Date: 17th March 2015

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROPOSED 11 STOREY OFFICE BUILDING (LCDA) ON LOT 2879,


PROJECT BLOCK 7, MUARA TEBAS LAND DISTRICT KUCHING, SARAWAK NAME OF JOB / FACILITIES/ PROCESS Site Preparation/ Temporary Work
(PACKAGE 4 EXTERNAL WORK)

SECTOR EXTERNAL WORK TITLE OF SUPERIOR / MANAGER (PIC) Site Safety Supervisor & Site Agent

HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL


STEP
SEQUENCE OF BASIC JOB STEPS CURRENT RISK CONTROL
NO. CATEGORY HAZARD CONSEQUENCES LIKELIHOOD SEVERITY RISK LEVEL RECOMMENDED ACTION

1 Site clearance Mechanical Hit by moving equipment Physical injury/ > Barricade work areas. 2 4 8 Assign experienced staff closely
e.g. excavator, Death >Trained / experienced operator, monitor the operator skill and
backpusher, bulldozer warning sign. (Medium) performance.
etc. >
Appoint watchman. Refer to Work Procedure for Crane
> Wear and lifting machine.
luminous jacket
Mechanical Contact with sharp hand Cut > Barricade work area. 2 2 4 Maintain current control.
tools > Ensure (Low) Refer to Work Procedure for Crane
worker is competent. and lifting machine.
>
Isolate of Equipment.
Physical Slip and fall due to oily Physical injury > Implement Housekeeping. 2 2 4 Maintain current control
surface > Ensure floor is (Low)
free from oil.
Physical Exposure to dust Ill health/ Lungs > Spray water to reduce dust airborne. 3 3 9 Maintain current control
cancer
> Wear (Medium)
face mask.
2 Surveying works for piling points Physical Trip and fall Physical injury > Implement Housekeeping, Training 2 2 4 Maintain current control
and briefing to workers. (Low)
> Wear proper
shoes
Physical Exposure to hot sun Heat stress > Limit duration of exposure. 2 2 4 Maintain current control
> Wear suitable clothing, gloves, (Low)
footwear, and facemask.
> Use non-fabric
gloves or neoprane only when
necessary because they not ventilated.

> Apply barrier cream.

3 Site mapping Physical Trip and fall Physical injury > Implement Housekeeping. 2 2 4 Maintain current control
> Safety training / (Low)
briefing to workers.

> Perform work in daytime.


Physical Exposure to hot sun Heat stress > Limit duration of exposure. 2 2 4 Maintain current control
> Wear suitable clothing, gloves, (Low)
footwear, and facemask.
> Use non-
fabric gloves or neoprane only when
necessary because they not ventilated.

> Apply barrier


cream.

Page 10
SIM KUI HUA CONSTRUCTION SDN. BHD.

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROPOSED 11 STOREY OFFICE BUILDING (LCDA) ON LOT 2879,


PROJECT BLOCK 7, MUARA TEBAS LAND DISTRICT KUCHING, SARAWAK NAME OF JOB / FACILITIES/ PROCESS Site Preparation/ Temporary Work
(PACKAGE 4 EXTERNAL WORK)

SECTOR EXTERNAL WORK TITLE OF SUPERIOR / MANAGER (PIC) Site Safety Supervisor & Site Agent

HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL


STEP
SEQUENCE OF BASIC JOB STEPS CURRENT RISK CONTROL
NO. CATEGORY HAZARD CONSEQUENCES LIKELIHOOD SEVERITY RISK LEVEL RECOMMENDED ACTION

Mechanical Exposure to noise from Noise induced > Implement usage of ear plug 2 2 4 Maintain current control
machinery operation e.g. deafness (Low)
air compressor, hacker,
etc.

4 Temporary hoarding Physical Failure or collapse of Physical Injury > Ensure structure design is safe. 2 2 4 Maintain current control
hoarding (Low) Emergency Preparedness and
Response Plan

5 Delivered of Materials Physical Musculoskeletal disorder Physical injury to > Training regarding good lifting 3 2 6 > Where possible utilze mechanical
from handling large the workers techniques and how to recognize the handling to move large materials.
piece of construction assigned as own limitations. (Medium) >
materials and from material handlers. > Team Work if it looks Stress good lifting techniques
erecting hordings, like two or even three workers would do during tool box talks to and during
barriers and safety the job more effectively and safer than this project. This training should
signage. one, then that is probably true. include lifting with the legs while
keeping the back straight and
keeping the load as close the body
as possible.

Page 11
SIM KUI HUA CONSTRUCTION SDN. BHD.

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROPOSED 11 STOREY OFFICE BUILDING (LCDA) ON LOT


PROJECT 2879, BLOCK 7, MUARA TEBAS LAND DISTRICT KUCHING, NAME OF JOB / FACILITIES/ PROCESS Earth Works
SARAWAK (PACKAGE 4 EXTERNAL WORK)

SECTOR EXTERNAL WORK TITLE OF SUPERIOR / MANAGER (PIC) Site Safety Supervisor & Site Agent

HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL


STEP
SEQUENCE OF BASIC JOB STEPS CURRENT RISK CONTROL
NO. CATEGORY HAZARD CONSEQUENCES LIKELIHOOD SEVERITY RISK LEVEL RECOMMENDED ACTION

1 Excavation Mechanical Collision with static Physical injury > Trained/experienced operator and 2 3 6 Assign experienced staff to closely
objects Install warning sign. supervising the relevant work.
(Medium)

Physical Failure or collapse of soil Physical injury > Barricade excavate areas. 3 3 9 Maintain current control

> Trained / experienced operator. (Medium)


> Install warning sign.
> Worker wear luminous jacket.

Physical Falling into excavated pit Physical injury/ > Barricade excavated areas 3 5 15 Maintain current control
Death > Install warning sign.
(High)
> No storage beside excavation pit.

2 Temporary shoring works Physical Failure or collapse of soil Physical injury / > Barricade excavated areas. 3 5 15 W.P. Excavation have to applied if
Death deep then 2m
> Shoring done according drawing. (High)

> Install warning sign.

3 Back filling Mechanical Over turning of back Physical injury / > Barricade back filling areas. 2 5 10 Assign experienced staff to closely
pusher / backhoe. Death > Ensure no worker under the pit. supervising the relevant work.
> Install warning sign. (Medium) Establish safe method statement.
> Appoint competent operator. Emergency Preparedness and
Response Plan.

Mechanical Collision due to Physical injury > Trained/experienced operator. 2 3 6 Maintain current control
operation of machinery > Install warning sign.
(Medium)
> Wear luminous jacket.

Physical Exposure to dust Ill health/ Lungs > To wear face mask. 2 3 6 Maintain current control
cancer > Spray water prevent dust airborne.
(Medium)

Page 12
SIM KUI HUA CONSTRUCTION SDN. BHD.

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROPOSED 11 STOREY OFFICE BUILDING (LCDA) ON LOT 2879,


PROJECT BLOCK 7, MUARA TEBAS LAND DISTRICT KUCHING, SARAWAK NAME OF JOB / FACILITIES/ PROCESS Piling Works
(PACKAGE 4 EXTERNAL WORK)

SECTOR EXTERNAL WORK TITLE OF SUPERIOR / MANAGER (PIC) Site Safety Supervisor & Site Agent & Project Manager & Piling Operator

HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL


STEP
SEQUENCE OF BASIC JOB STEPS CURRENT RISK CONTROL
NO. CATEGORY HAZARD CONSEQUENCES LIKELIHOOD SEVERITY RISK LEVEL RECOMMENDED ACTION

1 Piling machine installation Mechanical Over turning while Physical injury / > Barricade the said area. 3 5 15 Emergency Preparedness and
moving down from load Death > Appoint watchman. (High) Response Plan.
loader. > Ensure crane capacity. SWP- Piling work
> Outrigger fully extended.

Mechanical Struck by falling objects Physical injury/ > Wear safety helmet. 3 5 15
death > Barricade work area. (High) SWP- Piling work
> Wear luminous jacket

Mechanical Contact with heavy hand Physical injury > Appoint competent operator. 3 2 6 Maintain current control
tools > Barricade working area. (Medium)

2 Pile load test (if any) Mechanical Collapse of kentledge Physical injury / > Barricade pile load test areas, 4 4 16 Maintain current control.
arrangement while Death > Trained / experienced worker, (High)
setting-up > Install warning sign.

Psychological Insufficient job rotation, Stress > Rotating with team worker to 4 1 4 Maintain current control
over night work reduce working hour (Low)
monitering.

3 Material storage and handling Physical Failure or collapse of Physical injury / > Install warning sign. 2 4 8 Control of pile stack height.
pile material Death > Ensure the ground is firm. (Medium) Emergency Preparedness and
> Do not store pile exceed height. Response Plan.
SWP- Piling work

Mechanical Collision due to Physical injury > To wear safety helmet. 2 5 10 Maintain current control
operation of machinery > Barricade work area. (Medium)
> Wear luminous jacket

4 Piling Physical Exposure to noise / Physical injury > Wear ear muff. 5 1 5 Maintain current control
vibration (Medium)

` Mechanical Struck by falling objects Physical injury/ > Wear safety helmet. 3 5 15 Educate worker not to throw things
death > Barricade working area. (High) from high level.
> Educate worker on lifting and
pitching procedure.

Page 13
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROPOSED 11 STOREY OFFICE BUILDING (LCDA) ON LOT 2879,


PROJECT BLOCK 7, MUARA TEBAS LAND DISTRICT KUCHING, SARAWAK NAME OF JOB / FACILITIES/ PROCESS Piling Works
(PACKAGE 4 EXTERNAL WORK)

SECTOR EXTERNAL WORK TITLE OF SUPERIOR / MANAGER (PIC) Site Safety Supervisor & Site Agent & Project Manager & Piling Operator

HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL


STEP
SEQUENCE OF BASIC JOB STEPS CURRENT RISK CONTROL
NO. CATEGORY HAZARD CONSEQUENCES LIKELIHOOD SEVERITY RISK LEVEL RECOMMENDED ACTION

5 Welding Electrical Failure of electrical Physical injury > Wear rubber glove safety and 2 2 4 Maintain current control
machinery. shoes. (Low)
> Appoint competent operator.

Chemical Release of harmful Ill health (Inhalation) > Wear appropriate mouth piece. 3 3 9 Maintain current control
smoke from welding > Ensure carbon monoxide expose to (Medium)
work open air.

Physical Exposure to extremely Eye injury > Wear face shield. 3 3 9 Maintain current control
brightness from welding (Medium)
work

6 Pile cutting Electrical Failure of electrical Physical injury > Wear rubber hand gloves. 2 2 4 Maintain current control
machinery. (Low)

Mechanical Struck by flying / falling Physical injury > Wear safety helmet. 3 3 9 Educate worker during Toolbox
objects / sparks (Medium) Meeting.

Chemical Inhalation of substances Ill health (Inhalation) > Wear mouth piece. 2 3 6 Maintain current control
hazardous to health > Ensure carbon monoxide escape to (Medium)
open air.

Physical Exposure to noise Physical injury > Wear ear muff 4 1 4 Maintain current control
(Low)

Physical Tripping / falling into Physical injury > Trained / experienced worker. 2 3 6 Maintain current control
excavated pit > Barricade excavation area. (Medium)

Page 14
SIM KUI HUA CONSTRUCTION SDN. BHD.

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROPOSED 11 STOREY OFFICE BUILDING (LCDA) ON LOT 2879,


PROJECT BLOCK 7, MUARA TEBAS LAND DISTRICT KUCHING, SARAWAK NAME OF JOB / FACILITIES/ PROCESS Formwork
(PACKAGE 4 EXTERNAL WORK)

SECTOR EXTERNAL WORK TITLE OF SUPERIOR / MANAGER (PIC) Site Safety Supervisor & Site Agent & Project Manager

HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL


STEP
SEQUENCE OF BASIC JOB STEPS CURRENT RISK CONTROL
NO. CATEGORY HAZARD CONSEQUENCES LIKELIHOOD SEVERITY RISK LEVEL RECOMMENDED ACTION

1 Fabrication Electrical Electrical short circuit / Physical injury > Wear rubber shoes and rubber 2 2 4 Close supervision. Any installation of
failure of electrical tools. hand gloves. (Low) electrical parts must done by licence
> Appoint competent operator. electriction.

Physical Poor lighting Physical injury > Ensure sufficient lighting. 2 2 4 Maintain current control
(Low)

Mechanical Contact with sharp / Cut / strike > Wear proper gloves . 3 2 6 Maintain current control
heavy hand tools (Medium)

Mechanical Components, work Physical injury > Wear appropriate mouth piece. 3 2 6 Maintain current control
pieces, sawdust, etc. (Medium)
being ejected.

Mechanical Struck by flying objects, Physical injury > Wear appropriate eyes protection. 3 3 9 Maintain current control
e.g. nail (Medium)

Chemical Inhalation of saw dust Ill health (Inhalation) > Wear face mask. 3 3 9 Maintain current control
> Saw dust escape to external. (Medium)

Physical Fire Physical injury > Implement "No Smoking" at project 2 3 6 Maintain current control
site. (Medium)
> Fire extinguisher stand by at the
carpenter yard site office.

2 Installation of fabricated formwork Ergonomic High force actions Physical injury > Shifting heavy material by using 4 2 8 Maintain current control
crane and allow rest breaks. (Medium)

Page 15
SIM KUI HUA CONSTRUCTION SDN. BHD.

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROPOSED 11 STOREY OFFICE BUILDING (LCDA) ON LOT 2879,


PROJECT BLOCK 7, MUARA TEBAS LAND DISTRICT KUCHING, SARAWAK NAME OF JOB / FACILITIES/ PROCESS Formwork
(PACKAGE 4 EXTERNAL WORK)

SECTOR EXTERNAL WORK TITLE OF SUPERIOR / MANAGER (PIC) Site Safety Supervisor & Site Agent & Project Manager

HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL


STEP
SEQUENCE OF BASIC JOB STEPS CURRENT RISK CONTROL
NO. CATEGORY HAZARD CONSEQUENCES LIKELIHOOD SEVERITY RISK LEVEL RECOMMENDED ACTION

3 Dismantling of formwork Mechanical Struck by falling objects Physical injury > Barricade the said area. 3 3 9 Close supervision.
> Appoint experienced worker. (Medium)
> Install warning sign.
> Wear safety helmet.

Ergonomic Pushing, pulling, Physical injury > Shift heavy object by using crane 5 2 10 Maintain current control
dragging, holding or and allow rest breaks. (Medium)
restraining > Manual handling not exceed 50 kg.

Chemical Inhalation of dust Ill health (Inhalation) > Wear face mask. 2 3 6 Close supervision.
(Medium)

Physical Exposure to noise Physical injury > Wear ear muff. 3 1 3 Maintain current control
(Low)

Physical Trip and fall Physical injury > Appoint experience worker. 3 2 6 Maintain current control
> Implement housekeeping. (Medium)

Page 16
SIM KUI HUA CONSTRUCTION SDN. BHD.

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROPOSED 11 STOREY OFFICE BUILDING (LCDA) ON LOT 2879,


PROJECT BLOCK 7, MUARA TEBAS LAND DISTRICT KUCHING, SARAWAK NAME OF JOB / FACILITIES/ PROCESS Steel Reinforcement Works
(PACKAGE 4 EXTERNAL WORK)

SECTOR EXTERNAL WORK TITLE OF SUPERIOR / MANAGER (PIC) Site Safety Supervisor & Site Agent & Project Manager

HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL


STEP
SEQUENCE OF BASIC JOB STEPS CURRENT RISK CONTROL
NO. CATEGORY HAZARD CONSEQUENCES LIKELIHOOD SEVERITY RISK LEVEL RECOMMENDED ACTION

1 Fabrication Electrical Electrical short circuit / Physical injury > Wear rubber hand gloves. 3 2 6 Maintain current control.
failure of electrical tools. (Medium) Implement experiances mechanic to
do a routine check.

Physical Poor lighting for night Physical injury > Ensure sufficient lighting. 2 2 4 Maintain current control
work (Low)

Physical Trip and fall Physical injury > Wear proper shoes and safety 3 2 6 Maintain current control
helmet. (Medium)
> Implement housekeeping.

Mechanical Contact with sharp / Cut / strike > Wear fabric gloves. 3 3 9 Maintain current control
heavy hand tools > Install guard at sharp hand tools. (Medium)

Mechanical Components, work Eye injury > Wear gloves 3 3 9 Maintain current control
pieces, steel dust, etc. (Medium)
being ejected.

2 Steel Reinforcement Installation Ergonomic Over exertion due to Physical injury > Human maximum carry weight 4 2 8 Maintain current control
manual handling 50kg and allow rest breaks. (Medium)

Mechanical Struck by falling objects Physical injury > Barricade the working area. 2 4 8 Provide education in Toolbox
> Appoint experienced worker. (Medium) Meeting and enhance supervision
> Install warning sign.
> Wear safety helmet.

Page 17
SIM KUI HUA CONSTRUCTION SDN. BHD.

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROPOSED 11 STOREY OFFICE BUILDING (LCDA) ON LOT 2879,


PROJECT BLOCK 7, MUARA TEBAS LAND DISTRICT KUCHING, SARAWAK NAME OF JOB / FACILITIES/ PROCESS Concreting Works
(PACKAGE 4 EXTERNAL WORK)

SECTOR EXTERNAL WORK TITLE OF SUPERIOR / MANAGER (PIC) Site Safety Supervisor & Site Agent & Project Manager

HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL


STEP
SEQUENCE OF BASIC JOB STEPS CURRENT RISK CONTROL
NO. CATEGORY HAZARD CONSEQUENCES LIKELIHOOD SEVERITY RISK LEVEL RECOMMENDED ACTION

1 Placing of concrete Physical Poor lighting for night Physical injury > Ensure sufficient lighting 4 1 4 Maintain current control
work (Low)

Physical Trip and fall Physical injury > Implement housekeeping. 3 2 6 Maintain current control
(Medium)

Ergonomic High force actions Physical injury > Allow rest breaks. 4 1 4 Maintain current control
(Low)

Mechanical Collision with moving / Physical injury > Appoint experienced worker, 3 2 6 Close supervision
static objects > Appoint watchman and singal (Medium)
man.

2 Operation of concrete pump (if any) Physical Trip and fall Physical injury > To wear proper shoes/ rubber boots 4 3 12 Maintain current control
(Medium)

Ergonomic Over exertion due to Physical injury > Human maximum carry weight 4 1 4 Maintain current control
manual handling 50kg and allow rest breaks. (Low)

Mechanical Collision with static Physical injury > Barricade the said areas. 3 2 6 Close
objects > Appointexperienced worker. (Medium) supervision.
> Install warning sign.
> Appoint watchman and signal man.
3 Vibrating of concrete Ergonomic Over exertion due to Physical injury > Allow rest breaks. 4 1 4 Maintain current control
manual handling (Low)

Ergonomic High force actions Physical injury > Job rotation and allow rest breaks. 4 1 4 Maintain current control
(Low)

Page 18
SIM KUI HUA CONSTRUCTION SDN. BHD.

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC)

PROPOSED 11 STOREY OFFICE BUILDING (LCDA) ON LOT 2879,


PROJECT BLOCK 7, MUARA TEBAS LAND DISTRICT KUCHING, SARAWAK NAME OF JOB / FACILITIES/ PROCESS Concreting Works
(PACKAGE 4 EXTERNAL WORK)

SECTOR EXTERNAL WORK TITLE OF SUPERIOR / MANAGER (PIC) Site Safety Supervisor & Site Agent & Project Manager

HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL


STEP
SEQUENCE OF BASIC JOB STEPS CURRENT RISK CONTROL
NO. CATEGORY HAZARD CONSEQUENCES LIKELIHOOD SEVERITY RISK LEVEL RECOMMENDED ACTION

Ergonomic Pushing, pulling, Physical injury > Human maximum carry weight 4 1 4 Maintain current control
dragging, holding or 50kg and allow rest breaks. (Low)
restraining

Page 19