Continuous Flow
The Traditional Approach
Specialist departments
Delay | Transport | Storage
Long distances
Operation 3
Long lead times
Operation 2 Operation 1
Big batches
High WIP
Operation 4 High
g cost
Operation 5 Poor problem
solving & team
spirit
Operation 6 Operation 7
2
Dedicated Line Solution
Operation 3
Operation 2 Operation 1
ELIMINATE
Operation 4
the delays
p
Operation 5
the transport
Operation 6 Operation 7 and storage times
Parts
STEP 1
A X X X X
B X X X X Identify the
C X X X X parts and their
p
D X X X X X X process
E X X X X X X
F X X X
G X X X
Create Process Families
Parts
STEP 2
A X X X X
Identify
B X X X X
similar
C X X X X
processes
D X X X X X X
E X X X X X X
F X X X
G X X X
Create Process Families
Parts
STEP 3
A X X X X
Create parts
D X X X X X X
family by
E X X X X X X
G X X X
processes
B X X X X
C X X X X
F X X X
Analyse the Processes
Plant: Team: PARTS/PROCESS MATRIX Date:
Cutting Lathe Lathe cut Drilling Cham- Screw Milling Clean- Rolling Debur- Gear Milling Drilling
Process cutting 2 fering cuttin ing ing teeth
cutting
Qty Part #
1 9985M26
2 9176M25
3 9383M42
4 9522M60
5
9522M58
9522M50
6
10
Align the processes to optimise families
Op 1 Op 2 Op 3 Op 4 Op 5 Op 6
1 2 3 4 5
ELIMINATE
Parrt A
6 7 8
1 2 3
Part B
COMBINE 4 5 6 7
Part C
1 2 3
4 5 6
SIMPLIFY
A, B & C
Parts
1 2 3 4 5 6
P
Steps to implement dedicated lines
Define PARTS FAMILIES
Design IDEAL DEDICATED LINES
Find solutions to ACTUAL CONSTRAINTS
Find solutions to ORPHAN PARTS
Design REALISTIC DEDICATED LINES
Find solutions to MEET THE DEMAND
Implement dedicated lines and
ONE-PIECE FLOW
Design ideal dedicated lines
One line per parts family
Th shortest
The h path
h from
f raw materials
i l to fi
finished
i h d part iincluding
l di
every operation
every function
support activities
specialised activities
Op 2 Op 6
Op 1 Op 7
Find actual constraints
Op 5
Op 4
Op
p3 O 4
Op O 4
Op
Op 2 Op 6
Op 1 Op 7
K Op 3 Op 5
Op 4
Op 3
Op 2 Op 6
Op 2 Op 6
Op 1 Op 7 Op 4
Op 4
Op 1 Op 7
Op 4
Op 5
Op 4
O 3
Op Op 5
Op 2 Op 6
Op 1 Op 7
Fishbone
Line
U Line
L Line
Back to Back
Lines
I Line
Steps to implement dedicated lines
Define PARTS FAMILIES
Design IDEAL DEDICATED LINES
Find solutions to ACTUAL CONSTRAINTS
Find solutions to ORPHAN PARTS
Design REALISTIC DEDICATED LINES
Find solutions to MEET THE DEMAND
Implement dedicated lines and
ONE-PIECE FLOW
Batch vs 1 Piece Flow
One-piece flow
Batch vs Flow (Push vs Pull)
5 parts
2 h/ partt
= 10 h
A
= 10 h
B
= 10 h
C
= 10 h
D
First
good
part
H
How tto
eliminate
storage, transport and
0.0 10.0 20.0 30.0 32.0
Batch processing builds large stocks delay wastes ?
1 part First good part
2 h/ part
2 h 2 h 2 h 2 h
Second
One
A B C D good part
Piece
Flow
0.0 2.0 2.0 4.0 4.0 6.0 6.0 8.0 8 0 10.0
8.0 10 0
One piece flow eliminates delays and waiting time
The Customer Heartbeat Takt Time
Solution
TAKT =
420 mins /day= 70 min/part
6 parts /day
Example Production Line
Part
Op 5 Op 4
completed
Op 1
Op 2
Op 3
Op 4
Op 5 = set-up time
CYCLE TIME DIAGRAM = production time
Line Balancing
TAKT: 70 MINUTES
Part
completed Op
p5 Op
p4
= 1 part every 70 minutes
Op 3
Process capacity of the line
Raw Op 1 Op 2
= 1 partt every 90 minutes
i t
material
Op 1
Op 2
Op 3
Op 4
Op 5 = set-up time
CYCLE TIME DIAGRAM = production time
Line Balancing
TAKT: 70 MINUTES
Part
completed Op
p5 Op
p4
= 1 part every 70 minutes
Op 3
Process capacity of the line
Raw Op 1 Op 2
= 1 partt every 90 minutes
i t
material
OK 0 20 40 60 80 100 120
Op 1
Op 2
Op 3
Op 4
Op 5 = set-up time
CYCLE TIME DIAGRAM = production time
Summary
Operation 3
Operation 2 Operation 1
ELIMINATE
the delays
Operation 4
Operation 5
the transport 1 Set-up
1. Set up dedicated lines
Operation 6 Operation 7 and storage times
TAKT: 70 MINUTES
One-piece flow Part Op 5 Op 4
completed
= 1 part every 70 minutes
Op 3
Process capacity of the line
Raw Op 1 Op 2
= 1 part every 90 minutes
material
OK 0 20 40 60 80 100 120
Op 1
Op 2
Op 3
Op 4
Op 5 = set-up time
C C TIME DIAGRAM
CYCLE G = production
d ti ti time