Provide d= 350 mm
provide cover = 50 mm
Provide bar of dia 10 mm
Hence ok
1.37 m
m from left
C2
c
L
Combined Footing
C1= 964 KN
Provide d= 400 mm
provide cover = 60 mm
Provide bar of dia 16 mm
Mu/bdsq 0.37493407
Pt 0.08777575 %
Ast= 1475.77374
Spacing 136.224676 mm
c
L
Combined Footing F2
CG FOR TWO LOADS
C1= 1000 KN (left)C1= 1000 KN
C2= 1000 KN (right)C2= 1000 KN
Distance between two col =
CG = 1.1075 m from left
Provide d= 350 mm
provide cover = 50 mm
Provide bar of dia 10 mm
Hence ok
2.215 m
m from left
C2
c
L
Combined Footing
CG FOR TWO LOADS
C1= 284 KN (left)C1= 664 KN
C2= 380 KN (right)C2= 1135 KN
C3= 582 KN Distance between two col =
C4= 553 KN CG = 1.091467 m from left
d
Total ax Load= 1799 KN
Self wt of footing= 179.9 KN
C3
Total Load = 1978.9 KN
SBC= 150 KN/SqM a
Area Required = 13.1926667 sqM B
L= 3.8 m
B= 3.8 m
Area Provided = 14.44 sqM C1
Net Upward Pressure = 124.584488 KN/SQM
Provide d= 400 mm
provide cover = 60 mm
Provide bar of dia 16 mm
Mu/bdsq 0.26383094
Pt 0.06143599 %
Ast= 1592.17516
Spacing 126.265505 mm
664
1135
1.73 m
m from left
C4
C2