Sie sind auf Seite 1von 3

Notations

Indices
t Index for time period
m Index for plant material
n Index for prefabricated product
v Index for site material

Decision variables
Omt Order quantity of plant material m at time period t
Rvt Order quantity of site material v at time period t
Pnt Units of prefabricated product n produced at time period t

State variables
Zvt Owner inventory level of site material v
Wnt Fabrication plant inventory level of prefabricated product n

Parameters
~
nt Fuzzy rush order of prefabricated product n at time period t
~
vt Fuzzy demand of site material v at time period t
~
nt Fuzzy change between designed and revised demand of
prefabricated product n
~
m Fuzzy transportation cost per unit quantity of plant material m
from supplier to owner inventory
~
v Fuzzy transportation cost per unit quantity of site material v
from supplier to owner inventory
~
n Fuzzy transportation cost per unit of prefabricated product n
from fabrication plant to construction site
~ Fuzzy transportation cost per unit quantity of site material v
v
from owner inventory to construction site
~
vt Conversion factor of site material v at time period t
sm Spot price of plant material m
sv Spot price of site material v
rm Rise and fall rate of purchase price of plant material m
rv Rise and fall rate of purchase price of site material v
dm Discount purchase price percentage of plant material m
dv Discount purchase price percentage of site material v
im Unit product cost of prefabricated product n
Xnt Demand of prefabricated product n at time period t
Jvt Demand of site material v at time period t
pv Penalty cost of site material v shortage
pn Penalty cost of prefabricated product n shortage
Omin
mt
Minimum order quantity of plant material m at time period t
max
Omt Maximum order quantity of plant material m at time period t
max
Zv Maximum inventory level of site material v
min
Rvt Minimum order quantity of site material v at time period t
max
Rvt Maximum order quantity of site material v at time period t
min
Lvt Upper limit of proportionality coefficient of purchase quantity
of site material v
max
Lvt Lower limit of proportionality coefficient of purchase
quantity of site material v
Cvt Actual quantity of site material v transported from owner
inventory to construction site at time period t
amt Option premium of plant material at time period t
avt Option premium of site material at time period t
bmt Conversion coefficient of plant material m at time period t
bvt Conversion coefficient of site material m at time period t
hv Holding cost of site material v in owner inventory
hn Holding cost of prefabricated product n in fabrication plant
Bn Maximum production quantity of product n
umn Quantity of plant material m required for unit prefabricated
product n
ont Original demand of prefabricated product n before
uncertainty