Verified Competent

Re-qualify Date
Date Complete
Competency Gap

Learning Method

Due Date

(Initial)
Code

Foundational Competencies Training Resources Gap Closure Plan

MRC (Y/N)
Criticality

(Y/N)
ALL FOUNDATION
TRAINING CONDUCTED

SAFETY HEALTH ENVIRONMENT


- NORM C
- Nitrogen C
- Iron Sulphide C
- Sulphur/Sour Gas C
- Height Safety C
- Noise Awareness C
- Environmental Awareness C
- Incident Management C
- Step Back 5x5 C
- Job Safety Analysis C
- Risk Assesment C
- Fire Fighting C
- Safety Manual C
- Breathing Apparatus C
- Confined Space Entry C
BUSINESS NEEDS
- OIMS (Operations Integrity Management System) C
- Drawing P & IDs C
- Basic Instrumentation C
- Basic Mechanical C
- Basic Electrical C
- Tool Handling and Care C
- Problem Solving and Diagnostic Analysis C
BASIC MATHS & SCIENCE
- Mathematics C
- Physics C
- Chemistry C
PETROLEUM GEOLOGY AND EXPLORATION
- Seismic C
- Basic Structural Geology C
- Petrology C
- Stratigraphy C
- Petroleum Geology C
BASIC DRILLING
- Drilling Equipment C
- Drilling Technique C
- Well Control C
- Well Completion C
BASIC RESERVOIR
- Hydrocarbon Properties C
- Drive Mechanism C
- Reserve Calculation C
FORMATION EVALUATION
- Coring C
- Logging C
- Drill Stem Test C
BASIC PRODUCTION
- Production Technology C
- Surface Production Operation C
UTILITY EQUIPMENT
Air System/Instrument/Utility/Breathing C
- Compressor/Drivers C
- Recievers/Humidifiers C
- Control, Shutdown & Alarms C
- Delmonox System C
Water System - Utility/Potable C
- Pump/Drivers C
- Control, Shutdown & Alarms C
Power Generation C
- Drivers - Main & Standby C
- Generator Main & Standby C
- Synchronization C
- Motor Control & Distribution C
- Isolations & Tie - Ins. C
- Black Start Operation C
- Electrical System C
- Batteries/UPS C
- Load Sharing/Shedding C
Diesel System C
- Pumps/Drivers C
- Centrifuge C
- Control, Shutdown & Alarm C
- Biocide Control C
Fire Water System C
- Drivers C
- Pumps C
- Deluge System C
- Foam Deluge System C
- Control and SD System C
- Detection System C
Flare, Vent & Drains C
- System Operation C
- Associated and Shutdown System C
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017

1 2 3 4 5 6

Competency Gap (Y/N)


H, M, L

Date Complete
Locations to OJT

Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan

Importance
/ P)

(A,B,C,D)
Safety General

1 Be fully conversant with PPE Safety requirements P LNG Process H A


Be fully conversant with Facility Safety Briefings and Regulations including
2 H A
different alarms and action required and Muster Points P LNG Process
3 Read and understand the basics of the Safety Manual P LNG Process H A

5 Be fully conversant with the location of all ESD switches P LNG Process H A
6 Operate eye wash station and emergency shower P LNG Process H A
7 Gas Detector Training (Personal H2S) P LNG Process M A
8 Gas Detector Training (LEL, O2, H2S) P LNG Process M A

9 Nitrogen hazards (Gas/Liquid) K LNG Process M A

11 H2S Site Safety Training K/P Done by FSHE H A

12 Environmental Awareness K Done by FSHE H A

13 Incident Management K LNG Process H A

2 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017

Competency Gap (Y/N)


H, M, L

Date Complete
Locations to OJT

Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan

Importance
/ P)

(A,B,C,D)
14 Risk Assesment K LNG Process M A

15 Basic Fire Fighting P Done by FSHE H A

16 Be able to use a Self Contained Breathing Apparatus (SCBA) P LNG Process M A/C

17 Overview Process Safety Management (PSM) M A


K LNG Process

LNG Specific Safety

1
Familiarized special Badge, Clean shaven and LNG Access Control P LNG Process L A

2 Familiarized with Emergency Drill P LNG Process H

3 Explain the purpose of the Fire & Gas system LNG Process

4
Explain the function and location of the following Fire & Gas equipment P LNG Process M

a) Gas detectors P LNG Process M

b) Flame detectors P LNG Process M

c) Smoke detectors P LNG Process M

d) Heat detectors P LNG Process M


5 Be able to explain what is a Material Data Safety Sheet (MSDS) K LNG Process M A

6 Be able to use a Self Contained Breathing Apparatus (SCBA) P LNG Process M A/C
7 Operate eye wash station and emergency shower P LNG Process M
8 Know to Implemented LOTO (lock Out, Tag Out) P LNG Process M
9 Implemented wearing PPE ( Personal Protective Equipment) P LNG Process H
10 Performed and Implemented SWP and JSA P LNG Process L

A INLET FACILITIES UNIT

1st Stage & 2nd Stage Flush Drum

1 Prepare a sketch of the Sea Water , Cooling Water , Portable water supply
System and operating Parameter. P LNG Process M A
2 Prepare a sketch of the Utility Instrument Air , Plant Air System P LNG Process M A
3 Prepare a sketch and Explain of underground pipelines P LNG Process

4 Prepare a sketch of the Feed Gas flows to Treating Units P LNG Process M A

3 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017

Competency Gap (Y/N)


H, M, L

Date Complete
Locations to OJT

Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan

Importance
/ P)

(A,B,C,D)
5 Prepare a sketch of the Flare system, identify main components and their LNG Process
operating parameters P H
6 Prepare a sketch of the Drain systems showing flow. P LNG Process H

7 LNG Process
Explain the function and how to operate of the SDV and BDV P H

Prepare a sketch of the Drain systems showing flow, instrumentation and P LNG Process
8 set points. HM A

P LNG Process
9 Prepare a sketch of the Steam trap line , identify if not working properly M

10 Take Condensate sample, Explain procedure, operating parameters and P LNG Process
location of sample points M
11 Sketch a pig reciever and explain its purpose P LNG Process M

B TREATING UNIT

1 Prepare a sketch of Flow Diagram Unit, including Process Variable Control ( P LNG Process M
Pressure, Level ,Flow, Temperature)

2 Explain how to implemented , excecution the bellow tasks and record the P LNG Process M
performances :
- Adsorption Mercury (Hg) K/P LNG Process M

4 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017

Competency Gap (Y/N)


H, M, L

Date Complete
Locations to OJT

Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan

Importance
/ P)

(A,B,C,D)
- Absorption CO2 & H2S and Regeneration K/P LNG Process M A
- Chemical Reaction of Carbonate and DEA solution K/P LNG Process M A
- Equipment function K/P LNG Process M

- Intrumentation Process & Logic K/P LNG Process M A


- CO2 Analyzers Check P LNG Process

- Start/ Stop all Pumps P LNG Process M A


- Back wash sea water P LNG Process

- Prepare the Pumps, Fin Fan, Cooler , Reboiler , Filters for P LNG Process
Maintenance L A

P LNG Process M
- Start or put on service the above equipment after Maintenance

- Anti Foam injection P LNG Process L A


- Make up Carbonate and DEA Solution P LNG Process L
- Log sheets the pumps P LNG Process L
- Perform skimming at Carbonate Absorber and Wash Tower P LNG Process L

3 LNG Process
Following Daily Operator activities and record as working paper. P L
4 Explain steps of ESD. P LNG Process M

5 LNG Process L
Perform and explain what are the routine checks in the area plant. P

LNG Process
6 Explain how to implemented , Shut Down Unit as procedure. K/P M

7 LNG Process
Explain how to implemented ,Start up after Maintenace as procedure. P M

8 LNG Process
Take carbonate samples, Explain procedure and location of sample P M

11 Take DEA sample. Explain procedure and location of sample P LNG Process
M

12 What is the maximum allowable parts per million (PPM) of moisture and K/P LNG Process M
CO2 and H2S out of treating unit, what happens if that limit is exceeded

13 What is the maximum allowable parts per million (PPM) CO2, H2S and K/P LNG Process
Moisture the gas out of treating unit. What happens if that limit is
exceeded M
14 Trauble Shooting for all above items K/P LNG Process M
LNG Process

5 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017

Competency Gap (Y/N)


H, M, L

Date Complete
Locations to OJT

Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan

Importance
/ P)

(A,B,C,D)
Dehydration System LNG Process

Prepare a sketch of Flow Diagram, including Process Variable Control P LNG Process M
1 ( Pressure, Level ,Flow, Temperature)

2 Pre cooling and water removal ; P LNG Process L A


Feed Vapor Dryers - for Dehydration and Reactivition cycles
Explain location and how to implemented , excecution the bellow tasks
3 P LNG Process L A
then follow to record the performances :

a) Water hydrate formation P LNG Process L A

K LNG Process L A
b) Reactivation cycle ; Heating, Cooling, Depressurising and Repressurising
c) Perform to Nitrogen purge or derime the system P LNG Process L A
d) Familiar with equipment design for operating system P LNG Process L A

4 Preparing the equipment for startup and shutdown P LNG Process L A


5 Ensuring moisture analyzer and moisture result P LNG Process L A

Scrubbing System

1 Prepare a sketch of Flow Diagram, including Process Variable Control P LNG Process L A
( Pressure, Level ,Flow, Temperature)

3 Explain how to implemented , Start up Unit as procedure. P LNG Process L A

4 Explain how to implemented , Shut Down Unit as procedure. P LNG Process L A

Perform Nitrogen purge to release HC/O2 or derime gas to realase water


5 P LNG Process L A
content/mercury/heavy HC from the system

6 Perform to isolate steam and drain steam cond. of Scrub. Tower Reboiler P LNG Process L A
7 Maintain the operating condition ; temp, pressure, level & flow P LNG Process L A
8 Capable of performing trouble shooting P LNG Process L A

Propane Refrigerant System

1 Prepare a sketch of Flow Diagram Unit, including Process Variable Control K/P LNG Process M
( Pressure, Level ,Flow, Temperature)

2 Explain location and how to implemented , excecution the bellow tasks LNG Process
then follow to record the performances : K/P M

- Acid Gas to React. Furnace Composition. K/P SRU Plant L

6 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017

Competency Gap (Y/N)


H, M, L

Date Complete
Locations to OJT

Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan

Importance
/ P)

(A,B,C,D)
- Reaction furnace Process theory K/P SRU Plant M
- Back wash strainers of sea water exchangers K/P LNG Process M
- Utilities Chemical injections for HRSG F LNG Process L

- Equipment function P LNG Process L


- Intrumentation Process & Logic K/P LNG Process M
- Critical parameter for pressure, temperature and level P LNG Process M
- Handling vacum breaker at sea water lines P LNG Process M
- Start up and Shut down Propane Compressor P LNG Process M
- Start up/ Shut down Propane Exchanger P LNG Process M h
- Start up/ Shut down (one bank) Propane Exchanger P LNG Process L
- De superheater propane exchanger P LNG Process L h
4 Propane refrigerant distribution ststem P LNG Process L
5 Turbine components and lubricating system P LNG Process L
6 Trauble Shooting for all above items. P LNG Process L

MCR Refrigerant System

1 P LNG Process M A
Sketch the MCR Compressor package and identify the major components
2 Perform Units routine check and log sheet. P LNG Process M A
3 Explain how to Start up and Shut down Unit as procedure P LNG Process M A

4 P LNG Process L A
What is the maximum allowable parts per million of moisture when unit
ready to online and what happens if that limit is exceeded

5 Explain how to implemented , excecution the bellow tasks and record the P LNG Process L A
performances :

7 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017

Competency Gap (Y/N)


H, M, L

Date Complete
Locations to OJT

Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan

Importance
/ P)

(A,B,C,D)
1 LNG Process
Prepare a sketch of Flow Diagram of MCR System, including Process
Variable Control ( Pressure, Level ,Flow, Temperature) K/P

2 Explain location and how to implemented , excecution the bellow tasks LNG Process
then follow to record the performances : K/P
- Turbine Air Inlet Filter K/P LNG Process
- Starting gas components K/P LNG Process
- Axial Compressor K/P LNG Process
- Combustion Chamber K/P LNG Process

- General Electric and Logic K/P LNG Process


- Lube oil system P LNG Process

LNG Process
- Sealing system P

LNG Process
- Inlet guide vane P

LNG Process
- Start up and Shut down Dry Gas Seal P

LNG Process
- Start up and Shut down of HRSG P

LNG Process
- Start up/ Shut down air blower P

LNG Process
- To adjust deverter and dumper, when the mechine stop P

LNG Process
- To adjust turbine speed for balancing the product, if needed P

LNG Process
- Compressor anti surge system K/P

- Perform rachetting after turbine stop P LNG Process

3 Explain theory of MCR System K/P LNG Process

4 Explain theory of dryer reactivation gas K LNG Process

5 Explain theory of MCR composition/ Inventory K LNG Process

6 Explain about backwash sea water strainers P LNG Process

8 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017

Competency Gap (Y/N)


H, M, L

Date Complete
Locations to OJT

Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan

Importance
/ P)

(A,B,C,D)
M A

M A
M A
M A

L A

9 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017

Competency Gap (Y/N)


H, M, L

Date Complete
Locations to OJT

Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan

Importance
/ P)

(A,B,C,D)
L A

M B

10 of 19
Verified Competent
7

(Initial) and Work


Location

Verified Competent
8

(Initial) and Work


Location

Verified Competent
9

(Initial) and Work


Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP

11 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP

12 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP

13 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP

14 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP

15 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP

16 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP

17 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP

18 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location

Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP