GROUP -2 ( MACON )
PCCP
2 Transverse crack
within the middle settlement of base and sub Base of concrete
third base due to inadequate must attain 100%
compaction compaction
Concrete mixture
must attained its
workability and
durability
3 Transverse crack
outside the middle Due to unfavorable Provide contraction
third weather condition joint or weakened
Contraction of expansion of plane joint before it
concrete passes to 24 hours
after pouring
4 Longitudinal crack
Insufficient prepared road Maintain the full
width road width
preparation
5 Multiple/criss-
cross/series cracks Total base failure Remove and replace
the damage PCCP
and prepare the sub
base to its maximum
compaction
GROUP -2 ( MACON )
PCCP