Company Profile

Company Profile & Capability Statement

NDICE DE CONTENIDOS

1. ORGANIZATION OVERVIEW ................................................................................................... 2


1.1. BACKGROUND............................................................................................................2
1.2. LEGAL STATUS AND CAPITAL ..........................................................................................3
1.3. HEADQUARTERS ADDRESS ..............................................................................................4
1.4. BRANCH OFFICES ........................................................................................................4
1.5. OUR STAFF ...............................................................................................................6
1.6. GLOBAL CORPORATE FINANCIAL INFORMATION .....................................................................7
1.7. QUALITY, HELTH & ENVIRONMENT MANAGEMENT ..................................................................8
1.8. SECTORS..................................................................................................................9
1.9. SERVICES ............................................................................................................... 10

2. TOLL SYSTEMS ........................................................................... ERROR! MARCADOR NO DEFINIDO.


2.1. SICES TOLLING SYSTEM EVOLUTION ....................................... ERROR! MARCADOR NO DEFINIDO.
2.1.1. Generation 1 ..................................................................... Error! Marcador no definido.
2.1.2. Generation 2 ..................................................................... Error! Marcador no definido.
2.1.3. Generation 3 ..................................................................... Error! Marcador no definido.
2.1.4. Generation 4 ..................................................................... Error! Marcador no definido.
2.1.5. Generation 5 ..................................................................... Error! Marcador no definido.

3. RELATED EXPERIENCE ........................................................................................................ 13


3.1. TRACK RECORD ........................................................................................................ 13
3.2. CASE STUDIES .......................................................................................................... 15

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 1
Company Profile & Capability Statement

1. ORGANIZATION OVERVIEW
1.1. BACKGROUND
SICE, Sociedad Ibrica de Construcciones Elctricas, was founded in Bilbao (Spain) on January 8, 1921 by
Mr. Juan Urrutia y Zulueta and Mr. Lzaro Levi Laurel, making SICE the oldest of all the companies within
the ACS Group (www.grupoacs.com).

From that date until the 80s decade, there were several changes of
ownership, till General Electric acquired it. GE divided the company into
several sectors of activity dedicated to different business lines: Medicine,
Appliances, Traffic, Lighting and Railways.

In April 1986 the CAE Group (Control y Aplicaciones) purchased the Railways,
Lighting and Traffic business lines from General Electric, creating independent
companies becoming a national leader in the involved sectors. In 1989, Plessey
(Siemens) purchased the 49% of the company and separated the railway
branch. In 1992, the CAE Group part was purchased by the industrial division
of Dragados Group. With this operation the 51% of the company was owned by
Dragados and the 49% by Siemens.

This situation changed in 2000, when Dragados purchased the whole Company.
From that moment on, SICE has been acquiring other companies such as SEI
and Dyctel, to extend its activities. In July of 2003 the ACS Group and Dragados
merge to form Europes 2nd largest construction company with 90,000
employees and sales of 10.8 Billion Euros. In 2013, the ACS Group acquired
Hochtief and Leighton Construction companies, becoming the largest private
construction agglomerate in the world.

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 2
Company Profile & Capability Statement

Between 1921 and the 1970s, SICE worked on projects in the electrical applications field, after which it
began to specialise in the design and manufacture of analogue-type electronic traffic regulators. In the
last 30 years, SICE focused on the fields of Intelligent Traffic and Transport Systems (ITS), Industrial and
Environmental Control Systems and Telecommunications, providing added value to its solutions.

SICE has over 95 years of existence as a company and 30 years in the IT sector.

At present, SICE is 100% part of the ACS Groups Industrial Services Division.

Figure 1: ACS Group Structure Overview

1.2. LEGAL STATUS AND CAPITAL


SICE Tecnologa y sistemas is a group of different companies:

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 3
Company Profile & Capability Statement

1.3. HEADQUARTERS ADDRESS

1.4. BRANCH OFFICES


1.4.1. Spain
SICE maintains in Spain a total of 6 regional and 20 area offices that provide nationwide coverage.

1.4.2. International Offices


As a consequence of the international expansion, which is a priority for the company, SICE is now present
in over 20 countries on all five continents, and our successful growth across the world continues apace.
Due to the internationalization and globalization of markets, an international approach is a key factor in
SICEs financial growth and the economy of Spain as a whole.

SICEs internationalization process has been undertaken within the framework or our philosophy of the
local implementation and personal treatment of every need from a global perspective.
These are SICEs offices across the world:

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 4
Company Profile & Capability Statement

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 5
Company Profile & Capability Statement

1.5. OUR STAFF


One of our core values is represented by the Human Team this team is the key to achieve or goals. A
high level of vocation and leadership is present in all our organization and identifies the companys
project.
We focus the human resources management in the personal development on this basis; we include
training as part of our culture, to provide personnel a professional development and continuous
motivation.
Changes in social settings and technological changes have made our organizations more complex and
competitive. Correct operation under these conditions requires formulas that encourage creativity and
boost the potential of our people at all levels. As a consequence, we have created multidisciplinary work
teams.
Around 2.700 SICE professionals participate in projects providing the technological capacity to integrate
global solutions at both a national and international level.

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 6
Company Profile & Capability Statement

SICE has an experienced team of engineers working within our worldwide offices. Most of the staff
members are employed on a full-time basis. As a result of working at the high technology end of the
market, SICE maintains a highly qualified workforce.

1.6. GLOBAL CORPORATE FINANCIAL INFORMATION

Sales in Million Euros


350

300
313
294
250
285 284 285
261
280 292
255
200 215
201
150

100

50

0
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

Stable and sustainable sales growth is a measure of our positive results

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 7
Company Profile & Capability Statement

1.7. QUALITY, HELTH & ENVIRONMENT MANAGEMENT


The SICE Tecnologa y Sistemas group shares the corporate social responsibility commitment of the ACS
group.
As such, it identifies compliance with the following 6 principles as a fundamental requirement for the
growth, technological progress and development of its employees:
o Generation of value, creation of jobs and wellbeing as an economic driving force
o Quality as a determining factor that sets the company apart; permanent optimisation of
processes
o Ethics, integrity and transparency as fundamental values of all employees, customers, suppliers
and subcontractors

o Technical and technological development; promotion of innovation and research

o Customer focus
o Respect for economic, social and environmental surroundings
The application of an integrated quality, environmental and occupational risk prevention management
system guarantees that these principles are followed, based on the following international standards:

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 8
Company Profile & Capability Statement

1.8. SECTORS
SICE is a Technology systems and services integrator in the field of Intelligent Traffic and Transport
Systems (ITS), Railways Telecommunications and Control systems and Industrial and Environmental
Control System, providing added value to their solutions.

SICEs technological capacity, its capability for innovation, and a wide range of experience in different
markets, allows us to offer tailor made solutions in:

Continuous technological improvement ensures that SICE is a dynamic and modern company with the
highest capacity and capability to succeed globally.

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 9
Company Profile & Capability Statement

1.9. SERVICES
SICE is able to offer a host of services in the analysis of a project, from the very beginning of the project
through to the on-going operations. SICE can provide a complete end to end solution for any Toll System
project around the world.
The following figure summarises what SICE can offer.

For each of the phases depicted in the figure above, SICE can provide several value-added services. We
are willing to partner with our clients for any and all phases, covering the particular needs of each case
for an efficient collaboration.

The following list includes the typical services we have provided in the past for several clients worldwide:
1. Business Plan: Due to the knowledge of both the industry and the local environment, SICE can help
the Concessionaire in putting together the Business Plan; defining the business rules and business
procedures as well as the business processes that will rule over the functional definition of the system
to be implemented or customised.
This phase is critical for the success of the project and a deep knowledge of the business is essential to
allow a complete definition of how to deal with different situations, especially treating exceptions that
may represent a small percentage of the cases but which take a great part of the on-going operational
costs if not properly addressed.
2. Functional engineering: In this phase SICE can assist or completely perform the definition of the
system from a functional perspective, independent of the technology or products that will be used, and
aligned with the Business Plan.
3. Technical engineering: Producing all the elements to properly drive the supply of the system. This
includes the following:

a. Producing the System Design Specifications or SDS: Addressing all the functionality and
requirements from the previous phase into a proper design, both for software and hardware.
b. Traceability Matrix to show the compliance of the requirements by the design.
c. Management Plans an Procedures, including but not limited to the following:
Hardware Development Plan

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 10
Company Profile & Capability Statement

Software Development Plan

4. Supply: This includes all the services for development, installation, testing and commissioning of all
the components of the project. The following list highlights some of the services included within this
phase:

Software development /customisation


Hardware vendor selection
Hardware sizing
Performance checking and tuning of the application
Familiarisation sessions
Installation
Training
Commissioning, including all the testing required: FAT, SAT, SIAT, plans, procedures,
configuration management, change records

For the phase described above for functional engineering, technical engineering and supply, SICE can
perform either the role of the supplier, generating all of the documentation and products identified
above, or as a Project Management Office (PMO), independently supervising and ensuring compliance
from whomever is in charge of the delivery. The testing aspects may be included in both roles, depending
on the specific project.

5. Operation: SICE is involved with the operation of several projects worldwide. We have the
experience and capacity to recruit and train the required local resources to offer different operational
services and remote support. This includes:

a. Level 1 support
b. Complete IT administration, taking care of the corporate services for the operators and
personnel, such as e-mail or shared folders
c. Complement the capacity of the Concessionaire, assuming tasks such as monitoring and
supervision of the TOS alarms and roadside status monitoring

6. Maintenance: As part of the maintenance of the system, SICE can provide the Concessionaire with a
variety of services (as required), including maintenance of the entire system. Some services that can
be provided in isolation are:
a. Design Authority: A committee of level 3 resources that oversee and drive all major changes to
the system, ensuring coherence and cohesiveness of the system
b. Upgrades & patches: Testing and applying required changes (if any) in order to apply an
upgrade or patch to the operating system, the database, or any other third party software that
may impact the system
c. Migration: Typically to another operating system
d. New developments: This may be required in order to incorporate new functionality or to adapt
to new needs. This may include the following examples:

o New functionality to treat a group or company in a different way that was not
previously expected,

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 11
Company Profile & Capability Statement

o Adapt the system to work with newer software versions or to new mobile devices, such
as iPad 3 or iPhone 6
o Incorporate new security requirements
o Incorporation of new business within the same system
o Incorporation of new roadside providers, integrated within the system

e. Operation of the backups, defining the windows to perform them, controlling tapes that are
being used, periodically taking the tapes to an external safe location, etc.

f. Archiving: Supervising or performing the archiving of all data ensuring consistency of the data
after deleting the information from the production system and ensuring the archived data can
be restored if required

g. Periodic audits to check the correct operation of the system, such as:

o Usage of memory and CPU by the processes, detecting potential situations where a
given process is deteriorating and may give problems in the future
o Detecting mistakes in automatic or manual classification of transactions that follow a
given pattern and may be fixed automatically or operationally
o Analyse customers complaints to detect potential patterns of system functionality
and/or operation that may be generating those complaints and which may be fixed.

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 12
Company Profile & Capability Statement

2. TOLL SYTEMS RELATED EXPERIENCE


2.1. TRACK RECORD
2.1.1. Multi-Lane Free Flow (MLFF) 5,8 Ghz
Toll
Project Location Date KMS Lanes
Stations

Start date: Apr-2002 System in


Free Flow Tolling System for the Santiago de Chile
operation: Sept 1 Last section 61 29 MLFF
North-South Highway (Chile)
open: Mar-2006

Free Flow Tolling System BOCS


Santiago de Chile Start date: Dec-2003 Opening
for the Amrico Vespucio 29 12 MLFF
(Chile) date: Jan-2006
Nor-Poniente

Free Flow Tolling System for Start date: May-2005 Opening


Melbourne (Australia) 39 26 MLFF
EastLink Project date: July-2008

Free Flow Tolling System & ETC Start date: April 2013 MLFF: 2
Hull (UK)
System Humber Bridge Opening date: Oct 2015 ETC: 3

2.1.2. Electronic Toll Collection System 5,8 and 2,4 Ghz


Toll
Project Location Date KMS Lanes
Stations

Triangulo do Sol Motorway Brasil Start date: June-2000 Opening 7


date: Dec-2000

R2 Madrid - Guadalajara & M-50 Madrid - Guadalajara Start date: Jan. 2003 Opening 62 8 0
Highways (Spain) date: Extensions & up-dates
until Dec-2003

Len - Astorga Motorway Len (Spain) Start date: Sept 2002 Opening 38 2 18
date: Apr-2003

Fredericton - Moncton Motorway Canada Start date: 1998 Opening date: 195 130
2002

Leon-Campomanes, A66 Austurias, Len (Spain) Start date: 1996 Opening date: 2 6
Motorway Extensions & up-dates until
1998

Rosario-Campana Motorway Argentina Start date: 1996 Opening date: 205 2 8


Extensions & up-dates until
1998

Northern Access Motorway Buenos Aires Start date: 1995 Opening date: 19 321
(Argentina) 1998

Rosario-Santa Fe Motorway Argentina Start date: 1994 Opening date: 157 2 36


1995

Garraf Motorway Barcelona (Spain) Start date: 1991 Opening date: 60 3 36


Extensions & up-dates until
Sept 1993

Argentinian National Highways Buenos Aires Start date: July-1998 Opening 949 5 33
No.3 & No.205 (Argentina) date: Dec-1999

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 13
Company Profile & Capability Statement

Villalba-Adanero A6 Motorway Madrid and Segovia Start date: 1989 Opening date: 66 3 40
(Spain) Extensions & up-dates until
1996

Sevilla-Cdiz Motorway Sevilla-Cdiz (Spain) Start date: 1988 Opening date: 93 2 31


Extensions & up-dates until
1993

Tarragona-Valencia & Valencia- Tarragona, Valencia Start date: 1988 Opening date: 376 24 180
Alicante Motorways and Alicante (Spain) Extensions & up-dates until
2001

Bilbao - Behovia A8 Motorway Guipuzcoa (Spain) Start date: 10/2003 Opening 73 140
date: June-2004

2.1.3. Electronic Toll Collection System RFID - 0.9 Ghz


Toll
Project Location Date KMS Lanes
Stations

Buenos Aires Start date: Jan-1999


Autopistas Urbanas 56
(Argentina) Opening date: Aug-2002

Start date: 1998


Fredericton-Moncton Motorway Canada 195 130
Opening date: 2002

San Juan (Puerto Start date: 1993


Teodoro Moscoso Bridge 1 24
Rico) Opening date: Feb 1994

Starting date: October 2012


Atlacomulco Maravatio Highway Michoacn (Mexico) 64 2 32
Ending date: October 2017

Starting date: Jan - 2014


Autopista Ruta del Sol Colombia 60 14
Ending date: Oct - 2014

2.1.4. Conventional Toll System


Toll
Project Location Date KMS Lanes
Stations

Start date: 1999


Vino-San Alberto Highway Colombia 5 22
Opening date: 2000

The highway that crosses


Start date: Dec. 1999 Opening
Columbia from Cartagena de Colombia 28 174
date: Apr-2000
Indias to the border with Ecuador

Start date: 1998 Opening date:


Bogota- Villaciencio Motorway Colombia 3 36
1999

Start date: 1999 Opening date:


Miranda Motorway Miranda (Venezuela) Extensions & up-dates until 4 19
March 2000

Madrid and Segovia Start date: 1989 Opening date:


Villalba-Adanero A6 Motorway 66 3 40
(Spain) Extensions & up-dates until 1996

Start date: 1988 Opening date:


Sevilla-Cdiz Motorway Sevilla-Cdiz (Spain) 93 2 31
Extensions & up-dates until 1993

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 14
Company Profile & Capability Statement

2.2. CASE STUDIES


2.2.1. Mitcham Frankston Project EastLink (Melbourne, Australia)

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 15
Company Profile & Capability Statement

2.2.2. Autopista Central (Santiago de Chile)

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 16
Company Profile & Capability Statement

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 17
Company Profile & Capability Statement

2.2.3. Humber Bridge (Ongoing Project)

Mixed MLFF and Single Lane ETC Tolling System (First MLFF in the UK)

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 18
Company Profile & Capability Statement

3. ITS RELATED EXPERIENCE


3.1. TRACK RECORD
3.1.1. ITS
Latest Project Location

NATIONAL (Spain)

Speed enforcement radar installations Spain

Reverse lanes in the Carranza-Cadiz bridge Andalusien, Spain

Southern Zaragoza city ring road Saragossa, Spain

Cadiz travel times system Andalusien, Spain

M30 surface. Citys main ring road Madrid, Spain

Seville city ITS system with bridge reverse lane control Seville, Spain

Basque country ITS system Basque Country, Spain

EIX diagonal shadow toll and tunnels Catalonia, Spain

A-21 shadow toll and tunnels Pamplona, Spain

INTERNATIONAL

Baixo Alentejo and Algarve shadow toll systems Portugal

ITS I-595 Corridor Roadway Improvements Miami, USA

Atlacomulco-Maravato Highway Mexico

Autopista Central Santiago, Chile

Rabat- Casablanca-Settat ITS Morocco

Pathe and Ionia Roads ITS Greece

Salwa and Dukhan Highways ITS Qatar

Abu Dhabi Traffic Counting and Wind Stations UAE

3.1.2. Tunnel
Project Location M

NATIONAL (Spain)

Madrid Calle30 (Madrid) Spain 50km

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 19
Company Profile & Capability Statement

Navarre tunnels centralization (Navarre) Spain 14700 m

Infanzon Grases tunnels (Asturias) Spain 14402 m

Madrids 15 urban tunnels centralization [] Spain 19625 m

Los Nogales tunnels (Castille and Leon) Spain 600 m

San Juan de Alnazfarache tunnel (Andalussia) Spain 456 m

Nerja La Herradura tunnels (Andalussia) Spain 5626 m

Lantueno tunnel (Cantabria) Spain 1370 m

Priaes tunnel (Asturias) Spain 1234 m

Somport tunnel (Aragon - France) Spain 8608 m

Belate and Almandoz tunnels (Navarre) Spain 4150 m

III ring road of de las Palmas (Canarien Islands) Spain 1626 m

Padrn tunnels (Asturias) Spain 3600 m

Malmasn tunnels (Basque Country) Spain 2800 m

Sierrapando tunnel (Cantabria) Spain 456 m

M40 tunnels (Madrid) Spain 3224 m

Autopista del Sol tunnels (Malaga) Spain 4850 m

Las Caldas tunnel (Cantabria) Spain 1350 m

Sartego tunnel (Galicien) Spain 2030 m

San Tirso tunnel (Asturias) Spain 682 m

Ibarrekolanda tunnel (Basque Country) Spain 550 m

Belabieta/San Lorenzo tunnels improvement Spain 5036 m

Del Altet tunnel (Alicante) Spain 862 m

Morata tunnel (Aragon) Spain 580 m

Eix Diagonal 13 tunnels (Catalonien) Spain 6455 m

INTERNATIONAL

Port of Miami Florida USA 2420 m

SR99 in Seattle Washington USA 6400 m

Tintenbar to Ewingsbale T2E tunnel Australia 1000 m

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 20
Company Profile & Capability Statement

San Cristobal tunnel Chile 3600 m

La Plvora tunnel Chile 4400 m

57 Madeiras tunnels Portugal 44 km

Ramela, Barraao tunnels Portugal 1600 m

Gardunha tunnel Portugal 3600 m

Envalira tunnel Andorra 4100 m

Doctor Morales Lebrn tunnel Puerto Rico 1300 m

Sumapaz tunnel Colombia 8360 m

Daza tunnel Colombia 3420 m

Hidrosogamoso tunnels Colombia 2560 m

Boquern tunnel Colombia 4600 m

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 21
Company Profile & Capability Statement

3.2. ONGOING PROJECTS

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 22
Company Profile & Capability Statement

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 23
Company Profile & Capability Statement

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 24
Company Profile & Capability Statement

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 25
Company Profile & Capability Statement

3.3. CASE STUDIES


3.3.1. Madrid - Calle 30

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 26
Company Profile & Capability Statement

3.3.2. Madeira Tunnel (53 Tunnels)

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 27
Company Profile & Capability Statement

4. RAIL COMMUNICATIONS RELATED EXPERIENCE


4.1. TRACK RECORD

Client Scope City (Country) Ending Date M


Telecommunication Systems for the new Metro
de Santiagos lines 6 & 3 and Tetra Network
deployment on the current operating lines 1, 2,
Metro de Santiago 4, 4A and 5. Systems to be deployed are: Gigabit
Chile 2.019 29 M
(Chile) network, telephony, interphones, Broadband
Wireless Network, public address, CCTV, Public
Information displays, Voice Recording and alarm
control systems
Metro de Santiago Automatic Fare Collection Systems for the new 19
Chile 2.019
(Chile) Metro de Santiagos lines 6 & 3 MUS$
Signalling, Telecommunication network and
ANESRIF Power Distribution for the Line Thenia Tizi
Algeria June 2016 60 M
Ouzou. It also involves the Catenary line up to
Oued Aissi
STC Metro de Supply installation of a TETRA network to cover
Mexico July 2.016 13,8 M
Mxico. all Metro de Mxico
Design, engineering, procurement and
construction of signalling and communication for
Ferrocarriles de la L9 - FGV, Benidorm-Denia. (Upgrade of Benidorm
interlocking. New electric interlocking in Altea. Valencia/ June 2.016
Generalitat 6,7 M
Spain
Valenciana (FGV) Fibre optics and Gigabit network, TETRA
network, Operational telephony.)

This project included the supply, installation,


and 10 year of Maintenance Service over a Installation
security system that covers the full Metro de
Madrid Network. Systems implemented included: April 2.009
CCTV, train to ground communications, on board
Metro de Madrid Madrid/Spain 140 M
equipment, access control system, alarm Maintenance
management system, fiber optics
Communication network, Station management October
Software, Main Security Control Center and Line 2.014
Security Control Centers.
Automatic Fare Collection Systems for the new
October
Metro de Sevilla Metro de Sevilla L1. It includes acces gates and Sevilla/Spain 4,8M
2009
Ticket Vending Machines.
Automatic Fare Collection Systems for Metro de June 2.008
Valencia/
Metro de Valencia Valencia - Ferrocarrils de la Generalitat 3,4 M
Spain
Valenciana
Telecommunication Systems for the Barcelona
Tramway. Systems to be deployed are: Gigabit Barcelona/Spa
TRAM of Barcelona May 2010 1,6M
network, Broadband Wireless Network, CCTV, in
and Public Information displays

Consorcio Regional Development of Software for Multimodal


Integration - Integration Management Systems- September
de Transportes de Madrid/Spain 1,26 M
also named SGI. It allows the centralized 2.008
Madrid
monitoring of the operation of the Transport

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 28
Company Profile & Capability Statement

Regional Consortium that operates the 4 main


interchange Stations of Madrid: Moncloa, Plaza
Elptica, Prncipe Po y Plaza Castilla
Signaling, Telecommunication, Power
Substations and overhead Catenary for the
Alameda Chillan Line ( 448 Kms and 42
Stations):
48 Electronic Interlocking System (SIL 4 & 2 January
out of 3) 2009
EFE Chile Chile 72 M
30 Level Crossing
SDH/PDH Transmission Data System
Catenary
Power Supply System (Diesel Generator,
UPS, Batt)

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 29
Company Profile & Capability Statement

4.2. CASE STUDIES


4.2.1. Metro Madrid

COORDINATED SECURITY SERVICE SYSTEM, THE INSTALLATION ENHANCEMENT AND


MAINTENANCE OF THE CSSS SECURITY SYSTEMS (METRO DE MADRID)

Client: Metro Madrid

Location: Madrid (Spain)

Description of the project:

This project involves the installation of a coordinated security system as well as the maintenance
service plan for a period of 10 year period.

All the equipment that is covered by the comprehensive maintenance plan will be renewed upon
meeting its product life cycle. This is will be taken into account because of the degradation of the
equipment capabilities or because of technological obsolescence.

Key performance indicators will measure the quality of the service and the response times.

Stations, Depots, End of line interchanges will include video surveillance systems composed of:

MPEG 4 coded video recorders


IP Transmission infrastructure
With 6 day file (12.5 frame/sec) capacity.
Up to 25 frame/sec quality frame rate
Local client in PCL
Remote clients in PSL and PSC

Access control system, alarm panel, intruder and security rounds system, Station Centralized Remote
Control (TCE) system that concentrates the control and remote control of the station comms system with
the Central Control Centre (PCS).

The Security Control Centre controls the subsystems of all the line security centres. Each Line Security
Centre controls a part of the network:

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 30
Company Profile & Capability Statement

CCTV station system (camera visualization and recording)


CCTV Train system (access, visualization and transfer of images to the camera recording device)
cameras, transmission and visualization of land side images to on board monitors.
Intrusion alarm panel
Access control
Round control

The equipment installed include:

Communications system
o 60,000 m of optical fibre cable
o 31,000 m of UTP/FTP cable
o 558 communications equipment (ATM or Gigabit), installed at the stations and control local
centres.
o 2,500 point data connection with cat6 structured cabling and 250 voice points
Station video surveillance system
o 2,697 CCTV cameras
o 1,318 equalizer boards
o 757 video servers for processing and video storage
o 78,000 m of RG-11 or RG-59 cable
o 118 Wifi communications equipment for Train-ground comms system
Control station system (TCE)
o 197 servers
Access control system
o 552 access control system installed in technical rooms
o 213 access control positions at gates.
Intruder control system
o 244 central units
o 100 central units for ventilation shafts
o 68 central units for emergency exits
o 9,300 detectors (magnetic, volumetric, seismic, )
Train video surveillance system
o 916 CCTV cameras
o 273 servers for video processing and storage
Train-Ground communication system
o 15,000 m of 7/8 coax cable
o 222 Wifi communication nodes
o 68 Antennas
o 118 on board Wifi management equipment
o 236 on board equipment (antennas)

Installation and commissioning of different local control centres


o 6 Line security positions (it includes equipment and applications for video, intruder, and
station control centralization systems).

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 31
Company Profile & Capability Statement

Installation and commissioning of several security and surveillance management centers.


o PCS primary management center at Alto del Arenal, with 25 workstations and operation
videowall.
o Secondary management center at Nuevos Ministerios, with 16 workstations and operation
videowall.
o Secondary management center at Puerta del Sur, with 16 workstations and operation
videowall.
o Secondary management center at Ventas, with 16 workstations and operation videowall.
o Secondary management center at Avenida de America, with 16 workstations and operation
videowall.
o Secondary management center at Pacfico, with 16 workstations and operation videowall.
o Secondary management center at Moncloa, with 16 workstations and operation videowall.

Project technical support and maintenance Videowall subsystem.


o Primary management or PCS center
o Secondary management center Nuevos Ministerios
o Secondary management center Puerta del Sur
o Secondary management center at Ventas
o Secondary management center at Avenida de America
o Secondary management center at Pacfico
o Secondary management center at Moncloa

Budget: 132,000,000

68.000.000 (Installation, aprox.)

64.000.000 (Maintenance, aprox.)

Execution of the installations: 3 years

Starting date: 19th October 2004

Ending date: 19th October 2014

Client: EFE (Empresa de Ferrocarriles del Estado) (Chile Train authority)

Location: Chile

Description of the project:

The project consists in the modernization of the train signalling, electrification and communication
systems between:

Alameda - Chilln
Hualqui - Talcahuano
Concepcin - Lomas Coloradas

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 32
Company Profile & Capability Statement

The project includes the following systems:

Train signalling

CTC in Santiago and Concepcin


49 electronic interlocking system
4 intermediate control sheds
30 level crossings

Electrification

SCADA system composed of an energy management system and remote terminal units for
electrical substations.

4.2.2. EFE Chile

MODERNIZATION OF THE TRAIN Signalling, Electrification AND COMMUNICATIONS


SYSTEMS BETWEEN: ALAMEDA - CHILLN HUALQUI - TALCAHUANO CONCEPCIN -
LOMAS COLORADAS - SEC: EFE PROJECT (CHILE)

Client: EFE (Empresa de Ferrocarriles del Estado) (Chile Train authority)

Location: Chile

Description of the project:

The project consists in the modernization of the train signalling, electrification and communication
systems between:

Alameda - Chilln
Hualqui - Talcahuano
Concepcin - Lomas Coloradas
The project includes the following systems:

Train signalling

CTC in Santiago and Concepcin


49 electronic interlocking system
4 intermediate control sheds
30 level crossings

Electrification

SCADA system composed of an energy management system and remote terminal units for
electrical substations.
70 km of new overhead contact line (catenary)

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 33
Company Profile & Capability Statement

18 electric traction substations


20 rectifiers
Power switches, transformers, protection and control systems.

Communications

500 km of fibre optic cabling


70 communications nodes (3 SDH rings)
2 telephone and IP data centrals
2 network management centres
49 technical rooms and 4 lane sheds.

Budget: 180 million $

137,000,000 (aprox)

Starting date: 2005

Execution period: 3,5 years

Total period of the project: 16 years

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 34
Company Profile & Capability Statement

4.2.3. Metro Chile (Ongoing Project)

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement


Pgina 35
Company Profile & Capability Statement

Contact Details:

Javier Arbelaiz
South East Asia Regional Manager
Email: jarbelaiz@sice.com
HP: +34 608 201 046

Confidencial: Este documento es propiedad de SICE. Tanto l como la informacin que contiene es altamente sensible y estrictamente confidencial. As, no est permitido
su uso para fines distintos a los que ha sido creado. Ni el documento ni su contenido podrn ser revelados a terceros, ni copiados total o parcialmente, sin que exista
autorizacin expresa y por escrito de SICE.

Company Profile & Capability Statement