Sie sind auf Seite 1von 5

Resume

CAREER OBJECTIVE:
To seek a challenging assignment in Purchase /Procurement/Materials.
Contact Details.
Dattatraya.R. Hublikar
Mobile No 9552659600
EMAIL: drhublikar@rediffmail.com or drhublikar@yahoo.com
DATE OF BIRTH & AGE: 22nd DECEMBER 1967, 48 YEARS.

ACADEMIC PROFILE:
B.E.Mechanical Engineering in the year 1989 from Gogte Institute of Technology Belgaum, Karnataka
University Dharwad.

CAREER PROFILE:
B.E Mechanical with Experience of 25 years in Procurement, Vendor Development & Stores for
All types of items required for Diesel Engines, Foundry, Steel, Wind Power.
High proficiency in Purchase, Costing, Vendor Development, Negotiations, Inventory & Logistics.
Conversant with ISO Quality system and a certified internal auditor.
Always optimistic while resolving any problem or difficulty.
An effective Team Leader.
Working knowledge of SAP R/3, my SAP & ORACLE based ERP
Familiar with E Procurement.

Experience:
Present Employer: Working as DGM Commercial. Sona Alloys Pvt Ltd. Lonand.Dist Satara
since Oct 2012. Sona manufacturers presently Pig Iron,PSC/Slag Cement.Rolling Mill & SMS are
in Project stage. Manufacturing supported by Sinter Plant,Blast Furnace & BF Gas based Power
Plant.
Procurement of IMPORT spares, Capital Items, OEM Equipment & Spares (Electrical, Instrumentation &
Mechanical), Valves, Couplings, Rubber Items, Gear Boxes, Motors, Hoses, Conveyor belts, Pumps, Lab
chemicals, Refractory, AMC, Manpower Contracts, Logistics, Contracts required for Blast Furnace/
Sinter Plant, Slag Cement and Gas based Power Plant.
5 Purchase Persons are reporting to me.
MAJOR ACHIEVEMENTS:
#. Establishing total SCM Cycle including implementation of oracle based ERP.
#.Vendor Development: Alternate sources for OEM spare, Motors, Equipment &
Spares, Gear Boxes, Refractory, Substitution to Import spares which has resulted in Cost
reduction ,availability, multiple vendors.
#. Cost Reduction by Value Engineering, Alternate vendor, Improvement in Quality of
Products, Inward logistics contracts.
# Reduction in procurement delivery period by making AMC/Payment terms.
# Marine transit insurance policy, Fire policy.
# Procurement of Excavators, Loaders.
# Development & training of subordinates.

Present Salary: Rs 11-12Lakhs CTC.

Previous Employers
A. Greaves Ltd Diesel Engine Unit, Chinchwad Pune. (Nov 1989-May 2003)
Business Carried out- It is one of the leading manufactures of diesel engines used for Industrial, Marine,
Power generation applications and having its captive foundry. I was working as Senior Purchase Officer.
WORK PROFILE: Experience in procurement of
a. Machined Components and Subcontracting.
b. Bought out components.
c. Ferrous casting, steel materials.
d. Raw material and consumables for foundry.
e. Capital goods and maintenance items.
f. Foundry materials, Maintenance Spares
I have also handled stores and goods Inward department.
My experience of above jobs has helped me in following ways
a. Importance of timely procurement of material
b. Experience in computerized functioning of materials department
c. Costing of the components, Inventory control, Logistics Contracts
d. Manufacturing process of different components.
e. Development of alternate new vendors for continual improvements in QCD.
MAJOR ACHIEVEMENTS.
I COST SAVING:
a. Cost reduction in after cooler by changing the material of the end cover from Gunmetal
to cast iron.
b. Cost reduction in lub oil sumps by changing the material of the same from aluminum
to MS fabricated for non-marine application. Cost reduction in cylinder head cover by
changing the material of the same from aluminum casting to C.I.
c. Cost reduction by introducing alternate cheaper and better quality material in foundry
like coconut shell charcoal, silicon carbide, silicon punch scrap, silicon manganese.
d. Cost reduction of 3% by alternate new vendors and renegotiations with present vendors
for components like balance shaft & camshaft turning, casting of engine foot, valve
Seat inserts etc.
e. Reduction in inventory carrying cost by reducing raw material inventory of foundry
from Rs 10 Lakh to Rs 7 Lakh per month.
II REDUCTION IN MANUFACTURING EXPENSES

Subcontracted the works made process like Lagging of manifolds, heat treatment of components,
assemblies of lub oil pumps; assembly of water pumps, fettling of casting, core making etc. reduce the in
house manufacturing expenses incordination with Industrial Engineering Department.
B. Suzlon Windfarm Services P Ltd Satara. (May 2003-May 2005).

Business Carried out- Suzlon Energy Ltd is one of the leading manufactures of Non Conventional Energy
Systems (Wind Energy Turbines). Suzlon Windfarm is subsidiary of Suzlon, & works for O & M activities. I
was working as Deputy Manager Commercial. Experience: 2 years.
Work Profile:
I had been given a KRA to streamline the STORES activities, as the working of Site Store was totally
paralyzed. I was also responsible for Purchase, Material Planning functions related to Satara Site.

Achievements.
I have streamlined all the activities of Central Stores & other Section Stores. The activities carried out are
as below,
a. All the transactions of Stores were made on line.
b. Cost Reduction in Electrical Spares, Consuambles, Oils procurement & contracts.
c. Arranged for a third party Stock audit for all the stores& it was found that the results
of the audits were extremely good.
d. Reduced breakdowns for want of spares, consumables by streamline the activities of
Material planning & Procurement activities.
e. Involved in preparation of SAP Materials module for O & M activities related to
Materials Dept.
f. Got trained my self as end user &trained all concerned persons to make transactions
in SAP.

C. Endurance Systems I Pvt Ltd Aurangabad. (May 05-Apr 06)


Endurance is leading manufactures of Shock Absorbers. I was working as Dy Manager
Materials.
Responsible for Procurement, Scheduling & Stores Functions that consists of 800+ BOM items.
Achievements.
1. Inventory Reduction from 3.0 Crores to 2.6 crores.
2. Reduction in packing cost for shokabsorber.
3. Implementation of JIT
4. Implementation of FIFO.
5. Streamlining SOB of vendors to have max savings in purchases. (5 lakhs /month).
6. Managed material supplies to cater highest ever production made in production of
Shockabsorbers.

D.ISPAT IND LTD -JSW Dolvi (Near MUMBAI) (June 06-Nov 09)
Ispat-JSW manufacturers of HR Coil with 3 million ton Capacity.
I was working as Senior Manager Purchase..Responsible for Procurement of all the materials
required for Projects & Operational Spares.
Handled procurement of Turnkey Equipment Purchases, Turnkey bases Contracts (Indigenous&
Imported), Spares & other Mechanical items like Pipes, Fittings, Valves, Castings-Steel/CI/SG
(indigenous/Imported), Imported OEM spares, Machined/manufactured items, Conveyor
Belts,VBelts, Couplings, Pulleys, Idlers. Hoses, Seals, Wire Mesh, Electrical Equipments
&spares, Pumps.
Achievements:
1. Cost reduction by alternate vendors for Castings, Belts, Hoses, Machined items, OEM
Spares.
2. Reduction in procurement cycle from 70 days to 40 days.
3. Involved in getting sanctioning the Turnkey projects like LCP which was pending
since 3 years &completed turnkey Projects procurements in scheduled time.
4. Effective use of E Procurement tools like Reverse Auction.
5. Annual Rate Contracts made for V Belts, Couplings/Pulleys, and Conveyor Belts to
reduce the cost & procurement time.

E. Kalyani Carpenter Special Steels Ltd Pune ( Nov 09-Oct2012).


KCSSL manufacturers Alloys Steel &wires.
I was working as Asst VP Purchase/DGM. Handling procurement of Moulds, Rolls and Capital
Items, OEM Equipment & Spares (Electrical & Mechanical), Valves, Couplings, Rubber Items,
Gear Boxes, Motors, Hoses, Conveyor belts, Heat Exchangers, IMPORTS, Raw material etc. 4
Purchase Officers are reporting to me.
1. Vendor Development: Alternate sources for OEM spare, Motors, Hoses, Equipment &
spares etc.
2. Cost Reduction by alternate material/alternate vendor, Inward logistics contracts.
3. Payment to the vendors by converting advance payment, LC to credit payment.
4. Reduction in procurement time & entering to Annual Rate Contracts.

Das könnte Ihnen auch gefallen