Beruflich Dokumente
Kultur Dokumente
Risk Assessment
Maintenance Original Issue: 20-Aug-2017
L Likelihood
S Severity
RL Risk Level
Risk Evaluation:
`
Initial Risk Level Control Measures Residual Risk Responsibility
S/N Significant Hazards Level
L S RL L S RL
Keep all tools in the
close and safe area.
Safety helmet.
1. Being hit by falling tools, lashing gear or 3 4 12 Close to the area under 1 4 4 Supervisor and others.
other object the crane and manage
between working up
and down.
2. Injuries due to falling from a height 3 5 15 Safety harness 1 5 5 Supervisor.
Welding to be done by a
certified person.
The only senior
technician is allowed to Welding and others
tighten wire rope
3. Injuries due to Wire rope slip from clamp. Supervisor and welder
lashing gears, lock or bad welding joint. 3 4 12 Qualified person 1 4 4
inspects clamp bolts
tightening and welding
quality.
Welding joint must be
tracked during reeving
process.
`
Close and clear the
area under the service
4. Injuries due to Falling of suspended load crane.
while using a service crane Inspect service crane Supervisor and others
3 5 15 1 5 5
Before the job starts
check that emergency
push button is
working.
Use a well working Bravo.
Inform all workers before
5. Injuries due to Miscommunication 4 5 20 any movement and before 1 5 5 Supervisor.
the next step.
`
Use a proper hand glove.
Use emergency push
9. Hand Injuries 4 4 16 button before start 1 4 4 Supervisor and others
removing or assembling
parts.
Good housekeeping.
Clear work area of all
combustibles.
10. Fires from welding process 4 5 20 Fire extinguishers and 1 5 5 Supervisor and Welder
fire blanket required.
Comply with site hot work
permit/rules.