Inward/outward port clearances for Drill
5 Advance Info./ certs. required as
ship/Rig/Boat / Vessel on arrival, reporting
vessel to port, customs, Charterers, advising Per Rig / Drill per this SOP.
Master for arrival procedures, arrival clearances ship/ Vessel
like Quarantine, Customs, Port, Immigration, Same Day as Arrival
etc- agency charges.
Coastal Conversion of Drill ship / Rig / Per Rig / Drill About a Day after vessel customs
6
Vessel / Boat / Barge ship/ Vessel clearance.
2
Preparation by CSTS 02 days.
Essentiality Certificate from DGH for import Approval by OPERATOR 02
12
of spares, consumables, equipment, machinery days.
etc during operations. Per Courier 02 days.
consignment
Issue by DGH 02 days.
Total Days : Approx 8 working
days
Sign On / Sign Off, Immigration Clearances Mostly the same day, advance info.
13 Per person
Customs Baggage clearances etc for crew. required as per SOP.
Remarks:
All Statutory Clearance Applications need clarity and accuracy. Time for preparation /
compilation of such application is indicative. Information required for each application,
including copies of Contract, details of Imports etc. to be provided by the respective company.
It may be advised to Hand Carry Documents/Applications to respective Authority (say DGH)
after consultation with the Applicant in case of urgency, at the cost of the clinet.
All Imports/Exports (Re-Exports) and the permit system are subject to Statutory Laws, Acts,
Rules and Regulations in force.
In case of Second Hand (used) / Reconditioned Equipment / CG Imports, pl allow about 2
extra days for clearance. Chartered Engineer certificate is required.
<<<<<<<<<<<<<<< >>>>>>>>>>>>>>>>