TO : MR.

SONG
PROBLEM DETECTION IN NEW DRAINAGE DESIGN

6/29/2015

Engr.Zubair Masood
TO : Mr.song
Problem detection in new drainage design

Please Check Some Given Points.

(i)-Here P-Trap/Floor Drain missing in all Toilets.

(ii)-Here is one main pipe line (size:110mm) in every opening near the toilets and the designer is
connecting 4 To 5 pipe lines with this main pipe line, Please check it how is it possible to connect
these 4 OR 5 pipe lines with One pipe line at same level.

(iii)-Here is only one main pipe line for waste and soil drainage, please check it will spread smell in
every pipe line such as washbasin, ablution shower and sink.

(iv)-Here is a main pipe line in 1st Floor, 2nd Floor and 3rd Floor for drainage of male side and female
side toilet in the central part of the building near the expansion joint which is placed on the
expansion joint instead of nearest opening.

(v)-Here we have not found any rain drainage on the Roof Floor, there is not mentioned quantity of
floor trap and pipe line size.

(Vi)-Installing Water Heater in shaft is difficult due to its size.

(Vii)-In water supply drawings, some ablution shower for WC are shown on left side, these should be
on right side.

(Viii)-Water supply pipe sizes are not enough for required water flow.

Making Trap for Shower tray in difficult.

Best Regards
Engr.Zubair Masood
MEP MANAGER

June 29, 2015 Page 2