Sie sind auf Seite 1von 20

NO.

ACTIVITIES

1 SERI BOTANI INTERNATIONAL SCHOOL

2 AUTHORITIES SUBMISSION

3 1st Industry to Commercial [G: 166333, Lot 331255] for Seri Botani School

4 2nd Industry to Commercial [G: 166334, Lot 331254] for Seri Botani School

5 KM 5 Application & Approval

6 KM 11 Application & Approval

7 DCA Application & Approval

8 Road & Drainage Application & Approval

9 Earthworks Application & Approval

10 LAP Application & Approval

11 IWK Application & Approval

12 TNB, SKMM, TM Application & Approval

13 Building & Bomba Plan Approval

14 TENDER STAGE

15 Preparation of Tender Drawing & Document

16 Earthworks Tender, Evaluate & Award of Tender

17 Piling Tender, Evaluate & Award of Tender

18 School Block Tender, Evaluate & Award of Tender

19 M&E Tender, Evaluate & Award of Tender

20 CONSTRUCTION STAGE FOR SCHOOL BLOCK (4-storey)

21 Soil Investigation

22 Earthworks- Hoarding & Signage

23 Piling Works

24 Piling Test - PDA & Static Load Test

25 Substructure Works

26 Pile Cap

27 Lift Pit

28 Earthing

29 Underground Sewerage & Plumbing

30 Underground Services (TNB)


31 Superstructure Works

32 Lower Ground Floor

33 Lower Ground RC Beams, Slab & Backfiling

34 RC Column with RWDP from Lower Ground Floor to Mezzanine Floor

35 Ground Floor

36 Ground RC Beams, Slab & Backfiling

37 RC Column with RWDP from Ground Floor to 1st Floor

38 Staircase (Lower Ground Floor to Ground Floor)

39 Lift Core

40 Mezzanine Floor

41 RC Beams & Slab

42 RC Column with RWDP from Mezzanine Floor to 1st Floor

43 Staircase (Ground Floor to Mezzanine Floor)

44 Lift Core

45 1st Floor

46 RC Beams & Slab

47 RC Column with RWDP from 1st Floor to 2nd Floor

48 Staircase (Ground Floor to 1st Floor)

49 Lift Core

50 2nd Floor

51 RC Beams & Slab

52 RC Column with RWDP from 2nd Floor to 3rd Floor

53 Staircase (1st Floor to 2nd Floor)

54 Lift Core

55 3rd Floor

56 RC Beams & Slab

57 RC Column with RWDP from 3rd Floor to Roof Floor

58 Staircase (2nd to 3rd Floor)

59 Lift Core

60 Roof Floor

61 RC Beams & Slab

62 RC Column with RWDP & Stiffener


63 Staircase (3rd Floor to Roof Floor)

64 Lift Core Overrun

65 Roof Trusses

66 RC Plinth

67 Architecture Works

68 Lower Ground Floor

69 Brickworks

70 Sub Frame & Door Frame Installation

71 Plastering

72 Ceiling Tees

73 Ceiling Finishes

74 Skim Coating

75 Waterproofing

76 Floor Screeding

77 Wall Finishing

78 Floor Tiling & others Floor Finishes

79 Final Painting

80 Railing & Metal Works

81 Toilet Cubicles & Sanitary Fittings

82 Ironmongeries Installation

83 External Plastering

84 External Painting

85 Feature Wall

86 Door & Window Installation

87 Ground Floor

88 Brickworks

89 Sub Frame & Door Frame Installation

90 Plastering

91 Ceiling Tees

92 Ceiling Finishes

93 Skim Coating

94 Waterproofing
95 Floor Screeding

96 Wall Finishing

97 Floor Tiling & others Floor Finishes

98 Final Painting

99 Railing & Metal Works

100 Toilet Cubicles & Sanitary Fittings

101 Ironmongeries Installation

102 External Plastering

103 External Painting

104 Feature Wall

105 Door & Window Installation

106 Mezzanine Floor

107 Brickworks

108 Sub Frame & Door Frame Installation

109 Plastering

110 Ceiling Tees

111 Ceiling Finishes

112 Skim Coating

113 Waterproofing

114 Floor Screeding

115 Wall Finishing

116 Floor Tiling & others Floor Finishes

117 Final Painting

118 Railing & Metal Works

119 Toilet Cubicles & Sanitary Fittings

120 Ironmongeries Installation

121 External Plastering

122 External Painting

123 Feature Wall

124 Door & Window Installation

125 1st Floor

126 Brickworks
127 Sub Frame & Door Frame Installation

128 Plastering

129 Ceiling Tees

130 Ceiling Finishes

131 Skim Coating

132 Waterproofing

133 Floor Screeding

134 Wall Finishing

135 Floor Tiling & others Floor Finishes

136 Final Painting

137 Railing & Metal Works

138 Toilet Cubicles & Sanitary Fittings

139 Ironmongeries Installation

140 External Plastering

141 External Painting

142 Feature Wall

143 Door & Window Installation

144 2nd Floor

145 Brickworks

146 Sub Frame & Door Frame Installation

147 Plastering

148 Ceiling Tees

149 Ceiling Finishes

150 Skim Coating

151 Waterproofing

152 Floor Screeding

153 Wall Finishing

154 Floor Tiling & others Floor Finishes

155 Final Painting

156 Railing & Metal Works

157 Toilet Cubicles & Sanitary Fittings

158 Ironmongeries Installation


159 External Plastering

160 External Painting

161 Feature Wall

162 Door & Window Installation

163 3rd Floor

164 Brickworks

165 Sub Frame & Door Frame Installation

166 Plastering

167 Ceiling Tees

168 Ceiling Finishes

169 Skim Coating

170 Waterproofing

171 Floor Screeding

172 Wall Finishing

173 Floor Tiling & others Floor Finishes

174 Final Painting

175 Railing & Metal Works

176 Toilet Cubicles & Sanitary Fittings

177 Ironmongeries Installation

178 External Plastering

179 External Painting

180 Feature Wall

181 Door & Window Installation

182 Roof Floor

183 Brickworks

184 RWDP & Gutter System

185 Metal Roofing

186 Parapet Wall

187 Waterproofing

188 Floor Screeding

189 External Plastering

190 External Painting


191 M&E Works

192 Lower Ground Floor

193 Electrical Services - fan points and wiring works

194 Cold Water & Sanitary Plumbing Services

195 PA System

196 Fire Fighting Services

197 Air-con Services

198 Telecommunication Services

199 CCTV System

200 LPG Services

201 Kitchen Hood & Exhaust Service

202 Ground Floor

203 Electrical Services - fan points and wiring works

204 Cold Water & Sanitary Plumbing Services

205 PA System

206 Fire Fighting Services

207 Air-con Services

208 Telecommunication Services

209 CCTV System

210 Main Switch Room

211 Mezzanine Floor

212 Electrical Services - fan points and wiring works

213 Cold Water & Sanitary Plumbing Services

214 PA System

215 Fire Fighting Services

216 Air-con Services

217 Telecommunication Services

218 CCTV System

219 1st Floor

220 Electrical Services - fan points and wiring works

221 Cold Water & Sanitary Plumbing Services

222 PA System
223 Fire Fighting Services

224 Air-con Services

225 Telecommunication Services

226 CCTV System

227 M&E Room

228 2nd Floor

229 Electrical Services - fan points and wiring works

230 Cold Water & Sanitary Plumbing Services

231 PA System

232 Fire Fighting Services

233 Air-con Services

234 Telecommunication Services

235 CCTV System

236 M&E Room

237 3rd Floor

238 Electrical Services - fan points and wiring works

239 Cold Water & Sanitary Plumbing Services

240 PA System

241 Fire Fighting Services

242 Air-con Services

243 Telecommunication Services

244 CCTV System

245 M&E Room

246 Roof Floor

247 Electrical Services

248 Cold Water & Sanitary Plumbing Services

249 Fire Fighting Services

250 Hose Reel G.I Tank Installation

251 Ventilation Motorize Fan

252 Lighting Arrestor System

253 Cooling Tower Installation

254 Chiller & Chill Water Piping Installation


255 Domestic Water Tank Installation

256 Rainwater Harvesting System

257 Lift Installation

258 Erection of Scaffolding

259 Guide Rail Installation & Alignment Checking

260 Installation of Landing Door and Frame

261 Hoisting Lift Motor

262 Wiring & Setting of Motor

263 Car Cage & Counter Weight Installation

264 Shaft Trunking & Wiring

265 Final Adjustment & Cleaning

266 External Works

267 RC Retaining Wall

268 Electrical Cabling - TNB to Main Switch Room

269 Mainhole for TM

270 Sewerage Services

271 Water Reticulation System

272 Drainage System

273 Interlocking Paver

274 Road Premix & Road Marking

275 Security Fencing

276 Street Lighting

277 Landscape & Turfing

278 Covered Basketball Court

279 Structural Works

280 Mechanical & Electrical Works

281 Architecture Works

282 External Works

283 Guard House

284 Structural Works

285 Mechanical & Electrical Works

286 Architecture Works


287 External Works

288 Refuse Chamber

289 Structural Works

290 Mechanical & Electrical Works

291 Architecture Works

292 External Works

293 TNB Substation

294 Structural Works

295 Mechanical & Electrical Works

296 Architecture Works

297 External Works

298 ID Fit Out Installation & Handover

299 CPC

300 ID Fit Out Installation

301 Classroom

302 Principal Room

303 Admin Office

304 Strong Room

305 Staff Room

306 Student Canteen

307 Sick Bay

308 Board Room

309 Art & Craft Room

310 Laboratory

311 Library

312 Computer Room

313 Language Laboratory

314 IT Tech & Control Room

315 Music Room

316 Living Skill & Workshop

317 CCC
DURATION START FINISH

24-Oct-16

300 days 24-Oct-16 20-Aug-17

180 days 27-Feb-17 26-Aug-17

150 days 2-Jan-17 1-Jun-17

17 days 14-Jul-17 31-Jul-17

30 days 22-Apr-17 22-May-17

90 days 1-Jun-17 30-Aug-17

60 days 2-Apr-17 1-Jun-17

14 days 14-Feb-17 28-Feb-17

45 days 25-Feb-17 11-Apr-17

45 days 9-Dec-16 23-Jan-17

1-Jul-17

17 days 1-Sep-17 18-Sep-17

3 days 1-Sep-17 4-Sep-17

4 days 5-Sep-17 9-Sep-17

7 days 11-Sep-17 18-Sep-17

7 days 11-Sep-17 18-Sep-17

7 days 11-Sep-17 18-Sep-17

8 days 14-Jul-17 22-Jul-17

5 days 11-Sep-17 16-Sep-17

60 days 18-Sep-17 17-Nov-17

5 days 20-Nov-17 25-Nov-17

35 days 23-Nov-17 28-Dec-17

7 days 23-Nov-17 30-Nov-17

7 days 1-Dec-17 8-Dec-17

7 days 9-Dec-17 16-Dec-17

5 days 18-Dec-17 23-Dec-17

3 days 25-Dec-17 28-Dec-17


7 days 29-Dec-17 5-Jan-18

3 days 3-Jan-18 6-Jan-18

14 days 29-Dec-17 12-Jan-18

7 days 8-Jan-18 15-Jan-18

3 days 16-Jan-18 19-Jan-18

3 days 12-Jan-18 15-Jan-18

7 days 8-Jan-18 15-Jan-18

3 days 16-Jan-18 19-Jan-18

3 days 20-Jan-18 23-Jan-18

3 days 16-Jan-18 19-Jan-18

14 days 10-Jan-18 24-Jan-18

7 days 20-Jan-18 27-Jan-18

3 days 29-Jan-18 1-Feb-18

3 days 24-Jan-18 27-Jan-18

14 days 20-Jan-18 3-Feb-18

7 days 31-Jan-18 7-Feb-18

3 days 7-Feb-18 10-Feb-18

3 days 5-Feb-18 8-Feb-18