Course objectives
This course seeks to introduce different phases of managing projects from conception to termination with particular
emphasis on quantitative tools for planning, scheduling, resource allocation, monitoring, and control. In addition, topics
such as risk management, communication, and conflict management will be covered. Students will also gain a working
knowledge of both @RISK and MSProject software.
Course Materials
Announcements, updated schedules, assignments, class notes, etc. will be posted on Blackboard.
1. Required Course Packet: Available at Purdue Union Copy Center
2. Recommended Book: Microsoft Project 2013 Step by Step (Chatfield and Johnson)
3. Recommended Book: Critical Chain (Goldratt)
Email Policy
Please include MGMT 562 in the subject line of all emails and enough information in the body of the email that I can
answer your question in a single response. I do my best to respond within one day during the week and two days on the
weekend. Appointment requests should be sent at least 48 hours in advance through MSOutlook.
Course Grades
Attendance and Class Participation 20%
Group Assignments 60%
Individual Assignments 20%
Final grades will be assigned according to the Krannert grading policy for masters courses (see
http://www.krannert.purdue.edu/masters/student-life/academics/grading-policy/home.asp): The target grade
distribution for elective courses is 40-50% A/A- , 40-55% B+/B, 0-10% B-, and 0-5% C+ or below resulting in
approximately an average GPA of 3.42 for each elective course where the GPA is calculated as A = 4, A- = 3.70, B+ = 3.30,
B = 3.00, B- = 2.70, C+ = 2.30, C = 2.00, C- = 1.70, D = 1.00 and F = 0.00.
1
Students must try to schedule job interview travel and other appointments so they do not conflict with class
meetings.
Students with a medical or other emergency must notify the instructor at the earliest possible opportunity and
may be required to provide appropriate documentation.
Attendance and participation grades will include participation in class discussion, participation in small group
activities, the quality of work handed in for small group activities, peer evaluations, and self-evaluations in both
Week 4 and at the end of the term.
If, at any point during the module, I feel that many students are not doing the required reading and class
preparation, I reserve the right to give unannounced quizzes that will be considered part of your attendance
and participation grade.
The following rubric will be used to determine a percentage grade:
Group Assignments
Group assignments are case-based executive summaries to be completed in groups of 3-4 students. Assignments should
be submitted PRIOR TO CLASS on the due date given in the schedule below. As we will discuss the homework in class, no
late work will be accepted. Full guidelines for executive summaries and the grading rubric appear at the end of this
syllabus. Plagiarism of solutions found on the internet or other published materials will result in a zero grade.
Individual Assignments
Individual assignments are software-based assignments (@RISK or MSProject) to be completed INDIVIDUALLY. This
means you are not to share files or solutions with your classmates. Doing so will result in a zero grade given to all
students involved. Assignments should be submitted PRIOR TO CLASS on the due date given in the schedule below. As
we will discuss the homework in class, no late work will be accepted.
Peer Evaluations
Peer evaluations will be conducted through CATME. You will receive an email prompting you to complete the evaluation
at both midterm and at the end of the module, and you will have two days to do so in each case. You are expected to do
so thoughtfully and thoroughly, and to fairly evaluate your own participation as well.
Schedule at-a-Glance
Date (Day) Topics Covered Reading Materials Due
1 8/21 (M) Introduction and Project Selection
2 8/23 (W) The Project Team Case: MediSys Corp. Introduction
PM Survey
3 8/28 (M) Project Planning Case: Alvalade XXI Group Assignment 1
Article: Will Project Creep
Cost You or Create Value?
4 8/30 (W) LAB: Task Planning and Budgeting Access to @RISK
Time &
Location TBD
9/4 (M) Labor Day
5 9/6 (W) Project Scheduling (CPM) Article: ABCs of Critical Path Group Assignment 2
6 9/11 (M) LAB: Introduction to MSProject Individual Assignment 1
Time & Midterm Peer
Location TBD
Evaluation
Install MSProject
7 9/13 (W) LAB: Project Scheduling (PERT)
Time &
Location TBD
8 9/18 (M) Resource Allocation and Critical Article: Fundamentals of
Chain Critical Chain
9 9/20 (W) LAB: Resources in MSProject Individual Assignment 2
Time &
Location TBD
10 9/25 (M) Monitoring the Project Case: Turner Construction Group Assignment 3
Company
11 9/27 (W) LAB: Monitoring in MSProject
Time &
Location TBD
12 10/2 (M) Controlling the Project Access to simulation
13 10/4 (W) Closing the Project Article: Dont Throw Good Group Assignment 4
Money After Bad
14 10/11 (W) Final Exam Week Group Assignment 5
No class meeting (worth 20%)
Final Peer Evaluation
Course Feedback
The formal course evaluation period is the last week of the module. You will receive reminder emails from the registrar
during this time period. Further, I will ask for informal feedback in the fourth week, which allows me to make
appropriate changes to the course. If you have constructive feedback at other times, please do not hesitate to send me
an email or speak to me during office hours.
Intellectual Property
All course materials are the intellectual property of either the instructor, the university, or the course packet publishers.
No course materials should be posted on line or duplicated without express written consent.
To foster a climate of trust and high standards of academic achievement, Purdue University is committed to cultivating
academic integrity and expects students to exhibit the highest standards of honor in their scholastic endeavors.
Academic integrity is essential to the success of Purdue Universitys mission. As members of the academic community,
our foremost interest is toward achieving noble educational goals and our foremost responsibility is to ensure that
academic honesty prevails.
Emergency Statement:
In the event of a major campus emergency, course requirements, deadlines and grading percentages are subject to
changes that may be necessitated by a revised semester calendar or other circumstances.
Schedule of Topics, Readings, and Additional Resources
Class Session 1:
Topics: Basic terms, the project lifecycle, the PM triangle, project portfolios and selection methods, ethical duties of the
project manager
Class Session 2:
Topics: Project team structures, cross-functional teams, tools for managing project teams
Class Session 3:
Materials Due: Group Assignment 1
Topics: The project charter, the project plan, risk management planning, requirements gathering, scope management
Reading:
1. Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management
What are the business goals of the payment card project? What is required to meet these goals?
Who was responsible for managing quality on this project? What quality planning was done?
What key risks should have been identified prior to project execution? Which would be deemed most critical?
2. Will Project Creep Cost You or Create Value?
Additional Resources: @RISK Users Guide (posted on Blackboard), Tracking Signal Worksheet (posted on Blackboard)
Class Session 5:
Materials Due: Group Assignment 2
Prior to Class: If you are not a Krannert student, please make sure you are able to log in to a computer in the Krannert
lab, and contact the Krannert Computing Center with any issues.
Additional Resources: Chapters 1 - 4 from optional text, Microsoft Project 2013 Step by Step
Class Session 8:
Topics: Resource allocation and Critical Chain
Additional Resources: Chapters 5 - 11 from optional text, Microsoft Project 2013 Step by Step
Additional Resources: Chapters 12 - 16 from optional text, Microsoft Project 2013 Step by Step
Class Session 12 (bring laptops to class):
Topics: Controlling the project
Prior to Class: Sign up for a student user account at Harvard Business Publishing, http://hbsp.harvard.edu.
STRUCTURE
Although executive summaries can be written in different forms, it is important that you open with a
statement that sets the tone and context for the recommendation that you will be presenting and captures
the strategic relevance of the problem at hand.
Following the opening statement, there are two main approaches that can be adopted. The first is to lead
off with the recommendation, and then provide the rationale for it. Alternatively, one can adopt a more
linear approach by presenting the analysis that leads logically to the recommendation. Depending upon
the situation, either of these two approaches can be effective.
The recommendation should be sufficiently specific that it can be acted upon. Avoid wishy-washy
phrases like, They should consider; They might want to; etc.
Do not recommend that they complete a study or gather more information. You should either gather
that information, or make the necessary assumption to reach a recommendation.
Explain why you have rejected any reasonable alternatives to the course of action that you are
advocating.
Recognize any significant risks that might be associated with the course of action that you are
recommending and suggest how they might be mitigated.
Virtually all executive summaries should include some type of quantitative analysis, the details of which
can be attached (and appropriately referenced) as exhibits.
When writing an executive summary, you should focus on the most important data, conclusions, and
recommendations. Avoid including excessive background and detail. One possible approach in developing
your executive summary is to imagine that you need to present your recommendation to the CEO of your
company while you are with her on an elevator. You need to capture the significance of the issue and make
a logical, compelling case for your recommendation in a very short amount of time. Therefore, you cannot
afford to waste time on minor points or on summarizing information that is not directly relevant for
justifying your recommendation. The following example shows how an executive summary can be
structured and written. Although the right format is important, providing concise yet insightful content
is crucial.
EXECUTIVE SUMMARY (Example)
Introduction: BMW faces a threat from the Japanese entry into the high end segment of the automobile
market. Although BMWs share has not yet been affected, the threat is real, especially due to the lower
prices, better quality and shorter lead times for new product introductions by the Japanese. It takes BMW
six years to launch a new product, but the Japanese can do it in four. This difference is due to the fact that
the Japanese introduce incremental changes frequently, while BMW made big changes infrequently. It has
been proposed that BMW adopt a prototyping system more like that of the Japanese, by requiring design
decisions to be locked in 12 months prior to each prototype in order to allow pre-production grade tooling
to be used in the construction of each set of prototypes.
Analysis: The major advantage of BMWs current prototyping approach is that it affords maximum
flexibility in the design process; i.e., BMW can make changes relatively late in the design cycle. Not only
does this allow them to respond to the changing tastes of the market, it also allows them to incorporate
technological breakthroughs into their products, enhancing their reputation as a technological leader.
Advantages of proposed approach:
Improved product quality at launch.
Using actual materials bought from suppliers will lead to a more accurate prototype testing.
Use of pre-production tools enables BMW to discover tooling or parts problems earlier in the
product development cycle. Also by procuring parts from suppliers at the prototype stage, any
incompatibility issues with parts can be identified earlier.
Using plant workers for the final prototype more closely approximates the actual assembly line.
The new approach would speed up the ramp-up and pilot processes due to production problems
being identified earlier, and it will allow them time for fine tuning.
Lower warranty expenses due to improved quality of products at launch.
Disadvantages of proposed approach:
Higher tooling costs
Loss of flexibility in design commitment for each prototype build cycle.
Recommendations: To adopt the new prototyping approach BMW will have to trade off flexibility and
quality. While to make design changes later is important to keep up with changing consumer demands,
the higher quality levels of the Japanese vehicles are a bigger threat. BMW can balance these issues by:
For now, use the new approach for the cockpit design. The cockpit seems to be the area where
design and manufacturing quality matter the most, and it would benefit from the new approach.
However, in general they should adopt this approach only in the last one or two batches of the
prototype development cycle. This would minimize the investment needed in pre-production tools
and still offer them enough opportunities to identify problems before the pilot stage.
They should assess each of the 30 major subsystems regarding the relative importance of design
flexibility versus conformance quality at launch. The new approach should be used only for those
subsystems in which conformance quality is judged to be more important than design flexibility.
Although there is incremental investment required for the new prototyping approach, the overall savings
from all 3 stages (Prototyping, Pilot and Ramp-up) will more than justify these investments. (Attachments
skipped.)
EXECUTIVE SUMMARY RUBRIC