Beruflich Dokumente
Kultur Dokumente
We will update and maintain this document when possible to present the best available
information.
1 - Not Installed
2 - Upgrade from MRP
3 - Full Installation
Other values may appear, but are not longer used by the code.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MO: Operating Unit
This was used only until 11.5.9. From 11.5.10 this profile is not used.
Note Reference(s)
This profile is used to decide upon whether the request Calculate Plan
performance Indicators needs to be run at the end of MRP Launch or not.
This was an optional program used to gather info from MRP and load into
tables used by the old Business Intelligence programs. More information is
available in Note: 783088.1
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Calculate Supply Demand
PERFORMANCE NOTE:
This is used for ATP debugging and can effect performance, especially on
large orders or ATO models.
This should usually be setup at the User Level as required.
Note Reference(s)
368229.1
565918.1
436771.1
Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
-1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP: Category Set for Backlog Form
Suggest that this would be the same as used for preferences when viewing
data in the Collections Workbench (View Collected Data)
Use this profile option to indicate which items belonging to this category set
appear in the Backlog Scheduling Workbench tree navigator.
If no value is entered, no items appear in the Backlog Scheduling Workbench
tree navigator. You can update this profile at the site level.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP: Compute Standard Mandatory Components
for ATO Models
Setting this to Yes would be normal if ATO Models are present in the system.
Collections code will default this profile to Yes if it is NULL.
Set this profile in the EBS Source instance when you have distributed
installation.
We print the following for CTO BOM not found - this is a setup violation -
since the requirement for CTO is to configure and create the [STAR] item
using CTO Auto-Create or by progressing the sales order.
You may safely disregard this warning if the configured item is transferred
across orgs, and the warning points to an org in which no assembly of the
configured item takes place. If you are using ODS based ATP, please check
that you have the BOM in shipping org. If you are using PDS based ATP,
please check that item attribute ""Create Configured Item, BOM"" equals
""Based on Model"" and BOM exists in ship-from org.
Note Reference(s)
179522.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Cutoff History Days
Bug 6903209
One off patch released for 11.5.10
12.0.6
bypass code included in
$MRP_TOP/patch/115/MRPRLWFB.pls
120.1.12000000.6
BUT - the profile is not created, and must be
created manually - see below
SQL validation:
SQL="select lookup_code, meaning
\"MRP:DisableProjectValidation\"
into :profile_option_value, :visible_option_value
from fnd_lookups
where lookup_type = 'YES_NO'"
Column="\"MRP:DisableProjectValidation\"(*)"
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Hash Area Size (Bytes)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Net All Purchase Orders Prior To Requisitions
Default - No
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Old Sales Orders Cutoff Days
Bug details:
Commit ATP results data (mrp_atp_details_temp and
mrp_atp_schedule_temp) into database instead of removing data as is done
in types of ATP requests.
Customer is using these tables to generate a report.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Plan Revenue Price List
Valid values are names of prices lists defined. The list of values will show the
price lists that can be used.
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Planning Manager Run First Time
File $MRP_TOP/patch/115/sql/MRPPRELB.pls
See profile for Advanced Supply Chain Planning - MSC: Update Requested
Completion Date when Releasing Reschedules
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Use Alternate SQL for Daily Cleanup
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP: i2 Batch Client Timeout
147243.1
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP:Calculate Excess Exceptions on Time Fence
IMPORTANT NOTE: The Time Fence used for this exception is from the
Exception Set - NOT the Item
Planning Time Fence value. Check the User Defined Time Fence in your
Exception Set assigned to the item.
Note Reference(s)
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Consume MDS
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Consume MPS
The planning engine honors the item attribute Planning Time Fence
regardless of the value of this profile option.
Note Reference(s)
399888.1
422361.1
Bug Reference(s)
Document References(s) -1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Cutoff Date Offset Months
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance Yes
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP:Default Criteria Set
Note Reference(s)
This directory path is used for MRP Plans in old Standard MRP planning and
old Supply Chain Planning
So if you set profile to a directory that does not exist under $APPLCSF, then
it will fail when trying to set that directory and plan will fail.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Firm Planned Order Time Fence
If the overwrite option in the plan is set to overwrite all, then all firm planned
orders are deleted
Note Reference(s)
This profile is not used for MSO (constrained planning), looks at planning
time fence control.
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Retain Dates Within Calendar Boundary
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Sourcing Rule Category Set
Indicates the category set used when Oracle Supply Chain Planning or
Oracle Purchasing creates sourcing assignments at category-org or category
level.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Time Fence Warning
This should only be used with suggestion of support since this reaches to
many different applications.
Should only be set at User Level to avoid tracing many application
processes.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning Yes
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP:Use Direct Load Option
Default Value - No
Note Reference(s) 307443.1
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Use Ship Arrived Flag
'Yes' - will refer to the arrived date in the shipping tables (source data) to
determine if the shipment has arrived.
"No" - will be taken as arrived at the customer-site using the in-transit lead
time to determine the arrival date.
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP_NEW_PLANNER_BACK_COMPATIBILITY
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC : Publish Supply Commit based on pegging
information
Yes
No
Default Value - No
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC : VMI Requisitions Need By Date at RTF end
This enhancement impacts only the need-by date on the requisition that is
created, when a replenishment is released from VMI
Added the code to ignore RTF if the profile "VMI Requisitions Need By Date
at RTF end" is set to No. The default value of this profile is "Yes".
Sun 64-bit - 1
HP 64-bit - 2
AIX 64-bit - 3
Linux 64-bit - 4
HP Itanium 64-bit - 5
Note Reference(s)
254810.1
- MSC_DEMANDS_CUM_F
- MSC_RESOURCES_CUM_F
Note Reference(s)
Values:
with profile options "MSC: APCC Archive SCRM
Measures" set to "Yes'and "No" and also with
blank.
Blank and yes will have same result as the default
value is blank.
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Category Set 2
It precomputes the data for all three hierarchies, but displays the data using
only the MSC: APCC Category Set 1 value. Therefore, if the user wants to
view using the value in MSC: APCC Category Set 2, the values in these two
profiles must be switched. The user can then see the results using the new
category set, which is now in the MSC: APCC Category Set 1 profile.
844667.1
It precomputes the data for all three hierarchies, but displays the data using
only the MSC: APCC Category Set 1 value. Therefore, if the user wants to
view using the value in MSC: APCC Category Set 3, the values in these two
profiles must be switched.
The user can then see the results using the new category set, which is now
in the MSC: APCC Category Set 1 profile.
844667.1
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Category set for detailed pegging
analysis
1225973.1
Please note that if this profile is changed the plan must be republished to
APCC repository to see the data in the new currency.
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Gather Fact Tables Statistics
Valid Values
Yes
No (default)
Note Reference(s)
Valid Values
Yes
No (default)
Note Reference(s)
Valid Values
Yes
No (default)
Note Reference(s)
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC SNO Item Simulation Set
Bug 9274349
temporary solution for simulation sets for sno in apcc
It'll work like this:- user sets the profile option before publishing SNO
Note Reference(s)
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC WebLogic Console Username
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC WebLogic Password
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC WebLogic Username
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter Admin URL
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter Group Space Template
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter Spaces Member Role
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter Spaces Port
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter Spaces Recipient Key Alias
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter Spaces Saml Issuer Name
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter URL
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC debug mode
Valid Values
Yes - Debug messages are written to log file
No (Default) - No debug messages
You may use the following SQL to find the location of the log file:
Bug Reference(s)
Document References(s) Oracle Advanced Planning Command Center User's Guide
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: ATP Allocation Method
Bug Reference(s)
Document References(s) -1
-1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: ATP Capacity Allocation
Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: ATP Debug Mode
Values are:
+ Debug Only: ATP generates a log file for an ATP request.
+ Debug and Database Trace: ATP generates a log file and a database trace
file.
+ Database Trace Only: ATP generates a database trace file.
+ None: ATP does not generate a log file or a database trace file. (Default)
Note Reference(s) 954333.1
122372.1
Bug Reference(s)
Document References(s) -1
-1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: ATP Enforces Lead Time for ATO Model
Indicates whether ATP enforces lead time for ATO models or not.
+ Yes - Enforces lead time for ATO models.
+ No - Does not enforce lead time for ATO models.
Note Reference(s)
1177424.1
Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: ATP Infinite Time Fence Pad
A new profile option MSC: ATP Infinite Time Fence Pad has been
created to offset the Supply Fence Date with the number of days set
by user. ATP adds this number to the Infinite Supply Fence Date.
Thus, the Oracle Advanced Supply Chain Planning matches the ATP output.
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: ATP Synchronization Downtime (minutes)
Determines the approximate ATP downtime (in minutes) to cover the time
required to synchronize and to switch over to the
refreshed plan during the plan synchronization process. Oracle Global Order
Promising internally translates this value into
the number of orders to process.
You should set the value for this profile based on the sales order volume
during the ATP 24x7 plan run.
This profile option also determines the duration of the extended
synchronization process.
This process is executed for the duration of the ATP downtime or 10 minutes
(default), whichever is larger.
Note:
ATP Post Plan Processing is where this is executed and it reports in the log
file how much downtime was used.
Actual downtime is usually very small and default value of 10 mins should not
require any changes.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: ATP Web Service Responsibility
Determines whether manual updates are allowed to the original plan when
the plan copy is running.
Values are:
Yes: The ATP plan appears in the Workbench window while it is running.
You can make changes to the plan. However, the changes will not appear in
the refreshed plan.
No: The ATP plan appears only in the View Plan window.
Note Reference(s)
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Additional Demantra Item hierarchy in APCC
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: Aggregate Resource Name Flexfield Attribute
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Align Component Demand Date with Pegging
Date
Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Allocation Assignment Category Set
The planning engine uses lead-time percent to calculate the operation start
date; it assumes that the lead-time percent of an operation that is effective in
the future is the same as the lead-time percent of the operation it replaces. If
an operation's effectivity ends within a time bucket, the planning engine
assumes that its effectivity ends on the first day of the time bucket.
Note: The code will internally set this profile as Order Start Date if it is not
setup.
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Apply Lot Modifiers in Weekly/Period Buckets
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Apply Order Modifier To Start Quantity
Default Value - No
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Apply Safety Stock Change interval to non
MRP Planned Safety Stock
Note Reference(s)
276707.1
759329.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Apply shortage and excess tolerance to
planned orders
Valid Values
Yes - launches the Archive Plan Summary program after
ASCP runs if plan option Calculate KPI is also checked
No - the Archive Plan Summary program will not run
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Auto-Release Compression Days Tolerance
Example:
Assume the profile = NULL
Item/Org setup has Release time fence days User define - 15,
Leadtime is 10 days (working days).
New planned order created due on working day 1 though 9 will not be
released since the lead time is being compressed.
The Sugg Order Date will show the anchor date of the plan and Compression
Days field will be greater than 0.
But any planned order that with Compression Days 0 and Sugg Order Date =
to the anchor date of the plan run out to working day 15 will be released
Set the profile to 10. Now in the above example, the planned order will be
released on working day 1 through 9 since you're allowed up to 10
compression days for Autorelease to release the planned order.
The Production Flag must be checked in the Plan Names form for
Autorelease to run during the plan run.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Automatically Recalculate Operation Time
No - With this setting, you can plan by arrival date, change ship methods,
and change source org provided you have set up the correct sourcing rules.
Introduced because ASCP planning was resourcing FIRM sales orders and
changing the ship method that was chosen on the sales order.
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: BPEL Demantra Username
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: BPEL Domain Name
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: BPEL End Point URI
http://[m/c name]:port
Note Reference(s) 759571.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: BPEL Process Version
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: Batch Size for Self Service Loads
Integer
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Batchable Flag
Notes:
Ref Note 566206.1 for more information.ATP does not currently use this
profile. an ASL must be assigned to the item with the Supplier Capacity
Calendar same as the Org calendar to get ATP to offer the same
functionality as ASCP planning
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center Yes
Global Order Promising No
MSC: CP Debug Level
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Calendar Reference for Bucketing
372199.1
603981.1
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Cancel Oustanding Sales Order Quantities
Note that the only order modifier that is considered when determining partial
allocations to sales orders is the Round Order Quantities item attribute for
the shipping organization.
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Category Set for Jobs without an Item
Reference
Since the item does not exist on the standard job , there is no reference to a
category set hence the need for a default category from the profile option.
Category set for Non-standard Jobs without an 'Item' Reference can still be
displayed in the ASCP planner workbench because of the default category
set captured by the profile option.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Category Set for Liability Analysis
Since the item does not exist on the standard job , there is not reference to a
category hence the need for a default category from the profile option.
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Category set for serviceable items
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Choice of item for which to create supplies in
substitute relationship
Choices are:
Demanded Item (default), (701)
Highest Level Item, (702)
Follow Item Attributes (703)
When set to Follow Item Attribute and the item attribute Create Supply for all
the substitute items in the substitution chain is No, no supplies are created.
When you have a substitution chain A --> B --> C, and this profile option is
set to Highest Level Item, it is expected that Oracle Advanced Planning
creates supply for item C. Item C must be enabled in the organization where
you are trying to create supply. If item C is not enabled in the organization,
Oracle Advanced Planning creates supply for item B (the next highest level
item in the substitution chain) and does not create supply for item C.
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Class Hierarchy
Bug Reference(s)
Document References(s) -1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Closest Quantity Pegging
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Collect Item, Material and Resource Costs
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning Yes
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Collect PS SNO Data
Months of data to collect - Integer value - defaults NULL and this will collect
12 Months of data
Note Reference(s) 1225993.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Collection Window for Region and Zones
(Days)
If null, then all changes are collected. Used when collections for the trading
partners entity is run in complete mode.
Note Reference(s) 405295
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Collections Snapshot Threshold
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Compute Project Exception
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Configuration
Example:
Plan 1 shows in planner workbench - Planned order demand 03-DEC-2012
qty = 96
-- if you drill into the pegging for this demand you will see many smaller
demand making up this single qty of 96
Plan 2 has Plan 1 as demand Schedule and has Inter Plant box is checked
In Plan 2 we see many lines of Interorganization Demand for 03-DEC that
add up to 96 (profile is using default End Pegged Demand)
If we change the profile to By Demand Schedule Supply - then we only see
the single Interorganization Demand line for 96
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Consume forecast with no demand class
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Consume forecasts using Internal Sales
Orders
1. The profile was added in bug 5440895. This profile works in tandem with
the profile option MSC: Perform ATP Check for Internal Sales Orders. see
the table in the note to understand the profile values and how they are used.
2. If you have a centralized instance, set the profile value as required. If
you are a decentralized/distributed installation with both APS Destination and
EBS Source, set this on the APS destination and EBS source.
Notes:
1. Bug 6434413 Some Orgs do use an Internal sales order and need
consumptions, but other orgs do NOT want consumption, so fixes had to be
made so that profile value can be set for different orgs at different settings
(by Responsibility) and have the value honored. Set in EBS source
2. For Bug 6434413 - fix is released on ATP RUP #22 and above (See
Note 252108.1 for list of patches. Patch 6434413 should not be applied
instead of a rollup patch.
3. In R12.0.4, this fix is included ATP CU4, and also in base release of
12.0.6
Note Reference(s) 558908.1
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Cost of Using a BOM/ Routing Flexfield
Attribute
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Create Resource Requirements for all
Operations
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Currency Conversion Type
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Custom allocation
Only end item allocation. no component allocation. that is, the item cannot
be a component of other bom.
No ctp (so we don't deal with planned order demand allocation and CTP
suggested supply/demand allocation).
Note Reference(s)
555016.1
The profile option "MSC: DPP Allow Quantity Reduction Only When Supply
is Excess on Internal Requisition, Requisition and PO" is disabled starting
with 12.1.3 Engine patch, and should be removed from the Profile Options
listed in the user's guide.
So this profile is no longer active in the system.
The default behavior is as if the profile is set to Yes - per design this is not
supposed to have any other value - so it cannot be set by user.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: DPP Debug Level
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: DPP Related Exception Additional Offset Days
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: DPP allocates to existing ISO's before other
demands with same priority
Name: MSC: DPP allocates to existing ISO's before other demands with the
same priority
Valid Values:
Step1: Allocate available supply only to existing ISO demands, for a specific
priority.
Step2: Allocate remaining supply to all existing Non-ISO demands for the
same priority as used in Step 1.
Within each allocation bucket and for the same demand priority the Allocation
logic is performed in 1 Step: Group all existing ISO and Non-ISO demands
together, and allocate available supply to the demands.
Note Reference(s)
This profile option does not control the Load Consolidation processes.
This profile option does not apply with operating system Microsoft Windows.
Note Reference(s)
This profile option does not apply with operating system Microsoft Windows.
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Day UOM
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Days of Resource Availability before sysdate
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Default Project for Supplies Pegged to Excess
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan Yes
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Default Workbench Height
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Default Workbench Width
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Degree of Parallelism for Index Creation
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Demand Satisfied Percent Threshold for
Pegging
Even if you set this profile option below 100.0, the planning engine still
satisfies 100% of the demand.
Note Reference(s)
739561.1
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Display Order Rescheduling Supplies
Values are:
+ Yes: Displays the rescheduling supplies details in the Planner Workbench.
+ No: he rescheduling supplies details are hidden from the Planner
Workbench
This profile is provided for debugging and analysis only. Therefore, you
should set this profile to No in a production environment.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Display Supplier Item in Collaborative
Planning
After the profile change, allow 60-90 seconds for the profile change to take
place.
Note Reference(s)
Note Reference(s)
Bug Reference(s)
Document References(s) -1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Distribution Planning Use Firm Supplies and
Minimize Excess Supplies
Note Reference(s)
Format: String
Where Used: JDE-VCP Collections
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1 APS ODI URL
Default: +
Format: Character
Where Used: JDE-VCP Collections.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1APS_BATCH_SIZE
Default: 180
Format: Integer
Where Used: JDE-VCP Collections
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1APS_WS_TIME_OUT
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: ENFORCE CRITERIA REQUIREMENT BEFORE
EXECUTING QUERY
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable 64 bit snapshot
Disabled - 0
Lets the system know if 64 bit snapshot need to be launched or not. Which
platform is determined from profile MSC_PLANNER_PLATFORM.
Note Reference(s) 254810.1
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable ATP Summary Mode
You may only set this profile to Yes when Oracle Global Order Promising is
on the same instance as other ERP application (i.e. You have a centralized
instance setup)
ATP will use the detailed information in several cases even if you have this
set to Yes
ATP in the Order Backlog Workbench is based on the detail supply demand
tables, regardless of the profile setting for MSC:
Enable ATP Summary Mode.
ATP for ATO models is always based on detailed information.
563617.1
Bug Reference(s)
Document References(s) -1
Oracle Global Order Promising Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Enable ATP Workflow
Bug Reference(s)
Document References(s) -1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Enable ATP for Phantom Components
When set to No, it skips the Phantom components and ignores Phantom lead
times and moves directly to the next level in the BOM.
Note Reference(s)
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable Allocated ATP
Yes / No (default)
Note Reference(s) 212788.1
218010.1
339599.1
154293.1
333936.1
251920.1
Bug Reference(s)
Document References(s) -1
-1
-1
-1
-1
-1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Enable DRP Multitasking
Yes - All DPP plans run by this user or at this site are run in
high volume mode. This value does not apply with operating
system Microsoft Windows.
No - DPP plans run by this user or at this site are not run in
high volume mode
Note Reference(s)
Open the ATP inquiry screen and then go to /Tools and check on Enable
Diagnostic ATP
Then when you perform ATP inquiry for the item, additional information on
the constraints causing lateness will be available.
Example on the GOP Users Guide provides more information.
Note Reference(s) 303067.1
Rank 2 buy sources are considered if supplier capacity is exhausted for rank
1 sources. This profile option duplicates the functionality of the decision rule
Use Alternate Sources parameter for buy items but not for transfers from
other organizations. When the decision rules are enabled, the planning
engine does not consider this profile option.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable Group Based Netting
Oracle recommends that you set the value to Yes and use the latest netting
features. This profile option is for backward compatibility. In R12 this profile
has to be set to Yes.
Note Reference(s) 421097.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable In-Memory Performance Driven
Planning
Use this profile option to control whether the inter process communication will
use Advanced Queues or DBMS_PIPES. This impacts the following:
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center Yes
Global Order Promising No
MSC: Enable Large Plan Copy in 32 bit Linux
Name: MSC_ENBL_COPY_LARGE_PLAN
User Name: "MSC: Enable Copy Large Plan in Linux 32 bit"
This is YES/NO profile and should be defined at customer
site.
Default value should be "No".
SQL Validation is
SQL= "select meaning \"MSC: Enable Large Plan Copy\",
lookup_code
into :visible_option_value,:profile_option_value
from fnd_lookups where lookup_type = 'YES_NO'"
COLUMN="\"MSC: Enable Large Plan Copy\"(4)"
Note Reference(s) 1151597.1]
1510271.1
866422.1
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable Model and End Item dimensions in
APCC
Setting this profile option to Yes enables the ability to run Legacy Collections
and Standard Collections in parallel. In order to enable this functionality, the
system administrator must manually remove the following incompatibilities for
the concurrent program Request Set Planning Data Collection:
Pre-Process Monitor
Flat File Loader
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable Priority Pegging
This is actually a parameter on the options form for the plan options.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable Release of Defective Planned
Transfers
This is user defined profile, but does contain entry in the ASCP User Guide -
which is unusual.
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Excess and Safety Stock by Demand Class
+ No:
Allocate such supply or demand to OTHER.
Note Reference(s) 250289.1
Bug Reference(s)
Document References(s) -1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Fast Refresh of Region Site Map
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning Yes
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning Yes
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Firm Internal Requisition Time Fence
Yes: Use this to create a natural time fence for a firm internal
requisition.
No: Use this if you do not want to create a natural time fence
for a firm internal requisition.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Firm Intransit and PO in Receiving Supplies
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Forecast Spreading Calendar
Example:
Mfg calendar 7 days on
shipping calendar 5 on / 2 off
Forecast qty per week = 700
Spread Forecast qty / Forecast Bucketing
Day 1 100 100
Day 2 100 100
Day 3 100 100
Day 4 100 100
Day 5 100 300
Day 6 100
Day 7 100
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Gateway URL to External Application
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Generate Notifications for Transportation
Updates
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: HP Maximum Displayed Item Count
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: High Volume Items
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Horizon for APCC Collected data - Backward
days
How much data is pull into APCC depends on this profile and companion
profile
MSC: Horizon for APCC Collected data - Forward days
Note: During Data Collections - you can set ODS Load parameter - Refresh
Data in APCC repository - Yes and this will automatically launch the refresh
after ODS Load is completed.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Planning Command Center User's Guide
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: Horizon for APCC Collected data - Forward
days
How much data is pull into APCC depends on this profile and companion
profile
MSC: Horizon for APCC Collected data - Backward days
Note: During Data Collections - you can set ODS Load parameter - Refresh
Data in APCC repository - Yes and this will automatically launch the refresh
after ODS Load is completed.
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Oracle Advanced Planning Command Center User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: Horizontal Plan Demand Bucketing
Preference
Demand Due Date, Oracle Global Order Promising treats the demand due as
the Schedule Ship Date. (Suggested Due Date in Supply/Demand view of
ASCP plan.)
So using Demand Due Date will have ATP Hiorizontal Plan and ASCP
Horizontal Plan show demand in the same buckets.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Horizontal Plan Extension Program
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Hour UOM
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: INTER PLANT DEM PRIORITY
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: IO UI Period Set Name
If profile: "MSC: Ignore CMRO and EAM Workorders in ASCP" is set as Yes
(or NULL), we do not Create or Snapshot related supplies and ASCP Plan
will not plan for OR generate exceptions for CMRO and EAM.
Maintenance work order and maintenance work order demands are not
controlled by Net WIP when profile is set to No.
* Yes - set the Planning Time Fence to sysdate. So Planning Time Fence
is not considered while doing ATP.
* No
Default Value - No
Introduced to help customers who are running UNconstrained plan and using
ATP based on Planning output.
For GOP, for make order, the start date will respect Planning Time Fence .
For transfer order, the ship date will respect Planning Time Fence.
For buy order, the dock date will respect Planning Time Fence.
This it is consistent with the constrained plan, and it is by design.
However, for an unconstrained plan, due date will respect Planning Time
Fence.
So if GOP is done on a unconstrained plan, this could lead to confusion.
Available in 11.5.10 -
Front port bug 6241549 on top of VCP 12.1.3.8 was done Jan 2014 via Patch
18150049 but requires DEV Approval to apply.
Note Reference(s) 464095.1
Bug notes:
Set the Profile "MSC: Ignore Routings Without Any Date
Effective Operations" to 'NO'.
Yes: The ASCP planing engine will ignore the process effectivity entries
where the routings have no valid operations.
No: ASCP uses the process effectivty entries even if the routing for the
process do not have any valid operations.
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Ignore Safety Stock calculation inside Time
Fence
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Include Firm Planned Orders In Firm
Allocation Window
Note Reference(s)
For 11.5.9 and lower, this determines whether ATP uses 24x7 calendar
instead of Org Manufacturing calendar for shipping dates (No for 24x7, Yes
for Org Calendar)
Note Reference(s) 555016.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Include Postprocessing lead time when
planning for make orders
Note Reference(s)
Note that this profile option is used in conjunction with shop floor scheduling
products such as Oracle Manufacturing Scheduling. It is assumed that the
discrete jobs are not released from the planning engine. If the jobs are
rescheduled and released by the planning engine, the resource requirements
are deflated. This could result in data inconsistency as the resource
requirements are deflated on release whereas Oracle Manufacturing and
Scheduling might have calculated resource requirements based on the
inflated values. The planning engine always sends the original resource
requirements upon release. If the resource requirements are already inflated
in the source from Oracle Manufacturing Scheduling, set this profile option to
No to avoid double inflation of the resource requirements. Otherwise, set it to
Yes so that the planning engine inflates the resource requirements.
Default Value - No
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Launch System Sql Loader
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Level for Calculating Liability
In prior releases, the Planning ODS Load and Memory Based Snapshot
programs were incompatible with each other. This was put in place to
prevent the Planning ODS Load program from overwriting the data that was
in the process of being read in for the plan run.
In release 12.1.3.9, the profile was added to allow for parallel collection runs
between "multiple VCP planning instances on one shared physical
destination server". Review the related note 1570652.1 for all considerations
Note Reference(s) 1570652.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: MPS Auto-Firm Planned Orders
This profile option applies only to master production schedule plans. You can
set it at the site and user levels.
Note Reference(s) 259322.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: MSC_TOP Directory
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Make Safety Stock Transient
Name: MSC_MAKE_SS_TRANSIENT
User Name: "MSC: Make Safety Stock Transient"
Application: Advanced Supply Chain Planning
Purpose: Profile is set to yes then safety stock is
treated as transient.
Default Behavior: If the value is not set then it will be
treated as Yes.
Values: This is YES/NO profile and should be
defined at site level
In the Application field, choose "Advanced Supply
Chain Planning".
SQL validation
SQL= "select meaning
\"MSC_MAKE_SS_TRANSIENT \",
lookup_code
into :visible_option_value,:profile_option_value
from fnd_lookups where lookup_type = 'YES_NO'"
COLUMN="\"MSC_MAKE_SS_TRANSIENT \"(4)"
1431837.1
Bug Reference(s)
Document References(s) -1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Map Server Host
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Max display decimals for Quantity
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Max display decimals for Quantity
(aggregates)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Max display decimals for Ratios/Percentages
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Max display decimals for Time
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Max display decimals for Time (aggregates)
376451.1
276707.1
559867.1
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Maximum number of planned orders per
demand
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Maximum number of planned orders per
demand(1)
Suppose there is a demand line of 1000 and by mistake some one has setup
an order modifier (FOQ/MOQ) of 1 then 1 demand would generate 1000
work orders. In actual business the order sizes may be 50 or 100, so 1000
work order/demand is really not an ideal profile of supply /demand.
To check these kind of data maintenance issues this profile was introduced
where one has a rough idea on the maximum number of work orders one
demand might generate and can set this as an internal checkpoint.
I do not see this profile any more in planners log 11.5.10-Rollup 4 onwards.
This is correct, just to add this logic is not applicable to DRP Plans and will
get invoked only for Fixed Order Quantity order modifiers.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Maximum number of threads for save plan
Profile option is created to get the user preference for the number of threads
during save plan. During save plan, these number of threads are created
and assigned to the tables accordingly.
Note Reference(s)
417736.1
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Minimize changes to chronological sequence
of supplies while rescheduling
No
Default Value - No
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Minimum Capacity
Bug Reference(s)
Document References(s) -1
-1
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Minimum Supply/Demand Percent for Pegging
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Move Past Due To Sysdate
If the profile option is 'Yes' then the sales order will be scheduled and
message will not be displayed
If the profile option is 'No' then the message will be "Scheduling Failed"
IF NULL - this profile defaults to Yes
Note Reference(s)
This must match the absolute path of the OA_MEDIA environment variable
and [subdir] is the name of a subdirectory under the OA_MEDIA directory.
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: New Forecast Auto Plan
Set the profile to an unconstrained supply chain plan. When the demand plan
scenario mentioned in the profile option MSD: Default DP Scenario is
published, the unconstrained supply chain plan specified in the profile option
MSC: New Forecast Auto Plan starts running.
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: New Material and Resource Plan Fetch Size
Note Reference(s)
433492.1
Set the profile option MSC: SCEM Engine Launch Events to All to
automatically start Supply Chain Event Manager (SCEM) when a supplier
loads an order forecast or when you publish an order forecast from the
planning server. If you set the profile option to Publish, Supply Chain Event
Manager starts only when plans are published from Oracle Advanced Supply
Chain Planning. If you set the profile option to Load, Supply Chain Event
Manager starts only when data is loaded using flat files.
Ensure that the value of the profile option MSC: Configuration is set to APS &
CP.
Note Reference(s)
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Number of Workers for Self Service Loads
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: OTHER with zero allocation percent is valid
demand class
When set to Yes, demand classes with 0% allocation are considered as valid
demand classes for allocated ATP calculations.
When set to No, demand classes with 0% allocations are not considered as
valid demand classes for allocated ATP calculations
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: OTM Responsibility
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: OTM User
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Operator Company Name
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Order Number-CA Mandatory for CVMI
If the profile option is set to Yes, the user must enter order
number for the consumption advice.
If set to No, the key date for sales orders and ASN is
considered as part of deletion key.
Bug Reference(s)
Document References(s) Oracle Collaborative Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Order Type for Consigned VMI
Then the forecast explosion and consumption code reads this value to
determine which org to use for Model BOM that will used to Explode and
Consume the forecast.
Usually this would be set to the same org and OM validation org in Order
Management
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Overwrite all Order Forecast records
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Customer Package
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Inventory Safety Targets
Package
Bug Reference(s)
Document References(s) Oracle Advanced Planning Command Center User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Manufacturing Package
Bug Reference(s)
Document References(s) Oracle Advanced Planning Command Center User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Purchase Orders Package
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Reservation Package
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Sales Orders Package
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Supplier Package
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Transfer Orders Package
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Work Orders Package
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Visit Display Format in PS UI
Note Reference(s)
1386168.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Consistent Resource Assignment
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Enable CRO Scheduling
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Filter Active Items
This flag (set in number of days) is used to set the capacity constraint
Note Reference(s)
'Completion Date'
null -> default
When completion date is specified as 'Completion Date' then for all work
orders (not planned orders),
PS uses the work order completion date as the due date, rather than the
requested date.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO API Version
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO Alignment Date
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO Data Store Path
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO Debug Mode
Default Value - No
Note Reference(s) 868904.1
809199.1
405083.1
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO Download XML Files
761773.1
Values:
The default value is Yes.
If this set to "No" then negative demands will not be
extracted.
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Pass List Price to OM in DRP Release
Note that in 12.1 we recommend that customers use MSC: Enable Attribute
Netting = Yes to use the new netting engine, unless they have specific
business requirement for using old netting engine (No)
1. The profile was added in bug 5440895. This profile works in tandem
with the profile option MSC: Consume forecasts using Internal Sales Orders.
So, If profile MSC: Perform ATP Check for Internal Sales Orders is set with a
value, it is used. Otherwise, the value of the previous profile is used.
2. If you have a centralized instance, set the profile value as required. If
you are a decentralized/distributed installation with both APS Destination and
ERP Source, set this on the APS destination and ERP source.
3. Profile option values and meanings:
Notes:
1. Bug 6434413 Service Orgs do NOT use an External sales order, so fixes
had to be made so that scheduling would be correct for service orgs that
generate Internal Reqs directly
2. For Bug 6434413 - fix is released on ATP RUP #22 and above (See
Note 252108.1 for list of patches. Patch 6434413 should not be applied
instead of a rollup patch.
3. In R12.0.6 - this is included in latest ATP Cum Patch #10
Note Reference(s)
558908.1
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Performance target for Inventory Turns
1. This profile (enabled at user, responsibility and site levels) will drive the
KPI targets in ASCP and IO workbenches.
2. For 12.2 source systems, the collections parameter "KPI Targets (BIS)"
should be disabled and set to No. The UI will use the profiles exclusively to
display the KPI targets
3. For 12.1 and prior source systems, the collections parameter will still be
available and if KPI targets are collected they will be used. However, if there
are no KPI targets collected, the new profiles will be used.
4. For all source systems, BIS Periods (from GL) entity collections should
not be controlled by "KPI Targets (BIS)" parameter but should be controlled
by "Calendars" parameter.
Note Reference(s)
Note Reference(s)
Note Reference(s)
1. New profile (enabled at user, responsibility and site levels) will drive the
KPI targets in ASCP and IO workbenches.
2. For 12.2 source systems, the collections parameter "KPI Targets (BIS)"
should be disabled and set to No. The UI will use the profiles exclusively to
display the KPI targets
3. For 12.1 and prior source systems, the collections parameter will still be
available and if KPI targets are collected they will be used. However, if there
are no KPI targets collected, the new profiles will be used.
4. For all source systems, BIS Periods (from GL) entity collections should not
be controlled by "KPI Targets (BIS)" parameter but should be controlled by
"Calendars" parameter.
Note Reference(s)
Yes
No
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Plan for order at risk calculation
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Planning Currency
Default Value - No
Note Reference(s) 395804.1
804214.1
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Priority for Substitute Items Flexfield Attribute
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Priority of Alternate Resources for an
Operation Flexfield Attribute
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Production Plan for Transportation updates
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Project Task Collection Window Days
The collections process never collects tasks whose projects are completed.
Obsolete when the tables are partitioned, since we no longer have to delete
but can use truncate on the partition.
Partitioning released in in 12.1.3.9
This partitioning will be forward ported to 12.2.x via bug 9829260
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Provide Warning For Dates Entered on Non-
work Days
Yes - As the user tabs out of the New Quantity field, if the
quantity is changed then a warning is given as " Sales orders
with changed quantities cannot be released. The user must
update the sales order directly in the source instance." In
addition, the action for the sales order is set to None when
the quantity is changed.
No - supresses the warning
Default = Yes
Set on APS Destination in a distributed environment
Note Reference(s)
Use the same setting of this profile option for running both collections and
plans.
413816.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Purge Exception Days
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Purge Staging and Entity Key Translation
Tables
Note Reference(s)
405295.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Rapid Planning Scripts Home
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Rapid Planning UI Refresh Timeout
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Rapid Planning WebLogic Server Home
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Read Profiles From DB
Default Value - No
This is a profile option for INTERNAL USE - used only for Development
Testing purposes for automated Regression Tests runs to read profiles from
MSLD_FLAT_PROFILE_VAL.dat from previous run to get same behavior.
Note Reference(s)
When plan option Spread Forecast is checked and profile = Yes, then after
we spread the forecast, we recalculate the demand priority of sales orders
and forecasts.
With the alternate value selected, the collected data might not reflect the
exact region site mapping based if the standalone Refresh Collection
Snapshots is run.
Integer in minutes
Default Value - 10
Note Reference(s)
468903.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Region Instance
844667.1
If all conditions are met to release the WIP details when releasing a planned
orders (Ref Note 1346745.1)
Then we evaluate the order as per the following example:
Check the fixed and variable LT of the item and offset the start date:
Answer: Planned order with Suggested due Date of Day 60 and offset makes
start date Day 50
If the planed order has been compressed, or the planning engine has used
an alternate routing (also possible that Alternate BOM is used)
Then is it possible that the start date in workbench is not Day 50 but [different
day]
If [different day], then check the profile, If Yes, then release the details, IF
No, then do not release the details and just release the header row to WIP
and let WIP Mass Load compute the components and resources and dates
for these based on the BOM and Routing for the item.
then we will not release details unless the profile is set to Yes.
Note Reference(s)
958034.1
1346745.1
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Released Only By User
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Resource Type for an Operation Flexfield
Attribute
Note Reference(s)
1132403.1
Basic Functionality:
This Feature will result in ATP taking more time to find the Best Source.
- Original Behaviour:
----------------------------
Suppose the Rank1 source gives you a Date within the 'Latest Acceptable
Date'. ATP will stop there and won't go through all the sources.
So, if the profile MSC: Return best source in Global ATP is set as Yes, the
Best possible source from all the global Sources defined for the item will be
used.
NOTE:
This feature is not supported for Ship set and Arrival Set. If the profile is set
to yes the original behavior is retained for ship sets and arrival sets.
Note Reference(s) 960369.1
734925.1
Set the profile option MSC: SCEM Engine Launch Events to All to
automatically
start Supply Chain Event Manager (SCEM) when a supplier loads an order
forecast
or when you publish an order forecast from the planning server. If you set the
profile option to Publish, Supply Chain Event Manager starts only when plans
are
published from Oracle Advanced Supply Chain Planning. If you set the profile
option to Load, Supply Chain Event Manager starts only when data is loaded
using
flat files.
Note Reference(s)
295564.1
Both of these profile options allow the user to pick one of the following
options:
Both of these profile options allow the user to pick one of the following
options:
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Beginning Inventory Package
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Calendar Package
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Customer Package
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Demand Package
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Distribution Package
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Enterprise Forecast Package
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Fixed Production Package
Yes
No
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Manufacturing Package
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Manufacturing Package(1)
Yes
No
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Purchase Orders Package
Yes
No
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Sales Orders Package
Yes
No
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Supplier Package
Yes
No
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Transfer Orders Package
Yes
No
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Work Orders Package
Yes
No
Default Value - No
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Connector Precision
Integer
Default Value - 8
Note Reference(s)
Numeric
Default Value - 2
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Decimal Precision
Integer
Within SNO, the number of decimal places is called the display precision.
Changing the display precision does not change the actual data values
saved in a model. The display precision can affect results when you match
data. For example, if the display precision is 2, a Machine node Utilization
field with a value of 133.333333 displays 133.33. If you try to match Machine
nodes with a Utilization field value of 133.33, the Machine node in this
example is not matched because its actual value is 133.333333.
Default Value - 2
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Import Standard SNO Model
If the profile option "MSC: SNO Import Standard Model" is set to 'No' then
Integration will not do extraction. So there will not be any extracted xml under
the planId/refresh/src folder.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Optimization Type
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Publish On Client
Note Reference(s)
OBSOLETE -- in R12.1.2
Note Reference(s)
961419.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Transportation Capacity By
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Safety Stock Project
Oracle Advanced Supply Chain Planning assigns the project specified for all
safety stock demands which originate from non-MRP planned safety stock.
When safety stock requirements are specified in Oracle Inventory for specific
projects, the profile option value is not honored.
The list of values for this profile option is restricted to projects specified in
Oracle Projects. This profile option is enabled at project/seiban level, not at
the task level.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Safety stock change interval (Days)
759329.1
Bug Reference(s)
Document References(s) -1
-1
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Sales Orders Offset Days
Does not apply to complex maintenance repair and overhaul where the
material scheduled for a visit or task is collected as a sales order in Oracle
Advanced Supply Chain Planning.
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Scope of Analyze Plan Partition
Normally, we recommend the default setting for this profile, unless you run
several plans each cycle and the profile MSC: Launch Analyze Plan Partition
is set to No. Then you should set All Partitions and launch this request after
running all ASCP plans in your planning cycle. Using this strategy can have
positive performance impact if all plans are run together and then users start
working in the plans.
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Search Criteria Warning
~
,
Default Value - ~
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Service Level Category Set
Yes
No
Default Value - No
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Service Planning Item Safety Stock Level
Value
Valid Values.
Item - SPP will consider the safety stock level for each item
(for which safety stock is prescribed)
Prime (Default) - the safety stock for the entire prime will be
considered as the safety stock level and the existing supply
for the various members of the prime will be considered
while trying to maintain the safety stock level.
Example:
Consider this supersession session chain: A3 -] A4 [-] A5 [-] A6 -] A7 [-] A8
Assume safety stock for each item = 100 units for a give period.
If the profile option = 'Item', then consider the safety stock level for each item
to be 100 units and use only native supply to maintain this level. There will be
no substitution recommended by planning and safety stock violation
exceptions will be raised for each item.
If the profile = 'Prime', then planning determines that A3, A6 and A8 are the
primes in this supersession chain then planning will use the following levels:
SS target for A3=100 units, and planning will only use supply of A3 to
maintain this level. SS target for A6=300 units, and planning will use supplies
of A4, A5 and A6 to maintain this level. SS target for A8=200 units, and
planning will use supplies of A7 and A8 to maintain this level.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Share Plan Partitions
137293.1
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Shelf Life Override of Order Modifiers for
Transfer Orders
Do not consider Order Modifiers for transfer supplies when shelf life is
enabled. -- NOT IMPLEMENTED. BUG 16366566
Note Reference(s) 760046.1
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Smoothing method to calculate Safety stock
within Change interval
Maximum
Y - for Yes
N - for No
12+
Yes
No
Bug Reference(s)
Document References(s) -1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Sourcing History Start Date Offset(in months)
305327.1
780883.1
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Sourcing Variance Tolerance
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Split Planned Order to perform safety stock
pegging
Values:
1 - No
3 - Yes
Note Reference(s) 276707.1
Note Reference(s)
298806.1
787982.1
562872.1
787458.1
947399.1
958872.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Supplier Capacity Accumulation(multiplier)
It specifies the date that the planning engine begins supplier capacity
accumulation. You enter it as a multiplier of the Approved Supplier List
Processing Lead-time. To begin accumulation at the Approved Supplier List
Processing Lead-time, enter 1 (the default). To begin accumulation at the
plan start date, enter 0. To begin accumulation at a multiple of the Approved
Supplier List Processing Lead-time, enter another whole number.
Note Reference(s)
Values:
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Temp Table Extent Size(Bytes)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Unit of Measure
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Use Base Model during Forecast
Consumption
Coordinate how you set this profile option with how you set profile option
MSD: Publish CTO Forecast Percentages by Top-level Model.
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Use Enhanced Forward ATP
Example:
When this profile "MSC: Use Enhanced Forward ATP" is set to Yes -
Using binary search, we anchor on a date and always do backward pass
until a smallest date is found where the demand gets fulfilled.
The idea here is to use all the supply sources while finding the future date
and get the optimum supply_date which is not done during normal forward
pass -- i.e. component substitution, allocated ATP stealing, combine multiple
sources.
Eg :
Consider this scenario -
A (ITF = Day100)
_________________|_________
| |
B(ITF = Day40) C (ITF = Day75)
Suppose a request came for qty 100 on Day1 and there is no existing supply
for any of these items(assembly and components).
a. Using Binary search, anchor on Day 50 (1/2 of 100 day ITF) and set it as
requested_date. Do backward pass for assembly A. No supply.
During MAKE, we could get sufficient qty for B(ITF=Day40) but no supply for
C on Day50.
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Use Optimization Phase Supply Due Dates for
Pegging
730061.1
436771.1
Note Reference(s)
420752.1
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: VMI Default Query
If the timer expires, the program prints the following message in the log file:
Unable to obtain a lock on table.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Write MBP Flat Files
directory.
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:ATP Assignment Set
This will default into the ATP Inquiry form when accessed from Advanced
Supply Chain Planner responsibility.
Note Reference(s) 812964.1
760117.1
290251.1
1059017.1
986625.1
Bug Reference(s)
Document References(s) -1
-1
-1
-1
-1
-1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC:Coll Error Debug Mode
CAUTION: Should not be used with MSC:Coll Error Debug Mode set to
Medium or higher unless directed by DEV.
Best to set this profile and have MSC: Coll Error Debug Mode = OFF when
working a pure performance issue
This profile was Introduced in 11.5.10 Collections Rollup #13 and is only
used for Complete or Targeted Refresh of Data Collections
Note Reference(s) 404975.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:Collect Routing
Valid Values
Yes - source routing on discrete jobs are overwritten
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan Yes
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:Handle Large Sequence Id
Note Reference(s)
560587.1
2 - Request Date - this will check for sourcing effectivity based on the
Request Date or Planning Time Fence Date (whichever is greater)
Example:
Item has 5 days leadtime and ZERO on hand
Item sourced from supplier A on right now
Item sourcing will change on Day 10 to Supplier B
So sourcing rule is setup with supplier A sourcing disabled on Day 9
Sourcing shows supplier B with sourcing starts on Day 10
IMPORTANT NOTE: This profile exists in 11.5.10 and R12.x, but the code to
use this profile is only in 11.5.10.
There is not any code to use this profile in R12.x
Note Reference(s)
Note Reference(s)
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Conversion Type
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Customer Attribute
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Default DP Scenario
In R12, we enhanced ODP to support ISOs (Internal Sales Orders). Now the
demand plan
stripping code has been modified to use this profile to decide whether to use
the ISO
enhancement or not.
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: OLAP Maximum Page Pool
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: OLAP Workflow Page Pool
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: One Step Collection
If set to No, MSD collections allow cleansing of the data in the staging tables
before they are loaded into the final MSD tables.
If set to Yes, cleansing is skipped and data processing loads data from the
staging tables into the final MSD tables.
1671545.1
Default Value - Y
Note Reference(s)
Note: It is recommended to set this parameter to Yes, for All Options and
Option Classes before running shipping and booking history for Configure to
Order
Note Reference(s) 975066.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Category Set Name
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Enable Supply Plan Download for work
orders
Profile to determine whether supply plan download will bring in data by work
order attributes or not
The profile will be used as a switch between the existing SOP integration
design and the new design to bring in data striped by work order attributes.
Possible Values -
a. No - Existing SOP Integration
b. Yes - New SOP Integration with support for work orders
Default Value - No.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Explode Demand Method
This profile option specifies which historical data is used to determine the
failure rate.
The options are Field Service or Depot Repair & Field Service.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Fiscal Calendar
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Include organization in CMR Data Load
Important -
This feature is under CA and is meant for a specific customer only. For all
other customers, they should not use these
profiles till the feature is made GA.
A new planning side profile to specify the simulation set from which repair
cost of items will be collected into Demantra.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning Yes
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Source Instance for Global Forecast
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Truncate Staging Table
Important -
This feature is under CA and is meant for a specific customer only. For all
other customers, they should not use these
profiles till the feature is made GA.
A new source side profile to specify the UOM/counter that will be used to
identify the entry for fleet flight hours in the AHL_FLEET_UTILITZATION
(Product CMRO, Entity - Fleet Utilization Data) table.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning Yes
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Use new Site code format
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Version
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_SPF: History basis for Failure Rate
computation
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_SPF: Organization containing generic BOM for
Service Parts Forecasting
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Activity Selection Window (in Days)
Valid values are any number. The profile option is used in Days.
Default value: 7
Note Reference(s)
415276.1
Default Value - 0
Note Reference(s) 739561.1
952924.1
726610.1
747739.1
Bug Reference(s)
Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Allow Partial Demand Completion
This functionality can be enabled for all independent demands or only for
Sales Orders.
If the plan planning mode is Constrained (Without Detailed Scheduling), the
planning engine only uses this profile option if its value is All End Demands.
Default Value - None
Note Reference(s) 458693.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Allow Schedule Gaps for Shared Supplies
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Allow Simultaneous Resource To End At
Different Time
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Allow Simultaneous Resources to End at
Different Times
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Alternate Resource Selection Method
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Alternate Source Penalty
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Apply Windows for Firm Scheduling
Yes - The planning engine avoids placing the ship, dock, due
dates of buy and transfer orders on non-workdays according
to the appropriate calendar.
No: The planning engine does not schedule buy and transfer
orders with regard to the appropriate calendar.
This profile option does not govern the placement of order dates. If profile
option MSO: Use Shift definitions when scheduling lead-times is Yes, the
planning engine assumes accurate shift timing.
Note Reference(s)
853822.1
1331154.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Barrier Optimizer Algorithm Choice
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: CPLEX Refactor Rate
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: CPLEX messages to screen indicator
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Capacity Units Recalculation Threshold
At the end of the forward schedule phase, the planning engine adjusts the
schedule to remove gaps between supplies (right justification). It may move
a supply to occur at a time where there are more resource units available
that there were in its previously scheduled time.
If this profile option is 0, the planning engine does not consider assigning
more resource units.
Default Value - 0
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Choice of supply for substitution
Oracle Order Promising does not honor this profile option. Oracle Order
Promising always honors native demand satisfaction logic
Note Reference(s)
Bug Reference(s)
Document References(s) B31553-02
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Component offset logic for optimization
Note Reference(s)
This feature can also be set at the item/organization level using the
Continuous Inter-Org Transfers item attribute. The value specified for the
item attribute overrides the profile option setting. If the plan planning mode
is Constrained (Without Detailed Scheduling), the planning engine does
not use this profile option.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Convergent Supplies Consumption Pattern
for Inter-Org and Supplier Sourced orders
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Convergent Supplies Consumption Pattern
for Intra-Org Sourced orders
This profile option controls the cost increments used by the internal cost roll
up in Oracle Advanced Supply Chain Planning. The cost calculation is:
Default Value - 1
Note Reference(s) 555016.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Create Aggregate Supply for Unsatisfied
Demands within Planning Time Fence
Note Reference(s)
1068297.1
Integer > 0.
Bug Reference(s)
Document References(s) -1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Default Idle Time Tolerance (Hours)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Default Sales Order Priority
Integer > 0.
147220.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Default Timestamp Safety Stocks
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Default Timestamp for Forecasts
1331154.1
The timestamp denotes the time by which supplies to meet the demand must
be available to be considered on time: Values are:
The sales order demand due timestamp does not affect forecast
consumption because forecast consumption is done in daily buckets.
This profile option does not apply to forecasts.
Note Reference(s)
This was profile was used by the detailed scheduling code (initially planned)
NOT used anymore. Needs to be removed.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Delay Fulfillment of Small Demands
Default Value - No
Note Reference(s) 1068297.1
749448.1
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Demand Size Tolerance Before Splitting
Planned Orders
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Demand Type Priority
Integer >= 0
1068297.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: EDD Demand Cutoff Priority
If this profile option is the default value, the planning engine uses the
calculated EACT. If this profile option is lower than the default value, the
planning engine uses an earlier EACT than the calculated EACT which gives
the activity a larger scheduling window. If this profile option is higher than the
default value, the planning engine uses a later EACT than the calculated
EACT which gives the activity a smaller scheduling window. This is a user
level profile option.
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Enable Advanced Sequencing
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized No
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Enable Decision Rules
The Plan Options tab, Decision Rules, is disabled. If you select No, you can
duplicate the functionality of the decision rule Use Alternate Sources
parameter for buy items but not for transfers from other organizations; set
profile option MSC: Enable Enhanced Sourcing to Yes.
Default Value - No
Note Reference(s)
214041.1
225876.1
267399.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Enable Hard Links Globally
Note Reference(s)
Default Value - No
Note Reference(s)
562872.1
259322.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Firm Purchase Orders Within Time Fence
Yes - Firms purchase orders that are within the time fence.
No - The planning engine does not reschedule the non-firm
purchase orders that have dock dates within the Planning
Time Fence. The planning engine does not reschedule or
cancel recommendations even if there are conditions for
reschedules and cancellations.
365112.1
1068297.1
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Firm Requisitions Within Time Fence
1079681.1
1068297.1
365112.1
Default Value - 1
Note Reference(s)
1068297.1
This window is derived dynamically for each demand; it starts with the
demand due date
and moves forwards to the window size. This pegs demands to firm supplies
that are scheduled after the demand date. After searching backward, it
searches forward by the number of days set by this profile option, pegging
the supply with the nearest (earliest) schedule to the unallocated demand
quantity.
This can cause supplies to be late for the demand due date. This is stated
as the number of calendar days including non-workdays.
To use this feature, set profile option MSO: Net All Firm Supplies Before
Creating Planned Orders to Yes.
Note Reference(s)
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Firm Work Orders/Operations Within Time
Fence
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Floating Point Precision
Common Error
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Floating Point Precision for Increments of
Shift Start/End Times Within a Planning Bucket
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Generate Compression Days Exception
The planning engine issues exception message Orders with insufficient lead-
time when it schedules orders for less time than their assembly's lead-time.
If the reason for that scheduling is that the planning engine would schedule
the order in the past, it also issues exception message Orders with
compression days.
To avoid seeing both these exceptions for the same order, select No for this
profile option.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Generate Compression/Firming Exceptions
for Orders in Progress
The planning engine assumes that these orders are in progress and on time:
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Generate Reduced Model
Default value: No
With this profile set to no, the return fcst are used
now.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Generate Shared Supply Exceptions
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Global Batchable Flag
Bug Reference(s)
Document References(s) B31553-02
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Global Chargeable Flag
Material flows and resource loads are not influenced by charge quantities.
Valid values: yes/no
Default value: no
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Global Time Limit
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: HLS flat files path
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: LP Markowitz Coefficient
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: LP Optimization Algorithm
Default Value:0
Bug Reference(s)
Document References(s) -1
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: List Size for Pricing Candidates
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Lookahead days to net co-product/by-product
supplies before creating planned orders
**Begin PM Update
This profile was introduced in R1 for DS. Not used anymore
**End PM Update
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximium Number of Prepones
Default Value - 10
If you need to change the default value of this profile in your installation, it is
recommended that you consult with Oracle Development before doing so.
You can set this option if you receive the Requirement causes resource
overload exceptions in the Planner Workbench in Enforce Capacity
Constraints Plans.
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximize Use of Unfirm PurchOrd/WorkOrd in
Optimization
Note Reference(s)
567317.1
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Allowable Days Late
Note: Set this to a number as large as the typical planning horizon to avoid
unusual results.
Default Value - 1
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Demands per Group
Default Value - 5
Note Reference(s)
Integer >= 0
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Inventory Level % of Safety Stock
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles MSO: Target Inventory Level % of Safety Stock
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Lead Time Factor
This is used by the scheduling engine. This is the fraction of the overall
horizon length, within which the backward pass restricts looking for resources
to fit the schedule. If this cannot be scheduled within this fraction of the
overall horizon length, it is forward scheduled.
The value is specified as a number between 0 to 1. This profile option can be
defined at the site level. You can update this value.
The default value is 1
Note Reference(s) 167239.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Number of Demands in a Hard
Linked Demand Set
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Resource Over-capacity
Default Value - 5
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Simplex Iterations
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum number of pulls/push for hard
linked operations
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Multiplier To Derive Supply Allocation
Window
If you specify any value for the latter profile option, the information you enter
for MSC: Firm Supply Allocation Window is ignored. If the product of this
multiplier and cumulative manufacturing lead-time is a fractional quantity, the
number is rounded up to the next integer. Formulas for the item-specific firm
supply allocation window:
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Net All Firm Supplies Before Creating
Planned Order
2 - Only for Work Orders: Net only firm discrete jobs before
creating planned orders.
Default: No
Note Reference(s) 370386.1
749448.1
Bug Reference(s)
Document References(s) -1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Network routing cycle time coefficient
Number > 0
Default Value:0
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Network routing fixed time window
Default Value - 0
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Nfl Backward Compression Pct
Use this profile option to instruct the planning engine how to group demand
into demand groups by priority ranges. For example, the demand priority
values are from 1 to 100 and you set this profile option to 5. The planning
engine assigns demands to five demand groups. Each group includes a
range of 20 priorities - 1 to 20, 21 to 40, 41 to 60, 61 to 80, 81 to 100.
The planning engine searches for supplies that satisfy all demands having
priorities in the same range. It satisfies demands in the higher priority range
first. For multiple demands in the same priority range, the planning engine
satisfies demands based on individual demand priorities.
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized No
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Number of Iterations for Local Search
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized No
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Number of processes for Inline Forecast
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Optimization Daily Aggregation Buckets
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Optimization Weekly Aggregation Buckets
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Optimization debug level
Convention-> DEBUG_LEVEL:GROUP_LEVEL
DEBUG_LEVEL:
3 is message,
4 - info
6 - Detailed
GROUP_LEVEL:
Default Value - No
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Peg By-product Supplies
Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Basis for Changeovers
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Item
Material Capacity Flexfield Attribute
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Material
Capacity
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Org
Material Capacity Flexfield Attribute
Interger >= 0
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Org
Resource Capacity Flexfield Attribute
Interger >= 0
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Org
Transportation Capacity Flexfield Attribute
Interger >= 0
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Resource
Capacity
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Resource
Capacity Flexfield Attribute
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding
Transportation Capacity Flexfield Attribute
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Late Demands
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Late Item Demands
Flexfield Attribute
Interger >= 0
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Late Sales Orders
Flexfield Attribute
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Increase Tolerance Percentage in
Local Search
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Preemption Slack Ratio
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Preprocessing Aggregator Limit
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Preprocessing Flag for LP Matrix
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Pull push base
Default Value - 1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Re-computation percentage for sequence
generation
This profile option does not apply to other order types, for example, purchase
orders and purchase requisitions.
Note Reference(s)
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Resource Adjustment Factor For Improved
Offloading to Alternates
Bug Reference(s)
Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Resource Batching Strategy
Note Reference(s)
244748.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Resource Group for the Line Flexfield
Attribute
1. With the profile "MSO: Schedule Across Breaks" to allow breaks set to
'Yes', this will override OPM's activity break indicator (even if flag is not
checked) : APS can schedule across Calendar breaks.
2. With the profile to allow breaks set to 'No', and the OPM activity break
indicator set to 'N', APS does not schedule across breaks. Given these
settings APS does not schedule resources outside of working shifts for an
ECC plan.
Note Reference(s)
1106718.1
1112749.1
365112.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized No
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: SCO Reduced Cost Tolerance
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Schedule All Firm Planned Orders First
** However, the User Guide states that this is reserved for future use **
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Scheduling Activity Selection Window
Integer
The relative mix of various setup types that fall into this window is calculated
and then applied to each resource sequencing window.
When MSO: Use Sequencing Template is set to Yes, ASCP uses this
calculated mix of setup types to determine the desired spots.
Default Value - 1
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Simplex Perturbation Limit
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Simplex Perturbation Parameter
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Simplex Presolve Limit
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Simplex Singularity Repair Limit
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Skip Firm SDS Activities During Justify
Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Sourcing Allocation Window
Note that this does not mean that constraints will be ignored and constrained
plans will blindly enforce a sourcing split.
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Split Planned Orders for Assigned Units
Note that the maximum number of resource units at the routing level will
always be respected.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Split Supplies for SPP Release
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Supplies used for satisfying transient safety
stock
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Supply Reschedule Window Size for Safety
Stock Pegging
You can use this profile option to specify the number of days a specific
supply can satisfy safety stock demand.
Integer >= 0
NULL = 1
Note Reference(s)
Bug Reference(s)
Document References(s) B31553-02
-1
Dependent Profiles MSC: Use FIFO Pegging
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Synchronize Chargeable Resources to
Respect Hard Links
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles MSO: Maximum Inventory Level % of Safety Stock
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Transfer Quantity Threshold for Enforceing
Hard Links
Default Value: 0
Note Reference(s)
Only applies when profile option MSO: Penalty Basis for Changeovers is set
to Changeover Time.
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Breaks in Calculation of Unconstrained
Scheduling Windows
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan Yes
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Collections Start Time
This is only for EDD/ECC Constrained plans using HLS scheduling -see
related note 1540600.1
Note Reference(s) 1540600.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Customer Site in End Item Substitution
Rule
Introduced by SCO and we should be using that to set the partial fulfilment
flag (all_or_nothing) flag appropriately based on that.
This profile indicates if set to No, that rules are defined only at the customer
level and not at the site level.
GOP like SCO assumes that the user has run the script to set the customer
site id to NULL in the ODS prior to running the plan.
Name MSO_USE_CUSTSITE_IN_ITEMSUBST
Application Advanced Supply Chain Planning
User Profile Name MSO: Use Customer Site in End Item Substitution
Rule
Description Use Customer Site in End Item Substitution Rule
SQL Validation SQL= "select meaning \"MSO: Use Customer Site\",
lookup_code
into :visible_option_value,:profile_option_value
from fnd_lookups where lookup_type = 'YES_NO'"
COLUMN="\"MSO: Use Customer Site\"(4)"
Note Reference(s)
2041074.1
Default Value - No
Note Reference(s) 745977.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Effectivity Date to Infer End Item
Substitution Priority
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Existing Supplies in Alternate BOM/Subs.
Comp
2 means SCO will consume supplies in alt bom path but will
not consume supplies in substitute component path.
NOTE: This profile, when used with the profile "MSO: Postpone Use of
Alternates to Latest Possible Time" may give you different results. From Note
365112.1 - also see Note 567667.1 for clarification on the use of this profile
in an Enforce Due Date (EDD) plan.
Note Reference(s) 365112.1
Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Item Shelf Life Days in Scheduling
Buy/Transfer Orders
Default Value - No
Note Reference(s) 415101.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use JIT dates from high level scheduling
results
Note: The assumption that the activity duration is less when more units are
chosen is only valid for the basis type of Item specified in the Operation >
Resources form.
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Optimization and Decision Rules for
Simulation
Default Value - No (Do not run Optimization / Decision Rules during Online
Planning)
Note Reference(s) 365112.1
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use SCO Time Aggregation
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Safety Lead Time
Default Value - No
Note Reference(s)
872475.1
1068297.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Sequencing Template
Default value: No
Note Reference(s)
415276.1
950994.1
978623.1
1301132.1
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Up Existing Supply of Primary
Components Before Substitute
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Write Inline forecasting flat files
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Budget Enditem Favor Factor
The reasoning was that the user should be able to control where they want a deficit budget
to be preferentially allocated, more at the end items or more at the components.
Note Reference(s)
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Enable Cycle Stock Adjustment
Integers >= 0
Default Value - 10
Note Reference(s)
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Probability Distribution Type
Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Safety Stock Holding Strategy
Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Warehouse Capacity Granularity
Note Reference(s)
1453788.1