Sie sind auf Seite 1von 899

Oracle Corporation

Oracle Value Chain


Planning Profile
Options
Revised: 2016-02-06
For Oracle Internal and licensed customer use only.
This report is compiled from the Profile Options Database created and maintained by the
VCP Support Team and contains knowledge gathered from the Documentation, Notes,
Bugs, and other internal sources. We do not guarantee this data to be without flaw and
offer no warranty to its fitness for use.

We will update and maintain this document when possible to present the best available
information.

(c) Oracle Corporation 2010


Table of Contents
Advanced Planning and Scheduling Profile Options....................................................................20
BOM: Hour UOM...................................................................................................................21
CRP:Spread discrete requirements......................................................................................22
CSD: Default Repair Order...................................................................................................23
CSD: Default Repair Organization........................................................................................24
CSD: Default Repair Type.....................................................................................................25
CSD: Default Service Request Severity for Internal Repair Order........................................26
CSD: Default Service Request Type for Internal Repair Order.............................................27
CSD: Repair Mode for Depot Repair Orders.........................................................................28
CSD: Repair Type Internal Repair Order..............................................................................29
CSP: Repair Supplier Organization's Defective Subinventory..............................................30
CSP: Repair Supplier Organization's Usable Subinventory..................................................31
GMP: APS Installation Level.................................................................................................32
INV:Capable to Promise........................................................................................................34
MO: Operating Unit...............................................................................................................35
MRP: 2-Cuttoff Date Offset Months......................................................................................36
MRP: Calculate MATO Demand...........................................................................................37
MRP: Calculate Plan Performance.......................................................................................38
MRP: Calculate Supply Demand...........................................................................................39
MRP: Category Set for Backlog Form...................................................................................40
MRP: Compute Standard Mandatory Components for ATO Models....................................41
MRP: Cutoff History Days.....................................................................................................43
MRP: Disable Project Validation...........................................................................................44
MRP: Explode Demand Through Phantom Component.......................................................46
MRP: Firm Internal Req Transferred to OE...........................................................................47
MRP: Hash Area Size (Bytes)...............................................................................................48
MRP: Ignore Alternate BOM/Routing....................................................................................49
MRP: Ignore Zero Quantity Demands in Calculating First Bucket for Statistical Forecasting
50
MRP: Max Age of Materialized View Before Refresh (minutes)............................................51
MRP: Net All Purchase Orders Prior To Requisitions...........................................................52
MRP: Old Sales Orders Cutoff Days.....................................................................................53
MRP: Persist ATP Results....................................................................................................54
MRP: Plan Revenue Discount Percent.................................................................................55
MRP: Plan Revenue Price List..............................................................................................56
MRP: Planning Manager Run First Time..............................................................................57
MRP: RHX Check Profile......................................................................................................58
MRP: Round Source Entries.................................................................................................59
MRP: Sort Area Size (Bytes).................................................................................................60
MRP: Update Requested Completion Date when Releasing Reschedules..........................61
MRP: Use Alternate SQL for Daily Cleanup..........................................................................62
MRP: Use Progress Bar for Backlog Workbench..................................................................63
MRP: i2 Batch Client Timeout...............................................................................................64
MRP: i2 Calc Cumulative Yield.............................................................................................65
MRP: i2 Check if FP installed................................................................................................66
MRP: i2 Data Load Timeout..................................................................................................67
MRP: i2 Date Constant.........................................................................................................68
MRP: i2 Debug Mode............................................................................................................69
MRP: i2 Factory Planner Exec Dir Attr Number....................................................................70
MRP: i2 Factory Planner User Attribute Number..................................................................71
MRP: i2 Job Change Attribute Number.................................................................................72
MRP: i2 Log Directory...........................................................................................................73
MRP: i2 Net Change Dir........................................................................................................74
MRP: i2 RHYTHM Aggregate Resource Attribute Number...................................................75
MRP: i2 RHYTHM BC Delimiter............................................................................................76
MRP: i2 RHYTHM BOM Attribute Consumed attribute number............................................77
MRP: i2 RHYTHM BOM Attribute Produced attribute number..............................................78
MRP: i2 RHYTHM Batch Client Filter....................................................................................79
MRP: i2 RHYTHM Cooldown Time Attribute Number...........................................................80
MRP: i2 RHYTHM Delimiter..................................................................................................81
MRP: i2 RHYTHM Enable Attribute Base Planning..............................................................82
MRP: i2 RHYTHM Estimated Queue Time Attribute Number...............................................83
MRP: i2 RHYTHM Factory Planner Data Dir Attribute Number............................................84
MRP: i2 RHYTHM Factory Planner Host Attribute Number..................................................85
MRP: i2 RHYTHM Factory Planner Port Attribute Number...................................................86
MRP: i2 RHYTHM Inventory Attribute Alias Separator.........................................................87
MRP: i2 RHYTHM Minimum Queue Time Attribute Number................................................88
MRP: i2 RHYTHM OE Attribute Consumed attribute number...............................................89
MRP: i2 RHYTHM Offloadable To Attribute Number............................................................90
MRP: i2 RHYTHM Offloadable from Attribute Number.........................................................91
MRP: i2 RHYTHM PO Attribute Alias attribute number........................................................92
MRP: i2 RHYTHM Part Buffer Style Attribute Number..........................................................93
MRP: i2 RHYTHM Resource Type Attribute Number...........................................................94
MRP: i2 RHYTHM released as firm manufacturing order.....................................................95
MRP: i2 RhythmLink Data Directory.....................................................................................96
MRP: i2 RhythmLink Executable Directory...........................................................................97
MRP: i2 RhythmLink Host.....................................................................................................98
MRP: i2 RhythmLink Port Number........................................................................................99
MRP: i2 RhythmLink User...................................................................................................100
MRP: i2 Start Factory Planner Client..................................................................................101
MRP: i2 Start RhythmLink Client.........................................................................................102
MRP: i2 WIP Job Load Timeout..........................................................................................103
MRP:ATP Assignment Set..................................................................................................104
MRP:ATP Database Link....................................................................................................105
MRP:Activate OLP..............................................................................................................106
MRP:Allow Safety Stock Pegging.......................................................................................107
MRP:Backlog Progress Timeout.........................................................................................108
MRP:Calculate Excess Exceptions on Time Fence............................................................109
MRP:Combine Sugg Rep Schedules..................................................................................110
MRP:Complete Supply Chain ATP.....................................................................................111
MRP:Compute Sales Order Changes.................................................................................112
MRP:Consume Fcst Set Summary.....................................................................................113
MRP:Consume Forecast.....................................................................................................114
MRP:Consume MDS...........................................................................................................115
MRP:Consume MPS...........................................................................................................116
MRP:Create Time fence......................................................................................................117
MRP:Cutoff Date Offset Months..........................................................................................118
MRP:Debug Mode...............................................................................................................119
MRP:Default Criteria Set.....................................................................................................120
MRP:Default DRP Plan Name............................................................................................121
MRP:Default Forecast Date................................................................................................122
MRP:Default Forecast Name..............................................................................................123
MRP:Default Plan Name.....................................................................................................124
MRP:Default Schedule Name.............................................................................................125
MRP:Default Sourcing Assignment Set..............................................................................126
MRP:Demand Time Fence Days........................................................................................127
MRP:Derive PO supply date from need by date.................................................................128
MRP:Enhanced Exception..................................................................................................129
MRP:Environment variable to set path for MRP files..........................................................130
MRP:Firm Planned Order Time Fence................................................................................131
MRP:Include Schd Rcpts in Use-up....................................................................................132
MRP:Include Substitute Components.................................................................................133
MRP:Interface Table History Days......................................................................................134
MRP:MPS Relief Batch Size...............................................................................................135
MRP:MPS Relief Direction..................................................................................................136
MRP:Maintain Original Schedule Version...........................................................................137
MRP:Perform Planning Manager Functions in Loads.........................................................138
MRP:Planner Batch Size.....................................................................................................139
MRP:Planner Workers........................................................................................................140
MRP:Planning Manager Batch Size....................................................................................141
MRP:Planning Manager Max Workers................................................................................142
MRP:Purchasing By Revision.............................................................................................143
MRP:Purge Batch Size.......................................................................................................144
MRP:Recommend action within PTF..................................................................................145
MRP:Repetitive Past Due Supply Days..............................................................................146
MRP:Requisition Load Group Option..................................................................................147
MRP:Retain Dates Within Calendar Boundary...................................................................149
MRP:Snapshot Pause for Lock (Minutes)...........................................................................150
MRP:Snapshot Substitute Parts..........................................................................................151
MRP:Snapshot Workers......................................................................................................152
MRP:Sourcing Rule Category Set.......................................................................................153
MRP:Time Fence Warning..................................................................................................154
MRP:Trace Mode................................................................................................................155
MRP:Use Direct Load Option..............................................................................................156
MRP:Use Ship Arrived Flag................................................................................................157
MRP_NEW_PLANNER_BACK_COMPATIBILITY..............................................................158
MSC : Consider all supplies for VMI replenishment calculation..........................................160
MSC : Consume Highest Revision Forecast.......................................................................161
MSC : Publish Supply Commit based on pegging information............................................162
MSC : VMI Requisitions Need By Date at RTF end............................................................163
MSC: 64-bit Planner Platform.............................................................................................164
MSC: APCC - Enable Cumulative Measures in Archive.....................................................165
MSC: APCC Archive SCRM Measures...............................................................................167
MSC: APCC Calendar Code...............................................................................................169
MSC: APCC Category Set 1...............................................................................................170
MSC: APCC Category Set 2...............................................................................................171
MSC: APCC Category Set 3...............................................................................................172
MSC: APCC Category set for detailed pegging analysis....................................................173
MSC: APCC Currency Code...............................................................................................174
MSC: APCC Gather Fact Tables Statistics.........................................................................175
MSC: APCC Gather Intermediate Tables Statistics............................................................176
MSC: APCC Gather Plan Tables Statistics.........................................................................177
MSC: APCC Instance..........................................................................................................178
MSC: APCC Period Set name............................................................................................179
MSC: APCC SNO Item Simulation Set...............................................................................180
MSC: APCC WebLogic Console Password........................................................................182
MSC: APCC WebLogic Console Username.......................................................................183
MSC: APCC WebLogic Password......................................................................................184
MSC: APCC WebLogic Username......................................................................................185
MSC: APCC Webcenter Admin URL..................................................................................186
MSC: APCC Webcenter Enabled........................................................................................187
MSC: APCC Webcenter Group Space Template................................................................188
MSC: APCC Webcenter Spaces Member Role..................................................................189
MSC: APCC Webcenter Spaces Port.................................................................................190
MSC: APCC Webcenter Spaces Recipient Key Alias.........................................................191
MSC: APCC Webcenter Spaces Saml Issuer Name..........................................................192
MSC: APCC Webcenter URL..............................................................................................193
MSC: APCC debug mode...................................................................................................194
MSC: APCC to APS database link name............................................................................195
MSC: ASCP Planning URL.................................................................................................196
MSC: ATP Allocation Method..............................................................................................197
MSC: ATP Capacity Allocation............................................................................................198
MSC: ATP Debug Mode......................................................................................................199
MSC: ATP Enforces Lead Time for ATO Model..................................................................200
MSC: ATP Infinite Time Fence Pad....................................................................................201
MSC: ATP Synchronization Downtime (minutes)................................................................202
MSC: ATP Web Service Responsibility...............................................................................203
MSC: ATP Web Service User.............................................................................................204
MSC: AVOID RE-SOURCING SALES ORDERS...............................................................205
MSC: Action Allowed on ATP 24x7 Plan While Running....................................................206
MSC: Additional Demantra Item hierarchy in APCC...........................................................207
MSC: Aggregate Resource Name Flexfield Attribute..........................................................208
MSC: Align Component Demand Date with Pegging Date.................................................209
MSC: Allocated ATP Forward Consumption Method..........................................................210
MSC: Allocation Assignment Category Set.........................................................................211
MSC: Allow Release of Planned Orders from Demand Schedule Plan..............................212
MSC: Allow release of replenishments above suggested quantity.....................................213
MSC: Analytics Currency Code...........................................................................................214
MSC: Anchor date for calculating operation yields.............................................................215
MSC: Anchor date for calculating remaining shelf life.........................................................216
MSC: Apply Lot Modifiers in Weekly/Period Buckets..........................................................217
MSC: Apply Order Modifier To Start Quantity.....................................................................218
MSC: Apply Safety Stock Change interval to non MRP Planned Safety Stock..................219
MSC: Apply shortage and excess tolerance to planned orders..........................................220
MSC: Archive Plan Summary after plan run.......................................................................221
MSC: Auto-Release Compression Days Tolerance............................................................222
MSC: Automatically Recalculate Operation Time...............................................................224
MSC: Avoid Re-Sourcing Sales Orders..............................................................................225
MSC: BPEL Demantra Password.......................................................................................226
MSC: BPEL Demantra Username.......................................................................................227
MSC: BPEL Domain Name.................................................................................................228
MSC: BPEL End Point URI.................................................................................................229
MSC: BPEL Process Version..............................................................................................230
MSC: Batch Size for Self Service Loads.............................................................................231
MSC: Batchable Flag..........................................................................................................232
MSC: Batching Window......................................................................................................233
MSC: Buy Order Processing Lead Time Calendar.............................................................234
MSC: CP Debug Level........................................................................................................235
MSC: Calendar Reference for Bucketing............................................................................236
MSC: Cancel Oustanding Sales Order Quantities..............................................................238
MSC: Category Set for Jobs without an Item Reference....................................................239
MSC: Category Set for Liability Analysis.............................................................................240
MSC: Category for Jobs without an Item Reference...........................................................241
MSC: Category set for CP Horizontal View.........................................................................242
MSC: Category set for Strategic Planning..........................................................................243
MSC: Category set for serviceable items............................................................................244
MSC: Choice of item for which to create supplies in substitute relationship.......................245
MSC: Circular sourcing surplus days..................................................................................246
MSC: Class Hierarchy.........................................................................................................247
MSC: Closest Quantity Pegging..........................................................................................248
MSC: Collaborative Planning Default Calendar..................................................................249
MSC: Collect CMRO Work Order Demand for PS..............................................................250
MSC: Collect Item, Material and Resource Costs...............................................................251
MSC: Collect PS SNO Data................................................................................................252
MSC: Collection Time Window for Install Base under Contracts history.............................253
MSC: Collection Window for Region and Zones (Days).....................................................254
MSC: Collection Window for Trading Partner Changes (Days)..........................................255
MSC: Collections Snapshot Threshold...............................................................................256
MSC: Compute Project Exception.......................................................................................257
MSC: Configuration.............................................................................................................258
MSC: Consolidate Interplant Demands...............................................................................259
MSC: Consume Forecast Inside Demand Time Fence.......................................................260
MSC: Consume forecast with no demand class.................................................................261
MSC: Consume forecasts using Internal Sales Orders.......................................................262
MSC: Cost Type..................................................................................................................264
MSC: Cost of Using a BOM/ Routing Flexfield Attribute.....................................................265
MSC: Create Resource Requirements for all Operations...................................................266
MSC: Currency Conversion Type.......................................................................................267
MSC: Custom allocation......................................................................................................268
MSC: DPP Allow Quantity Reduction Only When Supply is Excess on Internal Requisition,
Requisition and PO.............................................................................................................269
MSC: DPP Debug Level......................................................................................................270
MSC: DPP Demand Priority Details viewing buckets..........................................................271
MSC: DPP Discrete Job Cutoff Window (Days)..................................................................272
MSC: DPP Related Exception Additional Offset Days........................................................273
MSC: DPP allocates to existing ISO's before other demands with same priority................274
MSC: DRP Multitasking Group ID's per Process................................................................275
MSC: DRP Multitasking Max Concurrent Processes..........................................................276
MSC: Daily Allocation to Maintain Safety Stock Level........................................................277
MSC: Day UOM..................................................................................................................278
MSC: Days of Resource Availability before sysdate...........................................................279
MSC: Debug Level..............................................................................................................280
MSC: Debug Module...........................................................................................................281
MSC: Default Category Set for Rapid Planning..................................................................282
MSC: Default Project for Supplies Pegged to Excess.........................................................283
MSC: Default Time Stamp for Make Planned Order Release.............................................284
MSC: Default Workbench Height........................................................................................285
MSC: Default Workbench Width.........................................................................................286
MSC: Degree of Parallelism for Index Creation..................................................................287
MSC: Demand Priority Flexfield Attribute............................................................................288
MSC: Demand Satisfied Percent Threshold for Pegging....................................................289
MSC: Display Order Rescheduling Supplies.......................................................................290
MSC: Display Supplier Item in Collaborative Planning.......................................................291
MSC: Display Warning Message When Rescheduling Recommendation Not Suggested by
the Plan...............................................................................................................................292
MSC: Distribution Planning Ship Date................................................................................293
MSC: Distribution Planning Use Firm Supplies and Minimize Excess Supplies.................294
MSC: E1 APS FC URL........................................................................................................296
MSC: E1 APS ODI URL......................................................................................................297
MSC: E1 Concatenation Character.....................................................................................298
MSC: E1APS_BATCH_SIZE..............................................................................................299
MSC: E1APS_DEM_END_DATE_IN_MONTHS................................................................300
MSC: E1APS_DEM_START_DATE_IN_MONTHS............................................................301
MSC: E1APS_DEM_WF_TIME_OUT.................................................................................302
MSC: E1APS_NO_OF_WORKERS....................................................................................303
MSC: E1APS_TIME_OUT..................................................................................................304
MSC: E1APS_WS_TIME_OUT...........................................................................................305
MSC: E1_DBLINK...............................................................................................................306
MSC: EBS source instance for OTM...................................................................................307
MSC: ENFORCE CRITERIA REQUIREMENT BEFORE EXECUTING QUERY................308
MSC: Enable 64 bit snapshot..............................................................................................309
MSC: Enable ATP Summary Mode.....................................................................................310
MSC: Enable ATP Workflow...............................................................................................311
MSC: Enable ATP for Phantom Components.....................................................................312
MSC: Enable Advanced Constraints...................................................................................313
MSC: Enable Allocated ATP...............................................................................................314
MSC: Enable DRP Multitasking..........................................................................................315
MSC: Enable Diagnostic ATP.............................................................................................316
MSC: Enable Enhanced Sourcing.......................................................................................317
MSC: Enable Group Based Netting....................................................................................318
MSC: Enable In-Memory Performance Driven Planning.....................................................319
MSC: Enable Java Debug...................................................................................................320
MSC: Enable Large Plan Copy in 32 bit Linux....................................................................321
MSC: Enable Model and End Item dimensions in APCC....................................................322
MSC: Enable Parallel Legacy Collections...........................................................................323
MSC: Enable Priority Pegging.............................................................................................324
MSC: Enable Release of Defective Planned Transfers......................................................325
MSC: Enforce Hard Links....................................................................................................326
MSC: Enhanced Project Netting.........................................................................................327
MSC: Excess and Safety Stock by Demand Class.............................................................328
MSC: Fast Refresh of Region Site Map..............................................................................329
MSC: File Flush Limit..........................................................................................................330
MSC: Firm Internal Requisition Time Fence.......................................................................331
MSC: Firm Intransit and PO in Receiving Supplies.............................................................332
MSC: Fixed Date for Install Base under Contracts History (DD-MON-YYYY)....................333
MSC: Flush All Items for Simulation....................................................................................334
MSC: Forecast Priority Flexfield Attribute...........................................................................335
MSC: Forecast Spreading Calendar...................................................................................336
MSC: Forecast Spreading Calendar(1)...............................................................................337
MSC: Future Days for Currency Conversion.......................................................................339
MSC: Gateway URL to External Application.......................................................................340
MSC: Generate Exceptions in CP.......................................................................................341
MSC: Generate Notifications for Transportation Updates...................................................342
MSC: HP Maximum Displayed Item Count.........................................................................343
MSC: High Volume Items....................................................................................................344
MSC: History Days for Currency Conversion......................................................................345
MSC: Horizon for APCC Collected data - Backward days..................................................346
MSC: Horizon for APCC Collected data - Forward days.....................................................347
MSC: Horizontal Plan Demand Bucketing Preference........................................................348
MSC: Horizontal Plan Extension Program..........................................................................349
MSC: Hour UOM.................................................................................................................350
MSC: Hybrid Allocated ATP................................................................................................351
MSC: INTER PLANT DEM PRIORITY................................................................................352
MSC: IO UI Performance tuning.........................................................................................353
MSC: IO UI Period Set Name.............................................................................................354
MSC: Ignore ATP Check for Configured Item from Sales Order in ODS-ATP....................355
MSC: Ignore CMRO and EAM Workorders in ASCP..........................................................356
MSC: Ignore PTF during CTP.............................................................................................357
MSC: Ignore Routings Without Any Date Effective Operations..........................................358
MSC: Ignore Safety Stock Inside Lead Time......................................................................359
MSC: Ignore Safety Stock calculation inside Time Fence..................................................360
MSC: Include Firm Planned Orders In Firm Allocation Window..........................................361
MSC: Include Manufacturing Calendar in ATP Sales Order Ship Date Calculations..........362
MSC: Include Postprocessing lead time when planning for make orders...........................363
MSC: Include Safety Stocks in Priority Based Pegging......................................................364
MSC: Inflate WIP Resource Requirements.........................................................................365
MSC: Inventory Rebalancing Surplus Inventory Basis........................................................367
MSC: JInitiator Version.......................................................................................................368
MSC: Launch Analyze Plan Partition..................................................................................369
MSC: Launch System Sql Loader.......................................................................................370
MSC: Launch Workflow-Enabled Exception Message Notifications...................................371
MSC: Legacy Flat File Directory.........................................................................................372
MSC: Level for Calculating Liability.....................................................................................373
MSC: Limit Gantt Chart Orders View Hierarchy..................................................................374
MSC: MBS and ODS Load Contention Wait Time (minutes)..............................................375
MSC: MPS Auto-Firm Planned Orders...............................................................................376
MSC: MSC_TOP Directory.................................................................................................377
MSC: Make Safety Stock Transient....................................................................................379
MSC: Map Server Host.......................................................................................................381
MSC: Map Server Port........................................................................................................382
MSC: Max display decimals for Currency...........................................................................383
MSC: Max display decimals for Quantity............................................................................384
MSC: Max display decimals for Quantity (aggregates).......................................................385
MSC: Max display decimals for Ratios/Percentages..........................................................386
MSC: Max display decimals for Time..................................................................................387
MSC: Max display decimals for Time (aggregates)............................................................388
MSC: Maximum Capacity....................................................................................................389
MSC: Maximum Percentage variation in safety stock values.............................................390
MSC: Maximum number of planned orders per demand....................................................391
MSC: Maximum number of planned orders per demand(1)................................................392
MSC: Maximum number of threads for save plan...............................................................393
MSC: Memory build during deployment for GOP WS.........................................................394
MSC: Memory cleanup window (Days) for GOP WS..........................................................395
MSC: Memory refresh mode for GOP WS..........................................................................396
MSC: Minimize Project Cross Peg within Window..............................................................397
MSC: Minimize changes to chronological sequence of supplies while rescheduling..........398
MSC: Minimum Capacity.....................................................................................................399
MSC: Minimum Percentage variation in safety stock values..............................................400
MSC: Minimum Supply/Demand Percent for Pegging........................................................401
MSC: Move Past Due To Sysdate......................................................................................402
MSC: Net Change Temp Dir...............................................................................................403
MSC: New Forecast Auto Plan...........................................................................................404
MSC: New Material and Resource Plan Fetch Size............................................................405
MSC: New Planner Backward Compatibility.......................................................................406
MSC: New Supply Commit Auto Plan.................................................................................408
MSC: Number of Workers for Self Service Loads...............................................................409
MSC: OTHER with zero allocation percent is valid demand class......................................410
MSC: OTM Punchout URI...................................................................................................411
MSC: OTM Responsibility...................................................................................................412
MSC: OTM User..................................................................................................................413
MSC: Operator Company Name.........................................................................................414
MSC: Oracle Rapid Planning URL......................................................................................415
MSC: Order Number-CA Mandatory for CVMI....................................................................416
MSC: Order Type for Consigned VMI.................................................................................417
MSC: Organization Translation WSDL URL.......................................................................418
MSC: Organization containing generic BOM for forecast explosion...................................419
MSC: Overwrite all Order Forecast records........................................................................420
MSC: Overwrite all supplier capacity records.....................................................................421
MSC: PS - Snapshot Base Package...................................................................................422
MSC: PS - Snapshot Beginning Inventory Package...........................................................423
MSC: PS - Snapshot Calendar Package............................................................................424
MSC: PS - Snapshot Customer Package...........................................................................425
MSC: PS - Snapshot Distribution Package.........................................................................426
MSC: PS - Snapshot Enterprise Forecast Package............................................................427
MSC: PS - Snapshot Inventory Safety Targets Package....................................................428
MSC: PS - Snapshot Manufacturing Package....................................................................429
MSC: PS - Snapshot Purchase Orders Package................................................................430
MSC: PS - Snapshot Reservation Package........................................................................431
MSC: PS - Snapshot Sales Orders Package......................................................................432
MSC: PS - Snapshot Supplier Package..............................................................................433
MSC: PS - Snapshot Transfer Orders Package..................................................................434
MSC: PS - Snapshot Work Orders Package.......................................................................435
MSC: PS - Visit Display Format in PS UI............................................................................436
MSC: PS Adjust Post Horizon Demand Qty........................................................................437
MSC: PS Allow WO Purchased Item Offloading.................................................................438
MSC: PS Consistent Resource Assignment.......................................................................439
MSC: PS Currency Symbol.................................................................................................440
MSC: PS Enable CRO Scheduling.....................................................................................441
MSC: PS Enable RMO Scheduling.....................................................................................442
MSC: PS Filter Active Items................................................................................................443
MSC: PS Firm Past Due WO..............................................................................................444
MSC: PS Import On-Hold Work Orders..............................................................................445
MSC: PS Resource Constraint Horizon..............................................................................446
MSC: PS Run Application Script.........................................................................................447
MSC: PS Run Connector Script..........................................................................................448
MSC: PS Work Order Request Date...................................................................................449
MSC: PS/SNO API Version.................................................................................................450
MSC: PS/SNO Alignment Date...........................................................................................451
MSC: PS/SNO App Server URL.........................................................................................452
MSC: PS/SNO Client Install Path........................................................................................453
MSC: PS/SNO Compress Xml Files...................................................................................454
MSC: PS/SNO Data Store Path..........................................................................................455
MSC: PS/SNO Debug Mode...............................................................................................456
MSC: PS/SNO Download XML Files...................................................................................457
MSC: PS/SNO Include Negative Inventory Demands.........................................................458
MSC: PS/SNO Past Due Supplies Window........................................................................460
MSC: PS/SNO Use DB for Integration Data.......................................................................461
MSC: Pass List Price to OM in DRP Release.....................................................................462
MSC: Peg Firm Supply First................................................................................................463
MSC: Peg Firm Work Orders Within Assigned Projects and Tasks....................................464
MSC: Peg to maximize supply usage.................................................................................465
MSC: Perform ATP check for Internal Sales Orders...........................................................466
MSC: Performance target for Inventory Turns....................................................................467
MSC: Performance target for Margin Percent.....................................................................468
MSC: Performance target for Ontime Delivery Percent......................................................470
MSC: Performance target for Resource Utilization Percent................................................472
MSC: Plan Name for CMRO...............................................................................................473
MSC: Plan co-products.......................................................................................................474
MSC: Plan for order at risk calculation................................................................................475
MSC: Planning Currency.....................................................................................................476
MSC: Pre-Flush...................................................................................................................477
MSC: Prefer Consumption within Forecast Bucket.............................................................478
MSC: Priority for Substitute Items Flexfield Attribute..........................................................479
MSC: Priority of Alternate Resources for an Operation Flexfield Attribute..........................480
MSC: Production Plan for Transportation updates..............................................................481
MSC: Project Task Collection Window Days......................................................................482
MSC: Provide Warning For Dates Entered on Non-work Days...........................................483
MSC: Provide Warning when Sales Order Quantity is Changed........................................484
MSC: Purchase Order Dock Date Calculation Preference..................................................485
MSC: Purge Exception Days...............................................................................................486
MSC: Purge Staging and Entity Key Translation Tables.....................................................487
MSC: Rapid Planning Group Planned Orders.....................................................................488
MSC: Rapid Planning Safety Stock Lead Time Method......................................................489
MSC: Rapid Planning Scripts Home...................................................................................490
MSC: Rapid Planning UI Refresh Timeout..........................................................................491
MSC: Rapid Planning WebLogic Server Home...................................................................492
MSC: Read Profiles From DB.............................................................................................493
MSC: Recalculate Demand Priorities after Spreading........................................................494
MSC: Refresh Site to Region Mappings Event...................................................................495
MSC: Refresh Snapshots Pending Timeout.......................................................................496
MSC: Region Instance........................................................................................................497
MSC: Release WIP Dtls if Order Date different then BOM Revision Date..........................498
MSC: Release dock date as work order completion date for items with post processing lead
time.....................................................................................................................................500
MSC: Released Only By User.............................................................................................501
MSC: Resource Group for a Line Flexfield Attribute...........................................................502
MSC: Resource Type for an Operation Flexfield Attribute..................................................503
MSC: Respect Minimum Remaining Shelf Life Days..........................................................504
MSC: Retain Time for Non-ATPable Items.........................................................................505
MSC: Return Best Source in Global ATP............................................................................506
MSC: SCEM Engine Launch Events...................................................................................507
MSC: SCP PS Next Flag Precedence................................................................................508
MSC: SCP PS Prior Flag Precedence................................................................................509
MSC: SNO - Snapshot Base Package................................................................................510
MSC: SNO - Snapshot Beginning Inventory Package........................................................511
MSC: SNO - Snapshot Calendar Package.........................................................................512
MSC: SNO - Snapshot Customer Package........................................................................513
MSC: SNO - Snapshot Demand Package..........................................................................514
MSC: SNO - Snapshot Distribution Package......................................................................515
MSC: SNO - Snapshot Enterprise Forecast Package.........................................................516
MSC: SNO - Snapshot Fixed Production Package.............................................................517
MSC: SNO - Snapshot Inventory Safety Targets Package.................................................518
MSC: SNO - Snapshot Manufacturing Package.................................................................519
MSC: SNO - Snapshot Manufacturing Package(1).............................................................520
MSC: SNO - Snapshot Purchase Orders Package.............................................................521
MSC: SNO - Snapshot Sales Orders Package...................................................................522
MSC: SNO - Snapshot Supplier Package...........................................................................523
MSC: SNO - Snapshot Transfer Orders Package...............................................................524
MSC: SNO - Snapshot Work Orders Package....................................................................525
MSC: SNO Connector Precision.........................................................................................526
MSC: SNO Currency Precision...........................................................................................527
MSC: SNO Decimal Precision.............................................................................................528
MSC: SNO Import Standard SNO Model............................................................................529
MSC: SNO Optimization Type............................................................................................530
MSC: SNO Publish On Client..............................................................................................531
MSC: SNO Run Application Script......................................................................................532
MSC: SNO Run Connector Script.......................................................................................533
MSC: SNO Transportation Capacity By..............................................................................534
MSC: Safety Stock Project..................................................................................................535
MSC: Safety stock change interval (Days)..........................................................................536
MSC: Sales Orders Offset Days.........................................................................................537
MSC: Scope of Analyze Plan Partition................................................................................538
MSC: Search Criteria Warning............................................................................................539
MSC: Selection order for Firm Supplies in backward allocation window............................540
MSC: Self Service Loads Delimiter.....................................................................................541
MSC: Service Level Category Set.......................................................................................542
MSC: Service Planning Enabled.........................................................................................543
MSC: Service Planning Item Safety Stock Level Value......................................................544
MSC: Share Plan Partitions................................................................................................545
MSC: Shelf Life Override of Order Modifiers for Transfer Orders.......................................546
MSC: Simultaneous Resource Sequence Flexfield Attribute..............................................547
MSC: Smoothing method to calculate Safety stock within Change interval........................548
MSC: Source Instance ID....................................................................................................549
MSC: Source Setup Required.............................................................................................550
MSC: Sourcing History Start Date Offset(in months)..........................................................551
MSC: Sourcing Rule Category Set......................................................................................552
MSC: Sourcing Variance Tolerance....................................................................................553
MSC: Split Planned Order to perform safety stock pegging................................................554
MSC: Split Planned Orders for Scheduling Flexibility.........................................................555
MSC: Supplier Capacity Accumulation(multiplier)...............................................................557
MSC: Supplier Capacity Consumption by Purchase Orders...............................................558
MSC: Suppress Exception for Selection of Alternates........................................................560
MSC: Temp Index Extent Size(Bytes).................................................................................561
MSC: Temp Table Extent Size(Bytes)................................................................................562
MSC: Unit of Measure.........................................................................................................563
MSC: Update Requested Completion Date when Releasing Reschedules........................564
MSC: Update Use Up Date.................................................................................................565
MSC: Use Base Model during Forecast Consumption........................................................566
MSC: Use Enhanced Forward ATP....................................................................................567
MSC: Use FIFO Pegging....................................................................................................569
MSC: Use Optimization Phase Supply Due Dates for Pegging..........................................570
MSC: Use Shipping/Receiving Calendar............................................................................571
MSC: Use attribute based netting.......................................................................................572
MSC: VMI Default Query.....................................................................................................573
MSC: Value of N for all top/bottom-N reports in Dashboards.............................................574
MSC: Vertical view default query........................................................................................575
MSC: Wait Time to Obtain Lock on Table/Partition for Snapshot Delete Worker (in sec)..576
MSC: Write MBP Flat Files.................................................................................................577
MSC:ATP Assignment Set..................................................................................................578
MSC:Coll Error Debug Mode..............................................................................................579
MSC:Coll Performance Debug Mode..................................................................................581
MSC:Collect Completed Jobs.............................................................................................582
MSC:Collect Routing...........................................................................................................583
MSC:Compute IB Aggregation during Collection................................................................584
MSC:Criticality Category Set...............................................................................................586
MSC:Explode in WIP when Details are not released..........................................................587
MSC:Handle Large Sequence Id........................................................................................588
MSC:Prevent Loops when pegging Non-Standard Jobs.....................................................589
MSC:Release only orders pegging fully to on hand............................................................590
MSC:Retain Released Data................................................................................................592
MSC:SRP PHASE2 ENABLED...........................................................................................593
MSC:Select Sourcing Rules In ATP Based On...................................................................594
MSC:Use Internal SO demand class for ATP allocation.....................................................595
MSC_USE_HASH_KEY......................................................................................................596
MSD: AW Tablespace.........................................................................................................597
MSD: Calculate Planning Percentages...............................................................................598
MSD: Category Set Name...................................................................................................599
MSD: Client Debugging.......................................................................................................600
MSD: Conversion Type.......................................................................................................601
MSD: Currency Code..........................................................................................................602
MSD: Customer Attribute....................................................................................................603
MSD: Default DP Scenario..................................................................................................604
MSD: Enabled Organization for Item Collections................................................................605
MSD: Excess and Obsolescence, Liability Category Set Name.........................................606
MSD: Include all internal sites within scope of LOB scoped demand plan.........................607
MSD: MAXVALUECOUNT for edges in XWDEVKIT..........................................................608
MSD: Master Org................................................................................................................609
MSD: OLAP Directory Alias................................................................................................610
MSD: OLAP Initial Page Pool..............................................................................................611
MSD: OLAP Maximum Page Pool......................................................................................612
MSD: OLAP Workflow Page Pool.......................................................................................613
MSD: One Step Collection..................................................................................................614
MSD: Two-Level Planning...................................................................................................615
MSD: Use Classic Even Allocation.....................................................................................616
MSD: Use Classic Worksheet.............................................................................................617
MSD: Worksheet Automatic resize.....................................................................................618
MSD:View Scope measures are editable............................................................................619
MSD_DEM: Calculate Planning Percentage.......................................................................620
MSD_DEM: Category Set Name.........................................................................................621
MSD_DEM: Conversion Type.............................................................................................622
MSD_DEM: Currency Code................................................................................................623
MSD_DEM: Customer Attribute..........................................................................................624
MSD_DEM: Data Profile for Price Lists...............................................................................625
MSD_DEM: Debug Mode....................................................................................................626
MSD_DEM: Enable Supply Plan Download for work orders...............................................627
MSD_DEM: Explode Demand Method................................................................................628
MSD_DEM: Fiscal Calendar...............................................................................................629
MSD_DEM: Host URL.........................................................................................................630
MSD_DEM: Include Dependent Demand...........................................................................631
MSD_DEM: Include organization in CMR Data Load.........................................................632
MSD_DEM: Master Org......................................................................................................633
MSD_DEM: Maximum seeded units available for price lists...............................................634
MSD_DEM: Publish CTO Forecast by Top-level Model.....................................................635
MSD_DEM: Sales and Operations Planning Category Set Name......................................636
MSD_DEM: Schema...........................................................................................................637
MSD_DEM: Simulation Set Name......................................................................................638
MSD_DEM: Source Instance for Global Forecast...............................................................639
MSD_DEM: Truncate Staging Table...................................................................................640
MSD_DEM: Two-Level Planning.........................................................................................641
MSD_DEM: UOM for fleet flight hours................................................................................642
MSD_DEM: Use new Site code format...............................................................................643
MSD_DEM: Version............................................................................................................644
MSD_SPF: History basis for Failure Rate computation......................................................645
MSD_SPF: Organization containing generic BOM for Service Parts Forecasting..............646
MSO: Activity Selection Window (in Days)..........................................................................647
MSO: Additional Demand Slices for Shared Supply Rescheduling....................................648
MSO: Allow Partial Demand Completion............................................................................649
MSO: Allow Schedule Gaps for Shared Supplies...............................................................650
MSO: Allow Simultaneous Resource To End At Different Time..........................................652
MSO: Allow Simultaneous Resources to End at Different Times........................................653
MSO: Allow early builds to consume existing supplies of phased-out components and
sources................................................................................................................................654
MSO: Alternate Process Penalty.........................................................................................655
MSO: Alternate Resource Penalty......................................................................................656
MSO: Alternate Resource Selection Method......................................................................657
MSO: Alternate Source Penalty..........................................................................................658
MSO: Apply Windows for Firm Scheduling.........................................................................659
MSO: Avoid non working days for Buy/Transfer order dates..............................................660
MSO: Barrier Optimizer Algorithm Choice..........................................................................661
MSO: Batching Precision....................................................................................................662
MSO: Big M Value for SCO.................................................................................................663
MSO: CPLEX Crash Parameter..........................................................................................664
MSO: CPLEX Refactor Rate...............................................................................................665
MSO: CPLEX Scaling Factor..............................................................................................666
MSO: CPLEX messages to screen indicator......................................................................667
MSO: Calculate Constraint Exceptions...............................................................................668
MSO: Capacity Units Recalculation Threshold...................................................................669
MSO: Check Redundant Constraints..................................................................................670
MSO: Choice of supply for substitution...............................................................................671
MSO: Component offset logic for optimization....................................................................672
MSO: Consume Existing Purchase Order Supplies in First-In-First-Out Sequence During
Component Substitution......................................................................................................673
MSO: Continuous transfer across organizations.................................................................675
MSO: Convergent Supplies Consumption Pattern..............................................................676
MSO: Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced orders
............................................................................................................................................677
MSO: Convergent Supplies Consumption Pattern for Intra-Org Sourced orders................678
MSO: Cost Roll-up incremental factor.................................................................................680
MSO: Create Aggregate Supply for Unsatisfied Demands within Planning Time Fence....681
MSO: DS Scheduling Window............................................................................................683
MSO: Default Forecast Priority...........................................................................................684
MSO: Default Idle Time Tolerance (Hours).........................................................................685
MSO: Default Resource Sequencing Window (in Days).....................................................686
MSO: Default Sales Order Priority......................................................................................687
MSO: Default Timestamp Safety Stocks.............................................................................688
MSO: Default Timestamp for Forecasts..............................................................................689
MSO: Default Timestamp for Sales Orders.........................................................................690
MSO: Default Value for Maximum Acceptable Days Early.................................................691
MSO: Delay Fulfillment of Small Demands.........................................................................692
MSO: Demand Size Tolerance Before Splitting Planned Orders........................................693
MSO: Demand Type Priority...............................................................................................694
MSO: Demand Window Size...............................................................................................695
MSO: Disable Inference of Item Substitution Relationship.................................................696
MSO: Divergent Supply Feeding Pattern............................................................................697
MSO: Divergent Supply Feeding Pattern for Inter-Org and Supplier Sourced orders.........698
MSO: Divergent Supply Feeding Pattern for Intra-Org Sourced orders..............................699
MSO: Dual Simplex Parameter...........................................................................................700
MSO: EDD Demand Cutoff Priority.....................................................................................701
MSO: EDD Scheduling Window Control.............................................................................702
MSO: Enable Advanced Sequencing..................................................................................703
MSO: Enable Cost Rollup for Optimization.........................................................................704
MSO: Enable Decision Rules..............................................................................................705
MSO: Enable Hard Links Globally.......................................................................................706
MSO: Enable Rounding of Fractional Supplies For Service Planning................................707
MSO: Enable sourcing split for end item substitution..........................................................708
MSO: Enforce Minimum Transfer Quantities......................................................................709
MSO: Enforce Resource Sequence Contiguity...................................................................710
MSO: Firm Purchase Orders Within Time Fence................................................................711
MSO: Firm Requisitions Within Time Fence.......................................................................712
MSO: Firm Supply Allocation Window (Backward days).....................................................713
MSO: Firm Supply Allocation Window (Forward days).......................................................714
MSO: Firm Work Orders/Operations Within Time Fence....................................................715
MSO: Floating Point Precision............................................................................................716
MSO: Floating Point Precision for Increments of Shift Start/End Times Within a Planning
Bucket.................................................................................................................................719
MSO: Floating Point Precision for Order Q.........................................................................720
MSO: Floating Point Precision for Planning Bucket Efficiency............................................721
MSO: Floating Point Precision for Transportation Capacities (Volume).............................722
MSO: Floating Point Precision for Transportation Capacities (Weight)..............................723
MSO: Floating Point Precision for Usage in Routings.........................................................724
MSO: Generate Compression Days Exception...................................................................725
MSO: Generate Compression/Firming Exceptions for Orders in Progress.........................726
MSO: Generate Reduced Model.........................................................................................727
MSO: Generate Shared Supply Exceptions........................................................................728
MSO: Global Batchable Flag...............................................................................................729
MSO: Global Chargeable Flag............................................................................................730
MSO: Global Time Limit......................................................................................................731
MSO: HLS flat files path......................................................................................................732
MSO: Hard link scheduling window.....................................................................................733
MSO: Hard link scheduling window expansion factor.........................................................734
MSO: Heuristic type............................................................................................................735
MSO: Incremental Planned Orders.....................................................................................736
MSO: Internal Demand Aggregation Within Optimization...................................................737
MSO: Inventory Carrying Costs Percentage.......................................................................738
MSO: JIT Selector Window Size.........................................................................................739
MSO: LP Constraint Batch Size..........................................................................................740
MSO: LP Markowitz Coefficient..........................................................................................741
MSO: LP Optimization Algorithm........................................................................................742
MSO: Late Demands Exceptions Tolerance Minutes.........................................................743
MSO: Lead Time Control....................................................................................................744
MSO: List Size for Pricing Candidates................................................................................746
MSO: Lookahead days to net co-product/by-product supplies before creating planned
orders..................................................................................................................................747
MSO: Max Gap Tolerence on SDS.....................................................................................748
MSO: Maximium Number of Prepones...............................................................................749
MSO: Maximize Search of Availability Intervals..................................................................750
MSO: Maximize Use of Unfirm PurchOrd/WorkOrd in Optimization...................................751
MSO: Maximum Activity Duration.......................................................................................752
MSO: Maximum Allowable Days Late.................................................................................753
MSO: Maximum Allowable Days Late before Forecast Expiration......................................754
MSO: Maximum Alternate Combinations............................................................................755
MSO: Maximum Demands Per Group for Advanced Sequencing......................................756
MSO: Maximum Demands per Group.................................................................................757
MSO: Maximum Demands per Slice...................................................................................758
MSO: Maximum Inventory Level % of Safety Stock............................................................759
MSO: Maximum Lead Time Factor.....................................................................................760
MSO: Maximum Number of Demands in a Hard Linked Demand Set................................761
MSO: Maximum Number of Groups by Low Level Code for Optimization..........................762
MSO: Maximum Number of Pull for Operation....................................................................763
MSO: Maximum Number of Pushes for Operation..............................................................764
MSO: Maximum Operations Per Slice................................................................................765
MSO: Maximum Resource Over-capacity...........................................................................766
MSO: Maximum Simplex Iterations.....................................................................................767
MSO: Maximum number of pulls/push for hard linked operations......................................768
MSO: Minimize Supply Duration.........................................................................................769
MSO: Minimum Processing Lead Time Adjustment Factor................................................770
MSO: Multiplier To Derive Supply Allocation Window.........................................................771
MSO: Net All Firm Supplies Before Creating Planned Order..............................................772
MSO: Network routing cycle time coefficient.......................................................................774
MSO: Network routing fixed time window...........................................................................775
MSO: Nfl Backward Compression Pct................................................................................776
MSO: Nfl Forward Compression Pct...................................................................................777
MSO: Number of Backtracks Allowed.................................................................................778
MSO: Number of Decomposition Groups Per Process.......................................................779
MSO: Number of Demand Groups for Optimization............................................................780
MSO: Number of Iterations for Local Search......................................................................781
MSO: Number of LP Phases for Safety Stock Calculation..................................................782
MSO: Number of Processes to use in Decomposition........................................................783
MSO: Number of Threads for Optimization.........................................................................784
MSO: Number of processes for Inline Forecast..................................................................785
MSO: Optimization Advanced Start....................................................................................786
MSO: Optimization Daily Aggregation Buckets...................................................................787
MSO: Optimization Weekly Aggregation Buckets...............................................................788
MSO: Optimization debug level...........................................................................................789
MSO: Order Modifier Max Searching Depth.......................................................................791
MSO: Overlap Activities by MTQ........................................................................................792
MSO: Peg By-product Supplies..........................................................................................793
MSO: Penalty Basis for Changeovers.................................................................................794
MSO: Penalty Cost Factor for Exceeding Item Material Capacity Flexfield Attribute..........795
MSO: Penalty Cost Factor for Exceeding Material Capacity...............................................796
MSO: Penalty Cost Factor for Exceeding Material Capacity Flexfield Attribute..................797
MSO: Penalty Cost Factor for Exceeding Org Material Capacity Flexfield Attribute...........798
MSO: Penalty Cost Factor for Exceeding Org Resource Capacity Flexfield Attribute........799
MSO: Penalty Cost Factor for Exceeding Org Transportation Capacity Flexfield Attribute800
MSO: Penalty Cost Factor for Exceeding Resource Capacity............................................801
MSO: Penalty Cost Factor for Exceeding Resource Capacity Flexfield Attribute...............802
MSO: Penalty Cost Factor for Exceeding Transportation Capacity Flexfield Attribute.......803
MSO: Penalty Cost Factor for Late Demands.....................................................................804
MSO: Penalty Cost Factor for Late Forecasts Flexfield Attribute........................................805
MSO: Penalty Cost Factor for Late Item Demands Flexfield Attribute................................806
MSO: Penalty Cost Factor for Late Org Demands Flexfield Attribute.................................807
MSO: Penalty Cost Factor for Late Sales Orders Flexfield Attribute..................................808
MSO: Penalty Increase Tolerance Percentage in Local Search.........................................809
MSO: Penalty multiplier outside unconstrained..................................................................810
MSO: Percent Complete Before Resequencing..................................................................811
MSO: Postpone Use of Alternates to Latest Possible Time................................................812
MSO: Preemption Slack Ratio............................................................................................813
MSO: Preprocessing Aggregator Fill...................................................................................814
MSO: Preprocessing Aggregator Limit................................................................................815
MSO: Preprocessing Flag for LP Matrix..............................................................................816
MSO: Preprocessor LP Compression.................................................................................817
MSO: Primal Simplex Parameter........................................................................................818
MSO: Primal/Dual Preprocessing Reduction......................................................................819
MSO: Pull push base..........................................................................................................820
MSO: Pull push offset.........................................................................................................821
MSO: Queue Time Factor...................................................................................................822
MSO: Re-computation percentage for sequence generation..............................................823
MSO: Reschedule Jobs Out to Reduce Inventory Carrying Costs......................................824
MSO: Reschedule Shared Supply to Influence Batching....................................................825
MSO: Resource Adjustment Factor For Improved Offloading to Alternates.......................826
MSO: Resource Batching Strategy.....................................................................................827
MSO: Resource Group for the Line Flexfield Attribute........................................................828
MSO: Respect Activity Contiguity Flag for Process Supplies.............................................829
MSO: Respect EDD Scheduling windows for Lead Times..................................................830
MSO: SCO Dual Variables Tolerance.................................................................................831
MSO: SCO Reduced Cost Tolerance.................................................................................832
MSO: SCO TRIANGULATION............................................................................................833
MSO: STL Buffer Size.........................................................................................................834
MSO: Schedule Across Breaks...........................................................................................835
MSO: Schedule All Firm Planned Orders First....................................................................836
MSO: Schedule Simultaneous Resources Across Breaks..................................................837
MSO: Schedule window width.............................................................................................839
MSO: Scheduler Time Step................................................................................................840
MSO: Scheduling Activity Selection Window......................................................................841
MSO: Scheduling Window UOM.........................................................................................842
MSO: Setup Pattern Calculation Window...........................................................................843
MSO: Simplex Feasibility Tolerance...................................................................................844
MSO: Simplex Optimality Tolerance...................................................................................845
MSO: Simplex Perturbation Constant.................................................................................846
MSO: Simplex Perturbation Limit........................................................................................847
MSO: Simplex Perturbation Parameter...............................................................................848
MSO: Simplex Presolve Limit..............................................................................................849
MSO: Simplex Singularity Repair Limit...............................................................................850
MSO: Skip Firm SDS Activities During Justify....................................................................851
MSO: Slack Hours For Batch Resource..............................................................................852
MSO: Solve Dual Problem..................................................................................................853
MSO: Sourcing Allocation Window.....................................................................................854
MSO: Split Planned Orders for Assigned Units...................................................................855
MSO: Split Supplies for SPP Release.................................................................................856
MSO: Spread Resource Consumption Within Optimization................................................857
MSO: Substitute Item Penalty.............................................................................................858
MSO: Supplies used for satisfying transient safety stock...................................................859
MSO: Supply Reschedule Window Size for Safety Stock Pegging.....................................860
MSO: Supply Window Size.................................................................................................861
MSO: Synchronize Chargeable Resources to Respect Hard Links....................................862
MSO: Target Inventory Level % of Safety Stock.................................................................863
MSO: Transfer Quantity Threshold for Enforceing Hard Links............................................864
MSO: UOM for converting Changeover Time to Penalty....................................................865
MSO: Upper Limit for Maximum Time Offset for Hard Links...............................................866
MSO: Use Breaks in Calculation of Unconstrained Scheduling Windows..........................867
MSO: Use Collections Start Time.......................................................................................868
MSO: Use Customer Site in End Item Substitution Rule....................................................869
MSO: Use Decomposition in Optimization..........................................................................871
MSO: Use Discrete Job Resource Usage to Consume Resource Capacity.......................872
MSO: Use Effectivity Date to Infer End Item Substitution Priority.......................................873
MSO: Use Existing Supplies in Alternate BOM/Subs. Comp..............................................874
MSO: Use Item Shelf Life Days in Scheduling Buy/Transfer Orders..................................875
MSO: Use JIT dates from high level scheduling results......................................................876
MSO: Use Of Assigned Units In Scheduling.......................................................................877
MSO: Use Optimization and Decision Rules for Simulation................................................878
MSO: Use SCO Time Aggregation.....................................................................................879
MSO: Use Safety Lead Time..............................................................................................880
MSO: Use Sequencing Template........................................................................................881
MSO: Use Shift Definitions When Scheduling Lead Times.................................................882
MSO: Use Up Existing Supply of Primary Components Before Substitute.........................883
MSO: Write Inline forecasting flat files................................................................................884
MSO:Use Old Pegging for SPP and ASCP without Detailed Scheduling...........................885
MSR: Budget Category Set.................................................................................................886
MSR: Budget Enditem Favor Factor...................................................................................887
MSR: Budget Heuristic........................................................................................................888
MSR: Enable Cycle Stock Adjustment................................................................................889
MSR: Postponement Factor................................................................................................890
MSR: Probability Distribution Type.....................................................................................891
MSR: Safety Stock Holding Strategy..................................................................................892
MSR: Variance to Mean Threshold for use of Negative Binomial Distribution....................893
MSR: Warehouse Capacity Granularity..............................................................................894
MSR: Warehouse Category Set..........................................................................................895
POR: Sync up Need by date on IR with OM.......................................................................896
WIP:Discrete Job Prefix......................................................................................................897
WSM: Create Job Level BOM and Routing Copies............................................................898
Advanced Planning and Scheduling Profile Options
BOM: Hour UOM

Profile Code BOM


Profile Option Name BOM:HOUR_UOM_CODE
Description Hour UOM used by leadtime calculations -
Usually set to HR for hours and then any conversions are entered as
required in Inventory application.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
CRP:Spread discrete requirements

Profile Code CRP


Profile Option Name CRP_SPREAD_LOAD
Description Spread discrete requirements that span multiple days
Not used for collections, but used in ASCP for resource horizontal plan
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
CSD: Default Repair Order

Profile Code CSD


Profile Option Name CSD_DEFAULT_REPAIR_ORDER
Description For SPP - Service Parts Planning
Set on EBS Source in a distributed environment

Default Repair Order


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
CSD: Default Repair Organization

Profile Code CSD


Profile Option Name CSD_DEFAULT_REPAIR_ORG
Description For SPP - Service Parts Planning
Set on EBS Source in a distributed environment

Default repair owning organization


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
CSD: Default Repair Type

Profile Code CSD


Profile Option Name CSD_DEFAULT_REPAIR_TYPE
Description For SPP - Service Parts Planning
Set on EBS Source in a distributed environment

Default repair type for new repair orders


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
CSD: Default Service Request Severity for Internal
Repair Order

Profile Code CSD


Profile Option Name CSD_IRO_DEFAULT_SR_SEVERITY
Description For SPP - Service Parts Planning
Set on EBS Source in a distributed environment

Default service request severity for internal repair orders


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
CSD: Default Service Request Type for Internal
Repair Order

Profile Code CSD


Profile Option Name CSD_IRO_DEFAULT_SR_TYPE
Description For SPP - Service Parts Planning
Set on EBS Source in a distributed environment

Default Service Request Type for internal repair orders


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
CSD: Repair Mode for Depot Repair Orders

Profile Code CSD


Profile Option Name CSD_REPAIR_MODE
Description For SPP - Service Parts Planning
Set on EBS Source in a distributed environment

Repair Mode for Depot Repair Processes - Site Level


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
CSD: Repair Type Internal Repair Order

Profile Code CSD


Profile Option Name CSD_IRO_REPAIR_TYPE
Description For SPP - Service Parts Planning
Set on EBS Source in a distributed environment

Repair Type for creation of internal repair orders


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
CSP: Repair Supplier Organization's Defective
Subinventory

Profile Code CSP


Profile Option Name CSP_REPAIR_SUP_ORG_DEFECT_SUBINV
Description For SPP - Service Parts Planning
Set on EBS Source in a distributed environment

This profile value used in Repair PO Execution as Defective Subinventory


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
CSP: Repair Supplier Organization's Usable
Subinventory

Profile Code CSP


Profile Option Name CSP_REPAIR_SUP_ORG_USABLE_SUBINV
Description For SPP - Service Parts Planning
Set on EBS Source in a distributed environment

This profile value used in Repair PO Execution as Usable Subinventory


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
GMP: APS Installation Level

Profile Code GMP


Profile Option Name GMP_APS_CONFIG_LEVEL
Description What is the APS Installation Level.

available profile settings

1 - Not Installed
2 - Upgrade from MRP
3 - Full Installation

Profile affects following screens :

ASCP instances form :

If profile is set to 1 or 2 on source or destination,


then show following message :

" Currently installed/licensed options of Advanced


Supply Chain Planning product do not allow
Distributed Instances"

Plan options screen :

If MSO is not licensed show message :

" Currently installed/licensed options of Advanced


Supply Chain Planning product do not allow
Constrained Plans. Please consult the
implementation guide and upgrade notes for
details"

If the profile option is set to 1 (Not Installed) then


restrict to single instance and single organization

Following message is displayed :

" Currently installed/licensed options of Advanced


Supply Chain Planning product do not allow Multi-
org Planning. Please consult the implementation
guide and upgrade notes for details"

If the profile is set to 2 (upgrade from MRP) then


restrict to single instance and multi organization

Following message is displayed

" Currently installed/licensed options of Advanced


Supply Chain Planning product do not allow Multi-
Instance Planning. Please consult the
implementation guide and upgrade notes for
details"
Note Reference(s)

Bug Reference(s) 5346351


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
INV:Capable to Promise

Profile Code INV


Profile Option Name INV_CTP
Description Valid values are
ATP based on collected data
ATP/CTP based on planning output

Other values may appear, but are not longer used by the code.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MO: Operating Unit

Profile Code MO:


Profile Option Name ORG_ID
Description MO: Operating Unit

The MO:Operating Unit profile option must be set


to the appropriate value at either the Responsibility
or User level.

This profile option is used to distinguish which


Operating Unit will be used by the users that login
into Oracle Applications.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: 2-Cuttoff Date Offset Months

Profile Code MRP


Profile Option Name MRP_CUTOFF_DATE_OFFSET_2
Description Do NOT Use
custom profile for secondary offset - not used except in DEV supported test
instances.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Calculate MATO Demand

Profile Code MRP


Profile Option Name MRP_CALC_MATO_DEMAND
Description This profile option is used by ASCP to support forecast consumption
processes
for Multi-level ATO models. Set to Yes if these processes are utilized.

This was used only until 11.5.9. From 11.5.10 this profile is not used.

Note Reference(s)

Bug Reference(s) 3125951


3125891
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Calculate Plan Performance

Profile Code MRP


Profile Option Name MRP_CALCULATE_PLAN_PERFORMANCE
Description Not used in Oracle Advanced Planning

This profile is used to decide upon whether the request Calculate Plan
performance Indicators needs to be run at the end of MRP Launch or not.

This was an optional program used to gather info from MRP and load into
tables used by the old Business Intelligence programs. More information is
available in Note: 783088.1
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Calculate Supply Demand

Profile Code MRP


Profile Option Name MRP_ATP_CALC_SD
Description Calculate Supply Demand details for ATP.
When you drill to ATP Details on the ATP inquiry or Sales order Availability
window (and other applications like iStore, Quoting, etc), the ATP Details and
Pegging are displayed.
In the pegging screen, you can right-click on lines showing Green or Red
icon, then you will have access to other information like
Supply/Demand, Horizontal Plan, etc.
These details are only available when this profile is set to Yes. Otherwise you
will get an error message to setup the profile.

PERFORMANCE NOTE:
This is used for ATP debugging and can effect performance, especially on
large orders or ATO models.
This should usually be setup at the User Level as required.
Note Reference(s)

368229.1

565918.1
436771.1

Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
-1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP: Category Set for Backlog Form

Profile Code MRP


Profile Option Name MRP_BALWB_CATEGORY_SET
Description Category Set for Order Backlog Workbench Form accessed from the Order
Management Responsibility / Scheduling

Suggest that this would be the same as used for preferences when viewing
data in the Collections Workbench (View Collected Data)

Use this profile option to indicate which items belonging to this category set
appear in the Backlog Scheduling Workbench tree navigator.
If no value is entered, no items appear in the Backlog Scheduling Workbench
tree navigator. You can update this profile at the site level.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP: Compute Standard Mandatory Components
for ATO Models

Profile Code MRP


Profile Option Name MRP_EXPLODE_ATO
Description Determines whether to call the CTO API to calculate the dependent demand
for ATO items during the Refresh Snapshots process.

This profile option was introduced as a performance tuning measure in


extreme cases when the collections performance is very slow. Normal usage
is that this profile is set to 'Yes' (defaulted to Yes)

Setting this to Yes would be normal if ATO Models are present in the system.
Collections code will default this profile to Yes if it is NULL.

Set this profile in the EBS Source instance when you have distributed
installation.

Note: Refresh Collection Snapshots will finish with warning when:


CTO BOM not found for the item
CTO_API was exploding the BOM and returns a warning
from the CTO code.

We print the following for CTO BOM not found - this is a setup violation -
since the requirement for CTO is to configure and create the [STAR] item
using CTO Auto-Create or by progressing the sales order.

Warning: Item_ID = 781553, ORG_ID=5002 ; No BOM found for configured


item in ship-from org.

You may safely disregard this warning if the configured item is transferred
across orgs, and the warning points to an org in which no assembly of the
configured item takes place. If you are using ODS based ATP, please check
that you have the BOM in shipping org. If you are using PDS based ATP,
please check that item attribute ""Create Configured Item, BOM"" equals
""Based on Model"" and BOM exists in ship-from org.

DOCUMENTATION BUG: The documentation has this profile


backwards.
Default Value - No

Note Reference(s)
179522.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Cutoff History Days

Profile Code MRP


Profile Option Name MRP_CUTOFF_HISTORY_DAYS
Description Not used by Advanced Supply Chain Planning

Note 303809.1 has more information about this


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Disable Project Validation

Profile Code MRP


Profile Option Name MRP_DISABLE_PROJECT_VALIDATION
Description
Special profile for Seiban project numbers. Used
for release of planned orders from the ASCP
workbench.
Profile set in EBS Source in distributed installation.

Valid values are:


Yes - project validation won't be executed.
No - the project validation will be executed.

Default Value - No when NULL

11.5.10 Patch 6903209


One off patch released by DEV.
Also included in 1st APS Source Side UI patch
7427625 and all Source Side rollups since October
2008

Bug 6903209
One off patch released for 11.5.10

12.0.6
bypass code included in
$MRP_TOP/patch/115/MRPRLWFB.pls
120.1.12000000.6
BUT - the profile is not created, and must be
created manually - see below

12.1.1 and above


bypass code included in
$MRP_TOP/patch/115/MRPRLWFB.pls
120.1.12010000.2 and above
BUT - the profile is not created, and must be
created manually - see below

Maunual Profile Creation details


Application - Master Scheduling/MRP
Hierarchy Type - Security
Hierarchy Type Access Level
Visible and Updatable at the following levels
Site, Application, Responsibility, User

SQL validation:
SQL="select lookup_code, meaning
\"MRP:DisableProjectValidation\"
into :profile_option_value, :visible_option_value
from fnd_lookups
where lookup_type = 'YES_NO'"
Column="\"MRP:DisableProjectValidation\"(*)"

Note Reference(s)

Bug Reference(s) 6865274


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Explode Demand Through Phantom
Component

Profile Code MRP


Profile Option Name MRP_EXPL_DEM_THROUGH_PHANTOM
Description Not used in Oracle Advanced Planning.

This is used by MRP to decide whether demand needs to be exploded


through Phantom components or not.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Firm Internal Req Transferred to OE

Profile Code MRP


Profile Option Name MRP_FIRM_OE_XFERRED_INTERNAL_REQ
Description Valid values are:

Yes - all internal requisitions transferred to Oracle Order


Management are treated as firm supplies by Oracle
Advanced Supply Chain Planning
No - Oracle Advanced Supply Chain Planning may generate
reschedule recommendations for these internal requisitions.

Rescheduled recommendations cannot be released to purchasing for internal


requisitions. To reschedule recommendations, cancel the internal requisition
in the source instance and create a new requisition with the new date.

Default Value - Yes


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Hash Area Size (Bytes)

Profile Code MRP


Profile Option Name MRP_HASH_AREA_SIZE
Description Used in 11.5.9 and below for Data Collections.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Ignore Alternate BOM/Routing

Profile Code MRP


Profile Option Name MRP_IGNORE_ALTERNATES
Description Not Used in Oracle Advanced Planning, only for Oracle MRP.

Ref Bug 3824520


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Ignore Zero Quantity Demands in Calculating
First Bucket for Statistical Forecasting

Profile Code MRP


Profile Option Name MRP_IGNORE_ZERO_QTY_DEMANDS
Description Not used in Oracle Advanced Planning.

This is for standard MRP Forecasting functionality - program INCFIF


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Max Age of Materialized View Before Refresh
(minutes)

Profile Code MRP


Profile Option Name MRP_MAX_MV_AGE_BEFORE_REFRESH
Description Introduced in VCP Cum patch 12.1.3.9
Age (in minutes) of an MV before it will be refreshed - applicable only to
Parallel Collections.
Note Reference(s) 1570652.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Net All Purchase Orders Prior To Requisitions

Profile Code MRP


Profile Option Name MRP_FIRM_REQS_WITHIN_TF
Description Use this profile to specify whether or not the planning engine should net all
existing supplies prior to netting purchase requisitions.

Yes - Net purchase orders, then net purchase requisitions.


This may result in purchase requisitions with schedule dates
earlier than purchase orders being canceled or rescheduled
out.
No - Net purchase orders and purchase requisitions
together. Note: If the plan planning mode is Constrained
(Without Detailed Scheduling), the planning engine does not
use this profile option.

Default - No
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Old Sales Orders Cutoff Days

Profile Code MRP


Profile Option Name MRP_OLD_SO_CUTOFF_DAYS
Description Only For MRP, it controls the number of days from sysdate backwards that
the Planning Manager goes to pick up sales orders. For example the value
365 will let the Planning Manager see sales orders up to 365 days old.

Choose a value that will capture all open sales orders.


The Planning Manager will pick up closed sales orders as well, these are
used for forecast consumption in MRP functionality.
A NULL value will pick up ALL sales orders.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Persist ATP Results

Profile Code MRP


Profile Option Name MRP_ATP_PERSIST
Description Profile added in 11.5.9.
This is to fulfill customer specific requirement for reporting on the
MRP_ATP_SCHEDULE_TEMP and MRP_ATP_DETAILS_TEMP tables
data.
Default is NO and should be left as NO

Bug details:
Commit ATP results data (mrp_atp_details_temp and
mrp_atp_schedule_temp) into database instead of removing data as is done
in types of ATP requests.
Customer is using these tables to generate a report.
Note Reference(s)

Bug Reference(s) 5102683


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP: Plan Revenue Discount Percent

Profile Code MRP


Profile Option Name MRP_BIS_AV_DISCOUNT
Description Specifies the average discount percent applied to all items in a plan. This
value is a key performance indicator used to calculate performance in a plan
for Business Intelligence reports. Valid values are:

Integers between 0 and 100.

Optional - Average Discount to be applied when calculating Revenue of a


plan as part of Plan Performance Indicators Set on EBS Source and APS
Destination in a distributed installation.

Default Value - NULL


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Plan Revenue Price List

Profile Code MRP


Profile Option Name MRP_BIS_PRICE_LIST
Description Lookup for Price List in Order Management Optional - Price List used to
calculate revenue of a plan as part of Plan Performance Indicators- from
SO_PRICE_LISTS.

Valid values are names of prices lists defined. The list of values will show the
price lists that can be used.

This value is a key performance indicator used to calculate performance in a


plan for Business Intelligence reports. Set in EBS Source in a distributed
installation.

Default Value - NULL


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Planning Manager Run First Time

Profile Code MRP


Profile Option Name MRP_PLNG_MGR_FIRST_TIME
Description Not used by Oracle Advanced Planning.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: RHX Check Profile

Profile Code MRP


Profile Option Name MRP_RHX_CHECK_PROFILE_FP
Description Not used by Oracle Advanced Planning.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Round Source Entries

Profile Code MRP


Profile Option Name MRP_ROUND_SOURCE_ENTRIES
Description Not used in Oracle Advanced Planning.

Used by MRP to decide whether to round forecast or sales order quantities


when loading the forecast or MDS.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Sort Area Size (Bytes)

Profile Code MRP


Profile Option Name MRP_SORT_AREA_SIZE
Description Used for Data Collections in 11.5.9 and below.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Update Requested Completion Date when
Releasing Reschedules

Profile Code MRP


Profile Option Name MRP_UPD_REQ_DATE_REL
Description Not used in Oracle Advanced Supply Planning.

Exists in release code for MRP Planning in MRP_REL_PLAN_PUB

File $MRP_TOP/patch/115/sql/MRPPRELB.pls

See profile for Advanced Supply Chain Planning - MSC: Update Requested
Completion Date when Releasing Reschedules
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Use Alternate SQL for Daily Cleanup

Profile Code MRP


Profile Option Name MRP_ALTERNATE_SQL
Description Not used for Advanced Planning. This is for the planning manager Once-A-
Day Task Worker operations. Ref Bug 3958467
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: Use Progress Bar for Backlog Workbench

Profile Code MRP


Profile Option Name MRP_ATP_PROGRESS_BAR
Description MRP: Use Progress Bar for Backlog Workbench
This is the display bar which is present when you schedule orders in the
Order Backlog Workbench.
PERFORMANCE ALERT:
This should be set to No if you are processing many orders OR IF you find
that the Backlog Workbench appears to hang while scheduling orders.
Note Reference(s)
742648.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP: i2 Batch Client Timeout

Profile Code MRP


Profile Option Name MRP_I2_P_BC_TIMEOUT
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 Calc Cumulative Yield

Profile Code MRP


Profile Option Name MRP_I2_P_ENABLE_CUMUL_YIELD
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 Check if FP installed

Profile Code MRP


Profile Option Name MRP_I2_P_CHECK_FOR_FP
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 Data Load Timeout

Profile Code MRP


Profile Option Name MRP_I2_P_DATA_LOAD_TIMEOUT
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 Date Constant

Profile Code MRP


Profile Option Name MRP_I2_P_DATE_CONSTANT
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 Debug Mode

Profile Code MRP


Profile Option Name MRP_I2_P_DEBUG
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 Factory Planner Exec Dir Attr Number

Profile Code MRP


Profile Option Name MRP_I2_P_FP_EDIR_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 Factory Planner User Attribute Number

Profile Code MRP


Profile Option Name MRP_I2_P_FP_USER_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 Job Change Attribute Number

Profile Code MRP


Profile Option Name MRP_I2_P_JC_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 Log Directory

Profile Code MRP


Profile Option Name MRP_I2_P_LOG_DIR
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 Net Change Dir

Profile Code MRP


Profile Option Name MRP_I2_P_FP_NET_DIR
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Aggregate Resource Attribute
Number

Profile Code MRP


Profile Option Name MRP_I2_P_AGG_RES_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM BC Delimiter

Profile Code MRP


Profile Option Name MRP_I2_P_BC_DELIMITER
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM BOM Attribute Consumed
attribute number

Profile Code MRP


Profile Option Name MRP_I2_P_BOM_AC_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM BOM Attribute Produced attribute
number

Profile Code MRP


Profile Option Name MRP_I2_P_BOM_AP_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Batch Client Filter

Profile Code MRP


Profile Option Name MRP_I2_P_BCL_FILTER
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Cooldown Time Attribute Number

Profile Code MRP


Profile Option Name MRP_I2_P_RES_CDT_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Delimiter

Profile Code MRP


Profile Option Name MRP_I2_P_DELIMITER
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Enable Attribute Base Planning

Profile Code MRP


Profile Option Name MRP_I2_P_ENABLE_ABP
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Estimated Queue Time Attribute
Number

Profile Code MRP


Profile Option Name MRP_I2_P_RES_EQT_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Factory Planner Data Dir Attribute
Number

Profile Code MRP


Profile Option Name MRP_I2_P_FP_DD_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Factory Planner Host Attribute
Number

Profile Code MRP


Profile Option Name MRP_I2_P_FP_HOST_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Factory Planner Port Attribute
Number

Profile Code MRP


Profile Option Name MRP_I2_P_FP_PORT_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Inventory Attribute Alias
Separator

Profile Code MRP


Profile Option Name MRP_I2_P_INV_AA_SEP
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Minimum Queue Time Attribute
Number

Profile Code MRP


Profile Option Name MRP_I2_P_RES_MQT_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM OE Attribute Consumed attribute
number

Profile Code MRP


Profile Option Name MRP_I2_P_OE_AC_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Offloadable To Attribute Number

Profile Code MRP


Profile Option Name MRP_I2_P_RES_OFFTO_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Offloadable from Attribute
Number

Profile Code MRP


Profile Option Name MRP_I2_P_RES_OFFFROM_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM PO Attribute Alias attribute
number

Profile Code MRP


Profile Option Name MRP_I2_P_PO_AA_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Part Buffer Style Attribute Number

Profile Code MRP


Profile Option Name MRP_I2_P_BUF_STYLE_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM Resource Type Attribute Number

Profile Code MRP


Profile Option Name MRP_I2_P_RES_TYP_ATTR_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RHYTHM released as firm manufacturing
order

Profile Code MRP


Profile Option Name MRP_I2_P_RELEASED_AS_FIRM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RhythmLink Data Directory

Profile Code MRP


Profile Option Name MRP_I2_P_RL_DATA_DIR
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RhythmLink Executable Directory

Profile Code MRP


Profile Option Name MRP_I2_P_RL_EXEC_DIR
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RhythmLink Host

Profile Code MRP


Profile Option Name MRP_I2_P_RL_HOST
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RhythmLink Port Number

Profile Code MRP


Profile Option Name MRP_I2_P_RL_PORT_NUM
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 RhythmLink User

Profile Code MRP


Profile Option Name MRP_I2_P_RL_USER
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 Start Factory Planner Client

Profile Code MRP


Profile Option Name MRP_I2_P_START_FP_CLIENT
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 Start RhythmLink Client

Profile Code MRP


Profile Option Name MRP_I2_P_START_RL_CLIENT
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP: i2 WIP Job Load Timeout

Profile Code MRP


Profile Option Name MRP_I2_P_JOB_LOAD_TIMEOUT
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:ATP Assignment Set

Profile Code MRP


Profile Option Name MRP_ATP_ASSIGN_SET
Description ATP Assignment Set to be used when scheduling Orders for ATP based on
Collected Data.
Required for ATP Based on Collected data to have sourcing information and
provide correct results.
This assignment set will default into the ATP Inquiry when accessed form the
Order Management application.

In a distributed installation, this would be setup on the EBS Source instance


(not required on the APS Destination instance - see MSC: ATP Assignment
Set)

If you use advanced Region/Zone Sourcing which is setup in Advanced


Supply Chain Planner only, then you must leave this profile NULL and use
MSC: ATP Assignment Set to provide ATP with assignment set that should
be used.
Note Reference(s)

147243.1

Bug Reference(s) 4567833


Document References(s) -1
-1
-1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP:ATP Database Link

Profile Code MRP


Profile Option Name MRP_ATP_DATABASE_LINK
Description Determines whether distributed Order Promising is used. This profile is
obsolete in 11.5.10 and later releases.
Note Reference(s)

Bug Reference(s) 3049003


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP:Activate OLP

Profile Code MRP


Profile Option Name MRP-OLP
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Allow Safety Stock Pegging

Profile Code MRP


Profile Option Name MRP_ALLOW_SS_PEGGING
Description This is a MRP Profile. Not used in advanced Supply Chain Planning
Note Reference(s)

Bug Reference(s) 5924044


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Backlog Progress Timeout

Profile Code MRP


Profile Option Name MRP_BALWB_TIMEOUT
Description Used to help the performance of the Order Backlog workbench.
Timeout in minutes.
Should be set to 10
Change to other values only at the direction of Development for debugging
an issue with the back log workbench
Note Reference(s)

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP:Calculate Excess Exceptions on Time Fence

Profile Code MRP


Profile Option Name MRP_CALC_EXCESS_EXCEPT
Description Indicates whether excess exceptions are calculated at the time fence or up to
the time fence
Yes: The planning engine issues exceptions only at the time
fence date.
No: The planning engine issues individual exception.

Valid values: yes/no


Default value: yes

IMPORTANT NOTE: The Time Fence used for this exception is from the
Exception Set - NOT the Item
Planning Time Fence value. Check the User Defined Time Fence in your
Exception Set assigned to the item.
Note Reference(s)

Bug Reference(s) 4540037


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Combine Sugg Rep Schedules

Profile Code MRP


Profile Option Name MRP_COMBINE_REP_SCHEDULE
Description Combines repetitive schedules, if scheduled back-to-back for the same
quantity. Used only by unconstrained plans

Valid values: yes/no


Default value: yes
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan Yes
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Complete Supply Chain ATP

Profile Code MRP


Profile Option Name MRP_COMPLETE_SCATP
Description Not used by Advanced Supply Chain Planning.

Note Reference(s)

Bug Reference(s) 2655891


2941520
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Compute Sales Order Changes

Profile Code MRP


Profile Option Name MRP_COMPUTE_SO_CHANGES
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Consume Fcst Set Summary

Profile Code MRP


Profile Option Name MRP_CONSUME_FC_SET_SUMMARY
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Consume Forecast

Profile Code MRP


Profile Option Name MRP_FORECAST_CONSUMPTION
Description Not used in Oracle Advanced Planning.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Consume MDS

Profile Code MRP


Profile Option Name MRP_MDS_CONSUMPTION
Description If set to yes, planning manager needs to be running when loading MDS in the
ASCP plan

Note Reference(s) 790125.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Consume MPS

Profile Code MRP


Profile Option Name MRP_MPS_CONSUMPTION
Description If set to yes, planning manager needs to be running on the source to collect
WIP/PO supplies.
Note Reference(s) 790125.1

Bug Reference(s) 4890962


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Create Time fence

Profile Code MRP


Profile Option Name MRP_FIRM_ORDER_TF
Description Instructs the planning engine to create a natural time fence on firm work
orders, purchase orders, flow schedules and shipments. Valid values are:
Yes - create a natural time fence based on firm work orders,
purchase orders, flow schedules, and shipments

No - the planning engine does not create a time fence

The planning engine honors the item attribute Planning Time Fence
regardless of the value of this profile option.
Note Reference(s)

399888.1
422361.1

Bug Reference(s)
Document References(s) -1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Cutoff Date Offset Months

Profile Code MRP


Profile Option Name MRP_CUTOFF_DATE_OFFSET
Description Determines how many months of resource availability should be computed
for resources and simulation sets. No resource availability is calculated
beyond this horizon. For constrained plans beyond this horizon, resource
capacity is viewed as infinite. Set this value to your plan horizon

Valid values: Integer >= 0


Default value: 6
Note Reference(s)

Bug Reference(s) 4736046


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Debug Mode

Profile Code MRP


Profile Option Name MRP_DEBUG
Description Enable debug messages.
Note:
Has high impact across many applications.
This profile should only be set at USER Level unless otherwise instructed by
support.
Setting at the Site Level can have impact on WIP, BOM, OM, MRP, ASCP
applications.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance Yes
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP:Default Criteria Set

Profile Code MRP


Profile Option Name MRP_DEFAULT_CRITERIA_SET
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Default DRP Plan Name

Profile Code MRP


Profile Option Name MRP_DEFAULT_DRP_NAME
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Default Forecast Date

Profile Code MRP


Profile Option Name MRP_DEFAULT_FORECAST_DATE
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Default Forecast Name

Profile Code MRP


Profile Option Name MRP_DEFAULT_FORECAST
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Default Plan Name

Profile Code MRP


Profile Option Name MRP_DEFAULT_PLAN
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Default Schedule Name

Profile Code MRP


Profile Option Name MRP_DEFAULT_SCHEDULE
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Default Sourcing Assignment Set

Profile Code MRP


Profile Option Name MRP_DEFAULT_ASSIGNMENT_SET
Description Not used by Oracle Advanced Planning.

Used in Oracle Purchasing to determine the sourcing assignment set to


assign sources to requisitions.
Note Reference(s)
209633.1
763822.1

Bug Reference(s) 7362528


Document References(s) Oracle Global Order Promising Implementation and User's Guide
-1
-1
Oracle Master Scheduling/MRP and Oracle Supply Chain Planning User's
Guide
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP:Demand Time Fence Days

Profile Code MRP


Profile Option Name MRP_DEMAND_TF
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Derive PO supply date from need by date

Profile Code MRP


Profile Option Name MRP_CALC_SUPDT_FROM_NBDT
Description Not used in ASCP

Used in Inventory Supply Demand form - Ref Bug


7260101

Check the value of the profile MRP:Derive PO


supply date from need by date
If this set to No, set it to Yes.
Then, we derive the PO due date as need by date
+ post processing lead time.

This calculation is done during the supply/demand


inquiry.
If this is not set, then the date displayed in the
supply/demand inquiry is the
expected_delivery_date in mtl_supply.

If you change the value in the profile option, then


you must also bounce the INV Remote Procedure
Manager for the change to be effective.

Note Reference(s)

Bug Reference(s) 7260101


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Enhanced Exception

Profile Code MRP


Profile Option Name MRP_ENHANCED_EXCEPTION
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Environment variable to set path for MRP files

Profile Code MRP


Profile Option Name MRP_FILES_PATH_ENV_VAR
Description Specifies appropriate path for the MRP files. If this profile option is not used,
files are written to the $APPLCSF/ $APPLOUT directory.

This directory path is used for MRP Plans in old Standard MRP planning and
old Supply Chain Planning

In ASCP plans, we have reference to this in the code, but it is used as


$APPLCSF/$MRP_FILES_PATH_ENV_VAR

So if you set profile to a directory that does not exist under $APPLCSF, then
it will fail when trying to set that directory and plan will fail.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Firm Planned Order Time Fence

Profile Code MRP


Profile Option Name MRP_FIRM_PO_TF
Description Instructs the planning engine to create a natural time fence for an item at the
completion date of the latest firm planned order. Valid values are:
Yes - firm planned orders create a natural time fence.

No - planning engine does not create a time fence at a firm


planned order

If the overwrite option in the plan is set to overwrite all, then all firm planned
orders are deleted
Note Reference(s)

Bug Reference(s) 3642086


2553205
Document References(s) -1
-1
-1
-1
-1
-1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Include Schd Rcpts in Use-up

Profile Code MRP


Profile Option Name MRP_SCH_RCP_USEUP
Description If this profile option is set to Yes, it includes scheduled receipts when
computing the engineering change order use-up date.
Note Reference(s)

Bug Reference(s) 5087357


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Include Substitute Components

Profile Code MRP


Profile Option Name MRP_ATP_SUB_COMP
Description Indicates whether to include substitute components in the Oracle Global
Order Promising calculation.
Users can update at the site level.
This setting is only applicable when ATP is based on Planning output.
Note Reference(s)

Bug Reference(s) 3162334


1555350
Document References(s) -1
-1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP:Interface Table History Days

Profile Code MRP


Profile Option Name MRP_INTERFACE_HISTORY_DAYS
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:MPS Relief Batch Size

Profile Code MRP


Profile Option Name MRP_MPS_RELIEF_BATCH
Description Not used in Oracle Advanced Planning.

This is for standard MRP processing of MPS Relief.


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:MPS Relief Direction

Profile Code MRP


Profile Option Name MRP_MPS_RELIEF_DIRECTION_CONTROL
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Maintain Original Schedule Version

Profile Code MRP


Profile Option Name MRP_ORIGINAL_SCHEDULE_VERSION
Description Not used in Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Perform Planning Manager Functions in Loads

Profile Code MRP


Profile Option Name MRP_PLANNING_MANAGER_IN_LOADS
Description Not used by Oracle Advanced Planning
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Planner Batch Size

Profile Code MRP


Profile Option Name MRP_PLANNER_BATCH_SIZE
Description Not used by Oracle Advanced Planning. This profile is used by the MRP
planning manager. This impacts ASCP only in the sense that it affects how
the planning manager runs.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Planner Workers

Profile Code MRP


Profile Option Name MRP_PLANNER_WORKERS
Description Not used by Oracle Advanced Planning. This profile is used by the MRP
Planning Manager.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Planning Manager Batch Size

Profile Code MRP


Profile Option Name MRP_SCHED_MGR_BATCH_SIZE
Description Not used by Oracle Advanced Planning.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Planning Manager Max Workers

Profile Code MRP


Profile Option Name MRP_SCHED_MGR_MAX_WORKERS
Description Not used by Oracle Advanced Planning.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Purchasing By Revision

Profile Code MRP


Profile Option Name MRP_PURCHASING_BY_REVISION
Description When releasing planned orders, we check if profile is set.
IF NULL, then we check if item has Revision Control checked and if Yes,
then we set revision control Yes
When profile Yes (or NULL and item revision control - Yes), then we update
revision of item based on effectivity date of revisions defined for the item

Set on EBS Source in a distributed environment


Note Reference(s)
238838.1

Bug Reference(s) 3939138


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Purge Batch Size

Profile Code MRP


Profile Option Name MRP_PURGE_BATCH_SIZE
Description Used by Oracle Advanced Supply Chain Planning collections and Snapshot
Note Reference(s) .111955.1

Bug Reference(s) 4590579


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Recommend action within PTF

Profile Code MRP


Profile Option Name MRP_REC_ACTION_IN_PTF
Description Affects exceptions and recommendations. It instructs the planning engine, in
unconstrained plans, to generate recommendations for scheduled receipts
earlier than Planning Time Fence Date.

This profile is not used for MSO (constrained planning), looks at planning
time fence control.
Note Reference(s)

Bug Reference(s) 2980511


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan Yes
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Repetitive Past Due Supply Days

Profile Code MRP


Profile Option Name MRP_REP_PAST_DUE_SUPPLY
Description Not used by Oracle Advanced Planning.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Requisition Load Group Option

Profile Code MRP


Profile Option Name MRP_LOAD_REQ_GROUP_BY
Description This profile is used when the Auto-Release
Planned Orders process is run as part of an Plan
run.

The Auto-Release Planned Orders will launch


when the Production Flag is checked on the Plan
Names form.
Additional Item setups are required for orders to be
eligible for release during this process.

Set in APS Destination instance.

The profile is NOT used when releasing planned


orders from the workbench.
Instead, the Planner workbench -
/Tools/Preferences - the Plan Preferences - Other
tab - Req Group By
This has a lookup to choose the options for how
you group lines being released to PO application to
create requisitions.

Indicates group by option used when loading


requisitions
Valid values are
DB Value [number] - Application Displayed
Value - Description

1 - All on One - (creates one purchase requisition


for all recommended orders)

2 - Item (creates one purchase requisition for each


item; within each requisition, creates one line for
each planned order),

3 - Buyer - (creates one purchase requisition for


each buyer; within each requisition, creates one
line for each planned order),

4 - Planner - (creates one purchase requisition for


each planner; within each requisition, creates one
line for each planned order),

5 - Vendor - (creates one purchase requisition for


each vendor; within each requisition, creates one
line for each planned order),

6 - Category - (creates one purchase requisition


for each item category; within each requisition,
creates one line for each planned order,
7 - One each (creates a purchase requisition for each planned order).
8 - Location - PO Req Import process chooses
deliver to location to group the lines.
Note Reference(s) 779922.1

Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Retain Dates Within Calendar Boundary

Profile Code MRP


Profile Option Name MRP_RETAIN_DATES_WTIN_CAL_BOUNDARY
Description Determines whether to pull dates outside the calendar boundary into
calendar horizon.
Note Reference(s)

Bug Reference(s) 4874810


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Snapshot Pause for Lock (Minutes)

Profile Code MRP


Profile Option Name MRP_SNAPSHOT_PAUSE_FOR_LOCK
Description Not used by Oracle Advanced Planning.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Snapshot Substitute Parts

Profile Code MRP


Profile Option Name MRP_SNAP_SUBSTITUTES
Description Not used in Oracle Advanced Planning.
Note Reference(s)

Bug Reference(s) 6436732


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Snapshot Workers

Profile Code MRP


Profile Option Name MRP_SNAPSHOT_WORKERS
Description Determines number of workers launched by the snapshot monitor. When set
to 0, the Snapshot runs as a single- threaded process. Snapshot workers
collect data on bills of material, work in process, on- hand quantities,
purchasing, firm planned orders, routings, and work-in-process job resource
requirements.
Note Reference(s) 111955.1
824317.1
130995.1

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Sourcing Rule Category Set

Profile Code MRP


Profile Option Name MRP_SRA_CATEGORY_SET
Description Not used in Advanced Supply Chain Planning

Indicates the category set used when Oracle Supply Chain Planning or
Oracle Purchasing creates sourcing assignments at category-org or category
level.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Time Fence Warning

Profile Code MRP


Profile Option Name MRP_MPS_TIME_FENCE_WARNING
Description Not used in Oracle Advanced Planning.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Trace Mode

Profile Code MRP


Profile Option Name MRP_TRACE
Description Enable trace option for MRP, ASCP, other processes.

This should only be used with suggestion of support since this reaches to
many different applications.
Should only be set at User Level to avoid tracing many application
processes.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning Yes
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MRP:Use Direct Load Option

Profile Code MRP


Profile Option Name MRP_DIRECT_LOAD
Description Valid values are:
Yes - SQL Loader is called directly to load rows into the
database during planning.
No

Default Value - No
Note Reference(s) 307443.1

Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP:Use Ship Arrived Flag

Profile Code MRP


Profile Option Name MRP_SHIP_ARRIVE_FLAG
Description Determines whether sales orders are automatically viewed as arrived at a
customer site after transit lead-time has expired. Used when a customer is
modeled as an organization.

The valid values are

'Yes' - will refer to the arrived date in the shipping tables (source data) to
determine if the shipment has arrived.

"No" - will be taken as arrived at the customer-site using the in-transit lead
time to determine the arrival date.

Typically used when we model customers as an oranization - since the


modelling may not have the actual arrival date in the source instance this
option is provided to allow the system to calculate the arrival date.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MRP_NEW_PLANNER_BACK_COMPATIBILITY

Profile Code MRP


Profile Option Name MRP_NEW_PLANNER_BACK_COMPATIBILITY
Description Per bug 9848641:

There have been changes back and forth with this


profile in combination with MSC: New Planner
Backward Compatibility.

1. MRP profile will remain the same. It will decided


whether an item should be treated as phantom or
not.
2. MSC on the other hand will now decide whether
the new algorithm would be used or the old one.
Yes would mean old and No would mean new.

Yes - Phantoms will be treated as regular items


and planned orders will be created.

No - Phantoms will be exploded, and not appear in


the plan.

Default - Null - which is No

Note Reference(s)

Bug Reference(s) 9848641


Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized Yes
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized Yes
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC : Consider all supplies for VMI replenishment
calculation

Profile Code MSC


Profile Option Name MSC_VMI_ALL_SUPPLY
Description When profile is set as yes the VMI engine considers all manually created
PO/PR/ASN/Shipments as supply and account them in replenishment
calculation
Note Reference(s)

Bug Reference(s) 5949512


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC : Consume Highest Revision Forecast

Profile Code MSC


Profile Option Name MSC_CONSUME_HIGHEST_REV_FCST
Description Lower revision SOs consume against forecast of only the Highest revision
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC : Publish Supply Commit based on pegging
information

Profile Code MSC


Profile Option Name MSC_PUBLISH_SUPPLY_COMMIT
Description Enables or disables detailed publish of supply commits as a single supply
commit record or multiple supply commit records if there are multiple
supplies to meet the demand. Valid values are:

Yes
No

Default Value - No
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC : VMI Requisitions Need By Date at RTF end

Profile Code MSC


Profile Option Name MSC_VMI_REQUISTION_AT_RTF_END
Description When set to yes, this profile option ignores the release time fence.

This enhancement impacts only the need-by date on the requisition that is
created, when a replenishment is released from VMI
Added the code to ignore RTF if the profile "VMI Requisitions Need By Date
at RTF end" is set to No. The default value of this profile is "Yes".

Set on APS Destination in a distributed environment


Note Reference(s)

Bug Reference(s) 6001195


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: 64-bit Planner Platform

Profile Code MSC


Profile Option Name MSC_PLANNER_PLATFORM
Description Set to the supported 64-bit platforms. Valid values are:

Sun 64-bit - 1
HP 64-bit - 2
AIX 64-bit - 3
Linux 64-bit - 4
HP Itanium 64-bit - 5

Note Reference(s)

254810.1

Bug Reference(s) 6836990


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC - Enable Cumulative Measures in
Archive

Profile Code MSC


Profile Option Name MSC_APCC_ENABLE_CUM
Description When a plan is published from ASCP to APCC, all
fact tables are loaded irrespective of customer
needs.

The profile provides user the ability to load data of


selected facts/measures where possible.

It has Yes/No values, and defaults to Yes.

To disable cumulative measures, user needs to


explicitly set it to No.

When the profile "MSC: APCC - Enable Cumulative


Measures in Archive" is set to No

the following tables are not populated during


archive:

- MSC_DEMANDS_CUM_F
- MSC_RESOURCES_CUM_F

Note Reference(s)

Bug Reference(s) 10252796


12612608
12617301
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Archive SCRM Measures

Profile Code MSC


Profile Option Name MSC_APCC_ENABLE_SCRM
Description This is about performance problems in
msc_phub_cost_pkg due to source_count
section. It has to process msc_item_sourcing, and
has to densify by
multiplying weeks in horizon. This makes data
volume large, and results in
performance problems.

But source_count measures are mostly used for


SNO plans, while performance
problem in this bug happened on ASCP plans.
Confirmed with PM, we should
allow user to turn it off by setting a profile option.

We introduced new profile option "MSC: APCC


Archive SCRM Measures"
(MSC_APCC_ENABLE_SCRM, Yes(default)|No),
when set to No, source_count is
skipped. Following presentation columns are not
populated:

"- Excess, Obselescence And Risk


Management"."Count of Sources"
"- Excess, Obselescence And Risk
Management"."Count of Sources in IO Plan"
"- Sourcing Effectiveness"."Count of Items Single
Sourced"

Values:
with profile options "MSC: APCC Archive SCRM
Measures" set to "Yes'and "No" and also with
blank.
Blank and yes will have same result as the default
value is blank.

When profile set to "Yes" the count of sources and


Count of Items single
sourced are populated and when "No" the Count of
Sources and Count of Items
single sourced are not populated. Hence
performance could be improved by
switching off the profile.
Note Reference(s)

Bug Reference(s) 12820986


12845928
12820986
10252796
13638350
Document References(s) -1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Calendar Code

Profile Code MSC


Profile Option Name MSC_HUB_CAL_CODE
Description Used in the dashboard to code manufacturing calendar.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Category Set 1

Profile Code MSC


Profile Option Name MSC_HUB_CAT_SET_ID_1
Description Used to filter the category set name. Only 3 category sets are supported, and
dashboards will use this profile in the dashboards.
Note Reference(s) 844667.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Category Set 2

Profile Code MSC


Profile Option Name MSC_HUB_CAT_SET_ID_2
Description This profile works in conjunction with MSC: APCC Category Set 1 and MSC:
APCC Category Set 3. These profiles govern which category set the
analytical layer when displaying the item-category hierarchy uses.

It precomputes the data for all three hierarchies, but displays the data using
only the MSC: APCC Category Set 1 value. Therefore, if the user wants to
view using the value in MSC: APCC Category Set 2, the values in these two
profiles must be switched. The user can then see the results using the new
category set, which is now in the MSC: APCC Category Set 1 profile.

There is no need to rerun the plan or republish it to APCC, however, if user


decides to use a completely new category set, which is not currently in these
three profiles, then the
profile values must be updated, and the plans must be rerun, or republished,
to APCC for the change to take effect.

This is a site level profile


Note Reference(s) 759571.1

844667.1

Bug Reference(s) 6836737


Document References(s) -1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Category Set 3

Profile Code MSC


Profile Option Name MSC_HUB_CAT_SET_ID_3
Description This profile works in conjunction with MSC: APCC Category Set 1 and MSC:
APCC Category Set 2. These profiles govern which category set the
analytical layer when displaying the item-category hierarchy uses.

It precomputes the data for all three hierarchies, but displays the data using
only the MSC: APCC Category Set 1 value. Therefore, if the user wants to
view using the value in MSC: APCC Category Set 3, the values in these two
profiles must be switched.
The user can then see the results using the new category set, which is now
in the MSC: APCC Category Set 1 profile.

There is no need to rerun the plan or republish it to APCC, however, if user


decides to use a completely new category set, which is not currently in these
three profiles, then the
profile values must be updated, and the plans must be rerun, or republished,
to APCC for the change to take effect.

This is a site level profile.


Note Reference(s)

844667.1

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Category set for detailed pegging
analysis

Profile Code MSC


Profile Option Name MSC_APCC_PEGGING_CAT_SET
Description Category set for detailed pegging analysis. APCC archives pegging
information for ASCP items of this catetory set.
Note Reference(s)

1225973.1

Bug Reference(s) 10013480


12746734
Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Currency Code

Profile Code MSC


Profile Option Name MSC_HUB_CUR_CODE_RPT
Description The analytical layer to convert the values in functional currency to a common
reporting currency uses this. This profile is used as the reporting currency for
APCC.

Please note that if this profile is changed the plan must be republished to
APCC repository to see the data in the new currency.

This is a site level profile.


Note Reference(s) 759571.1
844667.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Gather Fact Tables Statistics

Profile Code MSC


Profile Option Name MSC_APCC_GATHER_FACT_STATS
Description Profile is used for gathering table stats on fact tables such as
MSC_SUPPLIES_F, MSC_ITEMS_F, etc.

Valid Values
Yes
No (default)

Note Reference(s)

Bug Reference(s) 13967788


Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Gather Intermediate Tables Statistics

Profile Code MSC


Profile Option Name MSC_APCC_GATHER_ST_STATS
Description Profile is used for gathering table statistics on staging tables such as
MSC_ST_SUPPLIES_F, MSC_ST_ITEMS_F, etc.

Valid Values
Yes
No (default)

Note Reference(s)

Bug Reference(s) 13967788


Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Gather Plan Tables Statistics

Profile Code MSC


Profile Option Name MSC_APCC_GATHER_PDS_STATS
Description Profile is used for gathering table statistics on staging tables such as
MSC_ST_SUPPLIES_F, MSC_ST_ITEMS_F, etc.

Valid Values
Yes
No (default)

Note Reference(s)

Bug Reference(s) 13967788


Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Instance

Profile Code MSC


Profile Option Name MSC_APCC_TARGET_DBLINK
Description Name of the database link in the 11.5.10 server to the 12.1 APCC instance. It
is used by the archive plan summary to push the plan summary for 11.5.10
Planning Server to the APCC Server.

This profile options is set up on the APS 11.5.10 instance only.


Note Reference(s) 844667.1

Bug Reference(s) 8665145


8597162
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Period Set name

Profile Code MSC


Profile Option Name MSC_HUB_PERIOD_SET_NAME
Description The analytical layer and the dashboards that display time in the hierarchy of
days, fiscal periods, quarters, and year use this.

This is a site level profile.


Note Reference(s) 759571.1
844667.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC SNO Item Simulation Set

Profile Code MSC


Profile Option Name MSC_APCC_SNO_ITEM_SIMULATION_SET
Description

Bug 9274349
temporary solution for simulation sets for sno in apcc

It'll work like this:- user sets the profile option before publishing SNO
Note Reference(s)

Bug Reference(s) 9274349


9612415
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC WebLogic Console Password

Profile Code MSC


Profile Option Name MSC_WC_WEBLOGIC_PASSWORD
Description MSC: APCC WebLogic Console Password Webcenter

Note Reference(s) 1081051.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC WebLogic Console Username

Profile Code MSC


Profile Option Name MSC_WC_WEBLOGIC_USERNAME
Description Set it to WebLogic admin user. For example, weblogic. This user should be
the admin user for WebLogic.
Note Reference(s) 1081051.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC WebLogic Password

Profile Code MSC


Profile Option Name MSC_WS_WEBLOGIC_PASSWORD
Description MSC: APCC WebLogic Password Soa server

Note Reference(s) 1081051.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC WebLogic Username

Profile Code MSC


Profile Option Name MSC_WS_WEBLOGIC_USERNAME
Description MSC: APCC WebLogic Username Soa server

Note Reference(s) 1081051.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter Admin URL

Profile Code MSC


Profile Option Name MSC_WC_ADMIN_URL
Description Webcenter Administration console url http://host:port/console without the
word console
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter Enabled

Profile Code MSC


Profile Option Name MSC_WC_ENABLED
Description 7
MSC_WC_URL
MSC: APCC Webcenter URL
Webcenter URL
For example,
http://rws60018rems.us.oracle.com/webcenter/wcAuthentication/?login=true
&success_url=/spaces
Replace your host and keep the other things same. Then, you skip the
Webcenter welcome/login screen when navigating from e-Business Suite to
Webcenter.
Note Reference(s) 1226033.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter Group Space Template

Profile Code MSC


Profile Option Name MSC_WC_SPACES_TEMPLATE
Description 3
MSC_WC_SPACES_TEMPLATE
MSC: APCC Webcenter Group Space Template
Webcenter Group Space Template Name
For example,
Note Reference(s) 1226033.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter Spaces Member Role

Profile Code MSC


Profile Option Name MSC_WC_SPACES_MEMBERROLE
Description 2
MSC_WC_SPACES_MEMBERROLE
MSC: APCC Webcenter Spaces Member Role
Viewer Or Participant
Members added to the webcenter group space can be either viewers or
participants.
Note Reference(s) 1226033.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter Spaces Port

Profile Code MSC


Profile Option Name MSC_WC_SPACES_PORT
Description 6
MSC_WC_SPACES_PORT
MSC: APCC Webcenter Spaces Port
Webcenter Spaces managed server Port
For example, 8877
Note Reference(s) 1226033.1
1081051.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter Spaces Recipient Key Alias

Profile Code MSC


Profile Option Name MSC_WC_SPACES_RECIPIENTKEYALIAS
Description 4
MSC_WC_SPACES_RECIPIENTKEYALIAS
MSC: APCC Webcenter Spaces Recipient Key Alias
Recipient Key Alias
For example,
Note Reference(s) 1226033.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter Spaces Saml Issuer Name

Profile Code MSC


Profile Option Name MSC_WC_SPACES_SAMLISSUERNAME
Description 5
MSC_WC_SPACES_SAMLISSUERNAME
MSC: APCC Webcenter Spaces Saml Issuer Name
Saml issuer name of Webcenter
For example, www.oracle.com
Note Reference(s) 1226033.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC Webcenter URL

Profile Code MSC


Profile Option Name MSC_WC_URL
Description 7
MSC_WC_URL
MSC: APCC Webcenter URL
Webcenter URL
For example,
http://rws60018rems.us.oracle.com/webcenter/wcAuthentication/?login=true
&success_url=/spaces
Replace your host and keep the other things same. Then, you skip the
Webcenter welcome/login screen when navigating from e-Business Suite
Note Reference(s) 1226033.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC debug mode

Profile Code MSC


Profile Option Name MSC_APCC_DEBUG_MODE
Description APCC debug mode flag.

Valid Values
Yes - Debug messages are written to log file
No (Default) - No debug messages

You may use the following SQL to find the location of the log file:

select msc_phub_util.log_file from dual;


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: APCC to APS database link name

Profile Code MSC


Profile Option Name MSC_APCC_BACK_TO_SELF_DBLINK
Description new profile option "MSC: APCC to APS database link name" (MSC_APCC_BACK_T
Note Reference(s)

Bug Reference(s) 8856448


8665145
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: ASCP Planning URL

Profile Code MSC


Profile Option Name MSC_ASCP_WEBLOGIC_URL
Description ASCP Weblogic Server URL

This profile is available in VCP 12.1.3.8 and later.


The profile is used for the ASCP Usability
Enhancements for the deployment of the ASCP
application to weblogic.
Note Reference(s)
1493554.1

Bug Reference(s)
Document References(s) Oracle Advanced Planning Command Center User's Guide
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: ATP Allocation Method

Profile Code MSC


Profile Option Name MSC_ALLOCATION_METHOD
Description For ATP based on Planning Output only

This site-level profile determines the allocation method used by ATP.


This is a site level profile.
Values are:
1 - Demand Priority
2 - User-Defined Allocation Percentage
Note Reference(s) 334286.1

Bug Reference(s)
Document References(s) -1
-1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: ATP Capacity Allocation

Profile Code MSC


Profile Option Name MSC_CAP_ALLOCATION
Description Set it to No.
You should only set it to Yes with specific instruction from Oracle
Applications development
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: ATP Debug Mode

Profile Code MSC


Profile Option Name MSC_ATP_DEBUG
Description Used to create debug files for ATP.
Files are named session-[number] -- [number] is assigned by a sequence.

In a distributed installation, files are created on both the EBS Source


instance and APS Destination instance.
Both files are required for Support and DEV to investigate an ATP issue.
Note 122372.1 is key guide to producing and providing these files to support.

Values are:
+ Debug Only: ATP generates a log file for an ATP request.
+ Debug and Database Trace: ATP generates a log file and a database trace
file.
+ Database Trace Only: ATP generates a database trace file.
+ None: ATP does not generate a log file or a database trace file. (Default)
Note Reference(s) 954333.1
122372.1

Bug Reference(s)
Document References(s) -1
-1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: ATP Enforces Lead Time for ATO Model

Profile Code MSC


Profile Option Name MSC_ENFORCE_MODEL_LT
Description Used for ATP based on Collected Data

Indicates whether ATP enforces lead time for ATO models or not.
+ Yes - Enforces lead time for ATO models.
+ No - Does not enforce lead time for ATO models.
Note Reference(s)

1177424.1

Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: ATP Infinite Time Fence Pad

Profile Code MSC


Profile Option Name MSC_ATP_INFINITE_TF_PAD
Description Add Offset Days to Infinite Supply Fence
Per Note 227406.1 for 11.5.9
Results displayed by Oracle Advanced Supply Chain Planning and
ATP mismatch when considering the Infinite Supply Fence Date to
satisfy demands. Oracle Advanced Supply Chain Planning considers
Delivery Calendar, but ATP does not.

A new profile option MSC: ATP Infinite Time Fence Pad has been
created to offset the Supply Fence Date with the number of days set
by user. ATP adds this number to the Infinite Supply Fence Date.
Thus, the Oracle Advanced Supply Chain Planning matches the ATP output.

Note: Once in 11.5.10 and using MSC: Use Shipping/Receiving Calendars,


this profile should be obsolete for functional purposes.
Note Reference(s) 227406.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: ATP Synchronization Downtime (minutes)

Profile Code MSC


Profile Option Name MSC_ATP_SYNC_DOWNTIME
Description Used for ATP 24x7 plan run.

Determines the approximate ATP downtime (in minutes) to cover the time
required to synchronize and to switch over to the
refreshed plan during the plan synchronization process. Oracle Global Order
Promising internally translates this value into
the number of orders to process.
You should set the value for this profile based on the sales order volume
during the ATP 24x7 plan run.
This profile option also determines the duration of the extended
synchronization process.
This process is executed for the duration of the ATP downtime or 10 minutes
(default), whichever is larger.

Note:
ATP Post Plan Processing is where this is executed and it reports in the log
file how much downtime was used.
Actual downtime is usually very small and default value of 10 mins should not
require any changes.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: ATP Web Service Responsibility

Profile Code MSC


Profile Option Name MSC_WS_ATP_FNDRESP
Description Responsibility used when ATP web service is invoked.
Not used yet
Note Reference(s)

Bug Reference(s) 6625571


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: ATP Web Service User

Profile Code MSC


Profile Option Name MSC_WS_ATP_FNDUSER
Description User used when ATP web service is invoked
Not Used yet.
Note Reference(s)

Bug Reference(s) 6625571


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: AVOID RE-SOURCING SALES ORDERS

Profile Code MSC


Profile Option Name MSC: AVOID RE-SOURCING SALES ORDERS
Description Ignore this profile, it is duplicate and needs to be removed.
See instead - MSC: Avoid Re-Sourcing Sales Orders
MSC_AVOID_RESOURCING_SALES_ORDERS
Note Reference(s) 352277.1

Bug Reference(s) 6134419


12846307
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Action Allowed on ATP 24x7 Plan While
Running

Profile Code MSC


Profile Option Name MSC_ALLOWED_ACTION_24X7
Description Profile to control whether 24X7ATP plan can be viewed and updated while
the plan is running.

Determines whether manual updates are allowed to the original plan when
the plan copy is running.
Values are:

Yes: The ATP plan appears in the Workbench window while it is running.
You can make changes to the plan. However, the changes will not appear in
the refreshed plan.

No: The ATP plan appears only in the View Plan window.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Additional Demantra Item hierarchy in APCC

Profile Code MSC


Profile Option Name MSC_APCC_DMTRA_ITEM_HIERS
Description You must set the profile to the name of the hierarchy in Demantra and then
run the standard "Refresh APCC Materialized Views" concurrent program to
make that custom hierarchy available in APCC. None of the seeded reports
or dashboards use this custom hierarchy.
Note Reference(s) 1504863.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: Aggregate Resource Name Flexfield Attribute

Profile Code MSC


Profile Option Name MSC_AGGREG_RES_NAME
Description This profile option stores the name of the flexfield column that contains the
value in the corresponding table. See 'Flexfield Attributes, page A-1 for more
information.
Set in EBS Source in a distributed installation.

Created by Create Planning Flexfields concurrent request.


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Align Component Demand Date with Pegging
Date

Profile Code MSC


Profile Option Name MSC_ALIGN_COMP_DMD_WITH_PEG
Description Per Bug 6512739 The work orders are scheduled out further than planned
order--"cross scheduling", because the assembly level, the pegging window
is very large, causing some early component supplies are pegged (via multi-
hop) to late high priority demand. The scheduler's right justification pushes
the work orders out.
.
Introduce a profile MSC: Align Component Demand Date with Pegging Date.

Yes - the component demand will be pushed out in the first


place, so it has less chance to grab the work orders

First introduced in 11.5.9 - Bug 5903195


Forward ported to 11.5.10 and included in ASCP Engine/UI RUP #33
Forward ported to R12 in Bug 6266579 and present in CU3 patch 6731645
and included in 12.0.6 Fixed in base release of 12.1.1
Note Reference(s)

Bug Reference(s) 6512739


6266579
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Allocated ATP Forward Consumption Method

Profile Code MSC


Profile Option Name MSC_ATP_FORWARD_CONSUME_METHOD
Description Determines the type of forward consumption that Oracle Global Order
Promising can perform to accommodate the shortage faced by a demand
class.
Values are:
+ Reduce future supply from lowest priority: (1)
Use the available supply from the lowest priority demand to account for the
shortage of a demand class. If every demand class is at same priority,
reduce the future supply to cover the shortage for a demand class.

+ Reduce available supply from any priority: (2)


A promised demand is the most important demand that you need to meet.
Oracle Global Order Promising starts the
adjustments from the higher priority demand class. That is, Oracle Global
Order Promising reduces the availability
of a lower priority demand class before a higher priority demand class to
account for shortages from a previous period.
Thus, it reduces the available supply to account for the shortage from lower
priority demand classes.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Allocation Assignment Category Set

Profile Code MSC


Profile Option Name MSC_ALLOC_CATEGORY_SET
Description The Assign Allocation Rule form and the Sourcing assignment form both use
the MSC: Sourcing Category Set to determine the valid category set. Use
this profile option if you want the allocation rule category set to be different
from the sourcing
assignments category set.
Note Reference(s)

Bug Reference(s) 3128505


Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Allow Release of Planned Orders from
Demand Schedule Plan

Profile Code MSC


Profile Option Name MSC_DRP_RELEASE_FROM_MRP
Description This profile option provides increased flexibility for releasing planned orders
and applies to manual release from the workbench and also for the Auto-
Release Planned Orders process that runs during plan run.
Valid values are:
Yes - You can release demand schedule MPP or MPP
planned orders from the lower level plan
No - You cannot release demand schedule MPP or MPP
planned orders from the lower level plan

Set on APS Destination in a distributed environment


Note Reference(s)
795033.1

Bug Reference(s) 5852065


Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Allow release of replenishments above
suggested quantity

Profile Code MSC


Profile Option Name MSC_VMI_RELEASE_ABOVE_MAX
Description When set to yes, this will allow users to replenish more than the suggested
quantity.
Used in Collaborative Planning for release of VMI Orders

Set on APS Destination in a distributed environment


Note Reference(s)

Bug Reference(s) 3389269


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Analytics Currency Code

Profile Code MSC


Profile Option Name MSC_ANALYTICS_CURRENCY_CODE
Description This profile is obsolete will be removed.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Anchor date for calculating operation yields

Profile Code MSC


Profile Option Name MSC_OPERATION_YIELD_TYPE
Description Use this profile option to instruct the planning engine on which effectivity date
to use when it generates resource requirements of operations with yields.
This profile option applies to discrete jobs and Oracle ShopFloor
Management (OSFM) routings with primary network scheduling method.

(1) - Operation start date: Use the operation start date to


check for operation effectivity and select yield value.
(2) - Order start date: Use the order start date to check for
operation effectivity and select yield value.

The planning engine uses lead-time percent to calculate the operation start
date; it assumes that the lead-time percent of an operation that is effective in
the future is the same as the lead-time percent of the operation it replaces. If
an operation's effectivity ends within a time bucket, the planning engine
assumes that its effectivity ends on the first day of the time bucket.

Note: The code will internally set this profile as Order Start Date if it is not
setup.
Note Reference(s)

Bug Reference(s) 3161454


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Anchor date for calculating remaining shelf
life

Profile Code MSC


Profile Option Name MSC_USE_SHIP_DAYS_FOR_MRSL
Description Specifies arrival date or ship date as the anchor date to use when calculating
the remaining shelf life. Determines if a supply can be used to satisfy
demand based on its MRSL.
Note Reference(s) 760046.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Apply Lot Modifiers in Weekly/Period Buckets

Profile Code MSC


Profile Option Name MSC_APPLY_LOT_MODIFIER
Description Determines whether order modifiers are considered when creating planned
orders for weekly or period time buckets. Valid values are:

Yes - considers order modifiers in these calculations


No - does not consider order modifiers in these calculations

Default Value - NULL (Yes)


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Apply Order Modifier To Start Quantity

Profile Code MSC


Profile Option Name MSC_APPLY_OM_TO_START_QTY
Description Use this profile option to specify whether order modifiers are applied to start
quantities for discrete or lot based jobs. This behavior only applies to routings
that have operation yield. In this case the start quantity may be different
from the expected supply quantity. Valid values are:

Yes - The planning engine inflates the order start quantity by


the routing operation yield and then applies order modifiers.
No - The planning engine applies the order modifiers to the
end quantity

Default Value - No
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Apply Safety Stock Change interval to non
MRP Planned Safety Stock

Profile Code MSC


Profile Option Name MSC_SS_SMOOTH_NON_MRP
Description Use this profile option to specify the safety stock to which the smoothing
within time interval applies: Valid values are:
Yes - Smoothing applies to all types of safety stock
No - Smoothing applies only to MRP planned safety stock

Note Reference(s)
276707.1
759329.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Apply shortage and excess tolerance to
planned orders

Profile Code MSC


Profile Option Name MSC_APPLY_TOL_PLAN_ORD
Description Introduced in ASCP Egnine/UI rollup #33
Valid values are:

Yes - The shortage tolerance and excess percentages are


applied to all supplies including planned orders. This is the
default value.
No - The shortage tolerance and excess percentages are
applied only to firm existing supplies (such as Onhand, WIP).

Introduced in ASCP Engine/UI rollup #33.

Default Value - Yes


Note Reference(s)

Bug Reference(s) 7461501


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Archive Plan Summary after plan run

Profile Code MSC


Profile Option Name MSC_APCC_AFTER_LAUNCH
Description This profile works in conjunction with the plan option 'Calculate KPI'. If the
profile option is set to Yes and the plan option 'Calculate KPI' is checked,
then the Archive Plan Summary program will be launched after the ASCP
plan runs.

Valid Values
Yes - launches the Archive Plan Summary program after
ASCP runs if plan option Calculate KPI is also checked
No - the Archive Plan Summary program will not run

Note Reference(s) 1579163.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Auto-Release Compression Days Tolerance

Profile Code MSC


Profile Option Name MSC_AUTO_REL_COMP_TOLERANCE
Description Allows orders to be auto-released provided their compression is not more
than the value specified
Set on APS Destination in a distributed environment

In the Planner workbench you can use /Folder/Show Field to show


Compression field to see how much compression - if any - is calculated for a
planned order.

Remember that Auto-Release will release orders based on the Suggested


Order Date for the planned order
(NOT the Suggested Due Date) - this field is also available via /folder/Show
field

Suggested Due Date - date order to be available in inventory


Suggested Dock Date - Due Date - Post processing Lead Time
Suggested Start Date - Dock Date - Processing LT
Suggested Order Date - Start Date - Pre-processing LT

Example:
Assume the profile = NULL
Item/Org setup has Release time fence days User define - 15,
Leadtime is 10 days (working days).
New planned order created due on working day 1 though 9 will not be
released since the lead time is being compressed.
The Sugg Order Date will show the anchor date of the plan and Compression
Days field will be greater than 0.
But any planned order that with Compression Days 0 and Sugg Order Date =
to the anchor date of the plan run out to working day 15 will be released

Set the profile to 10. Now in the above example, the planned order will be
released on working day 1 through 9 since you're allowed up to 10
compression days for Autorelease to release the planned order.

The Production Flag must be checked in the Plan Names form for
Autorelease to run during the plan run.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Automatically Recalculate Operation Time

Profile Code MSC


Profile Option Name MSC_RECALCULATE_OP_TIME
Description Enables automatic re-calculation of "New Date" (due date) of make orders
when order is firmed and the "New Start Date" is updated by the user. This
takes into account Fixed and Variable Lead Times and working days. This is
done only in the case of unconstrained plans and has certain limitations.
Note Reference(s)

Bug Reference(s) 6142627


9359714
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan Yes
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Avoid Re-Sourcing Sales Orders

Profile Code MSC


Profile Option Name MSC_AVOID_RESOURCING_SALES_ORDERS
Description Possible values: Yes or No - Default = Yes (If null, then Yes)
Yes - To maintain backward compatibility. Planning logic will avoid sourcing
sales orders.
This will disable the following functionalities: plan by arrival date, change ship
methods, and change source org for sales order lines. We do not snapshot
sales order sourcing if this profile is set to Yes.

No - With this setting, you can plan by arrival date, change ship methods,
and change source org provided you have set up the correct sourcing rules.

Introduced because ASCP planning was resourcing FIRM sales orders and
changing the ship method that was chosen on the sales order.

This is not forward ported to 12.1 or 12.2


Fixed in 11.5.10 and 12.0.6
Note Reference(s)
352277.1

Bug Reference(s) 6134419


12846307
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: BPEL Demantra Password

Profile Code MSC


Profile Option Name MSC_SCN_DEMANTRA_PASSWORD
Description Required for launching Demantra nodes in BPEL, default value is soa.
Note Reference(s) 759571.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: BPEL Demantra Username

Profile Code MSC


Profile Option Name MSC_SCN_DEMANTRA_USERNAME
Description Required for launching Demantra nodes in BPEL, default value is soa.
Note Reference(s) 759571.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: BPEL Domain Name

Profile Code MSC


Profile Option Name MSC_SCN_BPEL_DOMAIN
Description Required for launching BPEL. To deploy custom BPEL processes, you must
deploy the processes to the domain that is specified in the profile option
MSC:BPEL
Note Reference(s) 759571.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: BPEL End Point URI

Profile Code MSC


Profile Option Name MSC_SCN_SERVICE_ENDPOINT
Description Required for launching BPEL, typically:

http://[m/c name]:port
Note Reference(s) 759571.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: BPEL Process Version

Profile Code MSC


Profile Option Name MSC_SCN_BPEL_VERSION
Description Deployed BPEL process flows version number, ex : 1.0
Note Reference(s) 759571.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: Batch Size for Self Service Loads

Profile Code MSC


Profile Option Name MSC_SELF_SERVICE_LOADS_BATCH_SIZE
Description For large data loads using Legacy Self Service Loads, set to a higher value
in combination with profile MSC: Number of Workers for Self Service Loads
to achieve best fit for performance and data size being loaded. Valid values
are:

Integer

Default Value - 1000


Note Reference(s) 352277.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Batchable Flag

Profile Code MSC


Profile Option Name MSC_BATCHABLE_FLAG
Description No longer used in ASCP
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Batching Window

Profile Code MSC


Profile Option Name MSC_BATCHING_WINDOW
Description Not used in Oracle Advanced Planning.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Buy Order Processing Lead Time Calendar

Profile Code MSC


Profile Option Name MSC_BUY_ORDER_PROCESSING_LEAD_TIME_CALENDAR
Description Use this profile option to instruct the planning engine what calendar to use
when it offsets processing lead-time for buy orders. Valid values are:

Supplier Capacity Calendar - The planning engine offsets


processing lead-time for buy orders using the Approved
Supplier List Supplier Capacity Calendar. The Approved
Supplier List Supplier Capacity Calendar is the successor to
the Approved Supplier List supplier delivery calendar.
Org Manufacturing Calendar - The planning engine offsets
processing lead-time for buy orders using the organization
manufacturing calendar.

This profile was introduced to offer backward compatibility to the way


processing Lead-time was calculated in 11.5.9. The equivalent of the 11.5.9
functionalty is to use Org Manufacturing calendar.

Notes:
Ref Note 566206.1 for more information.ATP does not currently use this
profile. an ASL must be assigned to the item with the Supplier Capacity
Calendar same as the Org calendar to get ATP to offer the same
functionality as ASCP planning

Default Value - Supplier Capacity Calendar


Note Reference(s)
566206.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center Yes
Global Order Promising No
MSC: CP Debug Level

Profile Code MSC


Profile Option Name MSC_CP_DEBUG
Description Controls the level of detail in the concurrent program log messages for
Oracle Collaborative Planning. Valid values are:

Off - No debug messages generated


On - Short debug messages generated
High - Detailed debug messages generated.

Note Reference(s) 295564.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Calendar Reference for Bucketing

Profile Code MSC


Profile Option Name MSC_BKT_REFERENCE_CALENDAR
Description Calendar used for bucketing KPI's.
If the profile option MSC:Calendar Reference for
Bucketing is null, then the plan owning organization
calendar is used for the plan bucketing. If this
profile points at a valid calendar, then the plan will
use that calendar for bucketing.

Was introduced to have the users enter a Gregorian Calendar.


Also known to cause plan failures, Signal 11 errors
when this not setup.

This effects the Horizontal Plan display.


e.g. If you have Plan owning org with Holidays -
AND another org without holidays, AND do not
have this profile setup with a neutral calendar, the
the HZ plan will not display correctly

This profile calendar will also be used for the Plan


Options Aggregation Tab for Daily, Weekly and
Period buckets

The planning engine will still use the Org


Manufacturing calendar for planning and respect
days off, holidays, etc.

No formal documentation on the profile


Note Reference(s) 452630.1

372199.1
603981.1

Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Cancel Oustanding Sales Order Quantities

Profile Code MSC


Profile Option Name MSC_FILL_OR_KILL_ENABLED
Description Valid values are:

No - then the DRP engine behavior is not affected and does


not exhibit 'Fill or Kill'.
Yes - then for any sales orders with open quantities after the
Latest Acceptable Date, the quantities are canceled and the
demands are not carried forward. The cancellation is
effective as of the Latest Acceptable Date (which is
considered by DRP as the end of the allocation bucket).

Note that the only order modifier that is considered when determining partial
allocations to sales orders is the Round Order Quantities item attribute for
the shipping organization.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Category Set for Jobs without an Item
Reference

Profile Code MSC


Profile Option Name MSC_NO_ACTIVITY_ITEM_CATEGORY_SET
Description No information available for this profile in user guides.

This profile applies to non-standard jobs that do not have an assembly


defined in it.

Since the item does not exist on the standard job , there is no reference to a
category set hence the need for a default category from the profile option.

Category set for Non-standard Jobs without an 'Item' Reference can still be
displayed in the ASCP planner workbench because of the default category
set captured by the profile option.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Category Set for Liability Analysis

Profile Code MSC


Profile Option Name MSC_CATEGORY_SET_NAME
Description Not used in Oracle Advanced Planning.
Note Reference(s)

Bug Reference(s) 5481643


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Category for Jobs without an Item Reference

Profile Code MSC


Profile Option Name MSC_NO_ACTIVITY_ITEM_CATEGORY
Description No Information available in user guides.

This profile applies to non-standard jobs that do not have an assembly


defined in it.

Since the item does not exist on the standard job , there is not reference to a
category hence the need for a default category from the profile option.

Category for Non-standard Jobs without an 'Item' Reference can still be


displayed in the ASCP planner workbench because of the default category
captured by the profile option.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Category set for CP Horizontal View

Profile Code MSC


Profile Option Name MSCX_CP_HZ_CATEGORY_SET
Description Indicates a category set that you want to query in the Oracle Collaborative
Planning horizontal view. Using this profile option, you can restrict queries to
specific categories based on your requirement.
Note Reference(s)

Bug Reference(s) 2422506


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Category set for Strategic Planning

Profile Code MSC


Profile Option Name MSC_STRATEGIC_PLANNING_CATEGORY_SET
Description This profile option is not used by VCP. / SNO.
Note Reference(s) 365112.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Category set for serviceable items

Profile Code MSC


Profile Option Name MSC_SERVICE_ITEMS_CATSET
Description Category set to hold the serviceable Items. This profile is used to designate
the category set to which all Serviceable (FRU) items have been assigned.
Note Reference(s) 1225993.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Choice of item for which to create supplies in
substitute relationship

Profile Code MSC


Profile Option Name MSC_ITEM_CHOICE_FOR_SUBSTITUTE
Description Determines the item for which Oracle Global Order Promising and Oracle
Advanced Supply Chain Planning creates planned supplies when item
substitution relationships are specified.

Choices are:
Demanded Item (default), (701)
Highest Level Item, (702)
Follow Item Attributes (703)

When set to Follow Item Attribute and the item attribute Create Supply for all
the substitute items in the substitution chain is No, no supplies are created.
When you have a substitution chain A --> B --> C, and this profile option is
set to Highest Level Item, it is expected that Oracle Advanced Planning
creates supply for item C. Item C must be enabled in the organization where
you are trying to create supply. If item C is not enabled in the organization,
Oracle Advanced Planning creates supply for item B (the next highest level
item in the substitution chain) and does not create supply for item C.

Oracle Global Order Promising currently supports only the No Substitution or


Full Substitution options. It does not support partial substitution. Therefore, a
request is not fulfilled by using a partial quantity from the requested item and
a partial quantity from a substituted item.
Note Reference(s)
382638.1

Bug Reference(s) 6528915


Document References(s) -1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Circular sourcing surplus days

Profile Code MSC


Profile Option Name MSC_CIRC_SRC_DAYS
Description This profile is no longer used.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Class Hierarchy

Profile Code MSC


Profile Option Name MSC_CLASS_HIERARCHY
Description This profile determines the type of hierarchy that will be used. This profile
has two values:
+ Demand Class: single level. (01)
+ Customer Class: three levels; customer class, customer, and site (02)
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Closest Quantity Pegging

Profile Code MSC


Profile Option Name MSC_CLOSEST_QTY_PEGGING
Description This profile was removed in 11.5.9
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Collaborative Planning Default Calendar

Profile Code MSC


Profile Option Name MSC_X_DEFAULT_CALENDAR
Description When multiple customer sites display together, Oracle Collaborative Planning
uses the default system calendar (profile option MSC: Collaborative Planning
Default Calendar).
Note Reference(s)

Bug Reference(s) 4446794


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Collect CMRO Work Order Demand for PS

Profile Code MSC


Profile Option Name MSC_CMRO_WO_DEMAND_PS
Description Collect CMRO Work Order demands into msc_demands for PS
Set profile to Yes if using the CMRO integration
Note Reference(s) 1157809.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Collect Item, Material and Resource Costs

Profile Code MSC


Profile Option Name MSC_COLLECT_COSTS_FOR_ITEM
Description This profile option indicates whether data collection should include cost
information.
Specifying No may improve data collections performance.
Only required if using Cost Based Optmization type plan where Optimization
flag is checked in the plan options.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning Yes
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Collect PS SNO Data

Profile Code MSC


Profile Option Name MSC_COLLECT_PS_SNO_DATA
Description
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Collection Time Window for Install Base
under Contracts history

Profile Code MSC


Profile Option Name MSC_COLL_TIME_WINDOW_IBUC_HISTORY
Description Profile for Collection Time Window for Install Base under Contracts history
This profile option specifies the time window for which IB under Contract
history is to be collected.

Months of data to collect - Integer value - defaults NULL and this will collect
12 Months of data
Note Reference(s) 1225993.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Collection Window for Region and Zones
(Days)

Profile Code MSC


Profile Option Name MSC_COLL_WINDOW_FOR_REGION_ZONE_CHANGES
Description Specifies the number of days backwards that changes in regions and zones
would be collected. If null or 0, then all changes are collected.

Present in 12.1.3.8 and 12.1.3.9.x


Front port for 12.2 not completed as of March 2015 - Refer to bug 16200533
Note Reference(s)

Bug Reference(s) 15915083


16200533
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Collection Window for Trading Partner
Changes (Days)

Profile Code MSC


Profile Option Name MSC_COLLECTION_WINDOW_FOR_TP_CHANGES
Description Used by Oracle Advanced Supply Chain Planning collections. Specifies the
number of days backwards that changes in customer names, customer sites,
vendors, and vendor sites are collected.

If null, then all changes are collected. Used when collections for the trading
partners entity is run in complete mode.
Note Reference(s) 405295

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Collections Snapshot Threshold

Profile Code MSC


Profile Option Name MSC_SNAPSHOT_THRESHOLD
Description In Refresh Snapshots request, we checks the number of rows in table and
number of rows in the MLOG
If ratio exceeds the threshold, then we will launch Complete Refresh of the
Snapshot. We do not recommend setting this profile unless directed by DEV
We will perform a complete refresh when a large number of rows exist in the
MLOG, since this would be faster than referencing the MLOG table for a fast
refresh
This profile would usually be triggered when a large data load was performed
to load data into setup tables.
This profile is set on the source instance.
Valid values: Integer 0 - 100
NULL is default - seen as 40
Note Reference(s) 179522.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Compute Project Exception

Profile Code MSC


Profile Option Name MSC_PROJECT_TASK_EXCEPTION
Description This profile option determines whether to generate project specific
exceptions when running a project based plan. Valid values are:

Yes: Enable the generation of project specific exceptions.


No: Disable the generation of project specific exceptions.

Default Value - Yes


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Configuration

Profile Code MSC


Profile Option Name MSC_X_CONFIGURATION
Description Ensure that the value of the profile option MSC: Configuration is set to APS &
CP. This enables collaboration between Oracle Advanced Supply Chain
Planning and Oracle Collaborative Planning used to enable ASCP - CP
interaction
When set to APS & CP, then during data collections we will launch
Collaboration ODS Load program at end of collections
If you are not using CP, then do not worry about this process - it can be
ignored.

Also used by Demantra application to get information synched to Demantra

NOTE: This profile is maintained at Application Level


In Sys Admin / Profiles / System - click Application button and choose
Advanced Supply Chain Planning
then search for the profile and set profile in Application level. (Not Site level)
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Consolidate Interplant Demands

Profile Code MSC


Profile Option Name MSC_CONSOL_INTERPLANT_DEM
Description This profile option is not documented in the User Guide. (see Note 555016.1
)

Consolidates inter-plant demand into a single inter-plant supply, thus


reducing the number of inter-plant orders. Valid values are:
By End Pegged Demand - Retain current behavior of
creating a demand for each end pegged demand.
Interorganization Demand lines are shown for each
individual demand

By Demand Schedule Supply -On a given day aggregate the


dependent demands from one supply
Interorganization Demand are aggregated into a single
demand.

Default Value - By End Pegged Demand

Example:
Plan 1 shows in planner workbench - Planned order demand 03-DEC-2012
qty = 96
-- if you drill into the pegging for this demand you will see many smaller
demand making up this single qty of 96
Plan 2 has Plan 1 as demand Schedule and has Inter Plant box is checked
In Plan 2 we see many lines of Interorganization Demand for 03-DEC that
add up to 96 (profile is using default End Pegged Demand)
If we change the profile to By Demand Schedule Supply - then we only see
the single Interorganization Demand line for 96
Note Reference(s)

Bug Reference(s) 7457980


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Consume Forecast Inside Demand Time
Fence

Profile Code MSC


Profile Option Name MSC_CONSUME_FORECAST_DTF
Description Valid values are:

No - demand time fence control is implemented prior to


forecast consumption. Forecast entries in the demand time
fence are dropped as demand statements and not used for
consumption.
Yes - forecast consumption occurs prior to enforcing demand
time fence control. The forecast entries within the demand
time fence are used for consumption but not as demand.
After consumption, demand quantity for all the forecast
entries within the demand time fence is zero.

If you are using forecast spreading:

For a periodic forecast entry that falls in weekly planning


buckets within the demand time fence, the forecast
spreading process spreads the entries into daily entries.
If the daily entry is within the demand time fence, the process
ignores the value that you set and uses the value Yes in
processing.
If the daily entry is outside the demand time fence, the
process ignores this profile option and consumes against the
entry.

Note Reference(s) 565926.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Consume forecast with no demand class

Profile Code MSC


Profile Option Name MSC_CONSUME_NULL_DC
Description This profile option instructs the forecast consumption process in about the
order it should use to consume forecast entries when some of them have a
demand class and others do not have a demand class. Valid values are:

Within Each Bucket


The forecast consumption process starts by consuming
forecast entries for the day on the sales order; it consumes
entries with matching demand class first, then entries with no
demand class. Then, it consumes forecast entries within the
backward and forward consumption days; for each day, it
uses matching demand class first, then no demand class.
Within Each Bucket - After Consuming Demand Class
Specific Forecast:
The forecast consumption process starts by consuming
forecast entries for the day on the sales order with matching
demand class only. Then, it consumes forecast entries
within the backward and forward consumption days with
matching demand class only. If there is a remaining sales
order quantity, it repeats the process against forecast entries
with no demand class, first on the day on the sales order,
then within the backward and forward consumption days.

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Consume forecasts using Internal Sales
Orders

Profile Code MSC


Profile Option Name MSC_CONSUME_INT_SALES_ORDERS
Description Only used when INV: Inventory Capable to Promise - ATP/CTP based on
Planning Data

Valid values are:

(1 - default) Yes: The planning engine consumes forecasts


with internal sales orders
(2) No: The planning engine does not consume forecasts
with internal sales orders
(3) Only if Destination Organization on ISO is not part of
Plan: The planning engine consumes forecasts with internal
sales order that meet either of these conditions:
Its destination organization is not planned in this plan
Its destination organization is planned in a source plan
(MRP/MPS/MPP). This applies only one level down from the
internal sales order source organization.

From Note 558908.1

1. The profile was added in bug 5440895. This profile works in tandem with
the profile option MSC: Perform ATP Check for Internal Sales Orders. see
the table in the note to understand the profile values and how they are used.
2. If you have a centralized instance, set the profile value as required. If
you are a decentralized/distributed installation with both APS Destination and
EBS Source, set this on the APS destination and EBS source.

Notes:

1. Bug 6434413 Some Orgs do use an Internal sales order and need
consumptions, but other orgs do NOT want consumption, so fixes had to be
made so that profile value can be set for different orgs at different settings
(by Responsibility) and have the value honored. Set in EBS source
2. For Bug 6434413 - fix is released on ATP RUP #22 and above (See
Note 252108.1 for list of patches. Patch 6434413 should not be applied
instead of a rollup patch.
3. In R12.0.4, this fix is included ATP CU4, and also in base release of
12.0.6
Note Reference(s) 558908.1

Bug Reference(s) 6434413


Document References(s) -1
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Cost Type

Profile Code MSC


Profile Option Name MSC_COST_TYPE
Description Use this profile option on the source instance (execution system) to specify
the cost type that collections should use when collecting the item costs. You
should perform a cost rollup for the specified cost type before collecting data.
If this profile option is null, collections
uses the:

Frozen cost type for standard costed organizations


Average cost type specified for average costed organizations

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Cost of Using a BOM/ Routing Flexfield
Attribute

Profile Code MSC


Profile Option Name MSC_ALT_BOM_COST
Description Not used by Oracle Advanced Planning.

Confirmed that this is not used by SCO.


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Create Resource Requirements for all
Operations

Profile Code MSC


Profile Option Name MSC_CREATE_DUMMY_RES_REQS
Description If an operation has no resources with Schedule = Yes, when this profile
option is set to:

Yes - The planning engine creates a dummy resource


requirement for the operation
No - The planning engine does not create a dummy resource
requirement for the operation; the operation does not have
any resource requirements

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Currency Conversion Type

Profile Code MSC


Profile Option Name MSC_CURRENCY_CONVERSION_TYPE
Description Use this profile option on the destination instance to specify currency
conversion type. If you change the value, the next time you run collections,
the collections process purges the data with the previous currency
conversion type and replaces it with data with the new currency conversion
type.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Custom allocation

Profile Code MSC


Profile Option Name MSC_USE_CUSTOM_ALLOCATION
Description To improve performance for customer allocated ATP used only in following
cases.

Only end item allocation. no component allocation. that is, the item cannot
be a component of other bom.

No ctp (so we don't deal with planned order demand allocation and CTP
suggested supply/demand allocation).
Note Reference(s)
555016.1

Bug Reference(s) 6456520


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: DPP Allow Quantity Reduction Only When
Supply is Excess on Internal Requisition,
Requisition and PO

Profile Code MSC


Profile Option Name MSC_DRP_FIRM_REQS_QTY
Description Per Bug 9546158

The profile option "MSC: DPP Allow Quantity Reduction Only When Supply
is Excess on Internal Requisition, Requisition and PO" is disabled starting
with 12.1.3 Engine patch, and should be removed from the Profile Options
listed in the user's guide.
So this profile is no longer active in the system.

The default behavior is as if the profile is set to Yes - per design this is not
supposed to have any other value - so it cannot be set by user.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: DPP Debug Level

Profile Code MSC


Profile Option Name MSC_DRP_DEBUG_LEVEL
Description Debug Level for Distribution Planning
Was renamed from MSC: Distribution Planning Debug Level" to "MSC: DPP
Debug Level" in 12.0 Engine CU10 patch and in EBS 12.1.3

Should be set only with guidance of Support or Development.

0 - No Debug 1 - Informational Message 2 - Logic and Data Debug 3 - Logic


Note Reference(s)

Bug Reference(s) 9262606


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: DPP Demand Priority Details viewing buckets

Profile Code MSC


Profile Option Name MSC_DRP_DMD_PRIORITY_BK
Description This profile option is used to determine the number of buckets shown in the
Demand Priority Details form that is accessed from the horizontal plan. Used
only for DRP plans.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: DPP Discrete Job Cutoff Window (Days)

Profile Code MSC


Profile Option Name MSC_DRP_DISCRETE_JOB_CUTOFF_WINDOW
Description Use this profile option to control the number of days from plan start date that
discrete jobs are considered. Valid values are:
Null: -All discrete jobs are considered by the distribution plan.
0 - No discrete jobs are considered by the distribution plan.
Integer >=0 - All discrete jobs with completion dates from
plan launch date + {integer value} are considered by the
distribution plan. New planned orders for discrete jobs can
be created both inside and outside the job cutoff window.

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: DPP Related Exception Additional Offset Days

Profile Code MSC


Profile Option Name MSC_DRP_REL_EXP_OFFSET_DAYS
Description The profile is used to specify the number of days to
extend the lead time window calculation for related
exceptions in the source organization. Therefore,
the calculation is "Start date - max LT - profile
option days"

This profile option is added to account for the fact


that UI does not consider shipping / receiving /
manufacturing / intransit calendars in its window
calculation.

This profile option was designed to be included as


part of DRP but was never done. Its not used in
DRP/VCP , can be removed.

Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: DPP allocates to existing ISO's before other
demands with same priority

Profile Code MSC


Profile Option Name MSC_DRP_TWO_STEP_BKT_PRI_ALLOC
Description ISO has higher preference over a non-ISO demand with the same priority
and within the same allocation bucket

Profile Option details:

Name: MSC: DPP allocates to existing ISO's before other demands with the
same priority

Default Value: Yes

Valid Values:

A. Yes - DPP to use the existing Two-Step Allocation logic.

B. No - DPP to use the new One-Step Allocation logic

Two-Step Allocation logic details (current functionality): Within each


allocation bucket and for the same demand priority the Allocation logic is
performed in 2 Steps:

Step1: Allocate available supply only to existing ISO demands, for a specific
priority.

Step2: Allocate remaining supply to all existing Non-ISO demands for the
same priority as used in Step 1.

One-Step Allocation logic details (new feature):

Within each allocation bucket and for the same demand priority the Allocation
logic is performed in 1 Step: Group all existing ISO and Non-ISO demands
together, and allocate available supply to the demands.
Note Reference(s)

Bug Reference(s) 16411132


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: DRP Multitasking Group ID's per Process

Profile Code MSC


Profile Option Name MSC_DRP_GROUPIDS_PER_PROCESS
Description Use this profile option to specify how many Group IDs an unconstrained
demand and supply netting and allocation child process should process. In
this phase, a child process loads data based on internal group IDs and will
load all the org-items belonging to those group ID's. This option specifies the
length of the list of group ID's.

This profile option does not control the Load Consolidation processes.

This profile option does not apply with operating system Microsoft Windows.
Note Reference(s)

Bug Reference(s) 8523019


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: DRP Multitasking Max Concurrent Processes

Profile Code MSC


Profile Option Name MSC_DRP_MAX_CONCURRENT_PROCESSES
Description Use this profile option to specify the maximum number of DPP processes
that are allowed to run in parallel. For example, if your machine has 4
CPU's,you might choose to run a maximum of one concurrent process on
each CPU; in this case, set the value to 4.

This profile option does not apply with operating system Microsoft Windows.
Note Reference(s)

Bug Reference(s) 8523019


Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Daily Allocation to Maintain Safety Stock
Level

Profile Code MSC


Profile Option Name MSC_DAILY_ALLOCATION_SS
Description Indicates whether or not the safety stock level that you specify needs to be
maintained.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Day UOM

Profile Code MSC


Profile Option Name MSC:DAY_UOM_CODE
Description Supports the unit of measure conversion required for Oracle Advanced
Supply Chain Planning resource batching calculations. Batching Window is
considered in days, but users can specify the batching window in a unit of
measure other than days. The profile option establishes a standard for the
Day unit of measure.
Users must specify a unit of measure that represents the
value Day using this profile option.
Users must also set up a unit of measure conversion
between the unit of measure used for resources and the Day
unit of measure specified here.

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Days of Resource Availability before sysdate

Profile Code MSC


Profile Option Name MSC_RES_AVAIL_BEFORE_SYSDAT
Description Calculate Resource Availability for X days before sysdate. If a high number,
then resource availability calculation during ODS Load could take a longer
time. This can be used to collect resource availability in the past. Then this
can be used in Planning to calculate completion time of operations in
progress. You should collect resource availability in the past that will cover
the earliest operation start date currently running in the system. Valid values
are:
Integer / NULL = 1

Note Reference(s)

Bug Reference(s) 5044955


5043399
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Debug Level

Profile Code MSC


Profile Option Name MSC_DEBUG_LEVEL
Description
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Debug Module

Profile Code MSC


Profile Option Name MSC_DEBUG_MODULE
Description
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Default Category Set for Rapid Planning

Profile Code MSC


Profile Option Name MSC_RP_DEFAULT_CAT_SET
Description
This is the default category set that is used in the Rapid Planning UI. It is
used particularly in plan input views. In the case of plan output views, the
category set value is derived from the plan option. The category set is a
parameter that can be set in the plan options screen.
Note Reference(s) 1276896.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Default Project for Supplies Pegged to Excess

Profile Code MSC


Profile Option Name MSC_DEF_PROJ_SUP_EXCESS
Description This is a profile to support pegging of excess supplies to a default project.
This was however modified to be supported only for buy items and items with
no components.Refer bug# 5217328 mentioned below'
Default Value: blank.
Valid Values: Restricted to those setup in Oracle Projects (see Oracle
Projects User Guide).
Note Reference(s)

Bug Reference(s) 5217328


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Default Time Stamp for Make Planned Order
Release

Profile Code MSC


Profile Option Name MSC_PO_DEFAULT_TIME_STAMP
Description The profile allows you to set the timestamp to 23:59:59 for discrete jobs in
case of an unconstrained plan.
Note Reference(s) 1448762.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan Yes
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Default Workbench Height

Profile Code MSC


Profile Option Name MSC_DEFAULT_WORKBENCH_HEIGHT
Description Specify the default workbench height. Can be defined at the site level.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Default Workbench Width

Profile Code MSC


Profile Option Name MSC_DEFAULT_WORKBENCH_WIDTH
Description Specify the default workbench width. Can be defined at the site level.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Degree of Parallelism for Index Creation

Profile Code MSC


Profile Option Name MSC_INDEX_PARALLEL_THREADS
Description Controls the use of parallel workers in data
collections. Specifies how many parallel workers to
use when creating indexes.

If the profile is set to null, then the DOP (degree of


parallelism) is being calculated by the database
based on the number of cpu and the initialization
parameter PARALLEL_THREADS_PER_CPU.

If you set the profile to 1 then it will not use any


parallel slaves, as such performance will be slower
in collections
Note Reference(s)

Bug Reference(s) 4460213


Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Demand Priority Flexfield Attribute

Profile Code MSC


Profile Option Name MRP_DMD_PRIORITY_FLEX_NUM
Description Stores the value of the attribute column that controls the demand priority.
See 'Flexfield Attributes, page A-1 for more information. Set in EBS Source
in a Distrubuted installation.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Demand Satisfied Percent Threshold for
Pegging

Profile Code MSC


Profile Option Name MSC_DEMAND_SA_PER_THRESHHOLD
Description Set this profile option to instruct the planning engine to stop pegging supplies
to a demand which is over satisfaction percentage. Oracle recommends
setting the value greater than 99.9.

Even if you set this profile option below 100.0, the planning engine still
satisfies 100% of the demand.
Note Reference(s)
739561.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Display Order Rescheduling Supplies

Profile Code MSC


Profile Option Name MSC_DISP_RESCH_SUPPLIES
Description Yes: Planner Workbench displays Order Rescheduling Supply and Order
Rescheduling Demand inserted by available to promise when it unschedules
a sales order for a configured item

Values are:
+ Yes: Displays the rescheduling supplies details in the Planner Workbench.
+ No: he rescheduling supplies details are hidden from the Planner
Workbench

This profile is provided for debugging and analysis only. Therefore, you
should set this profile to No in a production environment.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Display Supplier Item in Collaborative
Planning

Profile Code MSC


Profile Option Name MSC_DIS_SUP_ITEM_CP_HZ
Description This setting is to display the Supplier Item value in the Horizontal Plan in
Collaborative Planning. Valid values are:
Yes - display the Supplier Item value in the Horizontal Plan in
Collaborative Planning

No - do not display the Supplier Item value in the Horizontal


Plan in Collaborative Planning

After the profile change, allow 60-90 seconds for the profile change to take
place.
Note Reference(s)

Bug Reference(s) 3969852


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Display Warning Message When
Rescheduling Recommendation Not Suggested by
the Plan

Profile Code MSC


Profile Option Name MSC_REL_SHOW_WARN
Description This profile option specifies whether or not the Planner Workbench should
display a warning message when you release rescheduled orders that the
planning engine has not recommended. Valid values are:

Yes - Use this value if you want the Planner Workbench to


prompt you for confirmation when you release rescheduled
orders that the planning engine does not recommend.
No - Use this value if you do not want the Planner
Workbench to display the message prompting to prompt you
for confirmation when you release the rescheduled orders
that the planning engine does not recommend.

Set on APS Destination in a distributed environment


Note Reference(s)

Bug Reference(s) 3016969


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Distribution Planning Ship Date

Profile Code MSC


Profile Option Name MSC_DIST_PLAN_SHIP_DATE
Description Use this profile option to schedule a trip for departure based on the earliest
and latest possible ship dates of the trip. Valid values are:
Ship full trips early or ship latest(Target) - Utilized trips ship
on the earliest possible ship date or in time to prevent
inventory levels from dropping below target.
Ship full trips early or ship latest (SS) -Utilized trips ship on
the earliest possible ship date or in time to prevent inventory
levels from dropping below safety stock.
Latest possible ship date (Target) -Trips ship just in time to
prevent inventory levels from dropping below target.
Latest possible ship date (SS) - : Trips ship just in time to
prevent inventory levels from dropping below safety stock

Note Reference(s)

Bug Reference(s)
Document References(s) -1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Distribution Planning Use Firm Supplies and
Minimize Excess Supplies

Profile Code MSC


Profile Option Name MSC_DRP_USE_FIRM_SUPPLIES
Description DPP uses for netting the firm supplies from entire horizon (not only within
current allocation bucket)

First released in 12.0.4/12.0.6 ASCP Engine/UI CU8 patch.


Forward ported in 12.1.2.1

Description from DRP FAQ Note 761820.1:

Why do sometimes I don't see


my future firm supplies netted
with current demand and I see a
new planned order created by
DRP?
In DRP, we do netting of supply
and demand within an allocation
bucket.
So if allocation bucket is say
weekly then supplies of 2nd week
onwards won't be used to meet the
demand of 1st week.
This is current functionality.
To make this functionality more
flexible, in R12 CU8 we have
provided one profile where based
on the business requirement, user
can select whether to net supplies
of next buckets to meet demands
of current buckets. The profile
name is "MSC: Distribution
Planning Use Firm Supplies and
Minimize Excess Supplies".

If profile value is Yes the


Unconstrained Netting phase will
use first all firm supplies within
entire horizon. Only if there is no
more firm supply than new
unconstrained supply will get
generated and dependent demand
gets pushed down to sourcing.

Note Reference(s)

Bug Reference(s) 9176212


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1 APS FC URL

Profile Code MSC


Profile Option Name MSC_E1APS_FCURL
Description URL for the webservice used to Launch ODI scenarios from collections
program

Format: String
Where Used: JDE-VCP Collections
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1 APS ODI URL

Profile Code MSC


Profile Option Name MSC_E1APS_ODIURL
Description URL for the webservice used to Launch ODI scenarios from collections
program
Format: String
Where Used: JDE-VCP Collections
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1 Concatenation Character

Profile Code MSC


Profile Option Name MSC_E1_CONCAT_CHAR
Description Delimiter character in the generated flat files from JDE

Default: +
Format: Character
Where Used: JDE-VCP Collections.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1APS_BATCH_SIZE

Profile Code MSC


Profile Option Name MSC_E1APS_BATCH_SIZE
Description Transaction batch size used in Legacy Collections
Default: 1000
Format: Integer
Where Used: JDE-VCP Collections
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1APS_DEM_END_DATE_IN_MONTHS

Profile Code MSC


Profile Option Name MSC_E1APS_DEM_END_DATE_IN_MONTHS
Description End date offset in months from the current date used for Demantra Price List
collections
Format: Integer
Where Used: JDE-VCP Collections
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1APS_DEM_START_DATE_IN_MONTHS

Profile Code MSC


Profile Option Name MSC_E1APS_DEM_START_DATE_IN_MONTHS
Description Start date offset in months from the current date used for Demantra Price List
collections
Format: Integer
Where Used: JDE-VCP Collections
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1APS_DEM_WF_TIME_OUT

Profile Code MSC


Profile Option Name MSC_E1APS_DEM_WF_TIME_OUT
Description Timeout value for Demantra Workflow in seconds
Format: Integer
Where Used: JDE-VCP Collections
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1APS_NO_OF_WORKERS

Profile Code MSC


Profile Option Name MSC_E1APS_NO_OF_WORKERS
Description Number of workers for Legacy Collections concurrent program
Default: 3
Format: Integer
Where Used: JDE-VCP Collections
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1APS_TIME_OUT

Profile Code MSC


Profile Option Name MSC_E1APS_TIME_OUT
Description Timeout value in minutes for Legacy collections preprocessor and ODS Load
programs

Default: 180
Format: Integer
Where Used: JDE-VCP Collections
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1APS_WS_TIME_OUT

Profile Code MSC


Profile Option Name MSC_E1APS_WS_TIME_OUT
Description Timeout value in seconds for ODI webservice
Format: Integer
Where Used: JDE-VCP Collections
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: E1_DBLINK

Profile Code MSC


Profile Option Name MSC_E1_DBLINK
Description Database link to ODI Work repository from the apps schema
Format: String
Where Used: JDE-VCP Collections
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: EBS source instance for OTM

Profile Code MSC


Profile Option Name MSC_EBS_INSTANCE_FOR_OTM
Description A string such as TST. Default to same instance as APS self instance. Now
APS-OTM integration only support single EBS source instance.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: ENFORCE CRITERIA REQUIREMENT BEFORE
EXECUTING QUERY

Profile Code MSC


Profile Option Name MSC_PQUERY_EXEC_WITH_CRITERIA
Description Use this profile option to specify if a query requestor needs to specify criteria
before executing a query. Valid values are:

Yes - This ensures that the query performs more efficiently.


No

Note Reference(s) 867822.1

Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable 64 bit snapshot

Profile Code MSC


Profile Option Name MSC_ENABLE_64BIT_SNAPSHOT
Description When using 64 bit planning, you can also run the Memory Base Snapshot in
64 bit mode.
This does not make the plan run faster. This is for extremely large data
models the exceed the requirements of 32 bit snapshot. Most customers
using 64 bit planning will not need 64 bit snapshot. Valid vaules are:
Enabled - 1

Disabled - 0

Default Value - Disabled

Lets the system know if 64 bit snapshot need to be launched or not. Which
platform is determined from profile MSC_PLANNER_PLATFORM.
Note Reference(s) 254810.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable ATP Summary Mode

Profile Code MSC


Profile Option Name MSC_ENABLE_ATP_SUMMARY
Description This profile determines whether we launch program - Load ATP Summary
Based on Collected Data - MSCCLCNC
This will summarize data for sales orders and supply / demand data and can
improve ATP scheduling performance.
This is a site level profile. Valid values are:
Yes - Enable ATP Summary Mode
No - Disable ATP Summary Mode.

You may only set this profile to Yes when Oracle Global Order Promising is
on the same instance as other ERP application (i.e. You have a centralized
instance setup)

ATP will use the detailed information in several cases even if you have this
set to Yes
ATP in the Order Backlog Workbench is based on the detail supply demand
tables, regardless of the profile setting for MSC:
Enable ATP Summary Mode.
ATP for ATO models is always based on detailed information.

Note: When using Summary mode, you cannot see ATP


Supply/Demand or ATP horizontal Plan when using rt-click from the
ATP Details form.
Note Reference(s) 457840.1

563617.1

Bug Reference(s)
Document References(s) -1
Oracle Global Order Promising Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Enable ATP Workflow

Profile Code MSC


Profile Option Name MSC_ALLOCATED_ATP_WORKFLOW
Description The profile MSC: Enable ATP Workflow is a site level profile option and it
cannot be set at the responsibility level.

Controls the notification sent to planner if we cannot meet the request, or


stealing is involved when allocated ATP is used or when override happens
under ATP based on planning output.

If end item substitution is used, then we send notification to customer


contacts and sales representative.

Also used for ATP Override functionality.


Note Reference(s) 419271.1

Bug Reference(s)
Document References(s) -1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Enable ATP for Phantom Components

Profile Code MSC


Profile Option Name MSC_ENABLE_PHANT_COMP
Description Enable ATP for Phantom Components
Yes / No

When set to No, it skips the Phantom components and ignores Phantom lead
times and moves directly to the next level in the BOM.
Note Reference(s)

Bug Reference(s) 11797513


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Enable Advanced Constraints

Profile Code MSC


Profile Option Name MSC_ENABLE_NEW_CONSTRAINTS
Description Use this profile option to control the values that display for plan option
Constraints Mode (on the Constraints tab). Valid values are:

Yes: All values for plan option Constraints Mode display


No: All values for plan option Constraints Mode display
except Constrained (Without Detailed Scheduling)

Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable Allocated ATP

Profile Code MSC


Profile Option Name MSC_ALLOCATED_ATP
Description Enable Allocated ATP is only available for ATP based on Planning Output
Update at the Site level only.

This should be set to NO for ATP based on Collected Data


-- there have been issues in the past where this profile was Yes and
ATP based on Collected Data has issues

Yes / No (default)
Note Reference(s) 212788.1
218010.1
339599.1
154293.1
333936.1
251920.1

Bug Reference(s)
Document References(s) -1
-1
-1
-1
-1
-1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Enable DRP Multitasking

Profile Code MSC


Profile Option Name MSC_DRP_MULTITASKING
Description Use this profile option to specify whether the planning engine should use
high volume distribution planning. You can set at the user and site levels.
Valid values are:

Yes - All DPP plans run by this user or at this site are run in
high volume mode. This value does not apply with operating
system Microsoft Windows.
No - DPP plans run by this user or at this site are not run in
high volume mode

Note Reference(s)

Bug Reference(s) 8523019


Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable Diagnostic ATP

Profile Code MSC


Profile Option Name MSC_DIAGNOSTIC_ATP
Description Use this profile to enable diagnostics within the ATP Inquiry form.

Open the ATP inquiry screen and then go to /Tools and check on Enable
Diagnostic ATP
Then when you perform ATP inquiry for the item, additional information on
the constraints causing lateness will be available.
Example on the GOP Users Guide provides more information.
Note Reference(s) 303067.1

Bug Reference(s) 6001023


Document References(s) -1
-1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Enable Enhanced Sourcing

Profile Code MSC


Profile Option Name MSC_ENHANCE_SOURCING
Description Enables enhanced sourcing logic that considers historical allocations and
allows the splitting of planned orders to achieve target sourcing percentages.

Rank 2 buy sources are considered if supplier capacity is exhausted for rank
1 sources. This profile option duplicates the functionality of the decision rule
Use Alternate Sources parameter for buy items but not for transfers from
other organizations. When the decision rules are enabled, the planning
engine does not consider this profile option.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable Group Based Netting

Profile Code MSC


Profile Option Name MSC_ENABLE_GROUP_BASED_NETTING
Description Use this profile option to control whether the planning engine uses group
based netting features. Valid values are:

Yes - provides the most recent netting logic

Oracle recommends that you set the value to Yes and use the latest netting
features. This profile option is for backward compatibility. In R12 this profile
has to be set to Yes.
Note Reference(s) 421097.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable In-Memory Performance Driven
Planning

Profile Code MSC


Profile Option Name MSC_ENABLE_IMPDP
Description This profile option was added in 12.1.3.9 and applies ONLY to engineered
systems, i.e. exadata and exalogic.

Use this profile option to control whether the inter process communication will
use Advanced Queues or DBMS_PIPES. This impacts the following:

+ All types of plan runs (ASCP/DRP/IO/SPP)


+ On-line planner for ASCP/DRP
+ ASCP Data Collection runs

When the profile option MSC: Enable In-Memory Performance Driven


Planning is set to Yes, the inter-process communication uses Advanced
Queues.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable Java Debug

Profile Code MSC


Profile Option Name MSC_JAVA_DEBUG
Description When setting this profile to Yes, debug messages are written to the java
console.
Note Reference(s) 396037.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center Yes
Global Order Promising No
MSC: Enable Large Plan Copy in 32 bit Linux

Profile Code MSC


Profile Option Name MSC_ENBL_COPY_LARGE_PLAN
Description User Defined profile for key code required by DEV for certain file functions in
mslflt.ppc
Enables large data files exceeding 2gb to be handled in 32 bit code.

Name: MSC_ENBL_COPY_LARGE_PLAN
User Name: "MSC: Enable Copy Large Plan in Linux 32 bit"
This is YES/NO profile and should be defined at customer
site.
Default value should be "No".
SQL Validation is
SQL= "select meaning \"MSC: Enable Large Plan Copy\",
lookup_code
into :visible_option_value,:profile_option_value
from fnd_lookups where lookup_type = 'YES_NO'"
COLUMN="\"MSC: Enable Large Plan Copy\"(4)"
Note Reference(s) 1151597.1]
1510271.1
866422.1

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable Model and End Item dimensions in
APCC

Profile Code MSC


Profile Option Name MSC_APCC_END_ITEM_ENABLED
Description Enabled flag, indicating whether APCC will archive pegging information at
End Item granularity.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable Parallel Legacy Collections

Profile Code MSC


Profile Option Name MSC_ENABLE_PARALLEL_LEG_COLL
Description Yes / No - No is default

Setting this profile option to Yes enables the ability to run Legacy Collections
and Standard Collections in parallel. In order to enable this functionality, the
system administrator must manually remove the following incompatibilities for
the concurrent program Request Set Planning Data Collection:
Pre-Process Monitor
Flat File Loader

Note Reference(s) 1570652.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable Priority Pegging

Profile Code MSC


Profile Option Name MSC_ENABLE_PRIORITY_PEGGING
Description This is not a visible profile.

This is actually a parameter on the options form for the plan options.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enable Release of Defective Planned
Transfers

Profile Code MSC


Profile Option Name MSC_ENABLE_REL_DFCT_PLAN_TRNSFRS
Description To Control Release of Defective Planned Transfers

May be customer specific and change in 12.2 - Per bug 9187165


Note Reference(s)

Bug Reference(s) 9187165


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enforce Hard Links

Profile Code MSC


Profile Option Name MSO_ENFORCE_HARD_LINKS
Description This profile option specifies whether time offsets are hard constraints or soft
constraints. Valid values are:
Yes - the planning engine can violate resource and material
capacities to satisfy minimum and maximum time offsets. If
capacity is exceeded, exception messages start the cause
as "Hard Link Constraint".

No - the planning engine cannot violate resource and


material capacities to satisfy the minimum and maximum
time offsets. In this case, the planning engine can violate
hard links and generate a "Hard Link Violation" exception
message.

Default Value - Yes


Note Reference(s)

Bug Reference(s) 7453287


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Enhanced Project Netting

Profile Code MSC


Profile Option Name MSC_ENHANCED_PROJECT_NETTING
Description The new schedule date on on-hand and expired-lots is calculated incorrectly,
when flushing to MSLD_SUPPLIES.dat. The new schedule date now is
calculated using date from call to get_curr_date() instead of arguments-
>curr_date as done previously

This is user defined profile, but does contain entry in the ASCP User Guide -
which is unusual.

ASCP User Guide says:


If the planning engine creates a planned order that pegs to multiple projects
or tasks, the planning engine splits the planned order.

Valid values are:


- Yes: If there is an excess, the planning engine includes its quantity in the
planned order of one of the projects.
- No: If there is an excess, the planning engine creates a separate planned
order for it

When defining the profile in Application Developer / Profile


use the following SQL validation

SQL= "select meaning \"MSC: Enhanced Project Netting\",


lookup_code
into :visible_option_value,:profile_option_value
from fnd_lookups where lookup_type = 'YES_NO'"
COLUMN="\"MSC: Enhanced Project Netting\"(4)"
Note Reference(s) 1465013.1
853103.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Excess and Safety Stock by Demand Class

Profile Code MSC


Profile Option Name MSC_EXCESS_SUPPLY_BY_DC
Description Controls the allocation of supply or demand that pegs to excess or safety
stock in the case of allocated ATP using the demand-priority based method.
Values are:
+ Yes:
If such supply or demand has a demand class, and if the demand class
exists on the allocation rule, then allocate the supply or demand to the
demand class. If the supply or demand does not have a demand class or if
the demand class does not exist on the allocation rule, then allocate the
supply or demand to OTHER.

+ No:
Allocate such supply or demand to OTHER.
Note Reference(s) 250289.1

Bug Reference(s)
Document References(s) -1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Fast Refresh of Region Site Map

Profile Code MSC


Profile Option Name MSC_FAST_REGION_SITE_MAP
Description This effects Region to site mapping of suppliers which is launched during the
Refresh Collections snapshots.

No - default - standard functionality


Yes - will launch and cursor to specifically select only newly changed records
for region to site mapping of supplies.

Introduced in VCP 12.1.3.4


Note Reference(s)

Bug Reference(s) 10417975


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: File Flush Limit

Profile Code MSC


Profile Option Name MSC_FILE_FLUSH_LIMIT
Description Use this profile option to control Planner concurrent process write to
database, if the number of records exceed this value, the process uses
SQL*Loader or array insert.
Note Reference(s) 725858.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning Yes
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning Yes
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Firm Internal Requisition Time Fence

Profile Code MSC


Profile Option Name MSC_FIRM_PURCH_REQ_TF
Description This profile option creates a natural time fence for an item if a firm internal
requisition exists. The natural time fence is the date of the latest firm internal
requisition. Valid values are:

Yes: Use this to create a natural time fence for a firm internal
requisition.
No: Use this if you do not want to create a natural time fence
for a firm internal requisition.

Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Firm Intransit and PO in Receiving Supplies

Profile Code MSC


Profile Option Name MSC_FIRM_INTRANSIT_PO_IN_RECEIVING
Description This profile option applies to unconstrained plans only and instructs the
planning engine whether it should consider intransit and purchase order in
receiving supplies as firm or it should issue reschedule recommendations for
them. Valid values are:
Yes - the planning engine considers intransit and purchase
order in receiving supplies as firm.

No - the planning engine generates reschedule


recommendations for these types of supplies. Use this
setting if you expedite shipments that are en route from a
supplier to a receiving organization or if you want to expedite
the movement of materials in receiving to the shop floor. For
example, you might offload a package from a ship at a port
and then fly the package to the receiving organization.

These recommendations are informational only and cannot be released from


the Planner Workbench.

This is a user level profile option.


Note Reference(s)

Bug Reference(s) 4593891


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan Yes
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Fixed Date for Install Base under Contracts
History (DD-MON-YYYY)

Profile Code MSC


Profile Option Name MSC_FIXED_DATE_IBUC_HISTORY
Description Profile for defining the end date for the Fixed date instances
This is only applicable for testing instances where fixed date is being used in
the system for testing stability.
Note Reference(s)

Bug Reference(s) 9979825


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Flush All Items for Simulation

Profile Code MSC


Profile Option Name MSC_FLUSH_ALL_ITEMS_ONLINE
Description Profile option used to identify items to calculate safety stock as part of the
batch replan. Valid values are:
Yes - flush all data for all items during simulation/batch
replan to calculate the safety stocks and not miss any data.
No - only the items changed for simulation or batch replan
are taken into account and recalculated

Note Reference(s)

Bug Reference(s) 5920518


9361980
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Forecast Priority Flexfield Attribute

Profile Code MSC


Profile Option Name MSC_FCST_PRIORITY_FLEX_NUM
Description Stores the value of the attribute column that will control the forecast priority.
See 'Flexfield Attributes, page A-1 for more information.
Note Reference(s) 794086.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Forecast Spreading Calendar

Profile Code MSC


Profile Option Name MSC_FORECAST_SPREAD_CAL
Description Obsolete - This is duplicate of profile with DB NAME =
MSC_FORECAST_SPREAD_CALENDAR
Note Reference(s)

Bug Reference(s) 7420122


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized Yes
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized Yes
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Forecast Spreading Calendar(1)

Profile Code MSC


Profile Option Name MSC_FCST_SPREADING_CALENDAR
Description MSC: Forecast Spreading Calendar will use the
calendar for spreading the forecast based on
either:
Org Manufacturing Calendar (1)
Org Shipping Calendar (2)

It should be noted that the bucketing of the forecast


is always based on the shipping calendar.
This is the design, since you cannot ship when the
org is closed for shipping, then forecast will be
bucketed so that it will be ready to ship.
For instance, using the example below - if you
enter a sales order with day 6 as requested ship
date, and we cannot ship on Day 6, then we will
back up the ship date to Day 5
So the sales order demand would fall on Day 5, so
we plan the forecast in the same manner, so you
can produce when the demand from sales order
will fall on the calendar.

Example:
Mfg calendar 7 days on
shipping calendar 5 on / 2 off
Forecast qty per week = 700
Spread Forecast qty / Forecast Bucketing
Day 1 100 100
Day 2 100 100
Day 3 100 100
Day 4 100 100
Day 5 100 300
Day 6 100
Day 7 100

Note: Introduced in 11.5.10 in Rollup #34


Note Reference(s)

Bug Reference(s) 7420122


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized Yes
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized Yes
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Future Days for Currency Conversion

Profile Code MSC


Profile Option Name MSC_FUTURE_DAYS_FOR_CURR_CONV
Description Use this profile option to instruct the collections process how many future
days of currency conversion rates to collect, starting from today.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Gateway URL to External Application

Profile Code MSC


Profile Option Name MSC_GATEWAY_URL_EXTERNAL
Description This profile is obsolete and needs to be removed from the applications. This
is documented in bug 2937850
Note Reference(s)

Bug Reference(s) 2937850


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Generate Exceptions in CP

Profile Code MSC


Profile Option Name MSC_WS_OTM_GEN_EXC_CP
Description Control whether the order later or earlier exceptions will be generated in
Collaborate Planning.
Note Reference(s) 761773.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Generate Notifications for Transportation
Updates

Profile Code MSC


Profile Option Name MSC_GEN_NOTIFICATION_FOR_OTM
Description Use this profile option to specify whether the process that passes estimated
arrival time updates from Oracle Transportation Management should create
workflow notifications.
Valid values are:
Yes - Create workflow notifications
No - Do not create workflow notifications

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: HP Maximum Displayed Item Count

Profile Code MSC


Profile Option Name MSC_HP_ITEM_LIMIT
Description Controls the number of items that can be viewed in the Horizontal Plan.
Note Reference(s) 734926.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: High Volume Items

Profile Code MSC


Profile Option Name MSC_HIGH_VOL_ITEMS
Description This snapshot profile controls plan weed out logic. Since snapshot on 64-bit
machines could run out of memory if the number of planned items is high.
Valid values:
Yes: Snapshot bypasses the weed out logic and directly
inserts items from operational data store to planning data
store. If item planning type is All Planned Items, the snapshot
inserts all items into the planing data store. If the items have
demand schedules only, snapshot only inserts the items in
demands schedules into the planning data store.
No: The snapshot uses weed out logic.

Note Reference(s) 749602.1


404046.1
387368.1

Bug Reference(s) 7696320


5203445
Document References(s) -1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: History Days for Currency Conversion

Profile Code MSC


Profile Option Name MSC_HISTORY_DAYS_FOR_CURR_CONV
Description Use this profile option to instruct the collections process how many past days
of currency conversion rates to collect, starting from today.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Horizon for APCC Collected data - Backward
days

Profile Code MSC


Profile Option Name MSC_APCC_COLL_HORIZON_DAYS_BACK
Description Refresh Collected Data in APCC Repository is concurrent program that is run
to pull in the collected data for use in APCC to compare with ASCP plan
results that are pulled into APCC

How much data is pull into APCC depends on this profile and companion
profile
MSC: Horizon for APCC Collected data - Forward days

Set as Integer value for number of days to pull in the data.

Note: During Data Collections - you can set ODS Load parameter - Refresh
Data in APCC repository - Yes and this will automatically launch the refresh
after ODS Load is completed.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Planning Command Center User's Guide
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: Horizon for APCC Collected data - Forward
days

Profile Code MSC


Profile Option Name MSC_APCC_COLL_HORIZON_DAYS
Description Refresh Collected Data in APCC Repository is concurrent program that is run
to pull in the collected data for use in APCC to compare with ASCP plan
results that are pulled into APCC

How much data is pull into APCC depends on this profile and companion
profile
MSC: Horizon for APCC Collected data - Backward days

Set as Integer value for number of days to pull in the data.

Note: During Data Collections - you can set ODS Load parameter - Refresh
Data in APCC repository - Yes and this will automatically launch the refresh
after ODS Load is completed.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Oracle Advanced Planning Command Center User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: Horizontal Plan Demand Bucketing
Preference

Profile Code MSC


Profile Option Name MSC_HP_DMD_BKT_PRF
Description This profile controls how Oracle Global Order Promising treats demand due
date when calculating availability.
Valid values are:

Plan Recommended Date - Oracle Global Order Promising treats the


demand due as the date recommended by Oracle Advanced Supply Chain
Planning. (Material Available Date of the Sales Order demand in
Supply/Demand view of the ASCP Plan)

Demand Due Date, Oracle Global Order Promising treats the demand due as
the Schedule Ship Date. (Suggested Due Date in Supply/Demand view of
ASCP plan.)

So using Demand Due Date will have ATP Hiorizontal Plan and ASCP
Horizontal Plan show demand in the same buckets.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Global Order Promising Implementation and User's Guide
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Horizontal Plan Extension Program

Profile Code MSC


Profile Option Name MSC_HP_EXTENSION_PROGRAM
Description Use this profile option when you are using a custom row in the Planner
Workbench Horizontal Plan. Specify the name of the PL/SQL program unit
with no parameters that specifies that information to display in the custom
row.
Note Reference(s) 743420.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Hour UOM

Profile Code MSC


Profile Option Name MSC:HOUR_UOM_CODE
Description Specifies unit of measure. Can be defined at the site level.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Hybrid Allocated ATP

Profile Code MSC


Profile Option Name MSC_HYBRID_ALLOC_ATP
Description MSC: Hybrid Allocated ATP

This is the profile option to support Hybrid


Allocated ATP

The profile provides ability for the system to check


if any allocation rule exists for items.

"MSC: Enable Allocated ATP" set to 'Yes',


Allocated ATP will be performed to ALL

items irrespective of checking if any allocation rule


exists for items.

Set the new profile "MSC: Hybrid Allocated ATP" to


'Yes' and "MSC: Enable Allocated ATP" set to
'Yes', Allocated ATP will
be performed ONLY for items which are having
allocation rules.

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: INTER PLANT DEM PRIORITY

Profile Code MSC


Profile Option Name MSC_INTERPLANT_DEM_PRI
Description Hidden. Used for coding.
Note Reference(s)

Bug Reference(s) 7457980


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: IO UI Performance tuning

Profile Code MSC


Profile Option Name MSC_IO_UI_PERF_TUNE
Description Inventory Optimization UI [Analysis Workbench] performance tuning for large
data volume.
Please refer to bug 7610080 for more details.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: IO UI Period Set Name

Profile Code MSC


Profile Option Name MSC_IO_UI_PERSETNAME
Description Introduced in Patch 9724753 for 12.1.1 CU4
Included in VCP 12.1.3.1 and above.

The period_set_name used in financial calendar is


different than the one being supported.
Currently only 'Accounting' is supported and defaulted by
the code.
This profile will allow setting of a different calendar, otherwise Accounting
calendar will be defaulted.
Note Reference(s) 1133108.1

Bug Reference(s) 9724753


9892129
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Ignore ATP Check for Configured Item from
Sales Order in ODS-ATP

Profile Code MSC


Profile Option Name MSC_IGNORE_ATP_CHECK
Description Valid values are:
Yes - and using "ATP Based on collected Data" then when there is a
configuration existing for the Sales order, we treat the model as non atpable.

No - no alterations on existing demand will be done


Default Value - No
Only available in 11.5.10 at this time (Jun 2011)
Note Reference(s)

Bug Reference(s) 6355057


6475340
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Ignore CMRO and EAM Workorders in ASCP

Profile Code MSC


Profile Option Name MSC_ASCP_IGNORE_CMRO_EAM_WO
Description This profile exists in 12.1.3.6 and later

If profile: "MSC: Ignore CMRO and EAM Workorders in ASCP" is set as Yes
(or NULL), we do not Create or Snapshot related supplies and ASCP Plan
will not plan for OR generate exceptions for CMRO and EAM.
Maintenance work order and maintenance work order demands are not
controlled by Net WIP when profile is set to No.

- If profile is set to Yes, depending on net_wip setting in the plan option


Continue with old behavior
- If profile is set to No and net_wip is No - Only Eam/cmro orders are dealt
with.
- If profile is set to No and net_wip to Yes, code deals with all except
eam/cmro orders. New code deals with eam/cmro orders alone.
- NULL = Yes
Note Reference(s)

Bug Reference(s) 12686233


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Ignore PTF during CTP

Profile Code MSC


Profile Option Name MSC_CTP_IGNORE_PTF
Description Valid values are:

* Yes - set the Planning Time Fence to sysdate. So Planning Time Fence
is not considered while doing ATP.
* No

Default Value - No
Introduced to help customers who are running UNconstrained plan and using
ATP based on Planning output.

For GOP, for make order, the start date will respect Planning Time Fence .
For transfer order, the ship date will respect Planning Time Fence.
For buy order, the dock date will respect Planning Time Fence.
This it is consistent with the constrained plan, and it is by design.
However, for an unconstrained plan, due date will respect Planning Time
Fence.
So if GOP is done on a unconstrained plan, this could lead to confusion.

Available in 11.5.10 -
Front port bug 6241549 on top of VCP 12.1.3.8 was done Jan 2014 via Patch
18150049 but requires DEV Approval to apply.
Note Reference(s) 464095.1

Bug Reference(s) 6113215


6241549
624154
Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Ignore Routings Without Any Date Effective
Operations

Profile Code MSC


Profile Option Name MSC_IGNORE_RTG_WITHOUT_DT_EFF_OPER
Description Ignore Routings Without Any Date Effective Operations

Introduced in bug 9387109


released in ASCP Engine/UI Rollup #41 - 9550751
A new profile MSC: Ignore Routings Without Any Date Effective Operations
is introduced and a code change was made to ignore the operations with
routings with effectivity date in the past.

Bug notes:
Set the Profile "MSC: Ignore Routings Without Any Date
Effective Operations" to 'NO'.

Create an item with primary bom, primary routing, and an


alternate routing.
Alternate routing is with all operations disabled.
-- This will be treated as item with no operations.

Valid Values are -

Yes: The ASCP planing engine will ignore the process effectivity entries
where the routings have no valid operations.

No: ASCP uses the process effectivty entries even if the routing for the
process do not have any valid operations.

The default value is 'No'


Note Reference(s) 1312424.1

Bug Reference(s) 9387109


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Ignore Safety Stock Inside Lead Time

Profile Code MSC


Profile Option Name MSC_IGNORE_SS_IN_LEAD_TIME
Description Hidden Profile - user defined

When the profile is set to yes then make of safety


stock quantity to zero inside Lead Time.

In 11.5.10 and R12.0 this profile has a different


Internal name - see Internal Name -
MSC_IGNORE_SS_IN_TIME_FENCE for more
complete details

Note Reference(s) 1264886.1


1323113.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Ignore Safety Stock calculation inside Time
Fence

Profile Code MSC


Profile Option Name MSC_IGNORE_SS_IN_TIME_FENCE
Description Hidden Profile - user defined
MSC: Ignore Safety Stock calculation inside Time Fence

This profile is used in version 11.5.9, 11.5.10 and 12.0


Refer to Note 459763.1 - Transient Safety Stock Causing High PAB
and Note 1053688.1 - PROFILE OPTION MSC_MAKE_SS_TRANSIENT
NOT VISIBLE IN ASCP R12 INSTANCE

In Version 12.1.3, this profile uses a different Internal name -


MSC_IGNORE_SS_IN_LEAD_TIME
Refer to Note 1431837.1 - Planned Order Not Pegging To Safety Stock
Profiles MSC_IGNORE_SS_IN_LEAD_TIME and
MSC_MAKE_SS_TRANSIENT

Seen Enhancement Request 17858550

Backend profile name MSC_IGNORE_SS_IN_LEAD_TIMEFront end name = MSC: Igno


Note Reference(s) 1053688.1
459763.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Include Firm Planned Orders In Firm
Allocation Window

Profile Code MSC


Profile Option Name MSC_INCLUDE_FPO_IN_FAW
Description For priority pegging, controls the point at which demands peg to firm planned
orders.
Valid values are:

Yes - Firm planned orders are included in the firm allocation


window (along with scheduled receipts). They are eligible for
pegging during the first phase of priority pegging.
No - Firm planned orders are not included in the firm
allocation window (along with scheduled receipts). They are
eligible for pegging during the second phase priority pegging.

Note Reference(s)

Bug Reference(s) 6623090


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Include Manufacturing Calendar in ATP Sales
Order Ship Date Calculations

Profile Code MSC


Profile Option Name MSC_INCLUDE_MFG_CAL
Description This profile was obsoleted in 11.5.10. The functionality of MSC: Use
Shipping/Receiving Calendars replaces this in 11.5.10 and above.

For 11.5.9 and lower, this determines whether ATP uses 24x7 calendar
instead of Org Manufacturing calendar for shipping dates (No for 24x7, Yes
for Org Calendar)
Note Reference(s) 555016.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Include Postprocessing lead time when
planning for make orders

Profile Code MSC


Profile Option Name MSC_INCL_PPLT_FOR_MAKE
Description Allows you to include the Postprocessing lead time when planning for Make
orders. Valid values are:
Yes - System includes Postprocessing lead time when plans
for make orders.
No - System does not include Postprocessing lead time
when plans for make orders. This is the default value.

This profile was introduced in 12.1.3.9 as part of


the enhancement to enable Post Processing Lead
Time for Make Orders
Note Reference(s)

Bug Reference(s) 14749921


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Include Safety Stocks in Priority Based
Pegging

Profile Code MSC


Profile Option Name MSC_INCLUDE_SS_IN_PRIORITY
Description Controls whether to exclude non-transient safety stock levels from the
priority-based pegging logic. Valid values are:

Yes - The planning engine does not give preference to non-


transient safety stock levels in priority-based pegging. It pegs
the demands and the safety stock levels, at the same time,
to the supplies.
No - The planning engine gives preference to non-transient
safety stock levels in priority-based pegging. It first pegs
them to non-firm planned orders. Then, it pegs the demands
to the other supplies.

Note Reference(s)

Bug Reference(s) 4011546


Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Inflate WIP Resource Requirements

Profile Code MSC


Profile Option Name MSC_INFLATE_WIP
Description Determines whether or not the planning engine should inflate the Work in
Process resource requirements based on resource efficiency and utilization
during collections from Oracle Work in Process. Valid values are:

Yes - Planning engine inflates the resource requirements for


the firm, unfirm, and non-standard discrete jobs considering
the resource efficiency and utilization.
No - The planning engine does not consider resource
efficiency and utilization to inflate the resource requirements
for the collected discrete jobs.

Note that this profile option is used in conjunction with shop floor scheduling
products such as Oracle Manufacturing Scheduling. It is assumed that the
discrete jobs are not released from the planning engine. If the jobs are
rescheduled and released by the planning engine, the resource requirements
are deflated. This could result in data inconsistency as the resource
requirements are deflated on release whereas Oracle Manufacturing and
Scheduling might have calculated resource requirements based on the
inflated values. The planning engine always sends the original resource
requirements upon release. If the resource requirements are already inflated
in the source from Oracle Manufacturing Scheduling, set this profile option to
No to avoid double inflation of the resource requirements. Otherwise, set it to
Yes so that the planning engine inflates the resource requirements.

Default Value - No

Set on APS Destination in a distributed environment


Note Reference(s)
373892.1
858515.1

Bug Reference(s) 2490553


Document References(s) -1
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Inventory Rebalancing Surplus Inventory
Basis

Profile Code MSC


Profile Option Name MSC_CIRC_SRC_SURP_INV_BASIS
Description This profile can be set at the Site, Responsibility, or User. This profile
relates to Distribution Planning. Use this option to specify whether inventory
rebalancing considers target or safety stock inventory levels. Valid values
are:
Target - Surplus inventory is defined as the quantity of
projected available balance greater than target inventory
level. Target inventory demands are considered by inventory
rebalancing.
Safety Stock - Surplus inventory is defined as the quantity of
projected available balance greater than safety stock
inventory level. Target inventory level demands are ignored
by inventory rebalancing.

Note Reference(s) 397199.1

Bug Reference(s) 7366907


7426019
Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: JInitiator Version

Profile Code MSC


Profile Option Name MSC_JINI_VERSION
Description used to explicitly specify the use of a different Jinitiator version for
gantt chart to render ui components correctly. may not be applicable to all
customers.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Launch Analyze Plan Partition

Profile Code MSC


Profile Option Name MSC_LAUNCH_ANALYZE_PART
Description Launches the concurrent request Analyze Plan Partition.
Note Reference(s) 250161.1
298355.1

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Launch System Sql Loader

Profile Code MSC


Profile Option Name MSC_LAUNCH_SYSTEM_SQLLDR
Description Valid values are:
Yes - will launch sqlldr by system call.

No - will call fdpldr() function as earlier.

This profile option is specifically used when MRP_DIRECT_LOAD is set to


Yes.
Note Reference(s)
555016.1
307443.1

Bug Reference(s) 5722157


Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Launch Workflow-Enabled Exception
Message Notifications

Profile Code MSC


Profile Option Name MSC_LAUNCH_EXCEPTION_NOTIFICATION
Description Determines if Oracle Collaborative Planning sends notification messages
when it generates exceptions
Note Reference(s)
564868.1

Bug Reference(s) 2474996


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Legacy Flat File Directory

Profile Code MSC


Profile Option Name MSC_LEG_FLAT_FILE_DIR
Description Directory containing flat files to be loaded by Legacy Collections.
Note Reference(s) 1570652.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Level for Calculating Liability

Profile Code MSC


Profile Option Name MSC_LIABILITY_CALC_LEVEL
Description This profile is not used.
Note Reference(s)

Bug Reference(s) 5481643


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Limit Gantt Chart Orders View Hierarchy

Profile Code MSC


Profile Option Name MSC_GANTT_ORDER_HIERARCHY
Description When you enter the ordersview of the ASCP Ganttchart from the context of
a supply, you should (optionally) see in the left hand pane tree only the
supply and those supplies that end peg to that supply. You should not see
any of the supplies between the context supply and the end pegged demand.
Note Reference(s)

Bug Reference(s) 3621869


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: MBS and ODS Load Contention Wait Time
(minutes)

Profile Code MSC


Profile Option Name MSC_MBS_ODS_WAIT_TIME
Description This profile controls the amount of time the Planning ODS Load program will
wait for the Memory Based Snapshot program to finish before failing.

In prior releases, the Planning ODS Load and Memory Based Snapshot
programs were incompatible with each other. This was put in place to
prevent the Planning ODS Load program from overwriting the data that was
in the process of being read in for the plan run.

In release 12.1.3.9, the profile was added to allow for parallel collection runs
between "multiple VCP planning instances on one shared physical
destination server". Review the related note 1570652.1 for all considerations
Note Reference(s) 1570652.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: MPS Auto-Firm Planned Orders

Profile Code MSC


Profile Option Name MSC_MPS_AUTO_FIRM_PO
Description This profile option specifies how the planning engine deals with master
production schedule firm planned orders. You can use this profile option to
specify whether or not the planning engine should treat all planned orders in
the master production schedule as firm:

Valid values are:


Yes - When running batch replan using an MPS plan, all
planned orders are treated as firm without regard to planning
time fence
No - When running batch replan, only planned orders inside
the PTF are firm.

If an MPS is a demand schedule for another plan,


this has no impact as planned orders from the MPS
are always treated as firm.

This profile option applies only to master production schedule plans. You can
set it at the site and user levels.
Note Reference(s) 259322.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: MSC_TOP Directory

Profile Code MSC


Profile Option Name MSC_TOP_DIR
Description Path to MSC_TOP directory on middle tier node.

Release Notes for Release 12.1.3.9 - Doc ID 1570652.1

1. Legacy Collections Running In Line with Standard


Collections

This enhancement allows you to include collection


of supplementary legacy file data just by launching
Standard Collections, without having to launch two
separate Collections processes (Standard
Collections and Legacy Collections.)

Specifically you can load data for Forecasts, MPS,


and MDS via flat files in line with loading other
entities using Standard Collections.

There are 3 profile options that are used with this


feature:
MSC: Enable Parallel Legacy Collections
MSC: Legacy Flat File Directory
MSC: MSC_TOP Directory

In order to use "Legacy Collections Running In Line


with Standard Collections", the system
administrator must manually remove the following
incompatibilities for the concurrent program
Request Set Planning Data Collection:
Pre-Process Monitor
Flat File Loader

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Make Safety Stock Transient

Profile Code MSC


Profile Option Name MSC_MAKE_SS_TRANSIENT
Description Hidden profile - user defined
MSC: Make Safety Stock Transient

Name: MSC_MAKE_SS_TRANSIENT
User Name: "MSC: Make Safety Stock Transient"
Application: Advanced Supply Chain Planning
Purpose: Profile is set to yes then safety stock is
treated as transient.
Default Behavior: If the value is not set then it will be
treated as Yes.
Values: This is YES/NO profile and should be
defined at site level
In the Application field, choose "Advanced Supply
Chain Planning".

PROFILE OPTION MSC_MAKE_SS_TRANSIENT


NOT VISIBLE IN ASCP R12 INSTANCE (Doc ID
1053688.1)

SQL validation
SQL= "select meaning
\"MSC_MAKE_SS_TRANSIENT \",
lookup_code
into :visible_option_value,:profile_option_value
from fnd_lookups where lookup_type = 'YES_NO'"
COLUMN="\"MSC_MAKE_SS_TRANSIENT \"(4)"

Note Reference(s) 1431837.1


1053688.1

1431837.1

Bug Reference(s)
Document References(s) -1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Map Server Host

Profile Code MSC


Profile Option Name MSC_MAPSERVER_HOST
Description Not Used.
Note Reference(s)

Bug Reference(s) 4573393


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Map Server Port

Profile Code MSC


Profile Option Name MSC_MAPSERVER_PORT
Description Not Used.
Note Reference(s)

Bug Reference(s) 4573393


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Max display decimals for Currency

Profile Code MSC


Profile Option Name MSC_RP_DEC_CURR
Description This profile is to control the decimal places for
Currency units. The default value for this profile is
2. This profile can be enabled only at the site and
responsibility level. Users will not be able to set
them at user level.
Note Reference(s) 1276896.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Max display decimals for Quantity

Profile Code MSC


Profile Option Name MSC_RP_DEC_QTY
Description This profile is to control the decimal places for
Quantity units (order quantity, exception quantity,
etc.). The default value for this profile is 2. This
profile can be enabled only at the site and
responsibility level. Users will not be able to set
them at user level.
Note Reference(s) 1276896.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Max display decimals for Quantity
(aggregates)

Profile Code MSC


Profile Option Name MSC_RP_DEC_QTY_AGG
Description This profile is to control the decimal places for
aggregate Quantity units. The default value for this
profile is 0. This profile can be enabled only at the
site and responsibility level. Users will not be able
to set them at user level.

Applies to quantities in the Material Plan and all


Hours measures shown in the Resource Plan.
Note Reference(s) 1276896.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Max display decimals for Ratios/Percentages

Profile Code MSC


Profile Option Name MSC_RP_DEC_RATIO
Description This profile is to control the decimal places for ratio measures (utilization %,
fill rate %, load ratio, etc.) in the resource plan. The default value for this
profile is 2. This profile can be enabled only at the site and responsibility
level. Users will not be able to set them at user level.
Note Reference(s) 1276896.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Max display decimals for Time

Profile Code MSC


Profile Option Name MSC_RP_DEC_TIME
Description This profile is to control the decimal places for Time
(hours, days, etc.). The default value for this profile
is 2. This profile can be enabled only at the site and
responsibility level. Users will not be able to set
them at user level.

This is useful when the lead time calculation is not


in the integer value in terms of days and Hours.
Note Reference(s) 1276896.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Max display decimals for Time (aggregates)

Profile Code MSC


Profile Option Name MSC_RP_DEC_TIME_AGG
Description Used to control the decimal places displayed for
time (hours, days, etc.)

Applies to the Hours measures shown in the


Resource Plan
Note Reference(s)

Bug Reference(s) 10193934


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Maximum Capacity

Profile Code MSC


Profile Option Name MSC_MAX_CAPACITY
Description Not Used
Note Reference(s)

Bug Reference(s) 4573393


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Maximum Percentage variation in safety stock
values

Profile Code MSC


Profile Option Name MSC_SS_MAX_VARIATION
Description The safety stock is not allowed to deviate by more than this value between
two adjacent time intervals. Null allows any deviation.
Note Reference(s) 759329.1

376451.1
276707.1
559867.1

Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Maximum number of planned orders per
demand

Profile Code MSC


Profile Option Name MSC: MAXIMUM NUMBER OF PLANNED ORDERS PER DEMAND
Description The maximum number of planned orders that the planning engine can create
to satisfy one demand.
Note Reference(s) 399364.1
434809.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Maximum number of planned orders per
demand(1)

Profile Code MSC


Profile Option Name MSC_MAX_PLANNED_ORDERS_PER_DEMAND
Description This profile is obsolete.

This profile was introduced in basically to plug abnormal demand supply


situation in plans.

Suppose there is a demand line of 1000 and by mistake some one has setup
an order modifier (FOQ/MOQ) of 1 then 1 demand would generate 1000
work orders. In actual business the order sizes may be 50 or 100, so 1000
work order/demand is really not an ideal profile of supply /demand.

To check these kind of data maintenance issues this profile was introduced
where one has a rough idea on the maximum number of work orders one
demand might generate and can set this as an internal checkpoint.

I believe this profile has been removed later as in some


business/Semiconductors work orders can really run into very huge
number/demand and it is difficult to guess the value for this. Plans at our end
were tripping on this profile.

I do not see this profile any more in planners log 11.5.10-Rollup 4 onwards.

This is correct, just to add this logic is not applicable to DRP Plans and will
get invoked only for Fixed Order Quantity order modifiers.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Maximum number of threads for save plan

Profile Code MSC


Profile Option Name MSC_MAX_THREADS_SAVE_PLAN
Description Maximum number of threads for save plan.

Profile option is created to get the user preference for the number of threads
during save plan. During save plan, these number of threads are created
and assigned to the tables accordingly.
Note Reference(s)

Bug Reference(s) 14167287


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Memory build during deployment for GOP WS

Profile Code MSC


Profile Option Name MSC_GOP_WS_MEMORY_BUILD_DEPLOY
Description Memory building for GOP Web service during deployment for Items,
Customers/Sites and Organizations
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Memory cleanup window (Days) for GOP WS

Profile Code MSC


Profile Option Name MSC_GOP_WS_CLEANUP_WINDOW
Description When GOP is deployed as a Web service
Specifies the number of days backwards that customers, customer sites,
items are not accessed from the memory map which will be cleaned up.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Memory refresh mode for GOP WS

Profile Code MSC


Profile Option Name MSC_GOP_WS_MEMORY_REF_MODE
Description Memory refresh mode for GOP Web service. Default is Net change
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Minimize Project Cross Peg within Window

Profile Code MSC


Profile Option Name MSC_MINIMIZE_CROSS_PEG
Description Values: Yes/No
Default: Yes Used in conjunction with profile option MSC: Use attribute
based netting in priority pegging. Valid values are:

Yes - The planning engine tries to minimize cross pegging


within the Supply/Demand window.
No - The planning engine does not attend to the amount of
cross pegging

Default Value - Yes


Note Reference(s)

417736.1

Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Minimize changes to chronological sequence
of supplies while rescheduling

Profile Code MSC


Profile Option Name MSC_MINIMIZE_WORKORDER_CROSSOVER
Description Valid values are:
Yes - to minimize the rescheduling of work orders in
progress during rescheduling operations during Memory
Based Planner.

No

Default Value - No

Available in 12.1.1 and upwards as well


Note Reference(s) 376038.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Minimum Capacity

Profile Code MSC


Profile Option Name MSC_MIN_CAPACITY
Description Not Used.
Note Reference(s)

Bug Reference(s) 4573393


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Minimum Percentage variation in safety stock
values

Profile Code MSC


Profile Option Name MSC_SS_MIN_VARIATION
Description The safety stock is held constant across time intervals if the deviation is
within
this percentage. Zero ignores all deviations.
Note Reference(s) 376451.1
276707.1
759329.1
559867.1

Bug Reference(s)
Document References(s) -1
-1
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Minimum Supply/Demand Percent for Pegging

Profile Code MSC


Profile Option Name MSC_MIN_SUP_DEM_PER_PEG
Description Set this profile option to instruct the planning engine not to peg tiny supplies
and large demands.
It skips a supply if (Supply size / Demand size) x 100 is less than the value of
this profile option.
Oracle recommends setting the value at 0.0001
Default Value - 0.0
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Move Past Due To Sysdate

Profile Code MSC


Profile Option Name MSC_MOVE_PAST_DUE_TO_SYSDATE
Description When the Order Date Type is ARRIVAL,
And when setup is NOT using the Latest Acceptable Date
And when setup not defaulting a value in Schedule Ship Date or Schedule
Arrival Date - i.e. Requested Arrival Date = Sysdate
And when Transit Time between Warehouse and Customer > Zero days
Then scheduling should fail with message "Scheduling Failed"

If the profile option is 'Yes' then the sales order will be scheduled and
message will not be displayed
If the profile option is 'No' then the message will be "Scheduling Failed"
IF NULL - this profile defaults to Yes
Note Reference(s)

Bug Reference(s) 5618929


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Net Change Temp Dir

Profile Code MSC


Profile Option Name MSC_OA_TEMP_DIR
Description Stores the location of image cache used in the Plan Comparison Report.
Indicate the location in the following format: [directory]@[subdir] where
[directory]

This must match the absolute path of the OA_MEDIA environment variable
and [subdir] is the name of a subdirectory under the OA_MEDIA directory.

The subdirectory must have write permissions for all.


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: New Forecast Auto Plan

Profile Code MSC


Profile Option Name MSC_DEFAULT_UNCONST_PLAN
Description The plan launched in Oracle Advanced Supply Chain Planning when Oracle
Collaborative Planning receives a supplier's forecast. Oracle recommends
that this plan be an unconstrained plan.

Set the profile to an unconstrained supply chain plan. When the demand plan
scenario mentioned in the profile option MSD: Default DP Scenario is
published, the unconstrained supply chain plan specified in the profile option
MSC: New Forecast Auto Plan starts running.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: New Material and Resource Plan Fetch Size

Profile Code MSC


Profile Option Name MSC_HP_FETCH_SIZE
Description Page fetch size of ASCP material and resource horizontal plan screen.
Note Reference(s) 1462359.1

Bug Reference(s) 14251869


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: New Planner Backward Compatibility

Profile Code MSC


Profile Option Name MSC_NEW_PLANNER_BACK_COMPATIBILITY
Description Based on latest information available in Bug
9848641

And Per bug 12352866, this needs to be set to


YES in 12.1.3 to avoid a performance issue in
constrained plans.
Yes - uses the new algorithm for planning phantom items.
When you also set
MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY =
Yes, then Phantoms will be planned as regular items.
When you also set
MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY =
No or NULL, then Phantoms will NOT be planned as regular
items.

No - Uses the old algorithm for planning phantom items.


When you also set
MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY =
Yes, then Phantoms will be planned as regular items.
When you also set
MRP_NEW_PLANNER_BACKWARD_COMPATIBILITY =
No or NULL, then Phantoms will NOT be planned as regular
items.

Most all customers should use Yes.

If case of certain plan errors when working with by-


products and profile = Yes, then you need to set
profile = No
The failure will occur when by-product is also a
component of the BOM as shown below
Ex: Assembly A
/ \
Phantom B Phantom C -> By-product
C
|
comp C

This setup will result in a A->C->A


loop.

This was seen in bug where plan failed


with the following message:
### Error: found loop between FROM
operation : with sequence number 10
supply id 1018430492 item id 1181059
TO operation : with sequence number 1
supply id 1018430492 item id 1181059
org Id = 86

This could occur in two conditions :


A. There is a loop in network routing
- if so, please check the set-up and
fix the routing
B. There are by/co-products of
assembly which are also a component of
an item forming this assembly
If so, try to change the profile
option MSO: Peg By-product Supplies to
FALSE -
APP-MRP-22064: An internal error has
occurred (hls_failure, 1)

Note Reference(s)
433492.1

Bug Reference(s) 9848641


Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized Yes
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized Yes
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: New Supply Commit Auto Plan

Profile Code MSC


Profile Option Name MSC_DEFAULT_CONST_PLAN
Description The profile controls the plan that is launched in Oracle Advanced Supply
Chain Planning when Oracle Collaborative Planning receives a supplier's
supply commits. Oracle recommends that this plan be a constrained plan.
Valid values are:
Specify the name of the plan that you want to launch
automatically in the profile option MSC: New Supply Commit
Auto Plan. It is recommended that you specify a constrained
plan.

Set the profile option MSC: SCEM Engine Launch Events to All to
automatically start Supply Chain Event Manager (SCEM) when a supplier
loads an order forecast or when you publish an order forecast from the
planning server. If you set the profile option to Publish, Supply Chain Event
Manager starts only when plans are published from Oracle Advanced Supply
Chain Planning. If you set the profile option to Load, Supply Chain Event
Manager starts only when data is loaded using flat files.

Ensure that the value of the profile option MSC: Configuration is set to APS &
CP.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Number of Workers for Self Service Loads

Profile Code MSC


Profile Option Name MSC_SELF_SERVICE_LOADS_WORKERS_NUM
Description Used in conjunction with profile MSC Batch Size for Self Service Loads to
help size loading for large data loads using Self Service Collections. Oracle
does not suggest using a value larger than 10. You may need to increase
Standard Manager workshifts (processes) to accommodate a larger number.
Valid values: Integer
Default value = 3
Note Reference(s) 352277.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: OTHER with zero allocation percent is valid
demand class

Profile Code MSC


Profile Option Name MSC_ZERO_ALLOC_PERC
Description Set this profile, if you want to consider others with zero allocation percent as
valid demand class

When set to Yes, demand classes with 0% allocation are considered as valid
demand classes for allocated ATP calculations.
When set to No, demand classes with 0% allocations are not considered as
valid demand classes for allocated ATP calculations
Note Reference(s)

Bug Reference(s) 6156478


Document References(s) -1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: OTM Punchout URI

Profile Code MSC


Profile Option Name MSC_OTM_PUNCHOUT_URI
Description Used by punchout. URL to OTM such as:
http://otm-it1-55-oas.us.oracle.com/
Note Reference(s) 761773.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: OTM Responsibility

Profile Code MSC


Profile Option Name MSC_WS_OTM_RESPID
Description Responsibility like supply chain planner
Note Reference(s) 761773.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: OTM User

Profile Code MSC


Profile Option Name MSC_WS_OTM_USERID
Description Userid, like MFG, this profile and next one will be used for notification
workflow
Note Reference(s) 761773.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Operator Company Name

Profile Code MSC


Profile Option Name MSC_X_COMPANY_NAME
Description Used by Oracle Collaborative planning. This profile option will be defaulted
with value of "My Company". User can update the company name. This
company name will get reflected in next collection run
Note Reference(s)

Bug Reference(s) 2297044


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Oracle Rapid Planning URL

Profile Code MSC


Profile Option Name MSC_RP_HOST_URL
Description Rapid Planning External Server URL

The port number provided in the profile value


should be same as the port number for the UI
Domain that is defined in Creating the UI Domain
from the Oracle Rapid Planning Installation Guide,
Release 12.1.3.3
Note Reference(s) 1276882.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Order Number-CA Mandatory for CVMI

Profile Code MSC


Profile Option Name MSC_X_CVMI_CA_MAND
Description Determines whether the order number is mandatory for a consumption
advice, while the customer enters the consumption advice record.

If the profile option is set to Yes, the user must enter order
number for the consumption advice.
If set to No, the key date for sales orders and ASN is
considered as part of deletion key.

Valid values: Yes/No


Default = No
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Collaborative Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Order Type for Consigned VMI

Profile Code MSC


Profile Option Name MSC_X_VMI_OM_ORDER_TYPE
Description This indicates the order type that Oracle Collaborative Planning uses when
creating a sales order for consigned VMI. This order type should encompass
billing and inventory reduction functions without any shipping being
performed

Set on APS Destination in a distributed environment


Note Reference(s)

Bug Reference(s) 6518881


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Organization Translation WSDL URL

Profile Code MSC


Profile Option Name MSC_GOP_WS_ORG_TRANS_URL
Description This will indicate the WSDL URL that will be used for Organization
translations.
VCP Collection's Organization Translation WSDL URL
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Organization containing generic BOM for
forecast explosion

Profile Code MSC


Profile Option Name MSC_ORG_FOR_BOM_EXPLOSION
Description Used by collections to identify and populate the bill of material validation
organization.

Collections code reads this profile and populates table


MSC_APPS_INSTANCES.VALIDATION_ORG_ID
In a distributed installation. - Setup this profile on the EBS Source instance
and value will be populated on the APS destination instance

Then the forecast explosion and consumption code reads this value to
determine which org to use for Model BOM that will used to Explode and
Consume the forecast.

The ATO model must exist in the organization.

Usually this would be set to the same org and OM validation org in Order
Management
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Overwrite all Order Forecast records

Profile Code MSC


Profile Option Name MSC_X_OVERWRITE_OF
Description If the profile "MSC: Overwrite order forecast" is Yes, we delete all the Order
forecast for that item,cust/cust_site, supp/supp_site , order type combination;
and then load the new Order forecast.
Note Reference(s) 461898.1

Bug Reference(s) 3754801


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Overwrite all supplier capacity records

Profile Code MSC


Profile Option Name MSC_X_OVERWRITE_SC
Description Indicates whether or not the previous records regarding supplier capacity
need to be maintained. You can set this profile option to replace all previous
supplier capacity values with the latest supplier capacity to which the supplier
commits.
Note Reference(s)

Bug Reference(s) 3103879


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Base Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_BASE_PKG
Description Valid value are:
Yes - Base Package is used for creating a model in
Production Scheduling.
No - Base Package is not used for creating a model in
Production Scheduling.

Default Value - Yes


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Beginning Inventory Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_BGN_INVNTRY_PKG
Description Valid value are:
Yes - Beginning Inventory Package is used for creating a
model in Production Scheduling.
No - Beginning Inventory Package is not used for creating a
model in Production Scheduling.

Default Value - Yes


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Calendar Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_CALENDAR_PKG
Description Valid values are:
Yes - Calendar Package is used for creating a model in
Production Scheduling.
No - Calendar Package is not used for creating a model in
Production Scheduling.

Default Value - Yes


Note Reference(s) 415381.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Customer Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_CUSTOMER_PKG
Description Valid value are:

Yes - Customer Package is used for creating a


model in Production Scheduling.
No - Customer Package is not used for creating a
model in Production Scheduling.
Default Value - Yes
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Distribution Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_DSTRBTN_PKG
Description Valid value are:

Yes - Distribution Package is used for creating a


model in Production Scheduling.
No - Distribution Package is not used for creating a
model in Production Scheduling.
Default Value - Yes

At this time this package is not used by the PS


model creation process.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Enterprise Forecast Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_FORECAST_PKG
Description Valid value are:

Yes - Enterprise Forecast Package is used for


creating a model in Production Scheduling.
No - Enterprise Forecast Package is not used for
creating a model in Production Scheduling.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Inventory Safety Targets
Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_IST_PKG
Description Valid value are:

Yes - Safety Stock Targets Package is used for


creating a model in Production Scheduling.
No - Safety Stock Targets Package is not used for
creating a model in Production Scheduling.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Planning Command Center User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Manufacturing Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_MFG_PKG
Description Valid value are:

Yes - Manufacturing Package is used for creating a


model in Production Scheduling.
No - Manufacturing Package is not used for
creating a model in Production Scheduling.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Planning Command Center User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Purchase Orders Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_PO_PKG
Description Valid value are:

Yes - Purchase Orders Package is used for


creating a model in Production Scheduling.
No - Purchase Orders Package is not used for
creating a model in Production Scheduling.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Reservation Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_RESERVATION_PKG
Description MSC: PS - Snapshot Reservation Package

This profile brings in reservations for PS plans


(similar to how you enable all the other data
packages).

Only meaningful for 12.1.3.6+ (which is not


released yet)
Note Reference(s) 1386168.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Sales Orders Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_SO_PKG
Description Valid value are:

Yes - Sales Orders Package is used for creating a


model in Production Scheduling.
No - Sales Orders Package is not used for creating
a model in Production Scheduling.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Supplier Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_SUPPLIER_PKG
Description Valid value are:

Yes - Supplier Package is used for creating a


model in Production Scheduling.
No - Supplier Package is not used for creating a
model in Production Scheduling.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Transfer Orders Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_TO_PKG
Description Valid value are:

Yes - Transfer Orders Package is used for creating


a model in Production Scheduling.
No - Transfer Orders Package is not used for
creating a model in Production Scheduling.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Snapshot Work Orders Package

Profile Code MSC


Profile Option Name MSC_SCP_PS_WO_PKG
Description Valid value are:

Yes - Work Orders Package is used for creating a


model in Production Scheduling.
No - Work Orders Package is not used for creating
a model in Production Scheduling.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS - Visit Display Format in PS UI

Profile Code MSC


Profile Option Name MSC_SCP_PS_VISIT_DISP_FORMAT
Description Allows the user to specify the display for CMRO
Visits in the Production Scheduling client.
Allowable vaues are: "Name" or "Code" or
"Name:Code"
Applicable to 12.1.3+
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Adjust Post Horizon Demand Qty

Profile Code MSC


Profile Option Name MSC_SCP_PS_ADJUST_POST_HORIZON_DEM_QTY
Description MSC: PS Adjust Post Horizon Demand Qty

This profile allows PS solver to "net-out" demands


that are not fulfilled until after the end of the
scheduling horizon.

When profile "MSC: PS Adjust Post Horizon


Demand Qty" to yes,

then PS uses the Work Orders that are on end of


horizon to meet demand.

Note Reference(s)
1386168.1

Bug Reference(s) 12939774


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Allow WO Purchased Item Offloading

Profile Code MSC


Profile Option Name MSC_SCP_PS_ALLOW_WO_PURCHASED_ITEM_OFFLOADING
Description Valid Values
Yes
No (default)

Note Reference(s) 1465355.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Consistent Resource Assignment

Profile Code MSC


Profile Option Name MSC_SCP_PS_CONSISTENT_RESOURCE_ASSIGNMENT
Description Whether the Production Scheduling functionality 'Consistent Resource
Assignment' should be used. If activated, where a routing has alternates on
multiple operation steps with the same resources, then the solver will try to
use the same resource across the routing.
There are three available options:
+ No - This functionality is not activated
+ Yes - The functionality is activated for all routings
Note Reference(s)
883676.1

Bug Reference(s) 5332948


7316625
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Currency Symbol

Profile Code MSC


Profile Option Name MSC_SCP_CURRENCY_SYMBOL
Description The currency symbol used by PS for measurement of costs and calculation
of key performance indicators.

Set this in the APS destination for a distributed installation


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Enable CRO Scheduling

Profile Code MSC


Profile Option Name MSC_SCP_PS_ENABLE_CRO
Description If CRO option is licensed along with Production
Scheduling application, the profile option "MSC: PS
Enable CRO Scheduling" must be set to "Yes".

RMO and CRO are synonymous.

Made obsolete in R12.1.3


Note Reference(s)
973027.1

Bug Reference(s) 7037527


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Enable RMO Scheduling

Profile Code MSC


Profile Option Name MSC_SCP_PS_ENABLE_RMO
Description Obsolete with v2 integration (11.5.10/12.1)
Note Reference(s) 454651.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Filter Active Items

Profile Code MSC


Profile Option Name MSC_SCP_FILTER_ACTIVE_ITEMS
Description Introduced in Patch 9921057
This profile option will filter out any items which do
not have any active demand within the PS horizon.
This can be dependent or independent. This works
with or without an ASCP plan reference. If an
ASCP plan is referenced, the active demand from
planned orders is also studied.

Not applicable after 12.1.3.7.


Note Reference(s)

Bug Reference(s) 9609494


9921057
9444710
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Firm Past Due WO

Profile Code MSC


Profile Option Name MSC_SCP_PS_FIRM_PAST_DUE_WO
Description This option if enabled will firm all work order operations which commence
prior to the beginning of the schedule horizon. This also considers the
schedule start date offset.
This is based on the operation start dates.
Note Reference(s)

Bug Reference(s) 7489790


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Import On-Hold Work Orders

Profile Code MSC


Profile Option Name MSC_SCP_PS_IMPORT_ON_HOLD_WO
Description We bring in the On hold workorders into PS. This is
controlled by a Profile option.

The On hold workorders will be extracted into PS if


the profile option is set to 'Yes'. The default value
will also be set to 'Yes'.
The On hold workorders will not be brought into PS
if the profile option is set to 'No'.
Note Reference(s)

Bug Reference(s) 13862916


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Resource Constraint Horizon

Profile Code MSC


Profile Option Name MSC_SCP_PS_RESOURCE_CONSTRAINT_HORIZON
Description Introduced in bug 10160770

This flag (set in number of days) is used to set the capacity constraint
Note Reference(s)

Bug Reference(s) 10160770


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Run Application Script

Profile Code MSC


Profile Option Name MSC_SCP_PS_APP_SCRIPT
Description Specifies the name of the batch script that starts
Production Scheduling.

Default Value - runPS.bat

Obsolete in PS V2 integration (11.5.10/R12.1)


Note Reference(s)

Bug Reference(s) 5136451


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Run Connector Script

Profile Code MSC


Profile Option Name MSC_SCP_PS_CONNECTOR_SCRIPT
Description Specifies the batch script that starts the Production
Scheduling Connector.

Default Value - runPSConnector.bat

Obsolete in v2 integration (11.5.10/R12.1)


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS Work Order Request Date

Profile Code MSC


Profile Option Name MSC_SCP_PS_WO_REQUEST_DATE
Description The profile option "MSC: PS Work Order Request Date" accepts values:

'Completion Date'
null -> default

When completion date is specified as 'Completion Date' then for all work
orders (not planned orders),
PS uses the work order completion date as the due date, rather than the
requested date.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO API Version

Profile Code MSC


Profile Option Name MSC_SCP_API_VERSION
Description The API version used when generating the XML packages for Strategic
Network Optimization and/or Production Scheduling. This must be
configured as specified for the current version of the software being used.
Typically, this value should not be changed unless the guidance of Oracle
Support.
Note Reference(s) 552381.1
973027.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO Alignment Date

Profile Code MSC


Profile Option Name MSC_SCP_ALIGNMENT_DATE
Description The date/time that determines the start of the period start date within
Strategic Network Optimization. For example, if set to a Monday all full SNO
periods will commence on a Monday. If the plan start date does not align
with this, the first period may be a partial period. If your plan start date falls
on a Wednesdy while the alignment date is a Monday will result in the first
period being Wednesday - Sunday (5 days).
Note Reference(s)

Bug Reference(s) 6012870


5646419
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO App Server URL

Profile Code MSC


Profile Option Name MSC_SCP_APP_SERVER_URL
Description The fully qualified URL (including port number) for the application server.
This is required for the Production Scheduling and Strategic Network
Optimization client release process
Note Reference(s)
760103.1

Bug Reference(s) 7037527


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO Client Install Path

Profile Code MSC


Profile Option Name MSC_SCP_CLIENT_PATH
Description This is the install path on the client. The system installs the software in a 'scp'
directory under this path.
PS and SNO are installed automatically the first time they are accessed by
the E-Business Suite.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO Compress Xml Files

Profile Code MSC


Profile Option Name MSC_SCP_ZIP_PACKAGES
Description This flag indicates whether the extracted
files/model files are stored in compressed format or
not. Typically this should be set to Yes to
mazimize data download speed to the client.
If integration extensions are being developed then
you may not want to store these in compressed
format.

Valid values are:


Yes
No

Default Value - Yes


Note Reference(s) 415381.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO Data Store Path

Profile Code MSC


Profile Option Name MSC_SCP_DATA_STORE_PATH
Description Where model/publish and temporary files are stored on the server.
Note Reference(s) 602712.1
868904.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO Debug Mode

Profile Code MSC


Profile Option Name MSC_SCP_DEBUG_MODE
Description This flag determines the level of logging appearing
in the integration log files. This flag is typically
only set upon request from Oracle support when
investigating issues. Setting this flag to Yes will
have peformance implications.

Valid values are:


Yes
No

Default Value - No
Note Reference(s) 868904.1
809199.1
405083.1

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO Download XML Files

Profile Code MSC


Profile Option Name MSC_SCP_DOWNLOAD_XML_FILES
Description Setting this flag causes the intermediate integration
data files to be downloaded to the client. This
causes significantly more data to be transfered and
is typically done for debugging model construction
issues. When set to No, only the final model file
will be downloaded to the client

Valid values are:


Yes - if users want to download the xml files to the client
machine for debugging purpose.
No

Default Value - No.


Note Reference(s)

761773.1

Bug Reference(s) 7293823


8762862
8945618
Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO Include Negative Inventory Demands

Profile Code MSC


Profile Option Name MSC_SCP_INCLUDE_NEGATIVE_INVENTORY_DEMANDS
Description MSC: PS/SNO Include Negative Inventory
Demands

This profile has been introduced to extract negative


beginning inventory.

If there is negative on-hand inventory then an


artificial demand will be created for this negative
quantity so that the projected inventory balances
are accurate.
For example, if Item A has -10 on hand a demand
of 10 will be created. This profile option controls the
creation of these artificial demands.

The profile controls the extraction of negative


demand.

Values:
The default value is Yes.
If this set to "No" then negative demands will not be
extracted.

Note Reference(s) 1386168.1

Bug Reference(s) 12848085


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO Past Due Supplies Window

Profile Code MSC


Profile Option Name MSC_SCP_PAST_DUE_SUPPLIES_WINDOW
Description This value specifies the amount of time in the past
to look for supply.

Not applicable after 12.1.3.7 so will be removed


from the ldt file, however, customers who have this
profile in their DB would continue to see them but
can safely ignore.

From bug 9909547 which introduced this profile


A new profile option "MSC: Past Due Supplies
Window" has been added.
The past due supplies will be extracted based on
the user's input.
If the value in this profile option is 10 then
integration will bring the supplies 10 days before
the horizon start.
Older past due supplies will be ignored.
Note Reference(s)

Bug Reference(s) 9909547


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: PS/SNO Use DB for Integration Data

Profile Code MSC


Profile Option Name MSC_SCP_USE_DB_FOR_DATA
Description In an distribution env, the application server and concurrent program server
may run on different machine. In this case the application server may not
have access to the file system which concurrent program server could
access. In this case you will need to use the database option to access the
data across servers.
Note Reference(s) 454651.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Pass List Price to OM in DRP Release

Profile Code MSC


Profile Option Name MSC_DRP_PASS_LIST_PRICE_OM
Description This is discussed in Bug 7284253 MSC CREATES ISO WITH STATUS OF
'ENTERED' INSTEAD OF 'BOOKED':

If profile MSC: Pass List Price to OM in DRP Release is set to Y, DRP


release will create the internal sales order in 'Booked' state.

Only in 11.5.10, not reported in any R12.x release.


Note Reference(s)
943244.1

Bug Reference(s) 7497020


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Peg Firm Supply First

Profile Code MSC


Profile Option Name MSC_PEG_FIRM_SUPPLY_FIRST
Description This profile option is not used.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Peg Firm Work Orders Within Assigned
Projects and Tasks

Profile Code MSC


Profile Option Name MSC_FIRM_JOB_RESV_TASK
Description When set to yes, reservation level for firm work orders will be set at Task
level
This is designed to work with MSC: Enable Attribute Netting = No

Note that in 12.1 we recommend that customers use MSC: Enable Attribute
Netting = Yes to use the new netting engine, unless they have specific
business requirement for using old netting engine (No)

Per Enhancement 8482143


When pegging firm work orders for hard pegged items, in
old attribute netting, peg the firm work orders to
demands having same project/task as itself.
Otherwise peg it to excess.
This is independent of the reservation level.

Introduced in ASCP Engine/UI RUP #37 for 11.5.10


- Per bug 9087339, further fix was made.
- Ported to 12.1.3.1 and 12.0.6 ASCP Engine/UI CU10 patch
Note Reference(s)

Bug Reference(s) 8482143


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Peg to maximize supply usage

Profile Code MSC


Profile Option Name MSC_PEG_TO_MAX_SUPPLY_USAGE
Description Peg supplies expiring earlier to demands with MRSL (Minimum Remaining
Shelf Life) earlier. To maximize the supply usage.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Perform ATP check for Internal Sales Orders

Profile Code MSC


Profile Option Name MSC_ATP_CHECK_INT_SALES_ORDERS
Description Only used when INV: Inventory Capable to Promise - ATP/CTP based on
Planning Data From Note 558908.1

1. The profile was added in bug 5440895. This profile works in tandem
with the profile option MSC: Consume forecasts using Internal Sales Orders.
So, If profile MSC: Perform ATP Check for Internal Sales Orders is set with a
value, it is used. Otherwise, the value of the previous profile is used.
2. If you have a centralized instance, set the profile value as required. If
you are a decentralized/distributed installation with both APS Destination and
ERP Source, set this on the APS destination and ERP source.
3. Profile option values and meanings:

* Yes - Perform ATP check on Internal Sales Orders (1)


* No - Do Not perform ATP check on Internal Sales Orders (2)
* Only if Destination Organization on ISO is not part of Plan (3)

Notes:

1. Bug 6434413 Service Orgs do NOT use an External sales order, so fixes
had to be made so that scheduling would be correct for service orgs that
generate Internal Reqs directly
2. For Bug 6434413 - fix is released on ATP RUP #22 and above (See
Note 252108.1 for list of patches. Patch 6434413 should not be applied
instead of a rollup patch.
3. In R12.0.6 - this is included in latest ATP Cum Patch #10
Note Reference(s)
558908.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Performance target for Inventory Turns

Profile Code MSC


Profile Option Name MSC_PERF_INVENTORY_TURNS
Description Performance target for Inventory Turns

MSC: Performance target for Inventory Turns = 6 (Default Value)

1. This profile (enabled at user, responsibility and site levels) will drive the
KPI targets in ASCP and IO workbenches.

2. For 12.2 source systems, the collections parameter "KPI Targets (BIS)"
should be disabled and set to No. The UI will use the profiles exclusively to
display the KPI targets

3. For 12.1 and prior source systems, the collections parameter will still be
available and if KPI targets are collected they will be used. However, if there
are no KPI targets collected, the new profiles will be used.

4. For all source systems, BIS Periods (from GL) entity collections should
not be controlled by "KPI Targets (BIS)" parameter but should be controlled
by "Calendars" parameter.
Note Reference(s)

Bug Reference(s) 13041641


13003746
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Performance target for Margin Percent

Profile Code MSC


Profile Option Name MSC_PERF_MARGIN_PERCENT
Description Performance target for Margin Percent

Margin is calculated as follows:


Top assembly margin = (Total shipment units *
Standard price) - (Total shipment units * Standard
cost)
Aggregate level margin = Sum of margin of top
assemblies

Margin KPI does not consider discounts.


To set the value of the target, use profile option
Performance target for Margin Percent

For 12.2 source systems, the collections


parameter "KPI Targets (BIS)" should be disabled
and set to No.
The UI will use the profiles exclusively to display
the KPI targets

For 12.1 and prior source systems, the collections


parameter will still be available and if KPI targets
are collected they will be used.
However, if there are no KPI targets collected, the
new profiles will be used.

For all source systems, BIS Periods (from GL)


entity collections is not be controlled by "KPI
Targets (BIS)" parameter but is be controlled by
"Calendars" parameter.

Note Reference(s)

Bug Reference(s) 13003746


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Performance target for Ontime Delivery
Percent

Profile Code MSC


Profile Option Name MSC_PERF_ONTIME_DELIVERY
Description Performance target for Ontime Delivery

Customer service level or delivery performance are


calculated as follows:

((Total number of orders - Number of late orders) *


100) / Total number of orders

To set the value for the target, use profile option


MSC: Performance target for Ontime Delivery
Percent.

For 12.2 source systems, the collections parameter


"KPI Targets (BIS)" should be disabled and set to
No.
The UI will use the profiles exclusively to display
the KPI targets

For 12.1 and prior source systems, the collections


parameter will still be available and if KPI targets
are collected they will be used.
However, if there are no KPI targets collected, the
new profiles will be used.

For all source systems, BIS Periods (from GL)


entity collections is not be controlled by "KPI
Targets (BIS)" parameter but is be controlled by
"Calendars" parameter.

Note Reference(s)

Bug Reference(s) 13003746


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Performance target for Resource Utilization
Percent

Profile Code MSC


Profile Option Name MSC_PERF_UTILIZATION_PERCENT
Description Performance target for Resource Utilization Percent

MSC: Performance target for Resource Utilization Percent = 100 (Default


Value)

1. New profile (enabled at user, responsibility and site levels) will drive the
KPI targets in ASCP and IO workbenches.

2. For 12.2 source systems, the collections parameter "KPI Targets (BIS)"
should be disabled and set to No. The UI will use the profiles exclusively to
display the KPI targets

3. For 12.1 and prior source systems, the collections parameter will still be
available and if KPI targets are collected they will be used. However, if there
are no KPI targets collected, the new profiles will be used.

4. For all source systems, BIS Periods (from GL) entity collections should not
be controlled by "KPI Targets (BIS)" parameter but should be controlled by
"Calendars" parameter.
Note Reference(s)

Bug Reference(s) 13003746


13041641
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Plan Name for CMRO

Profile Code MSC


Profile Option Name AHL_MSC_RES_CPCTY_PLAN
Description 12.1.3.7, we introduced a new enhancement to publish resource availability
to cMRO. In order to do that, we need to provide the ASCP plan name for
this profile.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Plan co-products

Profile Code MSC


Profile Option Name MSC_PLAN_COPRODUCTS
Description Indicate whether co-products are planned and whether supplies are created
for the co-products. Valid values are:

Yes
No

Can be defined at the site level.

If the plan planning mode is Constrained (Without Detailed Scheduling), the


planning engine only uses this profile option if its value is Yes.
Note Reference(s) 305575.1

Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Plan for order at risk calculation

Profile Code MSC


Profile Option Name MSC_PLAN_FOR_ORDER_AT_RISK
Description Indicates a plan that Oracle Collaborative Planning
uses to derive the pegging information for each
order that you upload.
See also Note.276003.1 for the description of
Enhanced Flagging of Potentially Late Orders.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Planning Currency

Profile Code MSC


Profile Option Name MSC_PLANNING_CURRENCY
Description In 11.5.10, this profile option is used to specify the planning currency.

This profile option can be defined at the site level.

In 12.1.x, this profile is not used.

Default Value - US Dollar


Note Reference(s)
147221.1

Bug Reference(s) 4573393


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Pre-Flush

Profile Code MSC


Profile Option Name MSC_PRE_FLUSH
Description Not used per bug 4573393
Note Reference(s)

Bug Reference(s) 4573393


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Prefer Consumption within Forecast Bucket

Profile Code MSC


Profile Option Name MSC_PREF_FOR_BUCKET
Description Valid values are:
Yes - this profile will take effect when the plan options are
"Spread Forecast" and "Consumption by bucket" is
unchecked. In that case, we would consume the forecasts in
the following fashion: Spread the forecasts first. First round
of consumption begins by walking backwards for the number
of backward days mentioned from the date of the sales
order, considering any forecast entry as eligible only if the
sales order falls in the same bucket as the forecast. Once we
find no more entries backwards we walk forwards for the
forward number of days mentioned checking for eligible
forecasts as mentioned above. Now, if we still need forecast
entries, we start walking backwards this time trying to
consume all the forecast entries within the backward time
fence. After this we go forward in the same fashion if
required.
No - old behavior

Default Value - No
Note Reference(s) 395804.1
804214.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Priority for Substitute Items Flexfield Attribute

Profile Code MSC


Profile Option Name MSC_BOM_SUBST_PRIORITY
Description This profile option stores the name of the flexfield column that contains the
value in the corresponding table. Set this profile option at the site level only
See 'Flexfield Attributes, page A-1 for more information.

Set in EBS Source in a distributed installation. Created by Create Planning


Flexfields process.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Priority of Alternate Resources for an
Operation Flexfield Attribute

Profile Code MSC


Profile Option Name MSC_ALT_RES_PRIORITY
Description This profile option stores the name of the flexfield column that contains the
value in the corresponding table. See 'Flexfield Attributes, page A-1 for more
information.
Set in EBS Source in a distributed installation.

Created by Create Planning Flexfields concurrent program

Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Production Plan for Transportation updates

Profile Code MSC


Profile Option Name MSC_PROD_PLAN_ID_FOR_OTM_UPDATES
Description Use this profile option to indicate the production plans that receive estimated
arrival time updates from Oracle Transportation Management. Valid values
are:

Null: Do not pass updates to any plan


All Production Plans: Pass updates to all plans with
Production flag selected
[specific plan name]: Pass updates only to the plan that is
specified

Default Value - NULL


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Project Task Collection Window Days

Profile Code MSC


Profile Option Name MSC_COLLECTION_WINDOW_FOR_PROJ_TASKS
Description Controls which projects/tasks are collected after the collection engine deletes
all of the previously collected records for the instance.
Valid values are:
+ Null: Collects all of the records from the source.
+ Integer: Collects all of the records from the source from projects whose end
date is within the number of days in the past specified in the profile option
value.

The collections process never collects tasks whose projects are completed.

Obsolete when the tables are partitioned, since we no longer have to delete
but can use truncate on the partition.
Partitioning released in in 12.1.3.9
This partitioning will be forward ported to 12.2.x via bug 9829260
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Provide Warning For Dates Entered on Non-
work Days

Profile Code MSC


Profile Option Name MSC_VALIDATE_NON_WORK_DATE
Description Warning is displayed in the workbench if a non-working day is entered
Note Reference(s)

Bug Reference(s) 4639108


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Provide Warning when Sales Order Quantity
is Changed

Profile Code MSC


Profile Option Name MSC_SO_QTY_CHANGED_WARN
Description The New Quantity field on a sales order is user editable. The user can raise
or lower the sales order quantity by firming the sales order. Valid values are:

Yes - As the user tabs out of the New Quantity field, if the
quantity is changed then a warning is given as " Sales orders
with changed quantities cannot be released. The user must
update the sales order directly in the source instance." In
addition, the action for the sales order is set to None when
the quantity is changed.
No - supresses the warning

Default = Yes
Set on APS Destination in a distributed environment
Note Reference(s)

Bug Reference(s) 4479258


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Purchase Order Dock Date Calculation
Preference

Profile Code MSC


Profile Option Name MSC_PO_DOCK_DATE_CALC_PREF
Description This profile option specifies the purchase order line date that the planning
engine uses as the material arrival (dock) date. Valid values are:

Promise Date: If the Promise Date is not available, the


planning engine uses Need by Date so that unacknowledged
purchase orders consume supplier capacity. (1)

Need By Date: Existing purchase orders do not consume


supplier capacity. (2)

This is a site level profile option.

Use the same setting of this profile option for running both collections and
plans.

Default Value - Promise Date


Note Reference(s)

413816.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Purge Exception Days

Profile Code MSC


Profile Option Name MSC_PURGE_EXCEPTION_DAYS
Description This profile is used only in Collaborative Planning.
When uploading flat files with Supplier PO information and
Then run the Supply Chain Event Manager aka SCEM and this will check
profile and exceptions are removed based on the profile
The same fix also prevents an exception from being generated when a PO is
uploaded with sync indicator = D (removing a closed PO)

Described in the bug as follows


When a PO is deleted by uploading a flat file, it produces Cancellation
exception message
Condition included to so that no cancellation exception is generated when
closed POs are deleted.
Procedure added to delete old exceptions based on the profile value. By
default the profile valuse is set as NULL.
In case the user wants to delete the old exceptions, he can set the value of
the profile 'MSC: PURGE EXCEPTION DAYS'.
Example
Set the profile MSC: PURGE_EXCEPTION_DAYS to 5 days.
All exceptions generated/updated before the last 5 days will get deleted
Note Reference(s) 555016.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Purge Staging and Entity Key Translation
Tables

Profile Code MSC


Profile Option Name MSC_PURGE_ST_CONTROL
Description Controls both truncation of the staging table during data collection process
and deletion of the link ID tables. Valid values are:
Yes - conserve disk space when running data collections for
single instances, or as separate processes for multiple
instances. Set this profile to Yes when you have only 1
source instance connected to the planning server. This
allows the MSC_ST_ tables to be truncated rather than
deleted from. This helps conserve space and improve
performance
No - When running data collections for multiple instances
simultaneously, set to avoid data loss. It should be set to
No if you have multiple source instances connected to the
planning server to avoid data loss as a truncation would get
rid of all the data in the table.

Note Reference(s)
405295.1

Bug Reference(s) 4717843


Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Rapid Planning Group Planned Orders

Profile Code MSC


Profile Option Name MSC_RP_GROUP_PLANNED_ORDERS
Description Determines if planned orders of the same type are grouped. Purchase and t
Note Reference(s)

Bug Reference(s) 10130815


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Rapid Planning Safety Stock Lead Time
Method

Profile Code MSC


Profile Option Name MSC_RP_SAFETY_STOCK_METHOD
Description Safety Stock Lead Time Method Values

This profile provides the following options:


Do not compute Safety Stock (currently exists)
Use Safety Stock Percent (currently exists)
Use Safety Stock Quantity (this is the enhancement)

In 12.1.3.6, this profile is not used. A new profile


has been introduced MSC: Safety Stock Planning
Method which has values-
a. Do not plan Safety Stock
b. Use Safety Stock Quantities
c. Use Safety Stock Lead Time from Safety Stock
Percent

To calculate safety stock using quantity, this plan


options must be set to Use Safety Stock Quantity.
Use Safety Stock Lead Time from Safety Stock
Percent (this option replaces Use Safety Stock
Percent option that was in RP 12.1.3.3.)
Note Reference(s) 1276896.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Rapid Planning Scripts Home

Profile Code MSC


Profile Option Name MSC_RP_SCRIPTS_HOME
Description This profile should point to the directory where all
the WLST_scripts will be kept.
Note Reference(s) 1276882.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Rapid Planning UI Refresh Timeout

Profile Code MSC


Profile Option Name MSC_RP_UI_TIMEOUT
Description Timeout value is in millisecond. Example value 5000
Note Reference(s) 1276882.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Rapid Planning WebLogic Server Home

Profile Code MSC


Profile Option Name MSC_RP_WLS_HOME
Description Installation path to the WLS Home directory
Note Reference(s) 1276882.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Read Profiles From DB

Profile Code MSC


Profile Option Name MSC_READ_PROFILES_FROM_DB
Description No During planning flat files are created that hold profile values. At times, it is
better to have profiles read from the database instead of the flat files. This
can espeically true for on-line or batch replan when profiles are changed.
Valid values are:
Yes
No

Default Value - No

This is a profile option for INTERNAL USE - used only for Development
Testing purposes for automated Regression Tests runs to read profiles from
MSLD_FLAT_PROFILE_VAL.dat from previous run to get same behavior.
Note Reference(s)

Bug Reference(s) 9406133


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Recalculate Demand Priorities after Spreading

Profile Code MSC


Profile Option Name MSC_RECALC_DMD_PRI_SPREADING
Description MSC: Recalculate Demand Priorities after Spreading
Default = No

When plan option Spread Forecast is checked and profile = Yes, then after
we spread the forecast, we recalculate the demand priority of sales orders
and forecasts.

First released in ASCP Engine/UI Rollup #35 for 11.5.10


Not ported to R12.x
Ported to 12.1 and released in 12.1.2.1 and above.
Note Reference(s)

Bug Reference(s) 8301504


8839391
8311261
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Refresh Site to Region Mappings Event

Profile Code MSC


Profile Option Name MSC_REFRESH_REGION_SITE
Description Valid values are:
Yes - Collection of Sourcing Rules / Existing behavior -
mapping during collection if sourcing rules parameter is set
to Yes
No - Running of Refresh Collection Snapshots Request /
Mapping will be performed only during standalone refresh
snapshot and not during a complete refresh of data
collections.

With the alternate value selected, the collected data might not reflect the
exact region site mapping based if the standalone Refresh Collection
Snapshots is run.

Default Value - Yes


Note Reference(s) 427338.1

Bug Reference(s) 5717270


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Refresh Snapshots Pending Timeout

Profile Code MSC


Profile Option Name MSC_REF_SNAP_PENDING_TIMEOUT
Description Sets the time that the Planning Data Pull concurrent process waits for
concurrent process Refresh Snapshots on the source before it times out.
This time out only applies if concurrent process Refresh Snapshots is at
status Pending/Inactive which occurs if another version of concurrent
process Refresh Snapshots is running. Valid values are:

Integer in minutes

Default Value - 10
Note Reference(s)
468903.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Region Instance

Profile Code MSC


Profile Option Name MSC_HUB_REGION_INSTANCE
Description This profile needs to be set when data is being
collected from multiple sources. APCC only reports
from the instance which is defined in this profile.

The profile is depreciated after patch


10309327:R12.MSC.B - APCC TO SUPPORT
REGIONS FROM MULTIPLE INSTANCES
Note Reference(s)

844667.1

Bug Reference(s) 6899253


6850493
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: Release WIP Dtls if Order Date different then
BOM Revision Date

Profile Code MSC


Profile Option Name MSC_RELEASE_DTLS_REVDATE
Description Oracle Work in Process uses the details effective on the job start date. Valid
values are:

Yes - then planning engine releases the WIP details even if


the Suggested Start Date is different than BOM Revision
Date.
No - the planning engine does not release the WIP details if
the new WIP Start Date is different than BOM Revision Date.

Set on APS Destination in a distributed environment

If all conditions are met to release the WIP details when releasing a planned
orders (Ref Note 1346745.1)
Then we evaluate the order as per the following example:

Check the fixed and variable LT of the item and offset the start date:
Answer: Planned order with Suggested due Date of Day 60 and offset makes
start date Day 50
If the planed order has been compressed, or the planning engine has used
an alternate routing (also possible that Alternate BOM is used)
Then is it possible that the start date in workbench is not Day 50 but [different
day]
If [different day], then check the profile, If Yes, then release the details, IF
No, then do not release the details and just release the header row to WIP
and let WIP Mass Load compute the components and resources and dates
for these based on the BOM and Routing for the item.

then we will not release details unless the profile is set to Yes.
Note Reference(s)
958034.1
1346745.1

Bug Reference(s) 2682123


Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Release dock date as work order completion
date for items with post processing lead time

Profile Code MSC


Profile Option Name MSC_REL_DOCK_DATE_ITEM_PPLT
Description Valid Values:
Yes - Release process releases the dock date on the
planned order (or work order in case of reschedule) as the
last unit completion date on the work order. When the work
order is re-collected and the plan is re-run, the plan's
snapshot process then uses the completion date on the
existing work order as the dock date and adds post-
processing lead time to arrive at the due date for planning.
This is the default behavior.
No - Release process releases the due date on the planned
order (or work order in case of reschedule) as the last unit
completion date on the work order. When the work order is
re-collected and the plan is re-run the plan's snapshot
process uses the completion date on the existing work order
as the due date for planning.

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Released Only By User

Profile Code MSC


Profile Option Name MSC_RELEASED_BY_USER_ONLY
Description Use this profile option to specify whether to restrict implementation of
planned orders and recommendations to the current user. Valid values are:
Yes - Only implement planned orders and recommendations
that this user marked
No - Implement planned orders and recommendations that
any user marked

Set on APS Destination in a distributed environment


Note Reference(s)

Bug Reference(s) 8326980


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Resource Group for a Line Flexfield Attribute

Profile Code MSC


Profile Option Name MSC_LINE_RES_GROUP
Description This profile option stores the name of the flexfield column that contains the
value in the corresponding table.
Note Reference(s) 147242.1
763878.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Resource Type for an Operation Flexfield
Attribute

Profile Code MSC


Profile Option Name MSC_RESOURCE_TYPE
Description This profile is no longer being used.
Note Reference(s) 147242.1

Bug Reference(s) 2954572


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Respect Minimum Remaining Shelf Life Days

Profile Code MSC


Profile Option Name MSC_RESPECT_SHELF_LIFE_DAYS
Description Details added to recent ASCP Guide - E13358-08
(page A-53)

This profile option enables ASCP to plan supplies


with respect to the shelf life enhancements
described in this design including the minimum
remaining shelf life days. Valid values are:

Yes - ASCP plans supplies with respect to minimum


remaining shelf life days. This is the recommended setting.
No - ASCP plans supplies without enforcing minimum
remaining shelf life days - This is the default value.

Safety Stock will NOT be generated for any item


when this profile is set to Yes and the user has
input a value in the Org Item Attributes - Inventory
tab for field = Shelf life Days

Note Reference(s)

1132403.1

Bug Reference(s) 7424037


Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Retain Time for Non-ATPable Items

Profile Code MSC


Profile Option Name MSC_RETAIN_TIME_NON_ATP_ITEM
Description Valid values are:
Yes - ATP returns same time stamp as passed to ATP from the Request
Date and Time, for all single lines for nonatpable
items or for all sets containing only non-atpable items. If a set contains mix of
atpaple and non atpable items, then ATP continues to return 23:59:00 as the
new timestamp.
No
Note Reference(s) 259601.1
9237457
551293.1

Bug Reference(s) 9237457


Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Return Best Source in Global ATP

Profile Code MSC


Profile Option Name MSC_BEST_SOURCE_GLOBAL_ATP
Description No Information available in User guides (115.5.10 or R12.1.1)

This profile in only available in 11.5.10


Not ported to R12 or 12.1

Basic Functionality:
This Feature will result in ATP taking more time to find the Best Source.

- Original Behaviour:
----------------------------
Suppose the Rank1 source gives you a Date within the 'Latest Acceptable
Date'. ATP will stop there and won't go through all the sources.

- New Behaviour with profile option set to YES:


--------------------------------------------------------------
If this profile is set to YES, ATP will go through all the Sources until it finds
the best Available Date. So this feature is strictly monitored by the above
profile option.

So, if the profile MSC: Return best source in Global ATP is set as Yes, the
Best possible source from all the global Sources defined for the item will be
used.

If the profile is set to NO or NULL, the original Behavior is retained. Default


value of this profile is NO.

NOTE:
This feature is not supported for Ship set and Arrival Set. If the profile is set
to yes the original behavior is retained for ship sets and arrival sets.
Note Reference(s) 960369.1
734925.1

Bug Reference(s) 5982134


Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: SCEM Engine Launch Events

Profile Code MSC


Profile Option Name MSC_X_AUTO_SCEM_MODE
Description Launch the Supply Chain Event Manager when data is loaded,published, or
both.

Set the profile option MSC: SCEM Engine Launch Events to All to
automatically
start Supply Chain Event Manager (SCEM) when a supplier loads an order
forecast
or when you publish an order forecast from the planning server. If you set the
profile option to Publish, Supply Chain Event Manager starts only when plans
are
published from Oracle Advanced Supply Chain Planning. If you set the profile
option to Load, Supply Chain Event Manager starts only when data is loaded
using
flat files.
Note Reference(s)

295564.1

Bug Reference(s) 2949437


2546115
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SCP PS Next Flag Precedence

Profile Code MSC


Profile Option Name MSC_SCP_PS_NEXT_FLAG_PRECEDENCE
Description Previously PS/SNO either ignored the next and previous operations or
treated next as starts at start and previous as ends at end for the activities
involved. The profile option was added to allow the user more flexibility in this
behavior.
Customers can still ignore them as the profile option "MSO Enforce
Resource Contiguity" takes precedence over the two new profile options
"MSC: SCP PS Next Flag Precedence" and "MSC: SCP PS Prior Flag
Precedence".

Both of these profile options allow the user to pick one of the following
options:

Starts After End


Starts At End
Starts After Start
Starts At Start --> default for NEXT_FLAG_PRECEDENCE
Ends At End --> default for PRIOR_FLAG_PRECEDENCE
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SCP PS Prior Flag Precedence

Profile Code MSC


Profile Option Name MSC_SCP_PS_PRIOR_FLAG_PRECEDENCE
Description Previously PS/SNO either ignored the next and previous operations or
treated next as starts at start and previous as ends at end for the activities
involved. The profile option was added to allow the user more flexibility in
this behavior.
Customers can still ignore them as the profile option "MSO Enforce
Resource Contiguity" takes precedence over the two new profile options
"MSC: SCP PS Next Flag Precedence" and "MSC: SCP PS Prior Flag
Precedence".

Both of these profile options allow the user to pick one of the following
options:

Starts After End


Starts At End
Starts After Start
Starts At Start --> default for NEXT_FLAG_PRECEDENCE
Ends At End --> default for PRIOR_FLAG_PRECEDENCE
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Base Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_BASE_PKG
Description Valid value are:

Yes - Base Package is used for creating a SNO


model.
No - Base Package is not used for creating a SNO
model.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Beginning Inventory Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_BGN_INVNTRY_PKG
Description Specifies whether the Beginning Inventory Package is used for creating a
model in Strategic Network Optimization. Valid values are:
Yes
No

Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Calendar Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_CALENDAR_PKG
Description Valid value are:

Yes - Calendar Package is used for creating a


SNO model.
No - Calendar Package is not used for creating a
SNO model.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Customer Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_CUSTOMER_PKG
Description Valid value are:

Yes - Customer Package is used for creating a


SNO model.
No - Customer Package is not used for creating a
SNO model.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Demand Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_DEMAND_PKG
Description Valid value are:

Yes - Demand Package is used for creating a SNO


model.
No - Demand Package is not used for creating a
SNO model.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Distribution Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_DSTRBTN_PKG
Description Valid value are:

Yes - Distribution Package is used for creating a


SNO model.
No - Distribution Package is not used for creating a
SNO model.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Enterprise Forecast Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_FORECAST_PKG
Description Valid value are:

Yes - Forecast Package is used for creating a SNO


model.
No - Forecast Package is not used for creating a
SNO model.
Default Value - Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Fixed Production Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_FP_PKG
Description Valid value are:

Yes - Fixed Production Package is used for


creating a SNO model.
No - Fixed Production Package is not used for
creating a SNO model.

Default Value - Yes


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Inventory Safety Targets
Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_IST_PKG
Description Specifies whether the Inventory Safety Targets Package is used for creating
a model in Strategic Network Optimization. Valid values are:

Yes
No

Default Value - Yes


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Manufacturing Package

Profile Code MSC


Profile Option Name MSC_SNO_SCP_MFG_PKG
Description
Specifies whether the Manufacturing Package is used for creating a model in
Strategic Network Optimization. Note: We have two profiles:
MSC: SNO - Snapshot Manufacturing Package
MSC: SNO - Snapshot Manufacturing Package (1)

Valid values: Yes/No


Default value: Yes
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Manufacturing Package(1)

Profile Code MSC


Profile Option Name MSC_SCP_SNO_MFG_PKG
Description Specifies whether the Manufacturing Package is used for creating a model in
Strategic Network Optimization. Valid values are:

Yes
No

Default Value - Yes

Note: We have two profiles:


MSC: SNO - Snapshot Manufacturing Package
MSC: SNO - Snapshot Manufacturing Package (1)
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Purchase Orders Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_PO_PKG
Description Specifies whether the Purchase Orders Package is used for creating a model
in Strategic Network Optimization. Valid values are:

Yes
No

Default Value - Yes


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Sales Orders Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_SO_PKG
Description Specifies whether the Sales Order Package is used for creating a model in
Strategic Network Optimization. Valid values are:

Yes
No

Default Value - Yes


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Supplier Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_SUPPLIER_PKG
Description Specifies whether the Supplier Package is used for creating a model in
Strategic Network Optimization. Valid values are:

Yes
No

Default Value - Yes


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Transfer Orders Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_TO_PKG
Description Specifies whether the Transfer Orders Package is used for creating a model
in Strategic Network Optimization. Valid values are:

Yes
No

Default Value - Yes


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO - Snapshot Work Orders Package

Profile Code MSC


Profile Option Name MSC_SCP_SNO_WO_PKG
Description Specifies whether the Work Orders Package is used for creating a model in
Strategic Network Optimization. Valid values are:

Yes
No

Default Value - No
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Connector Precision

Profile Code MSC


Profile Option Name MSC_SCP_SNO_CONNECTOR_PRECISION
Description 8 Specifies the precision value of the SNO connector. Valid values are:

Integer

Change only on advise from Oracle Development.

Default Value - 8
Note Reference(s)

Bug Reference(s) 5157640


Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Currency Precision

Profile Code MSC


Profile Option Name MSC_SCP_SNO_CURRENCY_PRECISION
Description The precision used when displaying currency
values in SNO.

For the most accurate calculations, a precision of 9


is recommended. Valid values are:

Numeric

Default Value - 2
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Decimal Precision

Profile Code MSC


Profile Option Name MSC_SCP_SNO_PRECISION
Description Specifies the number of decimal places shown for data in properties
windows. Valid values are:

Integer

Within SNO, the number of decimal places is called the display precision.
Changing the display precision does not change the actual data values
saved in a model. The display precision can affect results when you match
data. For example, if the display precision is 2, a Machine node Utilization
field with a value of 133.333333 displays 133.33. If you try to match Machine
nodes with a Utilization field value of 133.33, the Machine node in this
example is not matched because its actual value is 133.333333.

Default Value - 2
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Import Standard SNO Model

Profile Code MSC


Profile Option Name MSC_SCP_SNO_IMPORT_STANDARD_SNO_MODEL
Description MSC: SNO Import Standard SNO Model

If the profile option "MSC: SNO Import Standard Model" is set to 'No' then
Integration will not do extraction. So there will not be any extracted xml under
the planId/refresh/src folder.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Optimization Type

Profile Code MSC


Profile Option Name MSC_SCP_SNO_OPTIMIZATION_TYPE
Description Whether the model is a Cost or Profit based model. In cost based models,
the Selling Price is not part of the optimization. Valid values are:

Cost: The item list price is not considered.


Profit: The item list price is considered.

Default Value - Cost


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Publish On Client

Profile Code MSC


Profile Option Name MSC_SCP_SNO_PUBLISH_ON_CLIENT
Description This flag causes released results to be stored on
the client side for diagnostic purposes. It slows
down the whole release process so it is
recommended to be used under the guidance of
Oracle support.

Valid values are:


Yes
No - prevents the local save of the files in CSV for
debugging, This can save space and improve performance
on large models.

Default Value - Yes

Note Reference(s)

Bug Reference(s) 7233633


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Run Application Script

Profile Code MSC


Profile Option Name MSC_SCP_SNO_APP_SCRIPT
Description Specifies the name of the batch script that starts SNO.

Default Value - runSNO.bat

OBSOLETE -- in R12.1.2
Note Reference(s)
961419.1

Bug Reference(s) 7037527


6010199
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Run Connector Script

Profile Code MSC


Profile Option Name MSC_SCP_SNO_CONNECTOR_SCRIPT
Description Specifies the batch script that starts the SNO
Connector.

Do not change without advise from Oracle


Development.

Default Value - runSNOConnector.bat

Obsolete in v2 integration (11.5.10/R12.1)


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: SNO Transportation Capacity By

Profile Code MSC


Profile Option Name MSC_SCP_SNO_TRANSPORT_CAPACITY
Description Needs to be Weight as capacity constraints are not stored by volume in EBS.
Default Value - Weight
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Safety Stock Project

Profile Code MSC


Profile Option Name MSC_SAFETY_STOCK_PROJECT
Description Specifies the default project charged for all safety stock demands.

Oracle Advanced Supply Chain Planning assigns the project specified for all
safety stock demands which originate from non-MRP planned safety stock.
When safety stock requirements are specified in Oracle Inventory for specific
projects, the profile option value is not honored.

The list of values for this profile option is restricted to projects specified in
Oracle Projects. This profile option is enabled at project/seiban level, not at
the task level.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Safety stock change interval (Days)

Profile Code MSC


Profile Option Name MSC_SS_INTERVAL_DAYS
Description Use this profile option to specify the time interval used for smoothing within
the time interval functionality. You can instruct the planing engine to keep
safety stock levels relatively constant within a time interval. You specify:
The number of days in the time interval: Set profile option
MSC: Safety stock change interval (Days)
The method that the planning engine should use to calculate
the constant value: Set profile option MSC: Smoothing
method to calculate Safety stock within Change interval

Note Reference(s) 276707.1


559867.1
376451.1

759329.1

Bug Reference(s)
Document References(s) -1
-1
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Sales Orders Offset Days

Profile Code MSC


Profile Option Name MSC_SO_OFFSET_DAYS
Description Completed sales orders are collected within the offset duration. For example,
if Sales Orders Offset Days is set to 90, all the sales orders completed in the
past 90 days are also collected. Valid values are:
Integer > 0

Can be defined at the site level.


A Null value means all closed sales orders are collected.

Does not apply to complex maintenance repair and overhaul where the
material scheduled for a visit or task is collected as a sales order in Oracle
Advanced Supply Chain Planning.

Default Value - null


Note Reference(s)
277863.1
217116.1
780735.1
365770.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Scope of Analyze Plan Partition

Profile Code MSC


Profile Option Name MSC_ANALYZE_PARTITION_SCOPE
Description This profile option specifies the partitions that concurrent process Analyze
Plan Partitions should analyze. Valid values are:

All Partitions (1)

Plan Partition Only (2)

Normally, we recommend the default setting for this profile, unless you run
several plans each cycle and the profile MSC: Launch Analyze Plan Partition
is set to No. Then you should set All Partitions and launch this request after
running all ASCP plans in your planning cycle. Using this strategy can have
positive performance impact if all plans are run together and then users start
working in the plans.

Default Value - Plan Partition Only


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Search Criteria Warning

Profile Code MSC


Profile Option Name MSC_ALLOW_SEARCH_CRITERIA_WARNING
Description This profile is used by Rapid Planning UI to determine whether to show a
warning message when a search is made that could potentially return a large
number of rows. This message gives an opportunity to the user to avoid
searches that can take a long time. For example running a blank search (no
criteria) on the supply-demand view will trigger this message. But running a
query for a given item will not trigger the message.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Selection order for Firm Supplies in backward
allocation window

Profile Code MSC


Profile Option Name MSC_SUPPLY_SELECTION_ORDER_BACKWARD_WINDOW
Description Closest Supply (1), Earliest Supply (2)
Site level default: Closest Supply (1) If profile is set to Earliest Supply, then
we would walk forward instead of the existing backward way. If this profile is
set to Closest Supply, then we will peg it to the closest/ earliest firm supply.
This would mean that the loop for backward phase present in mslflp.ppc,
should be able to move in both the directions based on profile option.
Note Reference(s) 391548.1

Bug Reference(s) 5525679


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Self Service Loads Delimiter

Profile Code MSC


Profile Option Name MSC_SELF_SERVICE_LOADS_DELIMITER
Description ~/, (tilde or Comma) - default = ~ (tilde) Delimiter used to parse the data files
loaded using self service loads, for example, the loading of spreadsheet
forecast data to Oracle Demand Planning. Valid values are:

~
,

Default Value - ~
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Service Level Category Set

Profile Code MSC


Profile Option Name MSC_SERVICE_LEVEL_CATEGORY_SET
Description Not much information is available about this profile in user guides.

As per IO user guide:


As part of the setup it is necessary to specify the value of the profile option
MSC:
Service Level Category Set. Only categories from this category set are
available
when assigning target service levels and fulfillment lead times at a category
level
during the setup of specific item or category level service levels and
fulfillment lead
times.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Service Planning Enabled

Profile Code MSC


Profile Option Name MSC_SRP_ENABLED
Description If using Service Parts Planning, then set to Yes to collect data for SPP (aka
SRP). Valid values are:

Yes
No

Default Value - No

Used by collections to determine whether SPP related data needs to be


collected.
Note Reference(s) 760095.1
566096.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Service Planning Item Safety Stock Level
Value

Profile Code MSC


Profile Option Name MSO_SS_PLAN_LEVEL
Description This profile determines how safety stock targets for different revisions in a
supersession chain are considered in SPP.

Valid Values.
Item - SPP will consider the safety stock level for each item
(for which safety stock is prescribed)
Prime (Default) - the safety stock for the entire prime will be
considered as the safety stock level and the existing supply
for the various members of the prime will be considered
while trying to maintain the safety stock level.

Example:
Consider this supersession session chain: A3 -] A4 [-] A5 [-] A6 -] A7 [-] A8
Assume safety stock for each item = 100 units for a give period.

If the profile option = 'Item', then consider the safety stock level for each item
to be 100 units and use only native supply to maintain this level. There will be
no substitution recommended by planning and safety stock violation
exceptions will be raised for each item.

If the profile = 'Prime', then planning determines that A3, A6 and A8 are the
primes in this supersession chain then planning will use the following levels:
SS target for A3=100 units, and planning will only use supply of A3 to
maintain this level. SS target for A6=300 units, and planning will use supplies
of A4, A5 and A6 to maintain this level. SS target for A8=200 units, and
planning will use supplies of A7 and A8 to maintain this level.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Share Plan Partitions

Profile Code MSC


Profile Option Name MSC_SHARE_PARTITIONS
Description Yes: The number of plan partitions parameter to the concurrent program
mentioned becomes irrelevant; only one partition is created for a plan (you
can enter 1)
Note Reference(s)

137293.1

Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Shelf Life Override of Order Modifiers for
Transfer Orders

Profile Code MSC


Profile Option Name MSC_OVERRIDE_OM_FOR_TRANSFER
Description Instructs Oracle Advanced Supply Chain Planning whether to maximize the
number of demands satisfied with respect to minimum remaining shelf life.

Do not consider Order Modifiers for transfer supplies when shelf life is
enabled. -- NOT IMPLEMENTED. BUG 16366566
Note Reference(s) 760046.1

Bug Reference(s) 16366566


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Simultaneous Resource Sequence Flexfield
Attribute

Profile Code MSC


Profile Option Name MSC_SIMUL_RES_SEQ
Description This profile option stores the name of the flexfield column that contains the
value in the corresponding table. This setup is only performed during
application install.
Note Reference(s) 153919.1
136734.1
130995.1

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Smoothing method to calculate Safety stock
within Change interval

Profile Code MSC


Profile Option Name MSC_SS_SMOOTHING_METHOD
Description Specifies the mathematical construct used to calculate safety stock for a time
interval using values within the time interval. Available values include:
Minimum
Average (Default)

Maximum

Note Reference(s) 376451.1


276707.1

Bug Reference(s) 5370377


4520265
Document References(s) -1
-1
-1
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Source Instance ID

Profile Code MSC


Profile Option Name MSC_SR_INSTANCE_ID
Description This profile option is no longer used as of August 2003.
Note Reference(s)

Bug Reference(s) 2937850


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Source Setup Required

Profile Code MSC


Profile Option Name MSC_SOURCE_SETUP
Description Internal profile used by the software during collections configuration. Do not
manually update.

When the Default Value of a profile option states that it is automatically


calculated, this means that the Planning Engine determines the default value
of that particular profile option. If you must change these profile option
values, do so only after consulting Oracle Development and Oracle Support.

Valid values are:


11i

Y - for Yes

N - for No
12+

Yes
No

Note Reference(s) apsinfo_us


837670.1
211121.1
860349.1
580205.1

Bug Reference(s)
Document References(s) -1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Sourcing History Start Date Offset(in months)

Profile Code MSC


Profile Option Name MSC_START_SOURCING_HISTORY
Description Offsets the starting date of sourcing history calculations and is used with
collections parameters Purge Sourcing History = Yes and Recalculate
Sourcing History = Yes.
Note Reference(s) 399468.1

305327.1
780883.1

Bug Reference(s) 6959481


Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Sourcing Rule Category Set

Profile Code MSC


Profile Option Name MSC_SRA_CATEGORY_SET
Description Determines the category set used in Oracle Advanced Supply Chain
Planning in the assignment set form. If this is not set, the user cannot assign
sourcing rules and bills of distribution at the Category- Instance-Organization
and Category-Instance level.
Note Reference(s) 205167.1
783204.1
306913.1

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Sourcing Variance Tolerance

Profile Code MSC


Profile Option Name MSC_SOURCING_TOLERANCE
Description Used when Enforce Sourcing Constraints is enabled for a plan. This
percentage value establishes a threshold for triggering exception messages
if sourcing allocations are violated.

Exceptions are generated if the difference between the user-specified


sourcing allocation percentages and the plan-derived allocation percentages
is greater than the Sourcing Variance Tolerance. The profile option is entered
as a number and converted to a percentage.

If the user enters 0.5 it becomes 50%.

Valid values are:


Integer between 0 and 1

Default Value - 0.05 (5%)


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Split Planned Order to perform safety stock
pegging

Profile Code MSC


Profile Option Name MSC_VIOLATE_ORDER_MODIFIER_SS
Description Use this profile option to instruct the planning engine how to split a planned
order that pegs to customer demand when is pulled in to meet transient
safety stock.

Values:
1 - No

2 - Yes but do not violate order modifier


- If item has order modifiers, then it will NOT split the planned order.
- When no order modifiers exist, then the planned order can be split.

3 - Yes
Note Reference(s) 276707.1

Bug Reference(s) 3829477


Document References(s) -1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Split Planned Orders for Scheduling
Flexibility

Profile Code MSC


Profile Option Name MSC_SPLIT_SUPPLY
Description For constrained plan with decision rules and optimized plans, it determines
whether the planning engine consolidates planned orders that were split
during optimization processing prior to scheduling them. For unconstrained
plans, set it to No. Valid values are:
Yes - Do not consolidate planned orders prior to scheduling.
The planning engine splits them into multiple planned orders
whose quantities generally satisfy one planning time bucket's
worth of capacity against the resources or suppliers used in
the planned order. During scheduling, the planning engine
has more flexibility to place smaller quantities into available
time slots. You cannot specify the size of the durations and
the planning engine does not guarantee that each planned
order in the final plan output spans exactly one planning
bucket.
No - Consolidate orders when possible prior to scheduling.
Use this value if you tend to have long production runs per
routing that cross multiple planning buckets. The planning
engine creates a single planned order. If the plan planning
mode is Constrained (Without Detailed Scheduling), the
planning engine only uses this profile option if its value is No.

Note Reference(s)
298806.1
787982.1
562872.1
787458.1
947399.1
958872.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Supplier Capacity Accumulation(multiplier)

Profile Code MSC


Profile Option Name MSC_SUPP_CAP_ACCUM_MLTPLR
Description This profile option is a multiplier to ASL lead-time. The planning engine uses
it to derive the date when capacity accumulation begins for a supplier. If
profile option MSC: Purchase Order Dock Date Calculation Preference is
Promise Date, Oracle suggests that you set this profile option to 0 so that
suppliers accumulates capacity withintheir lead-time.
This is a site level profile option.

It specifies the date that the planning engine begins supplier capacity
accumulation. You enter it as a multiplier of the Approved Supplier List
Processing Lead-time. To begin accumulation at the Approved Supplier List
Processing Lead-time, enter 1 (the default). To begin accumulation at the
plan start date, enter 0. To begin accumulation at a multiple of the Approved
Supplier List Processing Lead-time, enter another whole number.
Note Reference(s)

Bug Reference(s) 8344302


8847552
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Supplier Capacity Consumption by Purchase
Orders

Profile Code MSC


Profile Option Name MSO_ALWAYS_CONSUME_CAPACITY_FOR_PO
Description MSC: Supplier Capacity Consumption by Purchase
Orders

Required capacity for purchase orders will be


correctly shown based on the setting of the profile
option

MSC: Supplier Capacity Consumption by


Purchase Orders.

The following behavior is expected:

Values:

Yes: all purchase orders should be considered


No: no purchase orders are considered
Unacknowledged Only: only purchase orders
without a promised date are considered

Purchase Orders Outside Lead time only: only


purchase orders scheduled outside lead time are
considered

Note Reference(s)

Bug Reference(s) 11790310


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Suppress Exception for Selection of
Alternates

Profile Code MSC


Profile Option Name MSC_SUPPRESS_ALT_EXCEPTION
Description Controls whether the planning engine generates exceptions related to
alternate bills of material and routings. If the profile option is No, it does not
generate those exceptions.
Valid values: Yes/No
Default value: No
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Temp Index Extent Size(Bytes)

Profile Code MSC


Profile Option Name MSC_TEMP_IND_NXTEXT
Description Not Used
Note Reference(s) 343996.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Temp Table Extent Size(Bytes)

Profile Code MSC


Profile Option Name MSC_TEMP_TAB_NXTEXT
Description Not used
Note Reference(s) 343996.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Unit of Measure

Profile Code MSC


Profile Option Name MSC_UNIT_OF_MEASURE
Description Not Used
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Update Requested Completion Date when
Releasing Reschedules

Profile Code MSC


Profile Option Name MSC_UPD_REQ_DATE_REL
Description Marked as N/A in the Users Guide for all information. Exists in the code for
releasing from Planner Workbench in the Source side code
MRP_AP_REL_PLAN_PUB and defaults to No
The file is $MRP_TOP/patch/115/sql/MRPRELPB.pls
Code review points to this not being used anywhere, even though the value
is determined during the release process.

Introduced in 11.5.9 and exists in 11.5.10


Bug 8603036 logged to get this ported into R12.2
Note Reference(s)

Bug Reference(s) 3938565


8603036
Document References(s) -1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Update Use Up Date

Profile Code MSC


Profile Option Name MSC_UPDATE_USE_UP_DATE
Description This is an internal profile
Note Reference(s) 747628.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Use Base Model during Forecast
Consumption

Profile Code MSC


Profile Option Name MSC_USE_BASE_MODEL_FCST_CONS
Description Use this profile option to instruct the planning engine whether to consume
configure to order forecasts with attention to the top-level models.
Valid values are:
Yes: Consume configure to order forecasts for the same top-
level model on the sales order line
No: Consume configure to order forecasts without attention
to their top-level models

Coordinate how you set this profile option with how you set profile option
MSD: Publish CTO Forecast Percentages by Top-level Model.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Use Enhanced Forward ATP

Profile Code MSC


Profile Option Name MSC_ENHANCED_FORWARD_ATP
Description Use Enhanced Forward ATP -which can combine sources in Supply Chain
ATP.
This works only for ATP based on Planning Data and is not available for ATP
based on Collected Data

12.1.3 Documentation updated with example of this functionality:


See Oracle Global Order Promising Implementation and User's Guide
Release 12.1
Part No. E13378-07 May 2010
pg 4-14 - Enhanced Forward ATP

This example applies to 11.5.10 with latest GOP Rollup patch


R12.0.6 with ATP CU patch 6
12.1.3

CAUTION: This can have significant performance impact as we do multiple


iterations to arrive at an answer for ATP.

Example:

When this profile "MSC: Use Enhanced Forward ATP" is set to Yes -
Using binary search, we anchor on a date and always do backward pass
until a smallest date is found where the demand gets fulfilled.
The idea here is to use all the supply sources while finding the future date
and get the optimum supply_date which is not done during normal forward
pass -- i.e. component substitution, allocated ATP stealing, combine multiple
sources.

Eg :
Consider this scenario -
A (ITF = Day100)
_________________|_________
| |
B(ITF = Day40) C (ITF = Day75)

Suppose a request came for qty 100 on Day1 and there is no existing supply
for any of these items(assembly and components).

With Enhanced forward ATP -


We will star with Day1. Backward pass on Day1 did not find any supply. Try
to make using components and hit ITF.

a. Using Binary search, anchor on Day 50 (1/2 of 100 day ITF) and set it as
requested_date. Do backward pass for assembly A. No supply.
During MAKE, we could get sufficient qty for B(ITF=Day40) but no supply for
C on Day50.

b. Set requested_date=Day75 (100 - 50 / 2 = 75) and do backward pass for


assembly A. No supply.
During MAKE, we could get sufficient qty for both the components B and C.

Available Date is Day75.


Note Reference(s)

Bug Reference(s) 8443590


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Use FIFO Pegging

Profile Code MSC


Profile Option Name MSC_USE_FIFO_PEGGING
Description If this profile option is Yes, the planning engine uses FIFO pegging. Not used
in constrained plans without detailed scheduling
Note Reference(s) 368676.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Use Optimization Phase Supply Due Dates for
Pegging

Profile Code MSC


Profile Option Name MSC_USE_SCO_DATE
Description When set to yes, Pegging uses the optimization recommended supply date
for planned orders and scheduled receipts
Note Reference(s)

Bug Reference(s) 6009093


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Use Shipping/Receiving Calendar

Profile Code MSC


Profile Option Name MSC_USE_SHIP_REC_CAL
Description Enables the collection and use of shipping, receiving and transit calendars in
ASCP, GOP, Rapid Planning
Works for both ATP based on Collected Data and ATP based on Planning
Data

Determines whether shipping/receiving/carrier calendars are used for order


promising.
Values are:
+ Yes: Uses the shipping, receiving, and carrier calendars to schedule ship
and arrival dates.
+ No: Uses only the organization's manufacturing calendar to schedule ship
dates at each level.
- EXCEPT for Processing Lead Time for Buy Items which will use 24x7
calendar
Note Reference(s) 845365.1
390531

730061.1
436771.1

Bug Reference(s) 845365.1


Document References(s) -1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Global Order Promising Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC: Use attribute based netting

Profile Code MSC


Profile Option Name MSC_USE_ATTR_BASED_NETTING
Description Use this profile option to control netting in a project manufacturing
environment.
Yes: Planning nets at the reservation level. It respects
pegging level and creates planned orders based on hard
pegging level. It does not respect order modifiers if the
reservation level and hard pegging level are not the same.
With this approach, you can enable priority pegging can be
enabled.

No: The planning engine uses customary netting in a project


manufacturing environment.

Note Reference(s)
420752.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: VMI Default Query

Profile Code MSC


Profile Option Name MSCX_SCE_DEFAULT_QUERY
Description Displays default results in the Oracle Collaborative Planning Horizontal View
Note Reference(s)

Bug Reference(s) 5058121


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Value of N for all top/bottom-N reports in
Dashboards

Profile Code MSC


Profile Option Name MSC_HUB_TOP_BOTTOM_N_VALUE
Description It holds the value of N for all top/bottom-N reports in Dashboards.
Note Reference(s) 759571.1
844667.1

Bug Reference(s) 6755107


Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center Yes
Manufacturing Operations Center No
Global Order Promising No
MSC: Vertical view default query

Profile Code MSC


Profile Option Name MSCX_VERTICAL_VIEW_DEFAULT_QUERY
Description Used by Oracle Collaborative Planning to determine whether default results
are displayed for the vertical view
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning Yes
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Wait Time to Obtain Lock on Table/Partition
for Snapshot Delete Worker (in sec)

Profile Code MSC


Profile Option Name MSC_LOCK_WAIT_TIME
Description Time (in seconds) the Snapshot Delete Worker waits to obtain a lock on a
table/partition before aborting.

Releasing plan recommendations through Workbench and running Purge


Plan can cause locks on the table/partition preventing the Snapshot Delete
Worker from obtaining a lock.

If the timer expires, the program prints the following message in the log file:
Unable to obtain a lock on table.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC: Write MBP Flat Files

Profile Code MSC


Profile Option Name MSC_WRITE_TO_FLAT_FILES
Description Profile provide controls whether to flush the Planner concurrent process data
files and setup data files during the plan run. If Yes, the process writes all the
files to the $APPLCSF/out/data[plan_id]

directory.

In R12, this profile is hard coded to yes in the source code.


So as long as related profile MSC: File Flush Limit = 1, then we will always
generate the proper MBP Dat files required for advanced debugging of
planning issues.

Refer to Note 245974.1 - #4 - How To Retrieve Memory Based Planner


(MBP) Dat Files for more information
Note Reference(s)
336724.1
245974.1

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning Yes
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:ATP Assignment Set

Profile Code MSC


Profile Option Name MSC_ATP_ASSIGN_SET
Description ATP Assignment Set used for ATP Based on Planning Output
This should be the same assignment set assigned to the ASCP - ATP
enabled plan to provide consistent results.

This will default into the ATP Inquiry form when accessed from Advanced
Supply Chain Planner responsibility.
Note Reference(s) 812964.1
760117.1
290251.1
1059017.1
986625.1

Bug Reference(s)
Document References(s) -1
-1
-1
-1
-1
-1
Oracle Global Order Promising Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC:Coll Error Debug Mode

Profile Code MSC


Profile Option Name MSC_COLL_ERR_DEBUG
Description Added in R12.x for debug messages for Data
Collections - Planning Data Pull and ODS Load
and other collections processes.
MRP: Debug mode is still debug profile used for
Refresh Collections Snapshots, but all other
processes now use this profile to set debug level.

Level settings may vary by release:


On (Minimal)
Medium
-- CAUTION - levels below may cause performance
issues. Should usually be set only with DEV
recommendation.
High
High (Verbose)
Dev

List of values available as in 12.1.3.4:


OFF
LOW (Default)
MEDIUM
HIGH
DEV

In decentralised sites, destination system's value of


this profile affects only destination side collections
code and source system's value of this profile
affects only source side coll code. Error debug
messages level;
Note Reference(s)

Bug Reference(s) 5514401


5578510
Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:Coll Performance Debug Mode

Profile Code MSC


Profile Option Name MSC_COLL_PERF_DEBUG
Description Introduced in R12. Helps by adding messaging about performance in the log
files. Valid values are:
Off
Medium
High (Verbose)

CAUTION: Should not be used with MSC:Coll Error Debug Mode set to
Medium or higher unless directed by DEV.

Best to set this profile and have MSC: Coll Error Debug Mode = OFF when
working a pure performance issue

In decentralised sites, destination system's value of this profile affects only


destination side collections code and source system's value of this profile
affects only source side coll code.
Note Reference(s)

Bug Reference(s) 6722040


5514401
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:Collect Completed Jobs

Profile Code MSC


Profile Option Name MSC_COLLECT_COMPLETED_JOBS
Description This profile is used to prevent the collection of remaining requirements for
jobs that are completed when set to No. Jobs may still have requirements for
components that were not issued to the job.

This profile was Introduced in 11.5.10 Collections Rollup #13 and is only
used for Complete or Targeted Refresh of Data Collections
Note Reference(s) 404975.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:Collect Routing

Profile Code MSC


Profile Option Name MSC_COLLECT_ROUTING
Description Use this profile to instruct the targeted collections process how to collect bill
of material and routing data. Valid values are:
Yes - Collect bill of material and routing data
No: Collect bill of material data but do not collect routing data

This profile option is overridden by profile option


INV: Capable To Promise is ATP/CTP based on
Planning Output.
Do NOT set no if running any Plans in VCP
Applications.
Useful when ATP based collected data is being
used and having very large BOM Routing tables
and it can help performance.

Currently only available in 11.5.10 starting in Data


Collections Rollup #25.
Bugs to Front port to R12 and R12.1 are pending
Note Reference(s)

Bug Reference(s) 6658721


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:Compute IB Aggregation during Collection

Profile Code MSC


Profile Option Name MSC_COMPUTE_IB_AGGREGATE
Description Initiallly and by default - the Aggregate Information
Collection was made part of Refresh Collection
Process.
We have made it a standalone program which can
be run independently of the Refresh Collection
Snapshot process based on value of the profile
option MSC:Compute IB Aggregation during
Collection.

Yes / No (NULL = Yes = Default)

If the profile option is set to No, then the Installbase


Aggregation can only be computed by running the
concurrent program.

Compute Aggregated Installbase under Contracts

To improve performance we have paralleilized the


computation by introducing concurrent programs
Installbase Worker, however this program can only
be invoked by the parent program "Compute
Installbase Aggregate Under Contracts".

It is recommended that the user run the concurrent program Compute


Aggregated Installbase under Contracts before the collection run so that the
collection performance is improved compared to running this process after
standard collections.
Note Reference(s)

Bug Reference(s) 12648806


11792946
11932063
11727030
11930028
Document References(s) -1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections Yes
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:Criticality Category Set

Profile Code MSC


Profile Option Name MSC_CRIT_CATEGORY_SET
Description Category Set To Define Criticality. this will be used in Item Simulation.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:Explode in WIP when Details are not released

Profile Code MSC


Profile Option Name MSC_EXPLODE_IN_WIP
Description Profile to control if the source routing of a rescheduled discrete job on the
source is overwritten when released by ASCP.

Valid Values
Yes - source routing on discrete jobs are overwritten

No (Default) - source routing on discrete jobs is not


overwritten

Note Reference(s) 1343976.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan Yes
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:Handle Large Sequence Id

Profile Code MSC


Profile Option Name MSC_USE_LARGE_SEQ
Description ASCP is enhanced to handle large sequence id that is too big to store in an
integer variable. These large IDs are stored as a string (code) and a local
(small) id will be generated and map to the code.
When 'MSC: Handle Large Sequence Id' is set, ASCP (including DRP per
bug 16756827) will flush the code instead of the id (local id).
When 'MSC: Handle Large Sequence Id' is not set, ASCP will flush the id
itself.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:Prevent Loops when pegging Non-Standard
Jobs

Profile Code MSC


Profile Option Name MSC_PREVENT_NSJOB_LOOP
Description Discrete job demands remain unpegged in case of job demands generated
due to Loops in BOM. Valid values are:
Yes - If there exists a non standard job demand for a top
level item in the supply chain bill and the non-standard job
also exists as a valid supply in the plan, ASCP will make the
pessimistic assumption that this could cause a fatal loop in
the pegging and essentially ignore this demand for pegging
purposes. This default setting is recommended strongly to
prevent plan failures due to pegging loops.
No - In the above case, ASCP makes the optimistic
assumption that loops will not exist after pegging and
proceeds to peg supply of the top level item to the non-
standard job demand. This setting should not to be used
unless the user is completely certain that loops will not be
caused based on their pegging related plan and profile
option settings

Default Value - Yes


Available 12.1.1 and upwards
Note Reference(s) 365112.1

Bug Reference(s) 4575602


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:Release only orders pegging fully to on hand

Profile Code MSC


Profile Option Name MSC_REL_ONLY_ONHAND_SUPPLY
Description Enhancement Bug 4417550 was logged to help
further control how orders can be released.

This is first released in 11.5.10 in ASCP Engine/UI


Rollup # 8 - Ref Note 252108.1 for more
information on the rollup patches for APS Suite.

Allows only those planned orders that peg fully to


on hand to be released from the planner
workbench. To be set on destination instance.

The implementation is described as follows:

1. Implement the functionality at


the Responsibility Level.
-- This is enabled at Site,
Application and Responsibility level
only
-- This is NOT available to set at
the User level

2. This is check ONLY for planned


orders for Make Items - that will
release as WIP jobs or OPM
batches

3. The check is ONLY for first level


of pegging for Buy From or
Transfer From type pegging lines.
Warning:This will not check the
pegging of any Sub-Assemblies
that are in the pegging tree to see
if they components of the Sub-
assembly are pegging to on hand.

4. The message is a Warning and


can be ignored by the user and
order may still be released
Set on APS Destination in a distributed
environment

Currently not supported for Auto-Release planned


orders process, which is launched during planning
Enhancement 6855650 has been logged for this
profile to be enabled for the Auto-Release Planned
orders process.

Note Reference(s)
560587.1

Bug Reference(s) 6855650


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:Retain Released Data

Profile Code MSC


Profile Option Name MSC_RETAIN_RELEASED_DATA
Description When set to Yes, then the data that is inserted into
the MSC%Interface tables during release from the
workbench (Or when Auto-Release Planned
Orders is run) is retained in these tables. ( Also
can effect release from PS application)
Default = No

Primarily used for debugging purposes.


Tables effected:
MSC_SO_RELEASE_INTERFACE
MSC_PO_RESCHEDULE_INTERFACE
MSC_WIP_JOB_SCHEDULE_INTERFACE
MSC_WIP_JOB_DTLS_INTERFACE
MSC_PURCHASE_ORDER_INTERFACE
MSC_SALES_ORDER_INTERFACE
MSC_PO_REQUISITIONS_INTERFACE

This profile is used for release process in E1-VCP


integration.

This profile is set on the VCP instance.


Note Reference(s)

Bug Reference(s) 12592939


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:SRP PHASE2 ENABLED

Profile Code MSC


Profile Option Name MSC_SRP_PH2_ENABLED
Description Profile for SRP phase2 enable
Special profile to Service Parts Planning and Install Base Under Contracts
integration.

In case of using new Install Base functionality in 12.1.3.3 in Data Collections,


this profile should be set to Yes.

This profile is not used anymore.


Note Reference(s)

Bug Reference(s) 9791058


11785629
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSC:Select Sourcing Rules In ATP Based On

Profile Code MSC


Profile Option Name MSC_SOURCING_DATE
Description From Documentation bug 8423266 logged to get this added to the
documentation.
Available in the latest Users Guide

1 - Sysdate - current default functionality


Sourcing rule effectivity date is based on system date

2 - Request Date - this will check for sourcing effectivity based on the
Request Date or Planning Time Fence Date (whichever is greater)

Example:
Item has 5 days leadtime and ZERO on hand
Item sourced from supplier A on right now
Item sourcing will change on Day 10 to Supplier B
So sourcing rule is setup with supplier A sourcing disabled on Day 9
Sourcing shows supplier B with sourcing starts on Day 10

So Customer A calls today and requests item to ship on Day 20,


SO -- best solution is to use profile with setting Request Date, since you
would need to order the product on Day 14 to arrive on Day 19, then ship on
Day 20.
Supplier B would be chosen for this order.

IMPORTANT NOTE: This profile exists in 11.5.10 and R12.x, but the code to
use this profile is only in 11.5.10.
There is not any code to use this profile in R12.x
Note Reference(s)

Bug Reference(s) 8423266


4535528
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC:Use Internal SO demand class for ATP
allocation

Profile Code MSC


Profile Option Name MSC_ISO_ALLOC_ATP
Description This is a User defined hidden profile.
This should only be deployed if recommended by Development.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSC_USE_HASH_KEY

Profile Code MSC


Profile Option Name MSC_USE_HASH_KEY
Description This is an internal hidden profile. Should be set to Yes always

Note Reference(s)

Bug Reference(s) 3575822


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: AW Tablespace

Profile Code MSD


Profile Option Name MSD_TABLESPACE
Description This profile controls where analytic workspaces are created and stored. New
plans are created in the specified tablespace; existing plans remain in the
tablespace specified at the time of their creation. Changing the tablespace
profile has no effect on existing data.
Note Reference(s)

Bug Reference(s) 3900222


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Calculate Planning Percentages

Profile Code MSD


Profile Option Name MSD_PLANNING_PERCENTAGE
Description This profile option controls the behavior of the planning percentage
calculations. For example, it controls whether the planning percentages can
be calculated from the sales history of options. This profile can prevent
expensive calculations when the user does not want to calculate planning
percentages and just wants to use the existing planning percentages
specified in the enterprise resource planning source to explode the forecast.
Note Reference(s) 556091.1

Bug Reference(s) 2930793


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Category Set Name

Profile Code MSD


Profile Option Name MSD_CATEGORY_SET_NAME
Description This profile option is used to select one category set during the data
collection process. If the user value is left blank, then all categories will be
selected for data collection. Valid values are limited to valid category set
names.
Note Reference(s) 344626.1

Bug Reference(s) 4058454


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Client Debugging

Profile Code MSD


Profile Option Name MSD_CLIENT_DEBUGGING
Description Used for debugging ODP
Note Reference(s) 789091.1
301936.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Conversion Type

Profile Code MSD


Profile Option Name MSD_CONVERSION_TYPE
Description This profile option determines what conversion rates are collected from the
General Ledger rates table
Note Reference(s) 419412.1

Bug Reference(s) 7530857


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Currency Code

Profile Code MSD


Profile Option Name MSD_CURRENCY_CODE
Description This profile option designates the base currency used in Oracle Demand
Planning. All revenues are calculated and displayed in this base currency
Note Reference(s) 577726.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Customer Attribute

Profile Code MSD


Profile Option Name MSD_CUSTOMER_ATTRIBUTE
Description This is a source profile option used to selectively bring the customer names
into Oracle Demand Planning to improve the system performance
Note Reference(s) 217042.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Default DP Scenario

Profile Code MSD


Profile Option Name MSD_DEFAULT_DP_SCENARIO
Description This profile option specifies a demand scenario, which appears as a demand
schedule in the Plan Options window. When you publish the demand
scenario specified in this option, the planning engine launches the
unconstrained plan specified in the profile option MSC: New Forecast Auto
Plan
Note Reference(s)

Bug Reference(s) 2710122


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Enabled Organization for Item Collections

Profile Code MSD


Profile Option Name MSD_ITEM_ORG
Description This profile option allows users to collect relationships for Items in Master
Organization only or All Organizations. This profile option specifies how
Oracle Demand Planning collects Product Family and Product Category
relationships
Note Reference(s)

Bug Reference(s) 4157588


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Excess and Obsolescence, Liability Category
Set Name

Profile Code MSD


Profile Option Name MSD_EOL_CATEGORY_SET_NAME
Description This profile is not used. We can remove this profile option.
Note Reference(s)

Bug Reference(s) 5202797


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Include all internal sites within scope of LOB
scoped demand plan

Profile Code MSD


Profile Option Name MSD_ISO_CHECK
Description New Site level profile option named - MSD: Include all internal sites within
scope of LOB scoped demand plan

In R12, we enhanced ODP to support ISOs (Internal Sales Orders). Now the
demand plan
stripping code has been modified to use this profile to decide whether to use
the ISO
enhancement or not.

Value - Yes. (11i Behavior)


All the internal sites are included into the plan even when its org is
inside
the scope of the plan.
Essentially no distinction between internal sites and external sites.

No. (R12 Behavior) -


Filter out the Internal sites from the plan if its org is already in the
scope of the plan.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: MAXVALUECOUNT for edges in XWDEVKIT

Profile Code MSD


Profile Option Name MSD_EDGEMAXVALCOUNT
Description Used for setting the maximum number of values allowed on an edge for
XWDEVKIT. Used in the ODP Worksheet
Note Reference(s) 359953.1

Bug Reference(s) 4725583


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Master Org

Profile Code MSD


Profile Option Name MSD_MASTER_ORG
Description This profile option is used to select a master organization, if there are
multiple master organizations. The item attributes pertaining to the selected
master organization are used by Oracle Demand Planning
Note Reference(s)

Bug Reference(s) 2779954


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: OLAP Directory Alias

Profile Code MSD


Profile Option Name MSD_DIR_ALIAS
Description Use this profile to specify the database directory alias used to store the log
files created during the demand plan build process.
Note Reference(s) 470483.1

Bug Reference(s) 3826884


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: OLAP Initial Page Pool

Profile Code MSD


Profile Option Name MSD_USER_INIT_PAGEPOOL
Description This profile specifies an initial minimum memory for planning and manager
sessions and can be optimized for individual users. A value of 4 to 6MB is
generally adequate. The default value is olap_page_pool_size.
Note Reference(s) 363491.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: OLAP Maximum Page Pool

Profile Code MSD


Profile Option Name MSD_USER_MAX_PAGEPOOL
Description Not used - obsolete
Note Reference(s) Note.416107.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: OLAP Workflow Page Pool

Profile Code MSD


Profile Option Name MAX_WF_MAX_PAGEPOOL
Description This profile specifies the memory footprint for workflow initiated Oracle
Demand Planning sessions. The default value is 64MB.
Note Reference(s) 363491.1
285489.1
286729.1

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: One Step Collection

Profile Code MSD


Profile Option Name MSD_ONE_STEP_COLLECTION
Description This profile option controls the number of steps in the data collection
process.

If set to No, MSD collections allow cleansing of the data in the staging tables
before they are loaded into the final MSD tables.

If set to Yes, cleansing is skipped and data processing loads data from the
staging tables into the final MSD tables.

In particular, during Self-Service Legacy collection of


CurrencyConversion.dat,
if the profile is not set to Yes, that data will remain in
MSD_ST_CURRENCY_CONVERSIONS and CP 'Pull Currency Conversion
Data' will not be run to move the data into
MSD_CURRENCY_CONVERSIONS.
Note Reference(s) 332545.1

1671545.1

Bug Reference(s) 2930793


18720625
Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Two-Level Planning

Profile Code MSD


Profile Option Name MSD_TWO_LEVEL_PLANNING
Description This profile allows you to forecast demand at product family level on the
basis of sales histories of member items. You can collect all the product
family members and their sales histories regardless of the forecast control as
long as the product family forecast control is 'Consume' or 'Consume &
Derive' and the planning method for product family as well as members is not
set to 'Not Planned'. This is achieved by setting the profile value to: Collect
all family members and their sales histories. The default profile value,
Exclude family members with forecast control 'None' enforces the existing
behavior that is, only 'Consume' or 'Consume & Derive' product family
members are collected.
Note Reference(s)

Bug Reference(s) 3009964


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Use Classic Even Allocation

Profile Code MSD


Profile Option Name MSD_USE_EVEN_ALLOC
Description This profile allows you to determine the allocation method used when an
allocation basis does not exist. You can allocate evenly down the time
dimension and use "first" allocation for other dimensions when an allocation
basis is not available. Demand Planning uses the First Child allocation
method by default, unless you enable the MSD: Use Classic Even Allocation
profile.
Note Reference(s) 436673.1

Bug Reference(s) 4577092


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Use Classic Worksheet

Profile Code MSD


Profile Option Name MSD_USE_CLASSIC_WORKSHEET
Description To force recalculations between worksheet edits, enable the MSD: Classic
Worksheet profile option. This option enforces consistency across hierarchy
levels, but may decrease performance. in 11.5.10 default is classic, in R12
default is simple. Not applicable to planning percentages worksheet
Note Reference(s)

Bug Reference(s) 6137940


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD: Worksheet Automatic resize

Profile Code MSD


Profile Option Name MSD_WKS_AUTO_RESIZE
Description Defines whether the worksheet should be automatically resized when you fill
cells
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD:View Scope measures are editable

Profile Code MSD


Profile Option Name VIEW_SCOPE_MEAS_EDITABLE
Description The measures not included in the Assignment scope, but included in the
View scope, can be viewed but not edited. Valid values are:
Y - Yes, the default behaviour
N - No

Default Value - Y
Note Reference(s)

Bug Reference(s) 6367799


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Calculate Planning Percentage

Profile Code MSD


Profile Option Name MSD_DEM_PLANNING_PERCENTAGE
Description Controls the planning percentage calculation for options and option classes.
Use this profile option to specify upon what entities to calculate planning
percentages. This occurs when system parameter
CTO_PLANNING_PERCENTAGE_CHOICE instructs Oracle Demantra to
calculate planning percentages.
Do not change the setting of this profile option after the initial download or
invalid combinations may result:
+ The typical reason for changing this value is to correct a setup error.
+ In that case, delete the invalid combinations and re-download. See
Implementation Considerations.

The default is Null. Valid vales are:


+ Yes for Consume & Derive Options and Option Classes: Include the sales
history of options and option classes
+ Yes for Consume & Derive Options only: Include the sales history of
options to model and removes option classes. Use it for assemble to order
situations.
+ Yes for all the Options and Option Classes: Include the sales history of
options and option classes including optional components of forecastable
product families that have Forecast Control None.

Note: It is recommended to set this parameter to Yes, for All Options and
Option Classes before running shipping and booking history for Configure to
Order
Note Reference(s) 975066.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Category Set Name

Profile Code MSD


Profile Option Name MSD_DEM_CATEGORY_SET_NAME
Description This profile defines the Item to Category rollups in each instance.
Note Reference(s) 549565.1

Bug Reference(s) 8235032


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Conversion Type

Profile Code MSD


Profile Option Name MSD_DEM_CONVERSION_TYPE
Description This profile determines which currency conversion rates are collected from
the General Ledger tables Source side profile
Note Reference(s)

Bug Reference(s) 5969081


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Currency Code

Profile Code MSD


Profile Option Name MSD_DEM_CURRENCY_CODE
Description This profile designates the Demand Management base currency. Destination
side profile
Note Reference(s)

Bug Reference(s) 5959651


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Customer Attribute

Profile Code MSD


Profile Option Name MSD_DEM_CUSTOMER_ATTRIBUTE
Description This is a source profile option used to selectively bring the customer names
into Demand Management to improve system performance. Source side
profile
Note Reference(s) 726444.1

Bug Reference(s) 6926188


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Data Profile for Price Lists

Profile Code MSD


Profile Option Name MSD_DEM_PRICE_LIST_PROFILE
Description Set this profile to import integration data profile for price lists. Destination
side profile
Note Reference(s)

Bug Reference(s) 6450646


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Debug Mode

Profile Code MSD


Profile Option Name MSD_DEM_DEBUG_MODE
Description When set to 'Yes', this profile is used to print debug information to the output
file of the concurrent request. Destination side profile
Note Reference(s) 741464.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Enable Supply Plan Download for work
orders

Profile Code MSD


Profile Option Name MSD_DEM_ENABLE_SUPPLY_PLAN_WO
Description As of 1/15/12 - This is a new profile options added in 12.1.3.6 for Integration
of CMRO and EAM with Demantra.
Important - This feature is under CA and is meant for a specific customer
only. For all other customers, they should not use these profiles till the
feature is made GA.

Profile to determine whether supply plan download will bring in data by work
order attributes or not

The profile will be used as a switch between the existing SOP integration
design and the new design to bring in data striped by work order attributes.
Possible Values -
a. No - Existing SOP Integration
b. Yes - New SOP Integration with support for work orders
Default Value - No.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Explode Demand Method

Profile Code MSD


Profile Option Name MSD_DEM_EXPLODE_DEMAND_METHOD
Description This profile option applies to Demantra integration with Service Parts
Planning.

This profile option specifies which historical data is used to determine the
failure rate.
The options are Field Service or Depot Repair & Field Service.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Fiscal Calendar

Profile Code MSD


Profile Option Name MSD_DEM_FISCAL_CALENDAR
Description All the fiscal calendars chosen in the calendar setup list will be available
in the List Of Values for this profile.
Note Reference(s)

Bug Reference(s) 6278515


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Host URL

Profile Code MSD


Profile Option Name MSD_DEM_HOST_URL
Description Set this profile to the Oracle Demantra Application Server Host Name, Port
Number and Application Name. This profile is used to invoke Oracle
Demantra URLs from the E-Business Suite applications. Destination profile
Note Reference(s) 431301.1

Bug Reference(s) 6497910


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Include Dependent Demand

Profile Code MSD


Profile Option Name MSD_DEM_INCLUDE_DEPENDENT_DEMAND
Description Use this profile option to specify whether the collections process should
include configure to order structures, demand, and history. Valid values are:
+ Yes: Include configure to order structures, demand, and history
+ No: Do not include configure to order structures, demand, and history. This
is the default
Note Reference(s) 975066.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Include organization in CMR Data Load

Profile Code MSD


Profile Option Name MSD_DEM_INCLUDE_ORG_CMRO_DATA
Description This is a new profile options added in 12.1.3.6 for Integration of CMRO and
EAM with Demantra.

As of 1/15/12 - Important - This feature is under CA and is meant for a


specific customer only. For all other customers, they should not use these
profiles till the feature is made GA.

In 12.2 as well as 12.1.3.6, even though the code is available, it is


hidden/disabled in UI out of the box.

A new planning side profile to specify whether organization should be a


dimension for the data loaded to SPF GL or not.
Possible Values -
a. No
b. Yes
Default Value - No.

Profile to determine whether to include organization in cMRO data load or


not.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Master Org

Profile Code MSD


Profile Option Name MSD_DEM_MASTER_ORG
Description This profile defines the Product Family to which an Item rolls up. Source side
profile
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Maximum seeded units available for
price lists

Profile Code MSD


Profile Option Name MSD_DEM_MAX_PRL
Description This profile determines the number of slots available for price lists in Oracle
Demantra. Destination side profile
Note Reference(s)

Bug Reference(s) 5879252


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Publish CTO Forecast by Top-level
Model

Profile Code MSD


Profile Option Name MSD_DEM_PUB_PLAN_PCT_BY_BASE_MODEL
Description This profile is used to specify whether planning factors should be published
by Base_Model or not
Note Reference(s)

Bug Reference(s) 11769109


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Sales and Operations Planning
Category Set Name

Profile Code MSD


Profile Option Name MSD_SOP_CATEGORY_SET_NAME
Description Select a category for which you want SOP Collections to filter by.
Note Reference(s)

Bug Reference(s) 16861475


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization Yes
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Schema

Profile Code MSD


Profile Option Name MSD_DEM_SCHEMA
Description Set this profile value to the database schema name where the Oracle
Demantra schema has been installed. Destination side profile
Note Reference(s)

Bug Reference(s) 8361879


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Simulation Set Name

Profile Code MSD


Profile Option Name MSD_DEM_SIMULATION_SET_NAME
Description This is a new profile options added in 12.1.3.6 for Integration of CMRO and
EAM with Demantra.

Important -
This feature is under CA and is meant for a specific customer only. For all
other customers, they should not use these
profiles till the feature is made GA.

In 12.2 as well as 12.1.3.6, even though the code is available, it is


hidden/disabled in UI out of the box.

A new planning side profile to specify the simulation set from which repair
cost of items will be collected into Demantra.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning Yes
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Source Instance for Global Forecast

Profile Code MSD


Profile Option Name MSD_DEM_SR_INSTANCE_FOR_GLOBAL_FCST
Description 'MSD_DEM: Source Instance for Global Forecast' was created to allow user
to specify the instance where global forecast will be uploaded into ASCP.
Note Reference(s) 850484.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Truncate Staging Table

Profile Code MSD


Profile Option Name MSD_DEM_TRUNCATE_STG_TABLE
Description The profile should be set to No, if both Demantra and SRP are used
together.

No additional information available - logged documentation bug 12685689


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Two-Level Planning

Profile Code MSD


Profile Option Name MSD_DEM_TWO_LEVEL_PLANNING
Description This profile enables demand forecasts at the Product Family level on the
basis of sales histories of member items. Destination side profile.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: UOM for fleet flight hours

Profile Code MSD


Profile Option Name MSD_DEM_FLEET_FLIGHT_HOURS_UOM
Description This is a new profile options added in 12.1.3.6 for Integration of CMRO and
EAM with Demantra.

Important -
This feature is under CA and is meant for a specific customer only. For all
other customers, they should not use these
profiles till the feature is made GA.

In 12.2 as well as 12.1.3.6, even though the code is available, it is


hidden/disabled in UI out of the box.

A new source side profile to specify the UOM/counter that will be used to
identify the entry for fleet flight hours in the AHL_FLEET_UTILITZATION
(Product CMRO, Entity - Fleet Utilization Data) table.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning Yes
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Use new Site code format

Profile Code MSD


Profile Option Name MSD_DEM_SITE_CODE_FORMAT
Description Determines whether new Site code format is used or not.

Created Doc bug 12685703


Note Reference(s) 1312493.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_DEM: Version

Profile Code MSD


Profile Option Name MSD_DEM_VERSION
Description Created documentation bug 12685733 .
Note Reference(s) 1061331.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_SPF: History basis for Failure Rate
computation

Profile Code MSD


Profile Option Name MSD_SPF_FAILURE_RATE_HIST_BASIS
Description This profile is used to specify the history data that should be used for failure
rate computation
Note Reference(s) 1225993.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSD_SPF: Organization containing generic BOM for
Service Parts Forecasting

Profile Code MSD


Profile Option Name MSD_SPF_MASTER_ORG
Description This profile is used to specify the master organization for service
organizations which will have the generic BOM definition
This is for Service Parts Planning forecasting and explosion.

This profile is used by Demantra Service Parts Forecasting (SPF)

Similar to profile used for ASCP planning - MSC: Organization containing


generic BOM for forecast explosion - which is used for ASCP planning.
Note Reference(s) 1225993.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Activity Selection Window (in Days)

Profile Code MSO


Profile Option Name MSO_SDS_SELECTOR_WINDOW
Description This profile option specifies the number of days over which the
planning engine groups activities that are candidates for scheduling.
The larger the number, the greater the chance of finding an activity
that can be scheduled with another activity of the same setup type.
Making this number too large might result in demand priorities
not being fully respected while scheduling.

Valid values are any number. The profile option is used in Days.
Default value: 7
Note Reference(s)
415276.1

Bug Reference(s) 8538729


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Additional Demand Slices for Shared Supply
Rescheduling

Profile Code MSO


Profile Option Name MSO_MAX_NUMBER_OF_RESCHEDULES
Description Controls the maximum number of slices to which supply can be rescheduled.
VAlid values are:
Between -1 and maximum number of slices.

Controls the maximum number of slices to which supply can be rescheduled.


Supply is not rescheduled after this maximum even when demand will be
delayed. Possible values include:
-1 - Reschedule to last slice

0 - Does not reschedule.

For example, if a supply pegs to demand in slice 2, 3, 4, 5, and 6, and the


parameter value is 2, supply will reschedule if needed in slice 3 and 4
(rescheduled 2 times, in slice 3 and 4) and will not reschedule in slice 5 and
6.

If the plan planning mode is Constrained (Without Detailed Scheduling), the


planning engine does not use this profile option.

Default Value - 0
Note Reference(s) 739561.1
952924.1
726610.1
747739.1

Bug Reference(s)
Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Allow Partial Demand Completion

Profile Code MSO


Profile Option Name MSO_PARTIAL_DEMAND_COMPLETION
Description Enables supply orders to individually schedule for partial satisfaction of a
demand when demand is split across several supply orders. Valid values
include:

All End Demands - Enable Partial Demand Satisfaction for all


independent demands (forecasts,sales orders, and MDS
entries).
Sales Orders: Enable Partial Demand Satisfaction for all
Sales Order demand only.
None: Schedules all supplies to coincide with completion
date (latest supply date) to meet demand.

This functionality can be enabled for all independent demands or only for
Sales Orders.
If the plan planning mode is Constrained (Without Detailed Scheduling), the
planning engine only uses this profile option if its value is All End Demands.
Default Value - None
Note Reference(s) 458693.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Allow Schedule Gaps for Shared Supplies

Profile Code MSO


Profile Option Name MSO_ENHANCED_RIGHT_JUSTIFY
Description This profile option controls the scheduling of shared supplies (scheduled
receipts, firm planned orders, and planned orders with multiple demands
pegged to them). Valid values are:
Yes - When scheduling shared supplies, the shared supply is
moved to the right (moving the schedule date later) during
the final scheduling step (to coincide with the start time of
downstream supplies) if it would make one of the pegged
demands late or later. The shared supply schedule is always
right justified if it does not make any pegged demands late or
later. When a lower-level shared supply is scheduled for the
highest priority demand pegged to it, there may be a gap
between the shared supply end date and the start date of the
next downstream supply. By not right justifying it, it is more
likely to be on time for the lower priority demands in later
demand slices which are also pegged to it. Before selecting
Yes, consider the setting for MSO: Additional Demand Slices
for Shared Supply Rescheduling. If this profile is not 0,
shared supplies may be rescheduled and this profile option
does not need to be Yes. For example, Demand A with
priority 100 and Demand B with priority 500 are in different
slices. If the shared supply is late for Demand B, it may still
be rescheduled to be on time depending on available
capacity and the number of additional demand slices in
which it is scheduled. If MSO: Additional Demand Slices is 0
and this profile option is Yes, the planning engine does not
right justify the shared supply due date; the shared supply
might still be on time for demand B even though it is not
rescheduled in a later slice.
No - When scheduling shared supplies and moving them to
the right (moving the schedule date later), the planning
engine does not consider demands in other slices that are
not yet unscheduled but pegged to this supply. This yields a
schedule with fewer gaps but at the expense of potentially
more late demands.

This is a user level profile option.


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Allow Simultaneous Resource To End At
Different Time

Profile Code MSO


Profile Option Name MSO_SIMULTANEOUS_RESOURCE_OVERLAP_MODE
Description Yes/No - Default = No

When scheduling simulateous resources, value of


Yes can allow these resources to finish at different
times. This can cause different resource
consumption. Yes may be required when resources
are available with different shift times in order to
get reasonable plan results.

Typically simultaneous resources start and end at


the same time , however in special cases it may be
required that one of the resources completes
sometime after other resources are completed.

Note Reference(s) 837834.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Allow Simultaneous Resources to End at
Different Times

Profile Code MSO


Profile Option Name MSO_ALLOW_SIM_RES_TO_END_DIFF_TIMES
Description This profile is NOT USED. We have two profiles with same name
MSO_SIMULTANEOUS_RESOURCE_OVERLAP_MODE - MSO: Allow
Simultaneous Resource To End At Different Time
MSO_ALLOW_SIM_RES_TO_END_DIFF_TIMES - MSO: Allow
Simultaneous Resources to End at Different Times
-- this profile has 's' at end of name - Times vs Time
-- this is description from application - Relaxes the constraint the the principal
and simultaneous resources should start and end at the same time

Available in 12.1.1 and upwards


Note Reference(s)

Bug Reference(s) 4566790


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Allow early builds to consume existing
supplies of phased-out components and sources

Profile Code MSO


Profile Option Name MSO_SCO_USE_EXIST_PHASEOUT_SUPP
Description Allow early builds to consume existing supplies of phased-out components
and sources
Note Reference(s) 1462299.1

Bug Reference(s) 7678394


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized Yes
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Alternate Process Penalty

Profile Code MSO


Profile Option Name MSO_SCO_ALT_PROCESS_PENALTY
Description Specifies weight for alternate process objective in optimization. Valid values
are:
Integer > 0

This is an internal value.


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Alternate Resource Penalty

Profile Code MSO


Profile Option Name MSO_SCO_ALT_RESOURCE_PENALTY
Description Specifies weight for alternate resource objective in optimization. Valid values
are:
Integer > 0

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Alternate Resource Selection Method

Profile Code MSO


Profile Option Name MSO_SDS_ALTRES_SELECTION
Description Valid values: (1) Rank of Alternate (2) Setup Type Match
If Rank of Alternate, ASCP will prefer to load the primary
resource if it is available even if it means incurring a setup
that could have been avoided by going to the alternate.

If Setup Type Match, ASCP will prefer the alternate that is


the best option from a setup minimization perspective. If all
alternates are equal from a setup perspective, then ASCP
chooses the alternate based on rank.

Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Alternate Source Penalty

Profile Code MSO


Profile Option Name MSO_SCO_ALT_SOURCE_PENALTY
Description Specifies weight for alternate source objective in optimization. Valid values
are:
Integer > 0

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Apply Windows for Firm Scheduling

Profile Code MSO


Profile Option Name MSO_APPLY_WINDOW_IN_FORWARD_SCHEDULE
Description Currently not used by HLS
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Avoid non working days for Buy/Transfer
order dates

Profile Code MSO


Profile Option Name MSO_AVOID_NON_WRKNG_DAY_BUY_AND_TFR
Description This profile option applies only when profile option MSO: Use Shift definitions
when scheduling lead-times is No. Valid vales are:

Yes - The planning engine avoids placing the ship, dock, due
dates of buy and transfer orders on non-workdays according
to the appropriate calendar.
No: The planning engine does not schedule buy and transfer
orders with regard to the appropriate calendar.

This profile option does not govern the placement of order dates. If profile
option MSO: Use Shift definitions when scheduling lead-times is Yes, the
planning engine assumes accurate shift timing.
Note Reference(s)

853822.1
1331154.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Barrier Optimizer Algorithm Choice

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_BARALG
Description This profile indicates which starting point algorithm the planning engine when
it uses the barrier algorithm to solve an optimization problem. It applies only
when multiple threads are used in optimization.
Values: 0, 1, 2, or 3 Default value: Null (interpreted as 0)
Note Reference(s)

Bug Reference(s) 3511063


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Batching Precision

Profile Code MSO


Profile Option Name MSO_BATCHING_TYPE
Description Documentation bug 9669424 has been created to include this profile option
in the ASCP User Guide.
Note Reference(s)

Bug Reference(s) 8899964


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Big M Value for SCO

Profile Code MSO


Profile Option Name MSO_SCO_BIG_M
Description No longer used in ASCP
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: CPLEX Crash Parameter

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_CRAIND
Description Determines how objective coefficients are used to select basis.
Values: -1, 0, and 1
Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP
User Guide.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: CPLEX Refactor Rate

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_REINV
Description Specifies the value of the parameter to control the refactor rate.
Values: Integer > 0.
Note Reference(s)

Bug Reference(s) 3964120


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: CPLEX Scaling Factor

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_SCAIND
Description Contains the scaling factor in the Planning Engine.
Values are -1, 0, 1.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: CPLEX messages to screen indicator

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_SCRIND
Description Used for Debugging issues for Supply Chain Optimized Plans
Which means plans that have Decision Rules OR Optimization set. Usually
specified by Development when additional information in the log file is
required for debugging purposes. Valid values: zero = Off and 1 = On
Available in 12.1.1 and upwards
Note Reference(s)

Bug Reference(s) 7424573


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Calculate Constraint Exceptions

Profile Code MSO


Profile Option Name MSO_CALCULATE_CONSTRAINT_EXCEPTIONS
Description Determines whether constraint exceptions are calculated for plans with
Enforce Capacity Constraints selected. The planning engine issues an
"Order lead time constraint exception" when the lead-time of an order is the
cause for a demand being satisfied late or a "Requirement lead time
constraint exception" when the lead time of a resource requirement is the
cause for a demand satisfied late or a "Material constraint exception" when a
demand due date needs to be pushed out due to either a "Lead time
violation" or a "Supplier capacity constraint" and if profile option MSO:
Calculate Constraint Exceptions is Yes. Values are Yes or No.
Note Reference(s) 214041.1

Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Capacity Units Recalculation Threshold

Profile Code MSO


Profile Option Name MSO_RESOURCE_CONSUMPTION_PERCENTAGE
Description Valid values are:
Any Value between 0 and 1

The planning engine schedules supplies in two phases:


Backward schedule - From demand due date to see if
demand can be met on time.
Forward schedule: If the backward schedule results in a late
demand, the forward schedule from the plan start date meet
demands with minimum lateness.

At the end of the forward schedule phase, the planning engine adjusts the
schedule to remove gaps between supplies (right justification). It may move
a supply to occur at a time where there are more resource units available
that there were in its previously scheduled time.

If this profile option is 1, the planning engine considers assigning more


resource units to the supply. For example, this profile option is 0.5. The
planning engine considers changing the number of resource units if the
current capacity units value is less than 0.5 * Max assigned units on the
routing for the item.

If this profile option is 0, the planning engine does not consider assigning
more resource units.

This is a user level profile option.


If the plan planning mode is Constrained (Without Detailed Scheduling),
the planning engine does not use this profile option.

Default Value - 0
Note Reference(s)

Bug Reference(s) 8745009


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Check Redundant Constraints

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_DEPIND
Description Specifies location and removal of redundant constraints.
Values: 0 and 1
Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP
User Guide.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Choice of supply for substitution

Profile Code MSO


Profile Option Name MSO_SUPPLY_FOR_SUBSTITUTE
Description Determines which supplies are considered by the Planning Engine for
substitution.

Valid values are:


All Supplies (1)
Oracle Advanced Supply Chain Planning takes supplies belonging to
substitute items even when there is demand for substitute items. Demand
priorities drive the allocation.

Excess supplies (2)


Oracle Advanced Supply Chain Planning takes supplies belonging to
substitute items only if it finds that the supply
from the substitute item is in excess. Oracle Advanced Planning performs
regular netting logic within the Substitution Window
and find that excess can be offered for substitution. The native demand
satisfaction has priority only within the Substitution Window. After the
Substitution Window demand priorities drive the substitution.

Oracle Order Promising does not honor this profile option. Oracle Order
Promising always honors native demand satisfaction logic
Note Reference(s)

Bug Reference(s)
Document References(s) B31553-02
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Component offset logic for optimization

Profile Code MSO


Profile Option Name MSO_SCO_COMP_OFFSET_LOGIC
Description Introduced in 11.5.10 - ASCP Engine/UI rollup #12
Works in tandem with MSO: Postpone Use of Alternates to Latest Possible
Time = Yes
1: Component requirement date is put one day before
assembly start date.

2: Component requirement date is put on the same date as


assembly start date

3: if assembly lead time =0, same result as 2. if assembly


lead time >0, same result as 1

Note Reference(s)

Bug Reference(s) 5018283


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized No
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Consume Existing Purchase Order Supplies
in First-In-First-Out Sequence During Component
Substitution

Profile Code MSO


Profile Option Name MSO_SCHEDULE_PO_IN_FIFO
Description Consume Existing Purchase Order Supplies in
First-In-First-Out Sequence During Component
Substitution

Introduced on top of EBS 12.1.2 in one-off patch


9238752 (included in VCP 12.1.2.1)
In base release of EBS 12.1.3

Bug 8238752 notes the following:


For enabling the Consume PO supplies
in FIFO sequence feature the following
profiles needs to be set.
1.MSO: Component offset logic for
optimization = 2
2.MSO: Schedule PO in FIFO = Yes
3.MSC: Use Optimization Phase Supply
Due Dates for Pegging - Yes
4.MSO: Additional Demand Slices for
Shared Supply Rescheduling -1
5.MSO: Net All Firm Supplies Before
Creating Planned Order - All Supply
Types

This enhancement was done for a


particular customer. They also used
some customization scripts for this
solution to work.
Default Value=No
Note Reference(s)

Bug Reference(s) 9238752


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Continuous transfer across organizations

Profile Code MSO


Profile Option Name MSO_MTQ_ACROSS_ORGS
Description Allows you to model continuous or non-continuous transfers across
organizations. Valid values are:
Yes - Allows continuous transfers across organizations.
No: Allows discrete, incremental or non-continuous transfers
across organizations.

This feature can also be set at the item/organization level using the
Continuous Inter-Org Transfers item attribute. The value specified for the
item attribute overrides the profile option setting. If the plan planning mode
is Constrained (Without Detailed Scheduling), the planning engine does
not use this profile option.
Note Reference(s)

Bug Reference(s) 7436622


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Convergent Supplies Consumption Pattern

Profile Code MSO


Profile Option Name MSO_DEMAND_SPLIT
Description Allows you to fulfill a demand in series or in parallel from multiple supplies
from suppliers and/or other organizations. Valid values are:
Series - Demand is satisfied in series from multiple supplies.
Parallel - Demand is satisfied in parallel from multiple
supplies.

Default Value - Parallel


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Convergent Supplies Consumption Pattern
for Inter-Org and Supplier Sourced orders

Profile Code MSO


Profile Option Name MSO_INTER_ORG_DEMAND_SPLIT
Description Allows you to fulfill a demand in series or in parallel from multiple supplies
from suppliers and/or other organizations.
Valid Values are:

Series - Demand is satisfied in series from multiple supplies.

Parallel - This is the default value.Demand is satisfied in


parallel from multiple supplies.

Default Value: Parallel


For supplier sourced orders, use profile option MSO: Convergent Supplies
Consumption Pattern for Inter-Org and Supplier Sourced Orders.
If the plan planning mode is Constrained (Without Detailed Scheduling), the
planning engine does not use this profile option.
Note Reference(s) 726610.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Convergent Supplies Consumption Pattern
for Intra-Org Sourced orders

Profile Code MSO


Profile Option Name MSO_INTRA_ORG_DEMAND_SPLIT
Description Allows you to satisfy a demand in series or in parallel from multiple supplies
in the same organization.
Values are:

Series - Demand is satisfied in series from multiple supplies.

Parallel - This is the default value. Demand is satisfied in


parallel from multiple supplies.

If a component is fed by orders from multiple


organizations, the value of profile option
MSO:Convergent Supplies Consumption Pattern
for Inter-Org and Supplier Sourced orders
overrides the value of this profile option.
If the plan planning mode is Constrained (Without
Detailed Scheduling), the planning engine does not
use this profile option.

Defaut value: Parallel


Note Reference(s) 726610.1

Bug Reference(s) 9310030


9147919
Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Cost Roll-up incremental factor

Profile Code MSO


Profile Option Name MSO_SCO_COST_ROLLUP_INCR_FACTOR
Description ASCP Userguide Profile Name: MSO: Incremental factor of internal cost
roll up

This profile option controls the cost increments used by the internal cost roll
up in Oracle Advanced Supply Chain Planning. The cost calculation is:

SUM across all components for the assembly [K * Cost of a component *


(Usage of the component for the assembly + 0.01)].

K is the value that you set in this profile option.

Oracle recommends a minimum value of 1.

Valid values are:


Number

Default Value - 1
Note Reference(s) 555016.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Create Aggregate Supply for Unsatisfied
Demands within Planning Time Fence

Profile Code MSO


Profile Option Name MSO_AGG_SUP_FOR_DMD_IN_PTF
Description Introduced in ASCP Engine/UI rollup #33 for
11.5.10
Front ported to R12 in CU5 patch 7270650
Fixed in VCP Cum patch 12.1.3.1 and above

The Memory Based Planner (MBP) used to create


supplies for unsatisfied demands inside PTF on
respective dates after considering the FDS. Later
on those supplies were moved to PTF date,
resulting in more than one supply on PTF date.
This would be wrong for some set up. So, we made
the code changes to create single supply for
unsatisfied demands in PTF.

This is now controlled by this profile.


Yes, then one supply is created for unsatisfied demands on
the PTF date if all of the following conditions are satisfied:

Plan is not constrained with


Decision Rules
Plan is not optimized.

No, more than one supply may be created for unsatisfied


demands on the PTF date. (Default if NULL)

Available in 12.1.3.1 and upwards

Note Reference(s)
1068297.1

Bug Reference(s) 7294117


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: DS Scheduling Window

Profile Code MSO


Profile Option Name MSO_DETAILED_SCHEDULING_WINDOW
Description This was introduced in R12 for DS. It is not being used.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Default Forecast Priority

Profile Code MSO


Profile Option Name MSO_DEFAULT_FORECAST_PRIORITY
Description Contains default priority value for forecasts and is used by the Scheduling
Engine to determine when to schedule the forecast. Can be defined at the
site level. Valid values are:

Integer > 0.

Default Value - 100000.


Note Reference(s) 147220.1
296941.1

Bug Reference(s)
Document References(s) -1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Default Idle Time Tolerance (Hours)

Profile Code MSO


Profile Option Name MSO_IDLE_TIME_TOLERANCE
Description This profile was introduced in R12 for Detailed Scheduling. It is not currently
used in ASCP.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Default Resource Sequencing Window (in
Days)

Profile Code MSO


Profile Option Name MSO_SETUP_CYCLE_FOR_HLS_SDS
Description After the planning engine select an unscheduled activity from the activity
selection window specified by MSO: Activity Selection Window (Days), this
profile option specifies the number of days from the pegged demand date
over which the planning engine can look for another activity of the same
setup type to schedule the activity with and achieve a good sequence on the
resource. This profile option
number can be overridden by resource level settings made in the
Departments: Resources screen in the source system. The large this
number, the longer
the time spent by the resource on a setup type before changing over to
the next setup type.

Valid values: any number


Default value: 7 (days)
Note Reference(s) 415276.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Default Sales Order Priority

Profile Code MSO


Profile Option Name MSO_DEFAULT_SO_PRIORITY
Description Contains default priority value for sales orders. Used by the Scheduling
Engine to determine when to schedule a sales order. Can be defined at the
site level. Valid values are:

Integer > 0.

Default Value - 10000.


Note Reference(s)
296941.1

147220.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Default Timestamp Safety Stocks

Profile Code MSO


Profile Option Name MSO_DEFAULT_TIMESTAMP_SFTSTCK
Description The planning engine uses this profile option value to determine when safety
stock supplies are due. The timestamp value applies to the safety stock
requirements from Oracle Inventory, Oracle Inventory Optimization, Oracle
Material Requirements Planning, and Oracle Advanced Supply Chain
Planning. Valid values are:

Beginning of Day - Supplies must be available at 00:00.Set


this option if you want to use timestamps that match safety
stock requirements from Oracle Inventory Optimization.
End of Day: Supplies must be available at 23:59.Set this
option if you want to use timestamps that match safety stock
requirements from Oracle Inventory or Oracle Material
Requirements Planning.

Default Value - Beginning of Day


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Default Timestamp for Forecasts

Profile Code MSO


Profile Option Name MSO_DEF_TIME_FCST
Description Determines the forecast timestamps that ASCP uses to plan. The timestamp
denotes the time by which supplies to meet the demand must be available to
be considered on time

E - End of Day (23:59)


B - Beginning of Day (00:00)
R - Retain Timestamp of Salesorders
Note Reference(s)

1331154.1

Bug Reference(s) 6273866


3198606
7460229
3573179
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning Yes
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Default Timestamp for Sales Orders

Profile Code MSO


Profile Option Name MSO_DEF_TIME_SO
Description This profile option determines the sales order line timestamps that Oracle
Advanced Supply Chain Planning uses to plan.

The timestamp denotes the time by which supplies to meet the demand must
be available to be considered on time: Values are:

B - Beginning of Day: Supplies must be available at 00:00.


E - End of Day: Supplies must be available at 23:59.
R - Retain Sales Order Timestamps: Supplies must be
available at the timestamp on the sales order line.

The sales order demand due timestamp does not affect forecast
consumption because forecast consumption is done in daily buckets.
This profile option does not apply to forecasts.
Note Reference(s)

Bug Reference(s) 4120214


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Default Value for Maximum Acceptable Days
Early

Profile Code MSO


Profile Option Name MSO_DEFAULT_MAX_EARLY_DAYS
Description Profile is not used in the code.

This was profile was used by the detailed scheduling code (initially planned)
NOT used anymore. Needs to be removed.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Delay Fulfillment of Small Demands

Profile Code MSO


Profile Option Name MSO_RESPECT_SUPPLY_TOLERANCES
Description Use this profile option to enable the planning engine to delay fulfilling a small
demand until it has a later larger demand. Valid values are:
Yes - set the item attribute Unsatified Demand Factor on
each item whose small demands you want delayed.
No

Default Value - No
Note Reference(s) 1068297.1
749448.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Demand Size Tolerance Before Splitting
Planned Orders

Profile Code MSO


Profile Option Name MSO_SPLIT_PO_THRESHOLD
Description Creates a threshold percentage that causes Planned Orders to split prior to
scheduling (if the remaining unallocated quantity of a planned order is
greater than the remaining unallocated quantity of the pegged demand). Not
used if order modifiers exist for an item and not used in a project planning
environment. Valid values are:
Positive decimal quantities (.5 is interpreted as 50%).

If the plan planning mode is Constrained (Without Detailed Scheduling), the


planning engine does not use this profile option.

Default Value - NULL


Note Reference(s) 739561.1
1068297.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Demand Type Priority

Profile Code MSO


Profile Option Name MSO_DEMAND_TYPE_PRIORITY
Description Appears to be unused according to the Oracle Advanced Supply Chain
Planning Implementation and Users Guide
Note Reference(s)

Bug Reference(s) 4573393


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Demand Window Size

Profile Code MSO


Profile Option Name MSO_DEMAND_WIN
Description During priority pegging, demands are sorted based on the demand priority
within the demand window. After these demands are fully pegged, Oracle
Advanced Supply Chain Planning sorts all demands in the next window by
priority. This is stated as the number of calendar days including non-
workdays. With a value of 10, the first demand window is between the start
date of the plan or the first demand date +10 days. Valid values are:

Integer >= 0

Default Value - NULL (1)


Note Reference(s)

1068297.1

Bug Reference(s) 8264328


2764894
8264323
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Disable Inference of Item Substitution
Relationship

Profile Code MSO


Profile Option Name MSO_NO_INFER_IN_ITEMSUBST
Description Use this profile option to instruct the planning engine whether to infer end
item substitution relationships. Valid values are:

Yes - Do not infer item substitution relationships


No/Null - Do infer item substitution relationships

Default Value - Null


Note Reference(s) 1068297.1

Bug Reference(s) 6901454


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Divergent Supply Feeding Pattern

Profile Code MSO


Profile Option Name MSO_SUPPLY_SPLIT
Description Not used.
Note Reference(s)

Bug Reference(s) 4573393


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Divergent Supply Feeding Pattern for Inter-
Org and Supplier Sourced orders

Profile Code MSO


Profile Option Name MSO_INTER_ORG_SUPPLY_SPLIT
Description Allows you to fulfill multiple downstream demands in parallel or in series by a
supply from another internal organization.
Values are:

Series With MTQ Only - This is the default value. A supply


always feeds multiple demands in series when a
corresponding MTQ has been specified.

Series - Supply feeds multiple demands in series.

If the plan planning mode is Constrained (Without


Detailed Scheduling), the planning engine does not
use this profile option.

Default Value: Series With MTQ Only


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Divergent Supply Feeding Pattern for Intra-
Org Sourced orders

Profile Code MSO


Profile Option Name MSO_INTRA_ORG_SUPPLY_SPLIT
Description Allows you to fulfill multiple downstream demands in parallel or in series by a
supply in the same organization.
Values are:

Series With MTQ Only - This is the default value. A supply


always feeds Multiple demands in series when a
corresponding MTQ has been specified.

Series - Supply feeds multiple demands in series.

If the plan planning mode is Constrained (Without Detailed Scheduling), the


planning engine does not use this profile option.
Note Reference(s)

Bug Reference(s) 8675345


9147919
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Dual Simplex Parameter

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_DPRIIND
Description Gradient parameter for dual simplex.
Values: 0, 1, 2, 3, and 4
Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP
User Guide.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: EDD Demand Cutoff Priority

Profile Code MSO


Profile Option Name MSO_EDD_DEMAND_CUTOFF_PRIORITY
Description For an (ECC) plan, we can Enforce Due Dates (EDD) for some sales order
demand based on priority
So if you have sales order priorities, and want all priority 1 and 2 to be
planned as EDD, then set the profile value = 3
This will override constraints, and plan these orders as EDD.
This can cause overloads in resources and also for supplier capacity. This is
a hidden profile in 11.5.10, but can be defined manually in Application
Developer
In R12, this is seeded profile.
This is available in 12.1.1 and upwards as well.
Note Reference(s)

Bug Reference(s) 4572101


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: EDD Scheduling Window Control

Profile Code MSO


Profile Option Name MSO_EDD_SCHEDULING_WINDOW_CONTROL
Description This profile option is applicable to constrained plans with enforce demand
due dates. The planning engine calculates an actual scheduling window for
each resource activity and supply. Valid values are:
Number between 0 and 1

The actual window is defined by the dates:


Latest Possible completion time (LPCT) - Determined by the
start time of downstream activities that have already been
scheduled.
Earliest Allowable Completion Time (EACT) - Calculated by
the planning engine which accounts for the unscheduled
upstream activities and how much time those activities need.

If this profile option is the default value, the planning engine uses the
calculated EACT. If this profile option is lower than the default value, the
planning engine uses an earlier EACT than the calculated EACT which gives
the activity a larger scheduling window. If this profile option is higher than the
default value, the planning engine uses a later EACT than the calculated
EACT which gives the activity a smaller scheduling window. This is a user
level profile option.

Default Value - 0.5


Note Reference(s)
259322.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Enable Advanced Sequencing

Profile Code MSO


Profile Option Name MSO_GLOBAL_SDS_FLAG
Description Determines if Sequence Dependent Setups (if
defined) are considered during the scheduling
process.

Valid values: Yes/No


Default value: Yes

It is also possible to completely disable


consideration of Sequence Dependent Setups by
setting the Sequence Dependent Setups for the
Days/Weeks/Periods buckets in the Plan Options-
>Constraints tab to No. However, regardless of the
setting of this profile option, if any of the Sequence
Dependent Setups are set to Yes in the Plan
Options, Sequence Dependent Setups will be
considered in that bucket(s).

The planning modes Constrained (Without Detailed


Scheduling) and Constrained (With Detailed
Scheduling) are available when the value of this
profile option is set to Yes.
Note Reference(s)

Bug Reference(s) 5233140


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Enable Cost Rollup for Optimization

Profile Code MSO


Profile Option Name MSO_SCO_COST_ROLLUP
Description This profile specifies where the optimization engine looks for costs during
cost-based optimization.
Valid values are:

No: Use user-provided costs from the source system


Yes: Use costs from the internal cost rollup

Default value = NULL (No)

Will be used if the Optimization Flag is checked in


Plan Options.

When Yes, it is possible that internal cost rollup


may take some time and impact performance.

Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized No
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Enable Decision Rules

Profile Code MSO


Profile Option Name MSO_ENABLE_DECISION_RULES
Description The profile option enables User Defined Decision Rules. Valid values are:
Yes - Use the user-defined decision rules.

No - User defined decision rules are not allowed.

The Plan Options tab, Decision Rules, is disabled. If you select No, you can
duplicate the functionality of the decision rule Use Alternate Sources
parameter for buy items but not for transfers from other organizations; set
profile option MSC: Enable Enhanced Sourcing to Yes.

Default Value - No
Note Reference(s)

214041.1
225876.1

267399.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Enable Hard Links Globally

Profile Code MSO


Profile Option Name MSO_GLOBAL_HARD_LINK_FLAG
Description Valid values are:
Yes - hard links in the code are not disabled
No - disable the hard links in the code.

Default Value - Yes


Note Reference(s)

Bug Reference(s) 5067925


Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Enable Rounding of Fractional Supplies For
Service Planning

Profile Code MSO


Profile Option Name MSO_ENABLE_ROUNDING_OF_FRACTIONAL_SUPPLIES_FOR_SRP
Description Enables rounding of fractional supplies and
demands and allocated qty after 1-to-1 splitting
based on pegging for SPP

Valid values are:


Y - By rounding the orders we are going to update
the data from the pegging, supplies and demands
table. Rounding is process that round up to the
nearest integer the fractional order quantities.
N - If the profile is not specified the order quantities
are NOT rounded up (default behavior)
Note Reference(s)

Bug Reference(s) 6834025


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Enable sourcing split for end item
substitution

Profile Code MSO


Profile Option Name MSO_SRC_SPLIT_FOR_SUBS
Description When using End Item Substitution, for Rank 1
sourcing rules with split sourcing %, this profile
must be set to enforce the sourcing split.
Valid values: Yes/No
Default value: No

Not supported on Rank 2 of the sourcing rule.


Note Reference(s)

Bug Reference(s) 6430766


9486069
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Enforce Minimum Transfer Quantities

Profile Code MSO


Profile Option Name MSO_GLOBAL_MTQ_FLAG
Description Valid values : Yes/No
Default value = Yes

If set to Yes : The downstream process starts after


a minimum quantity from the upstream process has
been completed. The material transfer is
continuous after the Minimum Transfer Quantity is
completed.

No documentation on this profile. However, you


can find information about "Minimum Transfer
Quantity" (MTQ) in ASCP guide (Page 6-79)

This is linked to MTQ setups for resources and


routings.
This should be No, unless you have specific MTQ
setups that must be enforced.

Note Reference(s)

Bug Reference(s) 6650688


9409110
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Enforce Resource Sequence Contiguity

Profile Code MSO


Profile Option Name MSO_ENFORCE_RESOURCE_SEQUENCE_CONTIGUITY
Description Controls contiguity constraints between resource activities within an
operation. Valid values are:
Yes - Resource activities within the same operation are
scheduled contiguously in time. The end of the preceding
activity exactly lines up with the start of the current activity
and the end of the current activity exactly lines up with the
start of the next (if there is MTQ specified, the activities may
also overlap).

No: The contiguity constraint is relaxed and in certain cases,


the chances of obtaining feasible schedules improved.

Default Value - No
Note Reference(s)
562872.1
259322.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Firm Purchase Orders Within Time Fence

Profile Code MSO


Profile Option Name MSO_FIRM_PURCHASE_ORDER_WITHIN_PTF
Description Indicates whether or not the planning engine should firm those purchase
orders that are within the time fence. Valid values are:

Yes - Firms purchase orders that are within the time fence.
No - The planning engine does not reschedule the non-firm
purchase orders that have dock dates within the Planning
Time Fence. The planning engine does not reschedule or
cancel recommendations even if there are conditions for
reschedules and cancellations.

Created to control behavior in HLS code and keep


supplies inside time fence from being rescheduled
out.
Note Reference(s) 370386.1

365112.1
1068297.1

Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Firm Requisitions Within Time Fence

Profile Code MSO


Profile Option Name MSO_FIRM_REQ_WITHIN_PTF
Description Indicates whether or not the planning engine should firm those requisitions
that are within the time fence. The valid values are:
Yes: Firms requisitions that are within the time fence.

No: The planning engine does not reschedule the non-firm


purchase requisitions that have dock dates within the
Planning Time Fence.

The planning engine does not reschedule or cancel recommendations even if


there are conditions for reschedules and cancellations.
The planning engine uses the start date of the receiving organization as the
reference for internal requisitions. Default : No
Note Reference(s) 555016.1

1079681.1
1068297.1
365112.1

Bug Reference(s) 8709703


Document References(s) -1
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Firm Supply Allocation Window (Backward
days)

Profile Code MSO


Profile Option Name MSO_FIRM_SUPPLY_ALLOC_WIN
Description The allocation of firm supplies to demands is based on demand priorities
within the Firm Supply Allocation window. Set this window using system
level profile options. This window is derived dynamically for each demand; it
starts with the demand due date and goes backwards to the window size.
This is stated as the number of calendar days including non-workdays. Valid
values are:
Integer > 0

Default Value - 1
Note Reference(s)

1068297.1

Bug Reference(s) 4688250


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Firm Supply Allocation Window (Forward
days)

Profile Code MSO


Profile Option Name MSC_FIRM_SUPPLY_FWD_FENCE
Description The allocation of firm supplies to demands is based on demand priorities
within the Firm Supply Allocation window. Set this window using system level
profile options.

This window is derived dynamically for each demand; it starts with the
demand due date
and moves forwards to the window size. This pegs demands to firm supplies
that are scheduled after the demand date. After searching backward, it
searches forward by the number of days set by this profile option, pegging
the supply with the nearest (earliest) schedule to the unallocated demand
quantity.
This can cause supplies to be late for the demand due date. This is stated
as the number of calendar days including non-workdays.

To use this feature, set profile option MSO: Net All Firm Supplies Before
Creating Planned Orders to Yes.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Firm Work Orders/Operations Within Time
Fence

Profile Code MSO


Profile Option Name MSO_SCHEDULE_FIRMED_BEFORE_PTF
Description Used for both constrained and unconstrained plans. Valid values are
Yes - all operations of an order with start dates in the
Planning Time Fence are treated as firm. Any operation with
a start date outside of the Planning Time Fence is not
considered firm and can be moved.
No - operations with start dates in the Planning Time Fence
can be rescheduled out.

Note Reference(s) 1068297.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Floating Point Precision

Profile Code MSO


Profile Option Name MSO_FLOATING_POINT_PRECISION
Description There is a documentation bug : The documentation
says that this profile is replaced by profile MSO:
Floating Point Precision for Order Quantities - but
this does not exist.

This (Floating Point Precision) is the correct profile


name - Refer to the documentation for MSO:
Floating Point Precision for Order Quantities and
use this profile instead.
Number > 0
Default = 100
Internal multiplier for order quantities.
Can change the value depending on precision
desired.
Verify that the product of the floating point precision
and the number does not exceed the maximum
integer size handled by
the machine.

In HLS, we are using integer values, not really


floating point numbers. The profile option "MSO:
Floating Point Precision" determines the number of
significant digits to consider in floating values like
quantities. When set to 100, basically we will
consider 2 significant values after the decimal point
(so for example, a value like 10.234 will be 10.23).
To do this, we basically multiply values by the
floating point precision to generate a true integer
value (we'll ignore any values after the decimal
point in this new value), but this means we cannot
exceed the maximum integer value that can be
represented by the machine.

Common Error

Fatal error, aborting


HLSDriver::testSupplierQuantitiesOverflow()
### Error: The product of largest quantity for
supplies for buy items 129083918
and the profile value of 'MSO: FLOATING POINT
PRECISION' 50
exceeds the maxmimum integer number
2147483647 for this platform
please either reduce the value of profile
option'MSO: FLOATING POINT PRECISION'
Or reduce the maximum supply quantity for buy
item.
Supply Id : 44544067
Item Id : 1587
Org Id : 211
Instance Id : 1

Basically, this error occurs because the quantity of


a supply must be exceeding 2^31 / 50 =
42,949,672. By setting the profile option to 1, the
supply quantity has to be bigger than
2,147,483,648 before they will get this error. The
suggestion is not to permanently set the profile
option to 1, merely to see if setting it to 1
generates the same error. If it does, then more
than likely it is a problem with the data setup,
unless they really are dealing with quantities larger
than 2 billion. If they are not, then the correct data
files (that correspond with the log file) should
contain the relevant supply that is causing this
problem, and the customer should be able to track
it down and correct if necessary.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Floating Point Precision for Increments of
Shift Start/End Times Within a Planning Bucket

Profile Code MSO


Profile Option Name MSO_HLS_SHIFT_INC_PRECISION
Description Could not find in the User guide.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Floating Point Precision for Order Q

Profile Code MSO


Profile Option Name MSO_HLS_ORDER_QUANTITY_PRECISION
Description Not used. Replaced by profile option MSO: Floating Point Precision for Order
Quantities
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Floating Point Precision for Planning Bucket
Efficiency

Profile Code MSO


Profile Option Name MSO_HLS_GRANULAR_PRECISION
Description This has been changed to MSO:HLS Granularity Precision.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Floating Point Precision for Transportation
Capacities (Volume)

Profile Code MSO


Profile Option Name MSO_HLS_TRANS_VOLUME_PRECISION
Description Internal multiplier for transportation lane capacities by volume, by day. Can
change the value depending on precision desired. Verify that the product of
the floating point precision and the number does not exceed the maximum
integer size handled by the machine. See 'Floating Point Precision, page A-2
of ASCP User guide for more information.
Valid Values: Number>0
Default Value: 100

If the plan planning mode is Constrained (Without Detailed Scheduling), the


planning engine does not use this profile option.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Floating Point Precision for Transportation
Capacities (Weight)

Profile Code MSO


Profile Option Name MSO_HLS_TRANS_WEIGHT_PRECISION
Description Internal multiplier for transportation lane capacities by weight, by day. Can
change the value depending on precision desired.
Verify that the product of the floating point precision and the number does not
exceed the maximum integer size handled by
the machine. See 'Floating Point Precision, page A-2 of ASCP User guide for
more information.
Valid Values: Number>0
Default Value: 100

If the plan planning mode is Constrained (Without Detailed Scheduling), the


planning engine does not use this profile option.
Note Reference(s)

Bug Reference(s) 5173359


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Floating Point Precision for Usage in
Routings

Profile Code MSO


Profile Option Name MSO_HLS_USAGE_PRECISION
Description Internal multiplier for order quantities. Can change the value depending on
precision desired. Verify that the product of the floating point precision and
the number does not exceed the maximum integer size handled by the
machine. See 'Floating Point
Precision, page A-2 of ASCP User guide for more information.
Valid Values: Number>0
Default Value: 100

If the plan planning mode is Constrained (Without Detailed Scheduling), the


planning engine does not use this profile option.
Note Reference(s) 560505.1
579204.1
224112.1

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Generate Compression Days Exception

Profile Code MSO


Profile Option Name MSO_GENERATE_COMPRESSION_EXCEPTION
Description Use this profile option to control issuance of exception message Orders with
compression days. Valid values are:

Yes - Issue the exception message


No - Do not issue the exception message

The planning engine issues exception message Orders with insufficient lead-
time when it schedules orders for less time than their assembly's lead-time.
If the reason for that scheduling is that the planning engine would schedule
the order in the past, it also issues exception message Orders with
compression days.

To avoid seeing both these exceptions for the same order, select No for this
profile option.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Generate Compression/Firming Exceptions
for Orders in Progress

Profile Code MSO


Profile Option Name MSO_GENERATE_COMPRESSION_FIRMING_EXCEPTIONS
Description When set to No, the planning engine does not issue the following exception
messages for firm orders whose start date is in the past (after applying the
lead time offset to the due date). Valid values are:

Order with Insufficient Lead Time


Order is Firmed Early

The planning engine assumes that these orders are in progress and on time:
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Generate Reduced Model

Profile Code MSO


Profile Option Name MSO_SCO_ENABLE_REDUCED_MODEL
Description Generate Reduced Model in Optimization

Description: Generate Reduced Model in


Optimization

Application: Constraint Based Optimization


Values = Yes / No

Default value: No
With this profile set to no, the return fcst are used
now.

This profile is available from VCP 12.1.3.5 PATCH:


12695590:R12.SCP_PF.B

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Generate Shared Supply Exceptions

Profile Code MSO


Profile Option Name MSO_GENERATE_SHARED_SUPPLY_EXCEPTIONS
Description MSO: Generate Shared Supply Exceptions
Values: Yes/No
No: The planning engine schedules demands in slices; each
slice contains a set of demands in a time period. Sometimes,
a supply is pegged to two demands (shared supply) that are
each in different slices. If these two slices are separated by
more slices than the value of profile option MSO: Additional
Demand Slices for Shared Supply Rescheduling, the
planning engine does not reschedule the shared supply in
the earlier slice when it schedules the demand in the later
slice. It is possible that the demand in the later slice is
satisfied late because the planning engine did not reschedule
in (earlier date) the supply in the earlier slice.

Yes: The planning engine issues a Shared Supply


Scheduled Late exception message when this occurs. If this
profile option is No, the planning engine does not generate
the exception message. This is a user level profile option.

Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Global Batchable Flag

Profile Code MSO


Profile Option Name MSO_BATCHABLE_FLAG
Description Enables resource batching functionality for order scheduling.
Note Reference(s)

Bug Reference(s)
Document References(s) B31553-02
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Global Chargeable Flag

Profile Code MSO


Profile Option Name MSO_CHARGEABLE_FLAG
Description This profile option controls whether Oracle Advanced Supply Chain Planning
schedules resource charges.

Yes: the planning engine schedules charges for chargeable


resources.
No, chargeable resources are considered as item basis an
no individual charges are scheduled.

Material flows and resource loads are not influenced by charge quantities.
Valid values: yes/no
Default value: no
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Global Time Limit

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_TILIM
Description Parameter used to set global time limit for halting optimization.
Values: Number > 0.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: HLS flat files path

Profile Code MSO


Profile Option Name MSO_HLS_FLAT_FILES_PATH
Description Specifies the directory to store the Planning Engine debugging data files.
Valid Values: Text
Default Value: Null
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Hard link scheduling window

Profile Code MSO


Profile Option Name MSO_HARD_LINK_SCHEDULING_WINDOW
Description This profile option specifies the time window within
which ASCP tries to schedule a set of operations
linked together through hard links.If scheduling is
unsuccessful,overloads are created.
This is a hidden profile option used by
development. This defines the scheduling window
within which the system schedules the hard-linked
operation set. Increasing the window gives room to
schedule operations with hard links without
overloading. Based on the number of operations
per hard linked operation set,increasing this value
can have a performance impact.

Valid Values : Integer Default value 30


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Hard link scheduling window expansion
factor

Profile Code MSO


Profile Option Name MSO_HARD_LINK_SCHEDULE_WINDOW_FACTOR
Description This hidden profile option used by development is used to limit the
propagation for the hard linked operation set.
Normally, we limit the propagation by a factor of (This profile option value *
Minimum duration of hard linked operation set).
Valid Values: Integer
Default Value: 10
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Heuristic type

Profile Code MSO


Profile Option Name MSO_HEURISTIC_TYPE
Description Determines which heuristic to use.
The look-ahead heuristic reserves time for lower priorities so the schedule
begins with the tasks of higher priorities.
This is a site level profile option.
Valid Value: Look Ahead
Default Value Look Ahead
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Incremental Planned Orders

Profile Code MSO


Profile Option Name MSO_SUPPLIER_DEMAND_SPLIT
Description Not used in the code
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Internal Demand Aggregation Within
Optimization

Profile Code MSO


Profile Option Name MSO_SCO_INT_DMD_AGGR
Description This profile specifies how the optimization engine should prioritize
independent demands.
Valid values are:

Yes: Prioritize by date. This value improves optimization


engine performance.

No: Prioritize by demand priority

Bug 9587814 shows that cusotmer had plan using


12gb of memory and by setting this profile = Yes,
the plan only used 5gb of memory
Note Reference(s)

Bug Reference(s) 9587814


Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Inventory Carrying Costs Percentage

Profile Code MSO


Profile Option Name MSO_CARRYING_COST_PCT
Description Specifies inventory carrying costs percentage for all items in the plan. Can be
defined at the site level. You can update this value. The inventory carrying
cost is a percent
(if the user enters 10, the value is 10%). A percentage between 0 and 100.

Note Reference(s)

Bug Reference(s) 6863019


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: JIT Selector Window Size

Profile Code MSO


Profile Option Name MSO_SELECTOR_JIT_WINDOW_SIZE
Description This profile is not currently being used in ASCP.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: LP Constraint Batch Size

Profile Code MSO


Profile Option Name MSO_CONSTRAINT_BATCH_SIZE
Description Not used.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: LP Markowitz Coefficient

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_EPMRK
Description Sets the Markowitz Coefficient.
Values: Number between 0.0001 and 0.99999
Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP
User Guide.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: LP Optimization Algorithm

Profile Code MSO


Profile Option Name MSO_LP_ALGORITHM
Description Determines which optimization algorithm is used. Can be defined at the site
level. This is Automatic Calculations.
When the Default Value of a profile option states that it is automatically
calculated, this means that the Planning Engine
determines the default value of that particular profile option.
Valid Values:
0: Primal simplex
1:Dual simplex
2: Hybrid barrier primal
3: Hybrid barrier dual

Default Value:0

If you must change these profile option values, do


so only after consulting Oracle Development and
Oracle Support.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Late Demands Exceptions Tolerance Minutes

Profile Code MSO


Profile Option Name MSO_LATE_DMD_EXC_TOL_MIN
Description This profile option is used by constrained plans. Sets the value in minutes for
a window during which the planning engine does not issue exception
messages for late demands. Use it particularly in cases where demands are
only a few minutes
or a few hours late.
The value that you enter is used based on a 24 hour, 7 day per week
calendar. For example, enter 1440 minutes (24 hours) for this profile option.
A demand due at 15:00 on Tuesday does not cause late demand exception
or diagnosis information
as long as the supplies are complete by 15:00 on Wednesday.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Lead Time Control

Profile Code MSO


Profile Option Name MSO_LEAD_TIME_CONTROL
Description Violate Minimum Processing Times to Meet
Demand Due Date: The planning engine meets
the demand due date even if it compresses
operations and supplies beyond their minimum
durations (from item lead-times and routing
usages).
-- This setting can violate the Planning Time Fence
settings for an item.
-- It can also violate a Natural Time Fence created
by using profile MRP: Create Time Fence = Yes

Do Not Violate Minimum Processing Times: The


planning engine respects the minimum durations of
operations and supplies (from item lead-times and
routing usages) even if it satisfies demands late.

Default Value: Violate minimum Processing Times


to Meet Demand Due Date

This, sometimes, used with plan option - Enforce


Purchasing Lead-times Constraint and can change
planning engine behavior.

In 11.5.10, this profile is only for EDD - Enforce


Demand Due Dates plan

In 12.0.4 and above, this profile works for BOTH


EDD and ECC - Enforce Capacity Constraints
plans.
Note Reference(s) 399888.1
850591.1
443357.1

Bug Reference(s)
Document References(s) -1
-1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: List Size for Pricing Candidates

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_PRICELIM
Description Parameter to set the list size for pricing candidates.
Values: Integer > 0.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Lookahead days to net co-product/by-product
supplies before creating planned orders

Profile Code MSO


Profile Option Name MSO_CO_LOOKAHEAD_WINDOW
Description Profile no longer used in the application.
Will be removed from UI in a future release.

Was originally available in 11.5.8 and removed in 11.5.10.


accidentally included in R12
Note Reference(s)
111.1

Bug Reference(s) 5462273


3631110
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Max Gap Tolerence on SDS

Profile Code MSO


Profile Option Name MSO_MAX_GAP_TOLERANCE_ON_SDS
Description Per bug 8538729 this profile is not currently used.

**Begin PM Update
This profile was introduced in R1 for DS. Not used anymore
**End PM Update
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximium Number of Prepones

Profile Code MSO


Profile Option Name MSO_MAXIMUM_PREPONES
Description Scalability factor for the Scheduling Engine. The Scheduling Engine attempts
to schedule the operations in different orders to find a solution. Limits the
number of times the Scheduling Engine attempts to schedule an operation.If
there are many components for some items or many small supplies
answering a demand, the number of orders is larger; reduce this parameter.
Valid values are:
Integer > 0

Can be defined at the site level.


This profile is automatically calculated,this means
that the Planning Engine determines the default
value of this profile option.

If the plan planning mode is Constrained (Without


Detailed Scheduling), the planning engine does not
use this profile option.

Default Value - 10

If you must change these profile option values, do


so only after consulting Oracle Development and
Oracle Support.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximize Search of Availability Intervals

Profile Code MSO


Profile Option Name MSO_MAXIMIZE_SEARCH_OF_AVAILABILITY_INTERVALS
Description Enhances the capability of the scheduling engine to accurately identify
pockets of available time where resource activities can be feasibly
scheduled. Valid values are:
Yes - Maintains a detailed picture of the Resource Profile
while scheduling. Resource Profile refers to the time varying
picture of requirements and availability. The maintenance of
this detailed picture causes the planning engine to miss
fewer valid slots for scheduling activities than otherwise.
No - Detailed Resource Profile is not maintained.

Default Value: Yes

If you need to change the default value of this profile in your installation, it is
recommended that you consult with Oracle Development before doing so.
You can set this option if you receive the Requirement causes resource
overload exceptions in the Planner Workbench in Enforce Capacity
Constraints Plans.

If the plan planning mode is Constrained (Without Detailed Scheduling), the


planning engine does not use this profile option.
Note Reference(s) 841308.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximize Use of Unfirm PurchOrd/WorkOrd in
Optimization

Profile Code MSO


Profile Option Name MSO_SCO_MAXIMIZE_POWO
Description Optimization phase of the engine has the capability to evaluate the use of
new planned orders versus using partial supplies from scheduled receipts.
If you set it to 0 (Zero) engine may create new planned
orders while scheduled receipts exist. Ex: you have demand
of 10 units and you have a W/O or PO of 100 units, engine
will create new supply for 10 units versus using 10 units ut of
100 units of scheduled receipts and carrying the 90 units.
This decision might be taken as it is cheaper to produce than
to carry extra inventory.

If you set it to 1, the engine will use existing supplies and


decide to carry the un used portion of the supplies from W/O
or a PO. Continuing the example, Engine will use 10 units of
supply out of 100 and decide to carry the rest of the 90 units
instead of creating new supplies. This might not be cost
effective.

Note Reference(s)
567317.1

Bug Reference(s) 4006732


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Activity Duration

Profile Code MSO


Profile Option Name MSO_HLS_ACTIVITY_DURATION_MAX
Description Defines the Planning Engine maximum activity duration in days.All
requirements should be less in duration than this. If null, the planning horizon
duration is used.
If the plan planning mode is Constrained (Without Detailed Scheduling), the
planning engine does not use this profile option.
Valid Values: Number>0
Default Value: by Automatic Calculations
Note Reference(s) 179406.1
1327805.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Allowable Days Late

Profile Code MSO


Profile Option Name MSO_MAX_DAYS_LATE
Description Limits the number of days by which a demand or unfirmed scheduled receipt
can be moved out when optimization is turned on. This value is used only to
improve performance and reduce the size of the plan for the optimization
component of the Planning Engine. Scheduling moves demands and
unfirmed scheduled receipts out as long as necessary. Valid values are:
Integer > 0

Can be defined at the site level.

Note: Set this to a number as large as the typical planning horizon to avoid
unusual results.

Default Value - 300


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Allowable Days Late before
Forecast Expiration

Profile Code MSO


Profile Option Name MSO_MAX_FCST_LATE_DAYS
Description Oracle Advanced Supply Chain Planning uses this profile option when
planning supplies for forecast scenarios from Oracle Demand Planning,
master demand schedule forecasts, and manual master demand schedule
entries. When a forecast or master demand schedule entry cannot be
completely satisfied within the allowable days late, the planning engine does
not plan supplies for the quantity that is late by this many days. The profile
option does not apply to sales orders. Valid values are:
Interger > 0

Default Value - Null


Note Reference(s)
859179.1

Bug Reference(s) 8801111


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Alternate Combinations

Profile Code MSO


Profile Option Name MSO_ALT_COMBINATIONS
Description Does not appear in any manual,

Profile Option is not used by the code.


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Demands Per Group for Advanced
Sequencing

Profile Code MSO


Profile Option Name MSO_NUMBER_OF_DEMAND_PER_GROUP_FOR_SDS
Description The profile option specifies the number of demands that are grouped
together for scheduling. The larger this number, the greater the chances of
obtaining good sequences on the resources. Making this number too large
might result in demand priorities not being fully respected while scheduling.
Valid values are:
Any number

Default Value - 1
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Demands per Group

Profile Code MSO


Profile Option Name MSO_DEMANDS_PER_GROUP
Description Determines the maximum number of demands that can be grouped together
for scheduling. Within a group, the default heuristic can try different orders
among the demands. Valid values are:

Integer > 0, smaller than the size of a slice

Default Value - 5
Note Reference(s)

Bug Reference(s) 2829066


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Demands per Slice

Profile Code MSO


Profile Option Name MSO_DEMANDS_PER_SLICE
Description Determines the number of demands in a slice. Enables the Scheduling
Engine to resolve interactions of demands within a slice. Supplies shared
between demands are scheduled better when the demands are in the same
slice. However, slices that are too large slow down the Scheduling Engine
use more memory. Valid values are:

Integer >= 0

Default Value - 100


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Inventory Level % of Safety Stock

Profile Code MSO


Profile Option Name MSO_MAX_INV_LEVEL
Description Use this option to specify maximum inventory levels. If no other method of
calculation is defined for an item-organization maximum inventory level, the
levels are based on the specified percentage of the safety stock level. Valid
values are:

Percentage between 0 and 100

Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles MSO: Target Inventory Level % of Safety Stock
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Lead Time Factor

Profile Code MSO


Profile Option Name MSO_MAX_LEAD_TIME_FACTOR
Description As per Bug#2953151 not used any more.

This is used by the scheduling engine. This is the fraction of the overall
horizon length, within which the backward pass restricts looking for resources
to fit the schedule. If this cannot be scheduled within this fraction of the
overall horizon length, it is forward scheduled.
The value is specified as a number between 0 to 1. This profile option can be
defined at the site level. You can update this value.
The default value is 1
Note Reference(s) 167239.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Number of Demands in a Hard
Linked Demand Set

Profile Code MSO


Profile Option Name MSO_MAX_DEMANDS_PER_HLK_DEMAND_SET
Description Value specified in number of demands. Default value is 1, indicating no
upper limit. This is a hidden profile option.
Note Reference(s)

Bug Reference(s) 6818322


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Number of Groups by Low Level
Code for Optimization

Profile Code MSO


Profile Option Name MSO_SCO_MAX_LLCODE_GROUPS
Description Maximum Number of Groups by Low Level Code for Optimization
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Number of Pull for Operation

Profile Code MSO


Profile Option Name MSO_MAX_PULL_OPERATION
Description When an operation cannot be scheduled on a certain day, the scheduling
engine attempts to schedule it on an earlier date (for backward scheduling).
This profile option controls how many days are tried in this manner. Many
days result in lower performance. Valid values are:
Integer > 0

Can be defined at the site level.

This profile is automatically calculated, this means


that the Planning Engine determines the default
value of this profile option.
Default Value - 8

If you must change these profile option values, do


so only after consulting Oracle Development and
Oracle Support.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Number of Pushes for Operation

Profile Code MSO


Profile Option Name MSO_MAX_PUSH_OPERATION
Description When you are running constrained plans with the Enforce Capacity
Constraints plan option checked,this profile option controls the number of
attempts made to schedule a resource activity feasibly. Valid values are:
-1 - Continues the search for available capacity till the end of
the planning horizon.
Integer > 0 - The number that you specify here determines
the number of attempts that the planning engine makes to
schedule the activity. For example, if you set the profile
option to 5, the planning engine makes 5 attempts to
schedule the activity feasibly, and after that schedules the
activity with an overload. The spot chosen to schedule the
activity with overload is the initial spot that was tried.

If the plan planning mode is Constrained (Without Detailed Scheduling), the


planning engine does not use this profile option.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Operations Per Slice

Profile Code MSO


Profile Option Name MSO_HLS_MAX_OPERATIONS_PER_SLICE
Description Determines the number of operations which can be scheduled in a slice.
Limits the problem size in a slice and can be a limiting factor in determining
the number of demands that can be scheduled in a slice.
Oracle recommends that you use a large value such as the default value.
If the plan planning mode is Constrained (Without Detailed Scheduling), the
planning engine does not use this profile option.
Valid Values: Integer>0
Default Value: 3000 operations
Note Reference(s) 747739.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Resource Over-capacity

Profile Code MSO


Profile Option Name MSO_MAX_EXCESS_RESOURCE_UNITS
Description Assigns resource slacks when it does not find the resource available and it is
forced to use slacks. The Scheduling Engine initiate the resource slack from
0 to maximum assigned units and will jump to this number if no solution is
possible. This limits the number of tries to assign the resource slack. Valid
values are:
Number > 0

Can be defined at the site level.

This is automatic Calculated profile. When the Default Value of a profile


option states that it is automatically calculated, this means that the Planning
Engine determines the default value of that particular profile option.

Default Value - 5
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum Simplex Iterations

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_ITLIM
Description Parameter to set the maximum number of simplex iterations.
Values: Integer > 0
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Maximum number of pulls/push for hard
linked operations

Profile Code MSO


Profile Option Name MSO_MAX_PUSH_PULL_FOR_HARD_LINKS
Description This hidden profile option is not used.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Minimize Supply Duration

Profile Code MSO


Profile Option Name MSO_MIN_SUPPLY_LEAD_TIME_BY_LEFT_JUSTIFY
Description Valid Values:
1. Yes
2. No
This is a profile to compress supply durations. It was introduced in R12.
Default value: Yes
This is used during HLS scheduling of jobs and supplies.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Minimum Processing Lead Time Adjustment
Factor

Profile Code MSO


Profile Option Name MSO_MIN_PROC_LEAD_TIME_ADJ_FACTOR
Description Not available in user guide.
Note Reference(s) 564241.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Multiplier To Derive Supply Allocation
Window

Profile Code MSO


Profile Option Name MSO_FIRM_SUPPLY_MULTIPLIER
Description You can set the Firm Supply Allocation window using the profile option MSC:
Firm Supply Allocation Window or you can use the manufacturing lead-time
and the profile option MSC: Multiplier to Derive Firm Supply Allocation
Window.

If you specify any value for the latter profile option, the information you enter
for MSC: Firm Supply Allocation Window is ignored. If the product of this
multiplier and cumulative manufacturing lead-time is a fractional quantity, the
number is rounded up to the next integer. Formulas for the item-specific firm
supply allocation window:

Make item: Cumulative manufacturing lead-time * MSO:


Multiplier to derive supply allocation window.

Buy item: Processing lead-time * MSO: Multiplier to derive


supply allocation window.

Valid Value: Number >= 0.


Default Value: Null.
Note Reference(s)
1068297.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Net All Firm Supplies Before Creating
Planned Order

Profile Code MSO


Profile Option Name MSO_FIRM_B4_PO
Description Nets all firmed supply available in any future period before creating new
planned orders.
The profile option treats firmed planned orders the same as real supplies.
The values are:

0 - No: Does not net firm supplies before creating planned


orders.

1 - All Supply Types: Net all firm supplies before creating


planned orders. This includes work orders, purchase orders,
transfer supplies and firm planned orders for these supplies.

2 - Only for Work Orders: Net only firm discrete jobs before
creating planned orders.

3 - Only for Purchase and Transfer Supplies: Net all firm


purchased and transfer supplies before creating planned
orders.

4 - All Supply Types Including by-product/co-product


supplies: Nets all firm supplies (including by-product and co-
product supplies) before creating planned orders. The
planning engine does not reschedule by-product and co-
product supplies, they follow the scheduling of the supply
that generates them. This choice allows these supplies to be
netted for earlier demands. This may cause late demands,
but may reduce overall inventory.

Default: No
Note Reference(s) 370386.1

749448.1

Bug Reference(s)
Document References(s) -1
-1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Network routing cycle time coefficient

Profile Code MSO


Profile Option Name MSO_NFL_CYCLE_TIME_COEFFICIENT
Description Used by the Scheduling Engine to calculate the window of time allocated to
schedule a network flow. This is used in conjunction with NFL Fixed Time
Window. The window of time is (Coefficient *Cycle time) + Fixed time
window. Valid values are:

Number > 0

Defined at the site level.

Profile is applicable when OSFM Network Scheduling Method is set to


Optimized.

Default Value:0
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Network routing fixed time window

Profile Code MSO


Profile Option Name MSO_NFL_FIXED_TIME_WINDOW
Description Used by the Scheduling Engine to calculate the window of time allocated to
schedule a network flow. This is used in conjunction with NFL Fixed Time
Window. The window of time is (Coefficient *Cycle time) + Fixed time
window.

Valid values are:


Number > 0

Profile is applicable when OSFM Network Scheduling Method is set to


Optimized.

Defined at the site level.

Default Value - 0
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Nfl Backward Compression Pct

Profile Code MSO


Profile Option Name MSO_NFL_BACKWARD_COMPRESSION_PCT
Description Defines the percentage of the actual resources capacity that the network flow
takes into account. A value under 100 percent tends to offload more
activities to alternate resources. Can be defined at the site level. Valid
values are:
Between 10 and 100%

Profile is applicable when OSFM Network Scheduling Method is set to


Optimized.

Default Value - 100%


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Nfl Forward Compression Pct

Profile Code MSO


Profile Option Name MSO_NFL_FORWARD_COMPRESSION_PCT
Description Defines the percentage of the actual resources capacity that the network flow
takes into account. Use in forward phase to force the system to use
alternates and limit the tardiness of activities. Valid values are:
Between 10 and 100%

Can be defined at the site level.

Profile is applicable when OSFM Network Scheduling Method is set to


Optimized.

Default Value - 100%


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Number of Backtracks Allowed

Profile Code MSO


Profile Option Name MSO_MAX_BACKTRACKS
Description As per Bug 2953151, this is not used
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Number of Decomposition Groups Per
Process

Profile Code MSO


Profile Option Name MSO_SCO_DECOMP_GROUPS
Description MSO: Number of Decomposition Groups Per
Process

Set to the number of decomposition groups in each


process in multi-process solve mode

Product: Constrained based optimization


Internal name: MSO_SCO_DECOMP_GROUPS
User name: MSO: Number of Decomposition
Groups Per Process
Description: Set to the number of decomposition
groups in each process in multi-process solve
mode
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Number of Demand Groups for Optimization

Profile Code MSO


Profile Option Name MSO_SCO_MAX_DEMAND_GROUPS
Description You can use this profile option only for constrained plans that have decision
rules enabled. In the case of cost-based optimization, the planning engine
considers the demand lateness penalty cost instead of demand priorities.

Use this profile option to instruct the planning engine how to group demand
into demand groups by priority ranges. For example, the demand priority
values are from 1 to 100 and you set this profile option to 5. The planning
engine assigns demands to five demand groups. Each group includes a
range of 20 priorities - 1 to 20, 21 to 40, 41 to 60, 61 to 80, 81 to 100.

The planning engine searches for supplies that satisfy all demands having
priorities in the same range. It satisfies demands in the higher priority range
first. For multiple demands in the same priority range, the planning engine
satisfies demands based on individual demand priorities.

Valid values: Integer > 0


Default value = 50
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized No
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Number of Iterations for Local Search

Profile Code MSO


Profile Option Name MSO_NUMBER_OF_LOCAL_SEARCH_ITERATIONS
Description Introduced for Detailed scheduling in R12. Not used
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Number of LP Phases for Safety Stock
Calculation

Profile Code MSO


Profile Option Name MSO_SCO_MRP_SS_LOGIC
Description Set only with guidance from Oracle Development
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Number of Processes to use in
Decomposition

Profile Code MSO


Profile Option Name MSO_DECOMPOSITION_TOTAL_PROCESSES
Description Number of Processes to use in Decomposition. This is applicable for Service
Parts Planning, Distribution Planning and Advanced Supply Chain Planning.
Used to help in performance of a specific stage of the planning engine.
Default is 1
This should be changed only with Support or DEV recommendation.
Note Reference(s)

Bug Reference(s) 12409853


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Number of Threads for Optimization

Profile Code MSO


Profile Option Name MSO_SCO_NUM_THREADS
Description This profile option applies to 64-bit platforms only.

Values greater than 1 invoke running optimized plans in a


multi-threaded mode. This enables various optimization
problems to be solved in parallel so that run time may be
reduced.

However, multi-threading increases the CPU usage and memory


consumption. You can control the load on CPU by specifying the number of
threads that you want to run in parallel.

Valid value: Integer >0


Default value: null
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized No
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Number of processes for Inline Forecast

Profile Code MSO


Profile Option Name MSO_NUM_OF_PROCS
Description Number of processes for Inline Forecast. For Multiprocess run for inline
forecast the user need to supply number of processes
Note Reference(s)

Bug Reference(s) 8687334


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Optimization Advanced Start

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_ADVIND
Description This profile option controls whether the planning engine should be set to use
advanced start (profile option value 1).
This means that the optimization engine uses certain values from a previous
run of the plan; it sees improved performance by reusing certain
computations.
This is an optimization engine profile option and should not be changed
under ordinary circumstances.
Values: 0 and 1
Default value is: Null (internally defaulted as a value of 1)
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Optimization Daily Aggregation Buckets

Profile Code MSO


Profile Option Name MSO_SCO_AGGREG_DAY_BUCKETS
Description Specifies the Daily Aggregation Time Bucket to be used by the Planning
Engine if the profile
option MSO: Use Optimization Internal Time Aggregation is set to True.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Optimization Weekly Aggregation Buckets

Profile Code MSO


Profile Option Name MSO_SCO_AGGREG_WEEK_BUCKETS
Description Specifies the Weekly Aggregation Time Bucket to be used by the Planning
Engine if the profile option MSO: Use Optimization Internal Time Aggregation
is set to True.
Note Reference(s)

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Optimization debug level

Profile Code MSO


Profile Option Name MSO_SCO_DEBUG_LEVEL
Description MSO: Optimization debug level

While Forecasting the Demantra generated logs


were not exposed to users.

USing the API's and providing the profile option for


the user, the logs are now genrated in
data[plan_id]/mbpoutput/Engine_XXX.log

When method blended was used, several differnt


forecast methods are called to generate the
forecast.
Based on the fit the best forecast method is
choosen and respective forecast numbers are
provided by
the Demantra Engine. User wants to see the Log
demantra engine generates while forecasting the
history series.

The user need to define the debug level and group


level to generate the Demantra Logs

from the PROFILE OPTION :


MSO_SCO_DEBUG_LEVEL

Convention-> DEBUG_LEVEL:GROUP_LEVEL

DEBUG_LEVEL:

valid range from 3 to 6 where:

3 is message,

4 - info

6 - Detailed

GROUP_LEVEL:

The combined filter for the log groups to show


during run time,

any of the LG_XXXX variables can be combined


here to form the group to show.

LG_Events = 32 , LG_ProcDebug = 64, LG_Default


= 128; (these could be combined and the value
could be 64 + 128 )

For Example, to get good amount of log info


MSO_SCO_DEBUG_LEVEL could be set to 5:128
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra Yes
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Order Modifier Max Searching Depth

Profile Code MSO


Profile Option Name MSO_OM_CTP_MAX_DEPTH
Description Use this profile option to specify the maximum number of lower levels in the
supply chain that the planning engine searches for alternate sources, bills of
material, components, and resources to resolve a shortage. The shortages
often occur when the planning engine rounds down planed orders with
respect to capacity constraints and order modifiers.
The planning engine searches this many levels down both in:

The organization with the shortage


Organizations that supply the short organization with the
short item

Oracle suggests that:


The solution quality improves with higher numbers while the processing time
worsens with higher numbers. For each integer increase in the profile option,
processing time worsens at a much higher rate than solution quality
improves. You consider the tradeoffs and tend towards lower rather than
higher numbers.
Note Reference(s)

Bug Reference(s) 6890145


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Overlap Activities by MTQ

Profile Code MSO


Profile Option Name MSO_OVERLAP_ACTIVITIES_BY_MTQ
Description Use this profile option to control overlapping activities inside one operation.
Valid values are:

Yes - Allow overlapping activities inside one operation.


No - Prevent overlapping activities inside one operation.

Default Value - No
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Peg By-product Supplies

Profile Code MSO


Profile Option Name MSO_PEG_BYPROD_SUPP
Description Yes: Pegging is considered when scheduling operations with
by-product supply. Scheduling of these operations respects
demand for the by-product and demand for the main product.
After scheduling these operations, the by-product supply
date is updated to reflect the operation scheduled date.

No: By-Product Supplies are not pegged to demands For


constraint-based plans. Set this profile option to No with
items that are components on the supply chain bill of
materials and that are by-product on a different level of the
same supply chain bill of materials. Selecting No prevents
the planning engine from continuous looping between the
component demand and the by-product supply.

Default Value: Yes


Note Reference(s) 566497.1
984372.1
957490.1

Bug Reference(s)
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Basis for Changeovers

Profile Code MSO


Profile Option Name MSO_PENALTY_BASIS_FOR_CHANGEOVERS
Description Used in Sequence Dependent Setup scheduling to indicate whether the
changeover time of the changeover penalty is to be used as the criterion for
calculation the ideal sequence.
Valid Values are:
Changeover time :If Changeover Time, ASCP uses the
relative changeover times between setup types as the
criteria for deciding on the ideal sequence of setup types.
Changeover Penalty: If Changeover Penalty, ASCP uses the
relative changeover penalties between setup types as the
criteria for deciding on the ideal sequence of setup types.

Default Value: Changeover time


Note Reference(s) 415276.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Item
Material Capacity Flexfield Attribute

Profile Code MSO


Profile Option Name MSO_ITEM_CAP_PENALTY
Description Stores the flexfield column name that contains the value in the corresponding
table. Setup performed only during application install. See 'Flexfield
Attributes, page A-1 of ASCP user guide for more information.
Valid Values: Interger>=0
Default Value: Null
Note Reference(s) 763878.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Material
Capacity

Profile Code MSO


Profile Option Name MSO_GLOBAL_ITEM_PENALTY
Description Defines a penalty cost factor for exceeding material capacity.
Valid Values: Number>=0
Default Value: Null
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Material
Capacity Flexfield Attribute

Profile Code MSO


Profile Option Name MSO_SUP_CAP_PENALTY
Description Attribute Number Automatically generated to denote flexfield segment
holding the penalty factor. This profile option stores the item flexfield
segment that holds the penalty cost factor for exceeding material capacity.

The collections process Generate Planning Flexfield concurrent program


captures the segment when it first runs during installation.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Org
Material Capacity Flexfield Attribute

Profile Code MSO


Profile Option Name MSO_ORG_ITEM_PENALTY
Description Stores the flexfield column name that contains the value in the corresponding
table. Setup performed only during application install. See 'Flexfield
Attributes,page A-1 for more information. Valid values are:

Interger >= 0

Default Value - Null


Note Reference(s) 1069694.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Org
Resource Capacity Flexfield Attribute

Profile Code MSO


Profile Option Name MSO_ORG_RES_PENALTY
Description Stores the flexfield column name that contains the value in the corresponding
table. Setup performed only during application install. See 'Flexfield
Attributes,page A-1 for more information. Valid values are:

Interger >= 0

Default Value - Null


Note Reference(s) 1069694.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Org
Transportation Capacity Flexfield Attribute

Profile Code MSO


Profile Option Name MSO_ORG_TRSP_PENALTY
Description Stores the flexfield column name that contains the value in the corresponding
table. Setup performed only during application install. See 'Flexfield
Attributes,page A-1 for more information. Valid values are:

Interger >= 0

Default Value - Null


Note Reference(s) 1069694.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Resource
Capacity

Profile Code MSO


Profile Option Name MSO_GLOBAL_RES_PENALTY
Description Denotes a factor for plan profit computations that is invoked only when the
plan profit parameter for optimization has a value greater than 0. The
penalty cost factor is multiplied by the resource cost to give the cost of
overloading a particular resource.
Valid Values: 0 and 1
Default Value: Null (internally defaulted as a value of 1)
Note Reference(s) 562872.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding Resource
Capacity Flexfield Attribute

Profile Code MSO


Profile Option Name MSO_RES_PENALTY
Description Stores the flexfield column name that contains the value in the corresponding
table. Setup performed only during application install. Valid values are:
Interger >=0

Default Value - NULL


Note Reference(s) 147242.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Exceeding
Transportation Capacity Flexfield Attribute

Profile Code MSO


Profile Option Name MSO_TRSP_PENALTY
Description Penalty Cost for Exceeding Transportation Capacity (Optimized Plan)
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Late Demands

Profile Code MSO


Profile Option Name MSO_GLOBAL_DMD_PENALTY
Description MSO: Penalty Cost Factor for Late Demands Defines a penalty cost factor
common to all demands. The demands include sales orders, forecasts and
safety stock. Can be defined at the site level.
Values Integer > 0
No default value
Note Reference(s)

Bug Reference(s) 4139766


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Late Forecasts
Flexfield Attribute

Profile Code MSO


Profile Option Name MSO_FCST_PENALTY
Description Stores the flexfield column name that contains the value in the corresponding
table. Setup performed only during application install. Valid values are
Integer >= 0

Default Value - NULL


Note Reference(s)
176030.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Late Item Demands
Flexfield Attribute

Profile Code MSO


Profile Option Name MSO_ITEM_DMD_PENALTY
Description Stores the flexfield column name that contains the value in the corresponding
table. Setup performed only during application install.
Valid Values: Integer>=0
Default Value: Null
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Late Org Demands
Flexfield Attribute

Profile Code MSO


Profile Option Name MSO_ORG_DMD_PENALTY
Description Stores the flexfield column name that contains the value in the corresponding
table. Setup performed only during application install. See 'Flexfield
Attributes, page A-1 for more information. Valid values are:

Interger >= 0

Default Value - Null


Note Reference(s) 1069694.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Cost Factor for Late Sales Orders
Flexfield Attribute

Profile Code MSO


Profile Option Name MSO_SO_PENALTY
Description Stores the flexfield column name that contains the value in the corresponding
table. Setup performed only during application install. See 'Flexfield
Attributes,
page A-1 in the ASCP User Guide for more information.

Valid values: integer >= 0


Default value: 0
Note Reference(s) 153919.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty Increase Tolerance Percentage in
Local Search

Profile Code MSO


Profile Option Name MSO_TOLERANCE_PERCENT_FOR_LOCAL_SEARCH
Description This profile was added in R12 for Detailed Scheduling. It is not currently used
in ASCP.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Penalty multiplier outside unconstrained

Profile Code MSO


Profile Option Name MSO_LATE_PENALTY_MULTIPLIER
Description This profile option specifies an extra lateness penalty when scheduling later
than the unconstrained latest possible completion time for a given activity.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Percent Complete Before Resequencing

Profile Code MSO


Profile Option Name MSO_PERCENTAGE_OF_OPS_SCHED_BEFORE_RESEQUENCE
Description This profile was introduced in R12 for Detailed Scheduling. It is not currently
being used in the ASCP engine.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Postpone Use of Alternates to Latest Possible
Time

Profile Code MSO


Profile Option Name MSO_USE_ALT_ALAP
Description This will cause the planning engine to postpone the use of Alternate Rank
sourcing until latest possible time in the plan. Used with sourcing rules where
multiple ranks are used and trying to force use of Alternates.
Best to set to Yes when using Multi-Rank sourcing rules.
Note Reference(s) 872452.1
363069.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Preemption Slack Ratio

Profile Code MSO


Profile Option Name MSO_PREEMPT_SLACK_RATIO
Description This was introduced in R12 for DS. It is not being used
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Preprocessing Aggregator Fill

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_AGGFILL
Description Preprocessor aggregator fill

Valid values: Integer >= 0


Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP
User Guide.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Preprocessing Aggregator Limit

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_AGGIND
Description Parameter to control preprocessing aggregator limit.
Values: Integer > 0
Default value: See 'Automatic Calculations, page A-1 of the R12.1 User
Guide.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Preprocessing Flag for LP Matrix

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_PREIND
Description Contains the presolve indicator.
Values are 0 and 1.
Note Reference(s)

Bug Reference(s) 2149275


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized Yes
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized Yes
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Preprocessor LP Compression

Profile Code MSO


Profile Option Name MSO_SCO_PREPROCESS_COMPRESS
Description Not Used by ASCP
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Primal Simplex Parameter

Profile Code MSO


Profile Option Name MSO_PARAM_PPRIIND
Description Gradient parameter for primal simplex algorithm. Valid values are:
-1
0
1
2
3
4

Default Value - Automatic Calulations

When the Default Value of a profile option states that it is automatically


calculated, this means that the Planning Engine determines the default value
of that particular profile option. These profile options are included in this
appendix for information purposes only. If you must change these profile
option values, do so only after consulting Oracle Development and Oracle
Support.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Primal/Dual Preprocessing Reduction

Profile Code MSO


Profile Option Name MSO_SCO_PREPROC_REDUCTION
Description Values 0, 1, 2, and 3
See 'Automatic Calculations,in ASCP User Guide page A-1.
Used by optimization
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Pull push base

Profile Code MSO


Profile Option Name MSO_PULL_PUSH_BASE
Description
Each time the planning engine needs to search for a new spot to schedule it
looks ahead by a certain time period that is dictated by the settings of the
profile options MSO: Push Pull Base and MSO: Push Pull Offset. Valid
values are:
Positive Interger

Default Value - 1

Used in the HLS code


Note Reference(s)

Bug Reference(s) 2953151


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Pull push offset

Profile Code MSO


Profile Option Name MSO_PULL_PUSH_OFFSET
Description
Each time the planning engine needs to search for a new spot to schedule it
looks ahead by a certain time period that is dictated by the settings of the
profile options MSO: Push Pull Base and MSO: Push Pull Offset. Valid
values are:
Positive Interger

Default Value - 1440

This is used in HLS code


Note Reference(s)

Bug Reference(s) 2953151


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Queue Time Factor

Profile Code MSO


Profile Option Name MSO_SCO_LEAD_TIME_FACTOR
Description Increases item lead-time in optimization, so that lead-time values are close to
those used in the Scheduling Engine.
Optimization lead-time is padded to include queue time.
Valid values: Number >=0
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Re-computation percentage for sequence
generation

Profile Code MSO


Profile Option Name MSO_RECOMPUTATION_PERCENTAGE_FOR_SDS
Description This profile option was introduced in R12 for Detailed Scheduling. It is not
currently used in the ASCP engine.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Reschedule Jobs Out to Reduce Inventory
Carrying Costs

Profile Code MSO


Profile Option Name MSO_RESCHEDULE_JOBS_OUT
Description This profile option involves right justifying standard and lot-based discrete
jobs when rescheduling them out to line up with other supplies for the job.
When there is a constraint, the planning engine always moves the jobs
based on the constraint. When there are no constraints, you have the option
to instruct the planning engine to right justify the jobs. Valid values are:
Yes - The planning engine attempts to schedule the job as
late as possible for one or more demands.
No - The planning engine does not reschedule or right justify
the job beyond its old due date. If there is existing capacity
earlier than the old due date of the job, the planning engine
may recommend a reschedule in.

This profile option does not apply to other order types, for example, purchase
orders and purchase requisitions.
Note Reference(s)

Bug Reference(s) 7280156


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Reschedule Shared Supply to Influence
Batching

Profile Code MSO


Profile Option Name MSO_BATCHING_BEST_EFFORT
Description Determines whether the Planning Engine schedules shared supplies early to
avoid item-based resource constraints prior to batch resources. Valid values
are:

Yes - considers whether scheduling shared supplies early


will allow subsequent resource batching; this value improves
the scheduled utilization of batch resources by considering
earlier constraints
No - schedules resource batching when supplies are
available

Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Resource Adjustment Factor For Improved
Offloading to Alternates

Profile Code MSO


Profile Option Name MSO_SCO_RES_ADJ_FACTOR
Description The factor that the planning engine uses to reduce
the resource availability when making the sourcing
decision. For example, if the factor is set to 0.8, the
resource availability is reduced by 20% and the
planning engine uses more of the alternate
processes. Then, at the time of scheduling,
planning has more flexibility.

Valid values: A number between and including 0


and 1
Default value: Null (internally defaulted as a value
of 1)

Note Reference(s) 562872.1


374093.1
317501.1
787458.1

Bug Reference(s)
Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Resource Batching Strategy

Profile Code MSO


Profile Option Name MSO_BATCHING_STRATEGY
Description Selects order scheduling strategy used in resource batching. Valid values
are:
Nearest Date - schedules orders to load resources nearest
the due date of the order)
Level Utilization schedules orders to level utilization of the
resource

Note Reference(s)
244748.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Resource Group for the Line Flexfield
Attribute

Profile Code MSO


Profile Option Name MSO_LINE_RESOURCE_GROUP
Description Stores the name of the flexfield column that contains the value in the
corresponding table. This setup is only performed during
application install.
Valid Values: Integer>=0
Default Value: Null
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Respect Activity Contiguity Flag for Process
Supplies

Profile Code MSO


Profile Option Name MSO_MAKE_ACTIVITY_NON_BREAKABLE_AS_PER_FLAG
Description When the profile is set to "respect" OPM activity flag (profile set to yes), this
is then used in conjunction of profile "MSO: Schedule Across Breaks" .

1. With the profile "MSO: Schedule Across Breaks" to allow breaks set to
'Yes', this will override OPM's activity break indicator (even if flag is not
checked) : APS can schedule across Calendar breaks.

2. With the profile to allow breaks set to 'No', and the OPM activity break
indicator set to 'N', APS does not schedule across breaks. Given these
settings APS does not schedule resources outside of working shifts for an
ECC plan.
Note Reference(s)
1106718.1
1112749.1

Bug Reference(s) 4517139


Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Respect EDD Scheduling windows for Lead
Times

Profile Code MSO


Profile Option Name MSO_PRESERVE_OPERATION_LEADTIMES
Description Do not compress post processing lead time for buy orders if enforce
purchasing lead time option is unchecked.
Yes - The scheduling windows used in enforce demand due
dates scheduling will be respected when scheduling lead
time activities such as pre-processing, processing, post-
processing and fixed+variable lead times.

No - In Enforce demand due dates scheduling, these lead


times will be scheduled backwards from due date and need
not respect the scheduling windows assigned to the supply.

Valid values: Yes/No


Default value: Yes
Available in 12.1.1 and upwards as well
Note Reference(s)

365112.1

Bug Reference(s) 4413913


4432428
Document References(s) -1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: SCO Dual Variables Tolerance

Profile Code MSO


Profile Option Name MSO_SCO_DUALVAR_TOL
Description Parameter used internally for optimization. Consult Oracle Development and
Oracle Support before modifying this profile option.

Valid values: Numeric


Default value: 0.000000001
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized Yes
Disable Constraints Not Optimized No
Disable Constraints Optimized Yes
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: SCO Reduced Cost Tolerance

Profile Code MSO


Profile Option Name MSO_SCO_REDCOST_TOL
Description Parameter used internally for optimization. Consult Oracle Development and
Oracle Support before modifying this profile option.

Default value: 0.000000001


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: SCO TRIANGULATION

Profile Code MSO


Profile Option Name MSO_SCO_TRIANGULATION
Description Internal (hidden profile)
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: STL Buffer Size

Profile Code MSO


Profile Option Name MSO_STL_BUFFER_SIZE
Description Not used.
Note Reference(s)

Bug Reference(s) 2953151


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Schedule Across Breaks

Profile Code MSO


Profile Option Name MSO_SCHEDULE_ACROSS_BREAKS
Description Determines whether the scheduling engine starts an activity before a break
and ends it after the break. Valid values are:
Yes
No - verify that every activity has enough resource in one
shift (otherwise the activities are moved to the end of the
horizon). Can be defined at the site level.

Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Schedule All Firm Planned Orders First

Profile Code MSO


Profile Option Name MSO_SCHEDULE_FIRM_PLANNED_ORDERS_FIRST
Description Determines if Firm Planned Orders are to be scheduled first before other
supplies. This can work in tandem with other Firm profiles to create a Natural
Time fence.

Valid values: Yes/No


Default value: No
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Schedule Simultaneous Resources Across
Breaks

Profile Code MSO


Profile Option Name MSO_SCHEDULE_ACROSS_BREAKS_FOR_SIM_RES
Description Details added to recent ASCP Guide - E13358-08
(page A-125)

Valid Values: Yes/No


Default Value: Yes (can schedule across break)
Specifies whether the simultaneous resource
activity is allowed to go across calendar breaks or
not.
This profile option behaves the same as profile
option MSO: Schedule Across Breaks. However, it
only applies to simultaneous resources.

MSO: Schedule Across Breaks: Determines


whether the scheduling engine starts an activity
before a break and ends it after the break. If set to
No, verify that every activity has enough resource
in one shift
(otherwise the activities are moved to the end of
the horizon).

The setting would depend on whether or not the


requirements on the simultaneous resource(s) are
"breakable". It would be best for this to be in sync
with the principal, but there may be cases where
we really can't allow a simultaneous requirement to
span a break even though the principal may be
able to. Generally, we expect the principal resource
to be the one dictating the behavior, but this allows
for the simultaneous resource to actually be
somewhat more restrictive. If we set "MSO:
Schedule Simultaneous Resources Across Breaks"
to "No", but "MSO: Schedule Across Breaks" to
"Yes", then the user should be prepared to see
requirements being pushed out by the
simultaneous if necessary.

When your requirement for the simultaneous is


non-breakable and too long to fit in shift time.
1. MSO: Schedule across break is set to No/
should be Yes
2. MSO: Schedule Simultaneous Resources
Across Breaks should also be yes.
We have this profile precisely to avoid that the
simultaneous would be longer because of breaks.
i.e. the labor finishing his job after the machine has
finished during the night.
Note Reference(s)

Bug Reference(s) 5028133


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Schedule window width

Profile Code MSO


Profile Option Name MSO_SCHEDULE_WINDOW_WIDTH
Description Defines time window (days) that the scheduling engine looks for its primary
resource. If the primary resource is not in this window, the scheduling engine
moves to an alternate resource. Can be defined at the site level. Valid
values are:
Integer >=0

Default Value - 8 days


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Scheduler Time Step

Profile Code MSO


Profile Option Name MSO_SCHEDULER_TIME_STEP
Description According to bug 2920076 this profile should have been removed from the
application and the user guide in 2003.

** However, the User Guide states that this is reserved for future use **
Note Reference(s)

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Scheduling Activity Selection Window

Profile Code MSO


Profile Option Name MSO_SELECTOR_FORWARD_WINDOW_SIZE
Description This profile is currently not being used in ASCP.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Scheduling Window UOM

Profile Code MSO


Profile Option Name MSO_DETAILED_SCHEDULING_WINDOW_UOM
Description Not currently used in ASCP per Bug 4007906
Note Reference(s)

Bug Reference(s) 4007906


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Setup Pattern Calculation Window

Profile Code MSO


Profile Option Name MSO_SUB_HORIZON_CYCLE_FOR_HLS_SDS
Description A window is calculated by multiplying the Resource's Sequencing window
value by the value in this profile. Valid values are:

Integer

The relative mix of various setup types that fall into this window is calculated
and then applied to each resource sequencing window.

When MSO: Use Sequencing Template is set to Yes, ASCP uses this
calculated mix of setup types to determine the desired spots.

Default Value - 1
Note Reference(s)

Bug Reference(s) 4113649


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Simplex Feasibility Tolerance

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_EPRHS
Description Parameter to set the simplex feasibility tolerance.
Values: Number between e-9 and e-4
Note Reference(s)

Bug Reference(s) 5090041


Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Simplex Optimality Tolerance

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_EPOPT
Description Parameter to set the optimality tolerance for the simplex algorithm.
Values: Number between e-9 and e-4
Default: e-6
Note Reference(s)

Bug Reference(s) 4164443


4416504
5090041
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Simplex Perturbation Constant

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_EPPER
Description This profile option is a parameter to set the simplex perturbation constant.
Provides a perturbation constant for the Planning Engine. Sets the amount
by which the Planning Engine perturbs the upper and
lower bounds on the variables when a problem is perturbed.
The value is specified as any number greater than e-8. This value is
defaulted by CPLEX. Use for SCO. This profile should not be changed
unless directed by Oracle Development
Available in 12.1.1 and upwards
Note Reference(s) 147222.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Simplex Perturbation Limit

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_PERLIM
Description Parameter for the simplex perturbation limit.
Values: Integer > 0
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Simplex Perturbation Parameter

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_PERIND
Description Provides a perturbation constant for the Planning Engine.
Sets the amount by which the Planning Engine perturbs the upper and lower
bounds on the variables when a problem is perturbed.
Values are 0 and 1.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Simplex Presolve Limit

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_PREPASS
Description Parameter to set the limit on the number of pre-solves.
Values are -1, 0, and integer > 0
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Simplex Singularity Repair Limit

Profile Code MSO


Profile Option Name MSO_CPX_PARAM_SINGLIM
Description Parameter to set the simplex singularity repair limit.
Values: Integer > 0.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Skip Firm SDS Activities During Justify

Profile Code MSO


Profile Option Name MSO_SKIP_FIRM_IN_SEQUENCE_FOR_JUSTIFY
Description This profile was introduced in R12 for DS. Not used anymore
Note Reference(s)

Bug Reference(s) 8538729


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Slack Hours For Batch Resource

Profile Code MSO


Profile Option Name MSO_SLACK_HOURS_FOR_BATCH_RESOURCE
Description This profile value is used by Oracle Advanced Supply Chain Planning to right
justify the maximum end date for a scheduled batch resource.
The value specified is the amount of slack time (in hours) to delay scheduling
the resource so that other supplies can be included in the same batch even
though they cannot be scheduled as early as the original supply. This means
that the batch must wait for the constrained supply.

Valid values: integer


Default value: null
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Solve Dual Problem

Profile Code MSO


Profile Option Name MSO_CPX_DUAL
Description Controls whether the Planning Engine solves the dual problem or the primal
problem.
Valid values: 0 and 1
Default value: See 'Automatic Calculations, page A-1 of the R12.1 ASCP
User Guide.
Note Reference(s) 147222.1

Bug Reference(s)
Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Sourcing Allocation Window

Profile Code MSO


Profile Option Name MSO_SCO_ALLOCATION_WINDOW
Description Specifies the Allocation Percentages Satisfaction Period. The constraints are
enforced in a rolling horizon manner.
Used in Constrained plans with Enforce Sourcing Constraints enabled in
specific plan options.

Note that this does not mean that constraints will be ignored and constrained
plans will blindly enforce a sourcing split.

This is discussed in Note 1349479.1 - How to enforce a hard/blind sourcing


split in a constrained plan without considering the constraints?
We have logged Enhancement request 12845468 to have this change
considered for implementation in some future release.
Note Reference(s)
1349479.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Split Planned Orders for Assigned Units

Profile Code MSO


Profile Option Name MSO_SCO_ASSIGNED_UNITS
Description This profile option is used by Oracle Advanced Supply Chain Planning
optimized plans only. It specifies if the planning engine should attempt to split
planned orders such that they can be scheduled within a specific day. Valid
values are:
Yes: Create more planned orders with quantities that can be
scheduled by the resource units available within a given day.
No: The planning engine generates larger planned orders
that may require a resource duration spanning several days.

Note that the maximum number of resource units at the routing level will
always be respected.
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Split Supplies for SPP Release

Profile Code MSO


Profile Option Name MSO_SPLIT_SUPPLIES_FOR_RELEASE
Description Split Supplies to Ensure 1-1 Pegging in Service Parts Planning During
Release

Set on APS Destination in a distributed environment.

Y-release code will read from msc_part_supplies, msc_part_demands


N- read from msc_supplies, msc_demands. To be set on destination VCP
instance.
Note Reference(s)

Bug Reference(s) 11882204


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Spread Resource Consumption Within
Optimization

Profile Code MSO


Profile Option Name MSO_SCO_SPREAD_RESOURCE
Description This profile specifies how the optimization engine should model resource
consumption is modeled in optimization. Valid values are:
Yes: Consume resources at the first operation. This value
provides improved optimization engine performance.
No: Consume resources at the operation to which they
belong. This value provides improved optimization engine
accuracy.

Default value: Null (interpreted as No)


Note Reference(s)

Bug Reference(s) 9020829


Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Substitute Item Penalty

Profile Code MSO


Profile Option Name MSO_SCO_SUB_ITEM_PENALTY
Description Defines an internal penalty weight for substitute item objective in supply
chain optimization.
Valid values: number > 0
Default: none
Note Reference(s) 228459.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Supplies used for satisfying transient safety
stock

Profile Code MSO


Profile Option Name MSO_TRANS_SS_SUPPLY_CHOICE
Description This profile is used in priority based pegging and can be used in constrained
plans. This profile is used only for transient supplies. It has two values

Supplies pegging to lower priority demands


Closest pegged supplies

Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Supply Reschedule Window Size for Safety
Stock Pegging

Profile Code MSO


Profile Option Name MSO_SS_WINDOW_SIZE
Description This profile options provides an estimate of the number of days by which the
supply and its associated demand (dependent demand) moves due to
constraints. Valid values are:
Integer > 0

You can use this profile option to specify the number of days a specific
supply can satisfy safety stock demand.

Default Value - Null


Note Reference(s)

Bug Reference(s) 3500953


Document References(s) -1
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Supply Window Size

Profile Code MSO


Profile Option Name MSO_SUPPLY_WIN
Description Used with demand priority pegging
The highest priority demands from the first demand window will peg to the
sorted supplies in the first window if possible. When the supplies from one
window are all pegged, the demand will peg to the highest sorted supply in
the next window until all demands are pegged. This is stated as the number
of calendar days including non-workdays

Integer >= 0
NULL = 1
Note Reference(s)

Bug Reference(s)
Document References(s) B31553-02
-1
Dependent Profiles MSC: Use FIFO Pegging
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Synchronize Chargeable Resources to
Respect Hard Links

Profile Code MSO


Profile Option Name MSO_SYNCHRONIZE_CHARGES
Description Determines if the number of charges are to be synchronized between
upstream and downstream supplies which are hard linked together. This
should be set to Yes if the user requires an even flow of material between the
upstream and downstream supplies.

Valid values: Yes/No


Default value: No
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Target Inventory Level % of Safety Stock

Profile Code MSO


Profile Option Name MSO_TGT_INV_LEVEL
Description Use this option to specify target inventory levels. If no other method of
calculation is defined for an item-organization target inventory level, the
levels are based on the specified percentage of the safety stock level.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles MSO: Maximum Inventory Level % of Safety Stock
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Transfer Quantity Threshold for Enforceing
Hard Links

Profile Code MSO


Profile Option Name MSO_HARD_LINK_TRANSFER_QUANTITY_THRESHOLD
Description Use this profile option to instruct the planning engine to ignore the hard link
constraints if a transfer quantity is less than or equal to this percent threshold
of the corresponding order quantity.
Valid values are
Number between 0 and 1: Ignores hard link constraints for
transfer quantities less than or equal to this percent threshold
Null: Respects all hard link constraints regardless of the size
of the transfer quantities

Default Value: 0
Note Reference(s)

Bug Reference(s) 8730427


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: UOM for converting Changeover Time to
Penalty

Profile Code MSO


Profile Option Name MSO_UOM_TO_CONVERT_CHANGEOVER_TIME_TO_PENALTY
Description In Sequence Dependent Setup scheduling, if the penalty basis is specified as
changeover time, this is the UOM used to convert this time to a penalty
number.

Only applies when profile option MSO: Penalty Basis for Changeovers is set
to Changeover Time.

Valid values: UOM time conversion factor


Default value: Hours
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Upper Limit for Maximum Time Offset for
Hard Links

Profile Code MSO


Profile Option Name MSO_HARD_LINK_MAX_OFFSET_UPPERBOUND
Description Use this profile option to set an upper limit for the
maximum time offset. If a maximum time offset is
higher than this number, the planning engine uses
this number instead of what you set. Valid values
are:

Valid Values: Integer (including 0),null: Use


10,000,000
Default value: Null

Note Reference(s) 760046.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Breaks in Calculation of Unconstrained
Scheduling Windows

Profile Code MSO


Profile Option Name MSO_USE_BREAKS_IN_UNCONSTRAINED
Description The planning engine calculates an unconstrained scheduling window for
each resource activity and supply in a plan. The scheduling window is
defined by the dates:
Unconstrained Earliest Possible Start Time (UEPST)
Unconstrained Earliest Possible Completion Time (UEPCT)
Unconstrained Latest Possible Start Time (ULPST)
Unconstrained Latest Possible Completion Time (ULPCT).

Valid values are:


Yes - the planning engine does not set any of these dates
during a break even if the calculation places it there.
No - the planning engine does set any of these dates during
a break if the calculation places it there.

Default Value - Yes


Note Reference(s) 1080929.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan Yes
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Collections Start Time

Profile Code MSO


Profile Option Name MSO_USE_COLLECTIONS_START_TIME
Description Use this profile option to coordinate plan start date and collections start time.
This affects how the plan calculates resource availability. Valid values are:
No - Always use plan start time.
Yes - Use collections start time.
Use Input Demand Plan Start Time or Collections Start Time
- If there is an input demand plan, the planning engine uses
the Input Demand Plan Start Time. Otherwise, it uses the
Collections Start Time.
Use Input Demand Plan Start Time or Plan Start Time - The
planning engine uses the Input Demand Plan Start Time.
Otherwise, it uses the Plan Start Time.

Default Value - Yes

This is only for EDD/ECC Constrained plans using HLS scheduling -see
related note 1540600.1
Note Reference(s) 1540600.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Customer Site in End Item Substitution
Rule

Profile Code MSO


Profile Option Name MSO_USE_CUSTSITE_IN_ITEMSUBST
Description Could not find information about this profile in user guides.
For GOP, this profile is NOT in R12.0 or 12.1.x
For SCO Planning, the profile is included in 11.5.10, R12.0 and above

Introduced by SCO and we should be using that to set the partial fulfilment
flag (all_or_nothing) flag appropriately based on that.
This profile indicates if set to No, that rules are defined only at the customer
level and not at the site level.

Used in GOP as well, per bug 5048642


When profile option MSO_USE_CUSTSITE_IN_ITEMSUBST is set to N,we
use specific customer id and customer site id is null to select the specific
rule.
If there is more than one records, we will randomly select one.

GOP like SCO assumes that the user has run the script to set the customer
site id to NULL in the ODS prior to running the plan.

1. Profile is Hidden and must be manually defined on the system.

Name MSO_USE_CUSTSITE_IN_ITEMSUBST
Application Advanced Supply Chain Planning
User Profile Name MSO: Use Customer Site in End Item Substitution
Rule
Description Use Customer Site in End Item Substitution Rule
SQL Validation SQL= "select meaning \"MSO: Use Customer Site\",
lookup_code
into :visible_option_value,:profile_option_value
from fnd_lookups where lookup_type = 'YES_NO'"
COLUMN="\"MSO: Use Customer Site\"(4)"

2. Need to use the Data Collections Hook to edit data in


MSC_ST_ITEM_SUBSTITUTES to remove the customer site data in column
CUSTOMER_SITE_ID
Refer to Note 976328.1 for more information on the data collections hook.

Note Reference(s)
2041074.1

Bug Reference(s) 5048642


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising Yes
MSO: Use Decomposition in Optimization

Profile Code MSO


Profile Option Name MSO_USE_DECOMPOSITION
Description MSO: Use Decomposition in Optimization. This is applicable for Service
Parts Planning, Distribution Planning and Advanced Supply Chain Planning.

This should be changed only with Support or DEV recommendation.


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Discrete Job Resource Usage to
Consume Resource Capacity

Profile Code MSO


Profile Option Name MSO_USE_RESOURCE_HOURS_PRECONSUME
Description Use this profile to instruct the planning engine what data to use for resource
loads when it determines resource availability. Valid values are:
Yes: The planning engine uses resource hours to determine
the resource load. Use this value if you do not attend to use
work in process timestamps, your work in process times are
not adjusted for efficiency, and you specify resource hours.

No: The planning engine uses timestamps to determine the


resource load. Use this value if your work in process times
are adjusted for efficiency. If work in process is scheduled by
the planning engine scheduling process, choose this value.

Default Value - No
Note Reference(s) 745977.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Effectivity Date to Infer End Item
Substitution Priority

Profile Code MSO


Profile Option Name MSO_USE_EFCDATE_FOR_PRIO_IN_ITEMSUBST
Description Could not find information about this profile in user guides.
Note Reference(s) 564241.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Existing Supplies in Alternate BOM/Subs.
Comp

Profile Code MSO


Profile Option Name MSO_SCO_EXIST_SUPP_ABR_SUBSCOMP
Description This profile will enable the user to adjust the objective sequence so that
optimization will always go to primary BOM before going to alternate BOM.
Controls how SCO will use the existing supply in alternate BOM or substitute
component paths.
NULL or 0 (zero) is the default and indicates all the existing
supply will be used before creating new planned orders in
primary path.

1 means SCO will consume supplies in subs comp path but


will not consume supplies in alternate BOM path.

2 means SCO will consume supplies in alt bom path but will
not consume supplies in substitute component path.

3 means Use supplies of components in alternate bills of


material; do not use supplies of substitute components

NOTE: This profile, when used with the profile "MSO: Postpone Use of
Alternates to Latest Possible Time" may give you different results. From Note
365112.1 - also see Note 567667.1 for clarification on the use of this profile
in an Enforce Due Date (EDD) plan.
Note Reference(s) 365112.1

Bug Reference(s)
Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Item Shelf Life Days in Scheduling
Buy/Transfer Orders

Profile Code MSO


Profile Option Name MSO_USE_SHELF_LIFE
Description This profile option specifies whether to use item shelf life days as a maximum
time offset between operations that produce and consume the item. Valid
values are:
Yes - the planning engine uses item shelf life days as a
maximum time offset if a maximum time offset value is not
specified on the routing step that produces the item.
No - the planning engine does not use item shelf life days as
a maximum time offset between operations.

Default Value - No
Note Reference(s) 415101.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use JIT dates from high level scheduling
results

Profile Code MSO


Profile Option Name MSO_USE_JIT_DATES_FROM_HLS
Description Not currently used in ASCP per Internal Bug 4007906
Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Of Assigned Units In Scheduling

Profile Code MSO


Profile Option Name MSO_USE_OF_ASSIGNED_UNITS_IN_SCHEDULING
Description Controls the number of resource units to be used when scheduling a
resource activity. Valid values are:
Variable - Permits a choice ranging between a minimum of
one unit and a maximum value equivalent to the assigned
units specified on the routing for the item.
Fixed at Routing Value - Forces the scheduling engine to
always choose the number of assigned units specified in the
routing when scheduling a resource activity. It is
recommended that you choose this option when you do not
need to use the flexibility of the Variable option.

Note: The assumption that the activity duration is less when more units are
chosen is only valid for the basis type of Item specified in the Operation >
Resources form.
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Optimization and Decision Rules for
Simulation

Profile Code MSO


Profile Option Name MSO_ONLINE_SCO
Description For online planner sessions against constrained plans with decision rules or
optimized plans. Valid values are:
Yes: To rerun the optimization and decision rules-based
decisions during the online planner session
No: To retain the optimization and decision rules-based
decisions from the initial planning run for the online planner
session Valid Values: Yes/No

Default Value - No (Do not run Optimization / Decision Rules during Online
Planning)
Note Reference(s) 365112.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use SCO Time Aggregation

Profile Code MSO


Profile Option Name MSO_USE_SCO_INT_TIMEAGGREG
Description Determines whether the Planning Engine should use different aggregate time
buckets than specified in the aggregation settings of the plan options. You
can specify large values for daily and weekly buckets for Planning Engine
output, but this increases Planning Engine calculation time. Valid values are:

True - The Planning Engine uses aggregate time buckets


specified in MSO: Optimization Daily Aggregation Buckets
and MSO: Optimization Weekly Aggregation Buckets. The
period time bucket is derived.

False - The Planning Engine uses the same aggregate time


buckets as specified in the Aggregation tab of the Plan
Options window.

Default Value - False


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Safety Lead Time

Profile Code MSO


Profile Option Name MSO_USE_SAFETY_LEAD_TIME
Description Use this profile option to instruct the planning engine how to plan material to
be completed early as a safety buffer. Valid values are:

Yes - Use safety lead-time planning. The value in item


attribute Safety Stock Percent is the safety lead-time in days;
for example, if safety lead-time is two days, enter 200.
No - Use non-transient / transient safety stock planning. The
value in item attribute Safety Stock Percent is a percent of
demand.

Default Value - No
Note Reference(s)
872475.1
1068297.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan Yes
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Sequencing Template

Profile Code MSO


Profile Option Name MSO_NEED_USE_SOFT_PATTERN
Description This profile option specifies whether Oracle Advances Supply Chain Planning
tries to schedule activities in accordance with a determined preferred
sequence of activities. Valid values are:

Yes - the planning engine determines a preferred sequence


of activities on resources and tries to schedule activities in
accordancewith the sequence. This setting is recommended
if the sequence dependent setup resource is the primary
bottleneck.
No - the sequence of activities is determined more
dynamically when scheduling other activities.This setting is
recommended if there are multiple bottleneck resources.

Default value: No
Note Reference(s)
415276.1

Bug Reference(s) 9500377


Document References(s) -1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD Yes
Constrained ECC Yes
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Shift Definitions When Scheduling Lead
Times

Profile Code MSO


Profile Option Name MSO_USE_SHIFT_TIMES_IN_LEAD_TIME_SCHEDULING
Description Determines whether the planning engine needs to take into account shift
times for calculating lead-times on shipping, receiving, and carrier calendars.
Valid values are:

Yes - Considers shift definitions for calculating lead-times on


calendars in case of constrained plans.
No - Shift definitions are not considered when offsetting lead-
times on calendars.

If the plan planning mode is Constrained (Without Detailed Scheduling), the


planning engine does not use this profile option. (Default)
Note Reference(s)

950994.1
978623.1
1301132.1

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
-1
-1
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Use Up Existing Supply of Primary
Components Before Substitute

Profile Code MSO


Profile Option Name MSO_SCO_SUBSCOMP_SEQ
Description Use this profile option to specify whether to use the supply of substitute
components or the primary component first. Valid values are:
Yes: Use the supply of the primary component before using
the supply of the substitute components
No: Use the supply of the substitute components before
using the supply of the primary component

Note Reference(s) 834624.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types No
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO: Write Inline forecasting flat files

Profile Code MSO


Profile Option Name MSO_FORECASTER_WRITE_FLATFILE
Description If this profile is set to "Yes" then Inline forecasting
calculation details are written in the flat files. This
should only be set if you would like to debug the
inline forecasting results.
Note Reference(s)

Bug Reference(s) 7621495


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSO:Use Old Pegging for SPP and ASCP without
Detailed Scheduling

Profile Code MSO


Profile Option Name MSO_OLD_PEGGING_FOR_SPP_AND_SCOOM
Description When not set, act as if it is set to Y (old pegging); if it is set to N (new
pegging).
Note Reference(s)

Bug Reference(s) 14306823


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning Yes
All Plan Types Yes
Enforce Constraints Not Optimized No
Enforce Constraints Optimized No
Disable Constraints Not Optimized No
Disable Constraints Optimized No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Budget Category Set

Profile Code MSR


Profile Option Name MSR_BUDGET_CATEGORY_SET
Description Use this profile option to specify the categories that you can use when
defining budgets in Oracle Inventory. Valid values are:

NULL - Define budgets with any category.

Any category set: Define budgets only with categories that


are in the category set.

Default Value - NULL


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Budget Enditem Favor Factor

Profile Code MSR


Profile Option Name MSR_BUDGET_ENDITEM_FAVOR_FACTOR
Description The profile "MSR_BUDGET_ENDITEM_FAVOR_FACTOR " lets the user control the relative
preference of deficit budget allocation between higher cost items (end items) and lower cost
items (components). The default value of the profile is 4.0. Lower values favor greater
preference for end item allocation, higher values reduce the preference for end item
allocation.

The reasoning was that the user should be able to control where they want a deficit budget
to be preferentially allocated, more at the end items or more at the components.
Note Reference(s)

Bug Reference(s) 5182644


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Budget Heuristic

Profile Code MSR


Profile Option Name MSR_BUDGET_HEURISTIC
Description Profile to enable use of budget heuristic for single level supply chain instead
of use of budget LP
Note Reference(s) 1081430.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Enable Cycle Stock Adjustment

Profile Code MSR


Profile Option Name MSR_ENABLE_CYCLE_STOCK_ADJUSTMENT
Description Enables cycle stock adjustment to safety stock.

Some documentation and notes were published with name


MSR: Include Cycle Inventory in Safety Stock Calculation
The profile in the application with same functionality is this one.
Note Reference(s)

Bug Reference(s) 13936760


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Postponement Factor

Profile Code MSR


Profile Option Name MSR_POSTPONEMENT_FACTOR
Description Specifies maximum depth in the bill of materials and sourcing tree to which
uncertainty must be postponed. Valid values are:

Integers >= 0

Default Value - 10
Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Probability Distribution Type

Profile Code MSR


Profile Option Name MSR_PROB_DISTR_TYPE
Description Determines probability distribution type associated with forecast sets as input
to Oracle Inventory Optimization. Valid values are:

Probabilities - Demand uncertainty is stated in terms of a


(non-cumulative) probability distribution.
Cumulative Probabilities - Demand uncertainty is stated in
terms of a cumulative probability distribution.

Default Value - Probabilities


Note Reference(s)

Bug Reference(s)
Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Safety Stock Holding Strategy

Profile Code MSR


Profile Option Name MSR_SS_HOLDING_STRATEGY
Description Specifies where safety stock should be held when the carrying cost is the
same for an item in the destination organization and a source organization.
Valid values are:

0 - causes the safety stock to be held at the destination


organization.

1 - causes the safety stock to be held at the source


organization.

Default Value - Source Organization


Note Reference(s)

Bug Reference(s) 2260006


Document References(s) Oracle Advanced Supply Chain Planning Implementation and User's Guide
-1
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Variance to Mean Threshold for use of
Negative Binomial Distribution

Profile Code MSR


Profile Option Name MSR_USE_NEG_BINOMIAL
Description In release 12.1.3.9, you can instruct Inventory
Optimization to use the Negative Binomial
distribution as the forecast error distribution for
items with high variability intermittent demands
when calculating safety stock levels.

This is achieved by using the a new profile option,


MSR: Variance to Mean Threshold for Use of
Negative Binomial Distribution.
Note Reference(s) 1570657.1

Bug Reference(s)
Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Warehouse Capacity Granularity

Profile Code MSR


Profile Option Name MSR_ORGANIZATION_WAREHOUSE_CAPACITY
Description Profile to indicate whether warehouse capacities have been defined at Org or
Cat-Org level. Valid values:
Category-Organization Level
Organization Level

Note Reference(s)
1453788.1

Bug Reference(s) 13936760


14369385
13820125
Document References(s) -1
-1
-1
-1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
MSR: Warehouse Category Set

Profile Code MSR


Profile Option Name MSR_WAREHOUSE_CATEGORY_SET
Description Category set to use for storage capacities.
Note Reference(s)

Bug Reference(s) 14141868


Document References(s) -1
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning No
Distribution Planning No
Collaborative Planning No
Inventory Optimization Yes
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
POR: Sync up Need by date on IR with OM

Profile Code POR


Profile Option Name POR_SYNC_NEEDBYDATE_OM
Description Required to be Yes for the rescheduling or Internal Reqs (IR) and Internal
Sales Orders (ISO) to be called to synchronize the IR/ISO when
rescheduled.

Only available when EBS source is on 12.1

Set on EBS Source in a distributed environment


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile No
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
WIP:Discrete Job Prefix

Profile Code WIP


Profile Option Name WIP_JOB_PREFIX
Description Set on EBS Source in a distributed environment

Default prefix for discrete job name


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types Yes
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning Yes
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No
WSM: Create Job Level BOM and Routing Copies

Profile Code WSM


Profile Option Name WSM_CREATE_LBJ_COPY_ROUTING
Description Create Job Level BOM and Routing Copies for OSFM jobs

Set on EBS Source in a distributed environment


Note Reference(s)
Bug Reference(s)
Document References(s)
Dependent Profiles
11.5.10 Profile Yes
12.1.1 Profile
Data Collections No
Item Mass Maintenance No
Advanced Supply Chain Planning Yes
All Plan Types No
Unconstrained Plan No
Constrained EDD No
Constrained ECC No
Distribution Planning No
Collaborative Planning No
Inventory Optimization No
Service Parts Planning No
Rapid Planning No
Demand Planning No
Demantra No
Strategic Network Optimization No
Advanced Planning Command Center No
Manufacturing Operations Center No
Global Order Promising No

Das könnte Ihnen auch gefallen