Sie sind auf Seite 1von 2

Checklist

DC9 / 80 NORMAL CHECKLIST MAR 07 rev 2

COCKPIT CREW CHECKLIST TAXIING

FLT Recorder/AIDS...................TEST/CKD 2 APU AIR Sw........................................OFF 2


AHRS Alignment ........................VERIFIED 1/2 TRP/ART........................................AS RQD 1/2
FMS/GPS.......... ......................CKD/X-CKD PF/PNF V Bugs.......................................__/__/__/__/ 1/2
Emergency Lights...........................ARMED 1 Flt Instruments/FGS..............................CKD 1/2
Cabin Sign.........................................ON/ON 1 FMS/GPS..............................................CKD PF/PNF
WINSHIELD ANTI-ICE Sw...................ON 1 Flt Controls.....................................TESTED 1/2
ENG SYNC Sel......................................OFF 1 FLAP/SLAT Lever...........................__/EXT 1/2
Stall Warning..................................TESTED 2 Ail,Rudder &
Air Cond Shutoff Sw......................... AUTO 1 Stab Trim........................ZERO/ZERO/CKD 2
Fire Protecion Sys...........................TESTED 2 T.O. Briefing..........................PERFORMED PF/PNF
TRP.................................................TESTED 2 Cabin Report.............................OBTAINED 1
Fuel Quantity...................................___KGS 1/2 Taxiing Checklist Completed
Altimeters......................QNH/QNH/X-CKD 1/2
FUEL Shutoff Levers.............................OFF 1
CABIN PRESS Lever.........................AUTO 1
Cockpit Crew Checklist Completed

BEFORE START BEFORE TAKEOFF

Parking Brakes........................................SET 1 T.O. Data................................CONFIRMED 1/2


Pneumatic Pressure................................_PSI 1 Fuel Balance..........................................CKD 1/2
ENG ING Sel.....................SYS A or SYS B 2 Brake Temperatures..............................CKD 2
Left/Right/Center Fuel ENG IGN Sel......................................BOTH 2
Tank Pumps.....................................ALL ON 1 EOAP....................................................CKD 1/2
Anti-Collision Lts....................................ON 2 Before Takeoff Checklist Completed
APU NORM/ECON Sw.....................NORM 2
AIR COND SUPPLY Sw.......................OFF 2
PNEU X-FEED Levers.......................OPEN 2
Thrust Levers...................................... .IDLE 2
Before Start Checklist Completed

AFTER START AFTER TAKEOFF

ENG IGN Sel..........................................OFF 2 Brake Temperatures..............................CKD


Pitot & Static Landing Gear...........................UP/LTS OUT
Heaters........................................ON(CAPT) 2 FLAP/SLAT Lever..........................UP/RET
AIR FOIL & ENG ENG IGN Sel..................................AS RQD
Anti Ice Sws............... ....................AS RQD 1 Center Fuel Tank Pump..................AS RQD
AIR COND SUPPLY Sws.................AUTO 2 Altimeters............................1013/1013/1013 1/2
Door Cue Light.............................CKD OFF 1/2 After Takeoff Checklist Completed
Hyd Sys.....................................CKD & SET 2
After Start Checklist Completed
Checklist
DC9 / 80 NORMAL CHECKLIST MAR 07 rev 2

DESCENT AFTER LANDING

MSA......................................................CKD PF/PNF FLAP/SLAT Lever...........................15/EXT


APPR and LND Briefing.......PERFORMED PF/PNF SPEEDBRAKE Lever......................... RET
MDF......................................._____/X-CKD PF/PNF ENG IGN Sel.........................................OFF
Landing Data..........................CONFIRMED 1/2 Pitot & Static Heaters............................OFF
V Bugs.......................................__/__/__/__/ PF/PNF AIR FOIL & ENG Anti-
Radio Altimeter/Audio Marker........SET/ON PF/PNF Ice Sw....................................................OFF
Hyd Sys.....................................SET & CKD 2 Radar.....................................................OFF
Pressurization.............................CKD/SET PNF After Landing Checklist Completed
Descent Checklist Completed

APPROACH PARKING

Cabin Signs.......................................ON/ON PNF FUEL TANK PUMP Sw................AS RQD 2


Fuel Sys..................................................SET PNF Aux & Trans Hyd Pumps......................OFF 2
Altimeters and Bugs......... __/__/__/X-CKD 1/2 Parking Brake........................................SET 1
Approach Checklist Completed Parking Checklist Completed

FINAL LEAVING THE AIRPLANE

Land Gear/Lts.................DOWN/ 3 GREEN 1/2 Emergency Lts........................................OFF 2


FLAP/SLAT Lever...........................__/EXT PNF APU.................................................AS RQD 2
SPEEDBRAKE Lever.........................ARM PNF BATT Sw........................................AS RQD 2
ENG IGN Sel.....................................BOTH PNF Leaving The Airplane Checklist Completed
EOAP....................................................CKD PNF
Final Checklist Completed

Das könnte Ihnen auch gefallen