Contractor: Main Con - MDC Report No: IR-MAQ-004-17 Employer: Myanmar Aquarium Co Ltd Date Issued: 26-07-2017 Reference THIS SITE INSPECTION REPORT HAS REFERENCE TO THE FOLLOWING WORKS: Zone 1 - Exhibit 1.3 Location Yangon, Myanmar Following site inspection by AQUA on the date indicated on this report we draw your attention to the following parts of the works:
1 Site Inspection July 26, 2017 Zone 1
2 In-tank Plumbing 3 We Note That; Broken Puddle Flanges In-tank Plumbing 4 Action by Others Rectify and call AQUA for inspection before casting
Exhibit 1.3 Broken Puddle Flanges
Signed for AQUA
AQUA Design and Management PTY LTD & Singapore AQUA Pte Ltd Unit 08-16 Peninsula Plaza, 111 North Bridge Road, Singapore, 179 098 M: +65 8425 8695 E: tim@singaporeaqua.com DISTRIBUTION: This Site Inspection Report is not an instruction. For formal instruction in regard to the rectification of works the contractor should seek direction from the Project Manager, Project Architect and or Project Engineer as necessary. Where possible this Report shall be accompanied by such Instruction.