Turning your idea

into reality
turnkey
hydropower plants

Kraftwerksbau & Engineering




 page 3/4

 page 5/6

 page 7



with electrically operated gate valves



  page 8/9

 page 10/11

 page 12

page 13/14 
page 15 
page 16 

page 17 


page 18 

page 19 

The view of the whole


enables a wholistic outcome

Progressive technology
in turnkey hydropower plants
neromylos The word neromylos has a Greek origin and means water wheel. The Greeks are said to have
                  
renewable energy sources goes back thousands of years. These ancient water wheels turned into powerful

resource saving energy is growing faster than ever and new possibilities and ideas to use the power of nature
sustainably are coming up nearly every day - and thats a good thing.

The path is the destination

What sets us apart from many others:

      
     

        



to the turnkey delivery of the entire system.

      

       
          


are needed and thus achieve a wholistic outcome.

Choosing the right path


with neromylos
3
To pay attention to the whole issue,
without losing sight of the details.
Creating new perspectives.

Our way of working



          
MW

        





in a modular construction system.
 


 prefabricated in collaboration with established and reputable

 
Sustainability
  Here lies an
underground DN 1000
 
pressure pipeline.
 

         

 - which means a short implementation
period of the entire project.
         - the assembly

         
building etc. will be built up on site within very short time.

4
The first steps
from the idea to its realization

Our engineers know the details:






         
      
as we have already successfully obtained more
       
it is necessary to draw accurate plans and write
numerous reports. Technical descriptions are
      
hundreds of metres of paper are processed for
each project to be submitted. We are familiar with

successfully.




      
       
success rate of      
that we obtained until now.
Energy results from calmness
100%
5
We convince by service with performance.
Therefore, we take care of all necessary steps.


        
assessment of your construction and planning project.
Well give you valuable hints and check the entire project
 

          
          

 
advise you!



order to represent you to the authorities. (General terms

         
       
        
components dimensioned and statically calculated. Of
        
 
processed hundreds of meters of paper to documents



        
soon as we receive a positive decision concerning water
right and nature conservation. At this time all components

The detailed planning is also basis for the tender and







 
          



            
          
state.

6
To questio n things, to change things.
New intelligence.

        
manufactured by neromylos. Maybe you have already gained

or the other intake structure. Then youll certainly notice a few

build functional and environmentally friendly at the same time
and to use resources where they are really needed.

the landscape with lots of concrete - just because it is not
necessary and will also save unnecessary costs.
         

       
hydraulics. Water pollution by leaking oil is thus impossible. It is

plant building via data line and monitored and controlled by the
cleverly designed neromylos nm2 power plant control system.


 
 
to have a precise measurement and control of the
  
 The dynamic residual water delivery system
         
       
  level sensores and compares the data with the
performance of the turbine. The nm2 power plant
  
     
         
          
     
       
     
of the necessary data for the authorities can be
guaranteed at all times. 7
effective
persistant
uncomplicated
environmentally friendy

Any more questions?


        


The principle was named after the Romanian
 

phenomenon in aircraft development. The coanda
       
    

      
Always the optimal solution - even for the screen into the body.
heavy bedload transporting waters        
       
few power plant operators are familiar with the


aspect.

altitude areas in 2005. The known construction

corrected. And until now we have already installed
several hundred meters of coanda screens for
      

      
    

     

8
arises out of many details

effective...
The screen is available with gaps of 1 mm - 12 mm. A screen with 3-mm-

 
out of water.
            



NO icing - 
even at temperatures ice at a distance of 3 - 5 cm to the screen. The remaining water keeps
below -30C. 


The intake capacity will


The wires are made of highly wear-resistant vary with the gap distance.
 
        l/s of water per running
 meter.
we reinforced to body up to a high grade of
 -
and heavy bedload cannot cause any damage 
 of 3 - 5 mm are the best
alternative for regular po-
wer plant operation.

          
makes hydraulic operated cleaning devices    -
unnessecary . lowing body dimensi-
The only maintenance action that might be ons:
 height/depth/width
- to clean it with a steam cleaner once a year.
         
          
installed directly into the dam. This results in an

additional gain in head of 1 meter versus a usual

Tyrolean weir.


       

          







9
We are developing new ideas, technologies and conceptions,
....right there where you go on vacation.

    
engineers of our research and development
department are working right there where
you go on vacation. Amidst the impressive

paradises. From here we get energy and
     
is providing everything we need - we only

    
in developing the neromylos desander.
Physical laws in connection with technical
formulas and calculations make him an
    
sets new standards in the matter of water

We are following an overall plan and we


      

function and the longest possible persistance
of all these products. If sand gets into the
      
        
wheels of the turbines. In order to counteract
       

reliably at a high grade. With the neromylos
      

       


neromylos steel constructed precast desander

Our precast desander is designed as full automatically


operating plate-pack-desander. It has a self-supporting

  
packs are arranged in a special way that reduces the

roller is being formed. This water roller is limited by

Gravitation and our ingeniously designed control
system handles the rest.

A maintenance shaft with valves and automatic control is


installed at the outlet. This control is able to communicate

work completely autonomously as well.
The water level is detected by a pressure probe and infrared
sensors measure the degree of turbidity at the same time.
        
        
movement. This enables on the one hand an undisturbed After installation and com-
   
 will be completely buried
 in the ground. The only
    
in the riverbed keep almost natural.     
you can see above. Ano-
ther factor that ensures
environmental protection.


  performance and degree of
     separation depend on local
circumstances and have to be
     calculated separately for each
case. In order to achieve the

best results we recommend
 to combine the desander with
 
We do not guarantee for
36       
48  the purpose to give a coarse
overview.

neromylos drinking water desander 




 

              
 proven and guaranteed. Each desander is hand-crafted in our factories and is


             
            
desander.


Our specialists will lay
your pipeline

The laying of the penstock is considered to be one of the biggest


         
        
obstacles that have to be overcome. Public roads have to be
      
overcome. The risk to encounter groundwater is always present



         
          
        

      
 


To connect existing technologies


with ones own know-how.

Generating individuality.

    
     


    
      


          
hpi pelton turbines poseidon und aglaia inside
the power house of Esterl Energie GmbH in Murau.
The housing is considered a novelty in the matter of
processing. It is double-walled with a spider-designed
water drainage network inside and powder coated

do not only impress by their appearance. The high-
      




Technology of today is already past.
What we conduct is engineering of the future.





        
components of a pelton turbine. Already a dimensional deviation
of the needle of less than one thousandth of a millimeter can
mean power loss of several kilowatts and reduce the overall life
of the entire plant.
The same is true for the turbine wheels. Our engineers
       
technological tools. The turbines are calculated and designed by

out of specially tested materials by means of high-precision

        
corrosion resistance.

Quietness

The legendary euro-test


Therefore, we place a one-euro coin di-
rectly on one of the nozzle bends. And it
stays upright - until reaching the full load,
new bucket geometry as well as during operation!


The Pelton wheel is machined out of solid stainless steel. The good material
         
               


contributing to the high power output.
The wheel is a machined and nitrited high-precision Pelton
 

is principally applicable for polluted waters or waters transporting
debris from glacial erosion.


        
       



Pelton turbines are the


preferred turbines for high
head (from about 100m)
DWVPDOORZUDWHV



water leakage without using additional gaskets. All rotating parts are provided with our contact-
 

              




neromylosHP neromylos i
 

 
 

 2mm additional wall thickness
 
  



 between generator and pelton wheel
 
 









 


This type of turbine is
applicable for low hydraulic
KHDGDQGXFWXDWLQJRUKLJK
RZUDWH

VHFWLRQDOYLHZRIDQHURP\ORV
DSFRQWURO
FURVVRZWXUELQH
       ZLWKHOOLQHDUPRWRU
turbines are particularly applicable for highly
inlet cone water inlet

FRQWUROEXWWHU\YDOYH
      FRQWUROEXWWHU\YDOYH
and smooth run. The very long durability turbine wheel
and the easy-to-maintain design of this type bearing
     
operation. suction tube
due to suction tube
additional head

      

        


plant control nm2. The picture above shows one

turbines.

Have a seat and relax!


nm2 has everything under control.

                 
 

 
 
 the necessary regulating actions are passed on to the relevant components within a split of a second


  
            



 
 





in a way that enables you to operate the
whole system just with the 4 functions AUTO/
    
    
     


If you would like to conclude a maintenance

latest updates. Remote maintenance is partly
possible via internet.


It is the intelligent and sustainable overall concept that we follow
within our entire range of activities.
- needless to say, that the same is true for our buildings!

The power station building is the part that represents


your hydroelectric power station. It is the location
       
        
         
       

     
power plant building to us. Why? The advantages
speak to our favour. We are building 




Each part is designed and manufactured by means of the








time: 1-2 days.

           
          
removed for revisions at the turbine or the generator. This


in price and maintenance. Minor maintenance actions can
be carried out through the double doors that lead into the
turbine room.

Innovative building technology


in ultimate perfection.

                  
buildings. That means we provide a turnkey solution - 
. This system proved very successful over the years and led to the fullest satisfaction of our customers
                
performance ratio plays a major role.



 
        
                
 
          
       
        

the insulation value can be determined to your needs.
 

No matter what time of year - the components are prefabricated
in our factories. At the day of delivery they are already completely
        


 
The short construction time and a careful selection of raw
materials used to make this system considerably cheaper than a 
traditional solid construction method.
With the neromylos casa system you can design
 
especially up to:
 
 17 m length
 4 m ceiling height and
 



     -
cation of our installations
    -
dustrialists and govern-
legend ments are among our cli-
SVGSSSFRPSRQHQWVWXUQNH\SS     
SVGSSSFRPSRQHQWVWXUQNH\SS be pleased to arrange a
under construction viewing of one of our po-
SRVVLEOHSURMHFWVIRU     
SS SRZHUSODQWSV SODQQLQJIRUVXEPLVVLRQ according to a prior agree-
dp = detailed planning 

 

Gewerbezone 10
A-9150 Bleiburg
www.neromylos.com
RIFH#QHURP\ORVFRP
+43 664 9103375