7. Make sure all pipes are connected to the plumbing fixture connector. If connector/s are not available within
8. Annotate and tag all pipes using pipe tags. Manual text is not permissible.
9. Use proper worksets, P-Piping for all pipes and P-Equip for all plumbing fixtures.
10. Indicate flow direction as shown in Fig. 1 & 3. Use generic annotation arrow symbol that is loaded in the
project.
11. Prepare water supply 3D view as shown in Fig. 2 and apply view template Plumbing-3D_Water
12. Prepare drainage 3D view as shown in Fig. 4 and apply view template Plumbing-3D_Drainage_LL & HL
Page 1 of 3
FIG. 1 WATER SUPPLY LAYOUT
Page 2 of 3
FIG. 3 - DRAINAGE LAYOUT
Page 3 of 3