S C H E D U L E - A ( PART - B )

Name of the work : Construction of Grama Panchayat Building at Huzurabad(v) MP. Huzurabad. Estimate Cost Rs. 40.00 Lakhs
Sl. APS Unit of
Probable Quantity Both in figure Measure
No Description of item S Rate Both in Figures & Words ment in
and Words
. No. Figures

1 2 3 4 5 6
1 Earth work excavation for foundations of building and deposting the earth on APSS
308
the bank with an initial lead of 10 Mtrs and lift of 2 Mts. In mixture of gravel and
soft disintegrated rock like shales ordinary gravels, stoney earth and earth
mixed with fair size boulders including all operational incidental, labour charges
such as shoring, sheeting, planking, strutting complete for finished item of work.
APSS 308 & Seigniorage charges.

143.60 Cum 76.25 1.00 Cum

( One hundred forty three (Rupees Sixty five and paisa


point six zero cubic meters twenty six only)
only)
2 P.C.C (1:4:8) mix using 40mm guage hard granite metal as per IS.456 including cost APSS
402
and conveyance of all materials like cement, sand, course aggregate, water lead etc.,
to site, including seigniorage charges on all materials, and all labour charges for
machine mixing concrete, Vibrating charges, laying concrete in foundation, ramming in
layers of 15 CM. thick each, finishing top surface to required level neatly water curing
etc., complete for finished item of work for foundations and flooring Bed APSS No. 402

18.38 Cum 2170.00 1.00 Cum

(Twenty nine point six two (Rupees One thousand three


cubic meters only) hundred twenty two and paisa
forty Five only)
3 P.C.C (1:5:10) mix using 40mm guage hard granite metal as per IS.456 including cost APSS
402
and conveyance of all materials like cement, sand, course aggregate, water lead etc.,
to site, including seigniorage charges on all materials, and all labour charges for
machine mixing concrete, Vibrating charges, laying concrete in foundation, ramming in
layers of 15 CM. thick each, finishing top surface to required level neatly water curing
etc., complete for finished item of work for foundations and flooring Bed APSS No. 402

13.43 Cum 2017.65 1.00 Cum

Contractor 1 of 10 Superintending Engineer,


P.R.Circle, Karimnagar.
1 2 3 4 5 6
(Twenty nine point six two (Rupees One thousand three
cubic meters only) hundred twenty two and paisa
forty Five only)
4 RR Masonary in cement mortar CM (1:6) for foundations using Hand Granite APS
stones including cost and conveyance of all materials like cement, sand granite S
stone, water leads etc., to work site cost of seigniorage charges on materials 615
including all labour charges for dressing stones to required size and shape,
mixing of cement mortar masonary construction, water curing etc., complete
for finished item of work. APSS No. 615 including VAT.

40.54 Cum 1741.70 1.00 Cum

( Forty point Five four cubic (Rupees One thousand seven


meters only) hundred forty one and paisa
seventy only)
4 Construction of CRS Masonary in CM (1:6) prop. using HG stones from APS
approved quarries including cost and conveyance of all materials like cement, S
sand, water etc., including cost and conveyance of all materials like cement, 615
sand, water etc. including seigniorage charges on all materials labour charges &
for cutting stones to required size and shape mixing of cement mortar, 601
construction, scaffolding charges curing for finished item of work and basement
including VAT.

38.00 Cum 1884.70 1.00 Cum

(Thirty eight point zero zero (Rupees One thousand Eight


cubic meters only) hundred Eighty four and paisa
seventy only)

Contractor 2 of 10 Superintending Engineer,


P.R.Circle, Karimnagar.
1 2 3 4 5 6
5 VRCC Corresponding to M15 grade as per IS 456 equalent to (1:2:4) APSS
402 &
proportional:nominal mix (cement: fine aggregates: courase aggreate) using 20mm size 403
SS 5 graded machine crushed hard granite metal (courase aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate
(sand) course aggregate, water etc. to site and seigniorage charges on all materials
including centring, shuttering, scaffolding, vibrating, machine mixing, laying concrete,
lift charges, curing etc., complete but excluding cost steel and fabrication charges for
finished item of work as per APSS No.402 & 403

a) 25.68 Cum For Columns footings 4547.40 1.00 Cum

(Seven point zero six cubic (Rupees Three thousand sixty


meters only) five and paisa Tsixty seven
only)

b) 12.05 Cum For Columns 5419.40 1.00 Cum

(Seven point zero six cubic (Rupees Three thousand sixty


meters only) five and paisa Tsixty seven
only)

c) 8.50 Cum for Plinth beams 4903.70 1.00 Cum

(Seven point zero six cubic (Rupees Three thousand sixty


meters only) five and paisa Tsixty seven
only)

Contractor 3 of 10 Superintending Engineer,


P.R.Circle, Karimnagar.
1 2 3 4 5 6
d) 13.29 Cum For Roof beams 5341.40 1.00 Cum

(Twenty six point Two nine (Rupees Four hundred four


cubic meters only) and paisa twenty seven only)

e) 26.70 Sqm For Slab 100mm 552.24 1.00 sqm

(Two point one five Square (Rupees Three thousand two


meters only) hundred eight and paisa
thirty six only)

f) 28.50 Sqm For Slab 125mm 648.05 1.00 sqm

(Two point one five Square (Rupees Three thousand two


meters only) hundred eight and paisa
thirty six only)

g) 219.90 Sqm For Slab 115mm 609.73 1.00 sqm

(Two point one five Square (Rupees Three thousand two


meters only) hundred eight and paisa
thirty six only)

6 Filling with sand for foundations & basement including cost conveyacne of all APSS
308
materials, watering and tamping and all labour charges as per SS complete.

135.59 Cum 348.00 1.00 Cum

(Seventy eight point Five (Rupees three hundred forty


zero Cubic meters only) seven and paisa Sixty only)

Contractor 4 of 10 Superintending Engineer,


P.R.Circle, Karimnagar.
1 2 3 4 5 6
7 Providing HYSD steel bars of different diameters (FE 415 grade as per IS 1786-1979) APSS
126
mild steel bars (FE 250 grade IS 432) of different diameters, cutting, bending, to
required sizes and shapes placing in position with cover block of approved size and
binding wire of 20 SWG, forming grills of reinforcement work as per approved designs
and drawing, including cost & conveyance of deformed bars from approved sources to
site of work, including cost & conveyance of binding wire, cover blocks and all
incidential, operational, labour charges such as cutting bending, placing in position,
tying etc., and its fabrication charges etc., complete for finished item of work as per
(APSS No. 126) in all floors including VAT.

3.90 MTs 59800.00 1.00 MT

(Twenty five metric tonnes (Rupees Thirty six thousand


only) eight hundred fifty only)

(Total Items Seven(7) only) Total Rs.

Rupees Thirty six lakhs Seventy one thousands two hundred Sixty seven and paisa Ninety one only

Contractor 5 of 10 Superintending Engineer,


P.R.Circle, Karimnagar.
D U L E - A ( PART - B )
Estimate Cost Rs. 40.00 Lakhs

Amount

10949.50

39884.60

27097.04

Contractor 6 of 10 Superintending Engineer,


P.R.Circle, Karimnagar.
7

70608.52

71618.60

Contractor 7 of 10 Superintending Engineer,


P.R.Circle, Karimnagar.
7

116777.23

65303.77

41681.45

Contractor 8 of 10 Superintending Engineer,


P.R.Circle, Karimnagar.
7
70987.21

14744.81

18469.43

134079.63

47185.32

Contractor 9 of 10 Superintending Engineer,


P.R.Circle, Karimnagar.
7

233220.00

962607.10

Contractor 10 of 10 Superintending Engineer,


P.R.Circle, Karimnagar.