Beruflich Dokumente
Kultur Dokumente
il"-,
L-]
l t+sn_ l
Description Arming
GYATA baHungarbn cory ol the Sovirgt PMN and Excavate cav or rnine io albw 2-4cm o spoil coverage
lhough veqy simibr lhero are some noticoable diferences. when buriod. Screry in detonator y'ug (unlike the PMN, the
The
-mine
body b o brown bakelite, the top hal{ having a detonalor b an integral part o th's y'ug). Place mine in
black rubber cover. GYATA has two possibte delay to prepared hole and partialv cover. Bemove saety pin.
arming timgs. 1.5 and 2.5 minules. The explosive content Careul cover and camoubge mine being careful not lo
beingiven greater than the PMN will tend lo }ead to atal exerl any pessure on the pessure plate. The mine will be
injuries. arrned 1.5 or 25 minutes after the safety pin b rernoved.
When tho saeby pin b withdrawn the pf6ssur9 o the iring , '
CAUTlOlV
'.'i:. ,
:-'
plin spring caues a steel wke to start cutting through a
-1'
:],
' '. 1'-,
ioaa eU stp (kJenticalin prhciplo to lhe MUV,2nitor). Do not app arry peurg to rubbor pressurs plata.
\.,:'_.:;
After a dehy o either 1.S or 25 minutes the wire cuts
through the lrcad stp and allotvs lhe strikor lo movo Holding the mino by the baketite siCos on, unscrotv and [ , ,';,,j,
'a.'::,"1i
orwaid to be retained by a slep in tho acluating plunger. remov the dgtonaiing paug. Having romove,d the plug and h.::., i,.j;
Aler th's stago the applicat'nn o Skgs or moro possure dolonator, the striker assemb can be romoved bY l: ...-
dopressing tho prossure late to iro the striker out
- ,,
..
to ihe pressure plato wilt depross lho actuatin9 yng",.
l,,,
!..,
57