Note No: CGN 001

Guidance on Construction, Repair and Maintenance


July 2000

ABOVE-GROUND CIRCULAR CONCRETE AND


RECTANGULAR WEEPING-WALL SLURRY STORES

Prepared by ADAS National Building Design Team.


Funded by The Ministry of Agriculture, Fisheries and Food.

Figure 1 Above-ground circular concrete store Figure 2 Weeping-wall store

Pre-cast and pre-stressed concrete wall panels are proprietary units manufactured under strict
controls. Many manufacturers will only supply units to approved installers.

The floors incorporate the panel foundations and are generally constructed of in-situ reinforced
concrete to BS 8110 or to BS 8007 (See References 3 & 4).

Weeping-wall stores must have a perimeter effluent collection channel and an effluent tank. If
spurting is likely to be a problem this may be overcome by increasing the width of the channel to
equal the net depth of slurry stored or by providing some means of deflecting liquids into the
perimeter channel.

Some systems, such as above-ground circular stores made of post-tensioned concrete staves or panels,
require special installation techniques. A post tensioning method is illustrated in figure 1. It is advised
that only experienced contractors and specialist installers should be engaged to build these systems.

Site Suitability
Avoid sites in a flood plain or sites with a high water table especially for below ground level
stores.
Avoid improperly filled ground or other unsuitable ground conditions such as peat soils or
ground liable to subsidence.
Locate at least 10 metres from a water-course (See Reference 1).
Suitable sites will be on firm and level non-organic sub-strata.

Specifications
Before placing an order for components, or commencing an installation, check that the specification
fully conforms to the Control of Pollution Regulations and BS 5502 (See References 1 & 5). The store
must be designed to properly withstand all loading conditions. If in doubt seek expert advice. Most pre-
cast concrete manufacturers supply detailed specifications of their products. Stores should be
designed to the load classifications of BS 5502 part 22 for Class 2 structures. In certain locations Class
1 structures may be required. Such design standards will meet the 20 year durability life requirement.

To calculate the size of a store refer to the Water Code (See Reference 2).
Wall panels and supports must be strong enough when the store is loaded full to the brim with
slurry, irrespective of the freeboard limits.
Below ground panels must withstand the external loads defined in Part 50 of BS 5502.
Check any construction drawings to see that they conform to the specification.
Check the maintenance requirements, especially the method of sealing and maintaining the
joints.
External maintenance of below ground stores will be very difficult so investigate durability,
particularly the joint seals.
Check the suitability of collection systems e.g. channels and tanks of weeping-wall stores.
Two lockable in-line valves at least one metre apart are required in outlet pipes. (Not applicable
to weeping-wall stores.)
Check details of the in-situ concrete work particularly the base, the foundations and the method
for sealing the joint between base and wall panels.
It is recommended that a 200mm thick C35A mix concrete floor slab to BS 8007 cast in one
pour should have at least one top layer of A393 steel fabric reinforcement to help reduce
cracking. If joints are necessary these should have water-stops to BS 8007(See Reference 4).

Construction
Employ an experienced contractor obtain references and investigate similar projects
undertaken.
Ensure that the relevant Health and Safety Regulations, including the CDM Regulations are
observed (See Reference 6).
Ensure that the construction is fully in accordance with the detailed drawings and specification.
A suitably qualified independent supervisor should carry out this duty.
All concrete work must be built to the correct dimensions and in accordance with the design
specification. This includes the mix specifications and the size, type, location and quantities of
steel reinforcement. Discrepancies may result in a failure of the structure.
Fix prominent permanent notices showing maximum depths (freeboard >300mm) proper
operational procedures and safety precautions.

Repair and Maintenance


Ask the designer or installer for operating and maintenance instructions.
Be aware of all hazards, particularly the presence of toxic gases when entering a partially full
tank, and observe all relevant precautions.
Inspect tank internally once a year when empty and externally at more frequent intervals.
Rectify defective joint seals with specified sealant.
Post tension systems and proprietary jointing systems require specialist attention (usually by
the installer or manufacturer).

References
1 The Control of Pollution (Silage, Slurry and Agricultural Fuel Oil) Regulations 1991 (as amended).
2 The Code of Good Agricultural Practice for the Protection of Water; MAFF Free publication.
3 British Standard 8110: Structural use of concrete.
4 British Standard 8007: Code of Practice for design of concrete structures for retaining aqueous liquids.
5 British Standard 5502 Part 50: Code of Practice for design construction and use of storage tanks and reception pits for
livestock slurry.
6 Health and Safety Executive: Construction (Design and Management) Regulations.

Das könnte Ihnen auch gefallen