Beruflich Dokumente
Kultur Dokumente
For internal
OWNER
OWNERS ENGINEER
CONTRACTOR
A 12 Jan 12 Issued For Internal J.H Kim Y.H Woo S.M Jang J.H Kim
Rev. Prepared Checked Reviewed Approved
Date Description
No by by by by
It may NOT be used, disclosed or reproduced for other purpose pertaining to this document or its contents without specific, written prior
permission of Daewoo E&C Co., Ltd.
SUR INDEPENDENT POWER PLANT DAEWOO E&C
Technical Specification for HDPE, PVC SUR-P-00BR-74-006
CONTENTS
1.0 GENERAL 2
2.0 SCOPE OF SUPPLY 2
3.0 CODE AND STANDARDS 3
4.0 DESIGN AND CONSTRUCTION REQUIREMENT 3
5.0 CLEANING, PAINTING, COATING AND MARKING 3
6.0 QUALITY REQUIREMENTS 4
7.0 PROTECTION, PACKING, SHIPPING AND STORAGE 7
8.0 DRAWING AND DATA SUBMITTAL REQUIREMENTS8
9.0 FORMS OF PROPOSAL 10
10.0 ATTACHMENT & REFERENCE LIST 10
Rev.0, Sheet 1 of 11
SUR INDEPENDENT POWER PLANT DAEWOO E&C
Technical Specification for HDPE, PVC SUR-P-00BR-74-006
1.0 GENERAL
1.1 This specification covers the technical and associated requirements for design and
furnishing of the HDPE, PVC Pipes and fittings for the SUR INDEPENDENT POWER
PLANT(2000MW)
1.1 It is neither Contractor's intent to specify all technical requirements nor to set forth to those
requirements adequately covered by applicable codes and standards. Supplier shall furnish
high quality material and accessories meeting the requirements of this specification and
industry standard.
1.2 All data, specification, drawings and documents shall be written in English. All
documentation which is specifically produced for the project shall be supplied in SI (System
International) units except that temperatures shall be given in degrees Celsius and
pressures in bar(a).
1.3 Any conflict between this Specification and its references shall be brought to the attention
of the Contractor for resolution prior to any further action by the Supplier.
Supplier shall furnish materials and services of alloy steel pipes and fittings.
HDPE, PVC in accordance with the purchase order requirements of 10.0 Reference
Bill of Materials
Technical directions for receiving, unloading, storing, erection, installation and testing.
Shop Inspection and tests
Mill test Certificate
Shop painting
Marking, Packing and tagging
Furnish all documents
Cleaning and preservation.
Scheduling and schedule monitoring
Quality control and inspections.
Quality assurance system
Rev.0, Sheet 2 of 11
SUR INDEPENDENT POWER PLANT DAEWOO E&C
Technical Specification for HDPE, PVC SUR-P-00BR-74-006
4.1 General
4.1.1 Pipe and fitting material shall be supplied in accordance with the supply agreements of
10.0 Reference Bill of Materials
4.1.2 Material shall be suitable for continuous exposure at the service condition and ratings
specified.
4.1.3 All materials shall be new, clean free from rust, pits and defects.
4.1.4 Pipe and joints shall be free from de-laminations, cracks, bubbles, pinholes, pits, blisters,
foreign inclusions and resin-starved areas that due to their nature, degree or extent
detrimentally affect the strength and serviceability of the pipe.
Joint sealing surfaces shall be free of dents, gouges, de-laminations, or other surface
irregularities that will affect the integrity of the joints.
Pipe shall be as uniform as commercially practicable in color, opacity, density and other
physical properties.
4.1.5 HDPE piping shall be incorporate to protect the polymer from the potentially damaging UV
radiation in sunlight. The primary specification for identifying and classifying HDPE piping
materials shall be determined in accordance with ASTM D3350 unless otherwise specified
by Contractor.
4.1.6 Basic material for PVC shall be in accordance with ASTM D1784, unless otherwise
specified.
4.1.7 Random length of pipe shall be as follows;
DN 50 and Smaller : 6m
DN 65 and Larger : 12m
5.1 Marking
5.1.1 The markings shall be indicated on all pipes. Normally, marking shall be accomplished with
stenciling and/or punching in the following order.
Rev.0, Sheet 3 of 11
SUR INDEPENDENT POWER PLANT DAEWOO E&C
Technical Specification for HDPE, PVC SUR-P-00BR-74-006
dry.
6.1 The Supplier shall comply with the Quality Requirement for Procurements (Refer to
Attachment F).
6.2 The Supplier is solely and fully responsible for the quality of his supply and services, the
quantitative and qualitative adequacy of the resources assigned by him to this purpose,
and the quality assurance program applied by him in the context.
6.3 The Supplier shall control the quality of items and services to meet the requirements of this
Rev.0, Sheet 4 of 11
SUR INDEPENDENT POWER PLANT DAEWOO E&C
Technical Specification for HDPE, PVC SUR-P-00BR-74-006
Rev.0, Sheet 5 of 11
SUR INDEPENDENT POWER PLANT DAEWOO E&C
Technical Specification for HDPE, PVC SUR-P-00BR-74-006
Rev.0, Sheet 6 of 11
SUR INDEPENDENT POWER PLANT DAEWOO E&C
Technical Specification for HDPE, PVC SUR-P-00BR-74-006
- Soundness
- Elongation at Break
- Long/Short term Strength
- Conditioning Test
- Impact Test (at least 3 samples per a specimen)
- Low Temperature Test
- Pressure Test(according to relevant international Code)
3) Pipes Pressure test shall be carried out at a minimum frequency of 10%, if required.
6.9.4 Final Inspection
1) Final inspection before delivery shall be done. Especially the completeness,
dimensions, workmanship, identification, certification and the conformity with the
Code and Standards.
2) The cleanliness, painting, preservation and the transport protection shall be
checked and certified for all parts according to requirements in this specification.
3) The end protection(ex. Plastic cap) shall be installed each both end of pipe. The
fitting shall be packed with wooden box
4) The Workshop inspection & test reports such as material certificate, electric test
report, function test reports, etc. shall be properly classified into related groups and
be bound.
6.10 Guarantee
6.10.1 The workmanship of all work in the Supplier responsibility as well as the fulfillment of
specified requirements are a part of technical guaranties.
6.10.2 The Supplier shall guarantee that the materials will meet all the requirements under all
design and operating conditions identified in the specification
Rev.0, Sheet 7 of 11
SUR INDEPENDENT POWER PLANT DAEWOO E&C
Technical Specification for HDPE, PVC SUR-P-00BR-74-006
marked and openings shall be covered. Before the equipment is shipped, the shipping
stops, bolts, ties, etc., shall be installed in all devices.
All control equipment shall be packed separately from the mechanical equipment. Shipping
preparation procedures shall be submitted to the Contractor for acceptance prior to
implementation
7.2.1 Export packing and shipping shall conform to the Contractors shipping and packing
instruction.
7.2.2 The Supplier shall clean all components and preserve and protect them on the basis that
equipment and all accessories will be stored unprotected in the field for a minimum period
of six(6) months.
7.2.3 Prior to shipment, the pipes shall be completely drained and thoroughly dry.
7.2.4 All materials are to be handled with proper equipment and in a careful manner to prevent
distortion or damage.
7.2.5 The inside and outside of carbon and alloy steel pipes shall be coated with suitable rust
prevention to avoid corrosion during transit and storage.
7.2.6 Exposed machined and threaded surface shall be protected with a suitable rust prevention.
7.2.7 Plain or bevel ends shall be protected with a non-metallic cover.
7.2.8 Threaded connections shall be protected with screwed or snap-in (snap-on) type plastic
protectors.
7.2.9 Metal fasteners, straps or covers shall not be welded to any part of pipe.
7.2.10 Seal ends tight with caps, plugs or covers (flanges with full face protection).
7.2.11 To protect machined welding ends, end protectors shall be designed to prevent the
entrance of foreign matter into pipes during storage in the field prior to erection
7.3 Delivery and Storage
The Supplier shall provide protection for the material during transit and storage.
The Supplier shall clearly informed to the Contractor in his proposal if any special
equipment to be used for the transportation.
7.3.1 Instruction covering handling and storage at construction site shall be prepared and
submitted by the Supplier
Rev.0, Sheet 8 of 11
SUR INDEPENDENT POWER PLANT DAEWOO E&C
Technical Specification for HDPE, PVC SUR-P-00BR-74-006
Rev.0, Sheet 9 of 11
SUR INDEPENDENT POWER PLANT DAEWOO E&C
Technical Specification for HDPE, PVC SUR-P-00BR-74-006
5) The Contractor has the rights to review and comment on all of the documents
submitted by the Supplier. If the Supplier's documents do not comply with the
contract requirements or not include sufficient technical information for verifying the
correctness of the design on his supplied items (Alloy Pipes), the Contractor will
comment the Supplier to revise and/or improve them. The Supplier shall resubmit
his drawings and documents to the Contractor after revising and improving them
according to the Contractor's comments.
8.3.2 Suppliers reply sheets
The Supplier shall submit his reply sheets to the Contractors comments on the Suppliers
documents together with the revised documents reflected suitably the Contractors
comments.
Attachment 1
1) A1. General Technical Requirements for General
2) A2. Technical Specification for Painting
3) B1. General Technical Requirement for Mechanical
4) D1. Guidelines for Vendor Document Numberin_R1
5) D2. Guidelines for Documentation of Vendor Print_R1
6) E. Plant Identification Procedure(KKS_Numbering_Procedure)
7) F. Quality Requirements for Procurement
8) G. Vendor Data Requirements
9) P3. Piping Material Classes
Reference 1
1) Bill of Material
Rev.0, Sheet 10 of 11
SUR INDEPENDENT POWER PLANT DAEWOO E&C
Technical Specification for HDPE, PVC SUR-P-00BR-74-006
Rev.0, Sheet 11 of 11