West Qurna I

Produced Water Treatment M109 Inspection Request Schedule


Date Time Location IR No. Discription Action
24TH Aug-Civil

Inspect the surface of clarifier tank columns and back wash pump
26.Aug 07:30 DS7 CE-C0956 (PBE681161B,PBE681261A/B)foundation after remove formwork in DS7.
HOLD

26.Aug 08:00 DS7 CE-C0957 Inspect the surface of pump shelter (train2) columns after coating in DS7. HOLD

Witness to test concrete cubes (compressive strength at 28 days) of clarifier tank


26.Aug 08:30 Al-fao DS8 lab CE-C0958 footing(ABJ681160) in DS7.
Witness

Witness conducting compaction degree test for samples of zone


26.Aug 09:00 Al-fao DS8 lab CE-C0959 (zone1,2,3,7,8,11,12131415) in IGF area in DS7.
Witness

Final inspection for the rebar and formwork of the DS7's Precast pipe support footing
26.Aug 10:00 CPECC camp CE-C0953-R1 in CPECC CAMP. (total=30) HOLD

26.Aug 11:30 DS7 CE-C0960 Sampling backfill soil (zone1,2,3) between two sleeper in DS7. Witness

26.Aug 11:30 DS7 CE-C0961 Sampling backfill soil (zone5,16) in DS7 Witness
26.Aug 11:30 DS7 CE-C0962 Re-sampling of IR-CE-C0954 fail point in DS7 Witness
ISSUED
West Qurna I
RESPONSIBILITY Date: 25-8-2017 Produced Water Treatment M109
Time:
SUBCONTRACT CPECC COMPANY/
OR
Comments
QC DEP. OWNER 8 9 10 11 12 13 14 15 16

thameen ma gang Mr.Hameed

thameen ma gang Mr.Hameed

thameen ma gang Mr.Hameed

thameen ma gang Mr.Maher

thameen ma gang Mr.Maher

thameen ma gang Mr.Maher

thameen magang Mr.Salam


thameen ma gang Mr.Maher