1.1.3. Responsibility
This activity is the responsibility of the Project Manager.
1.1.5. Deliverables
The deliverables from the Prepare for Final Cutover activity are:
Established Organisational, Technical and Working Environments;
Reviewed Cutover Plan;
Handover Form signed by TechnologyOne; and
Acceptance Form signed by the client.
1.2.3. Responsibility
This activity is the responsibility of the Client Technical Support Team.
1.2.5. Deliverables
The deliverables from the Final Install and Handover activity are:
Final Install Application Software ready for Data Takeup and Final System Acceptance;
Handover Form signed by TechnologyOne; and
Acceptance Form for the installation signed by the client.
1.3.3. Responsibility
This activity is the responsibility of the local site users under the control of the User Implementation
Team.
1.3.5. Deliverables
The deliverables from the Module Site Acceptance activity may include:
Acceptance Test Results (required);
Revised User Training Program;
Revised User Procedures Guide;
Revised Operations Guide;
Quality Improvement Requests;
Handover Form signed by TechnologyOne (required); and
Acceptance Form signed by the client (required).
1.4.3. Responsibility
This is the responsibility of the Consulting Team.
1.4.5. Deliverables
The deliverables from the Post Installation Review activity are:
Post Installation Review Report;
Updated Development Method;
Handover Form signed by TechnologyOne; and
Acceptance Form signed by the client.
1.5.3. Responsibility
This activity is the responsibility of the User Implementation Team and the TechnologyOne Student
Management Research and Development Team.
1.5.5. Deliverables
The deliverables from these activities are:
Documented Test Results;
Handover Form signed by TechnologyOne; and
Acceptance Form signed by the client.
1.6.3. Responsibility
This activity is the responsibility of the User Implementation Team.
1.6.5. Deliverables
The deliverables from the Commissioning activity are:
Live System;
Operations Handover;
Handover Form signed by TechnologyOne; and
Acceptance Form signed by the client.
1.7.3. Responsibility
This is the joint responsibility of both parties.
1.7.5. Deliverables
The deliverables from this activity are:
Signed Certificate of Commissioning.