Sie sind auf Seite 1von 1

SH Steady End Hose

Steady end hose reduces risk of injury

With the development of the SH end hose


(SH: "Steady Hose"), Putzmeister has
been able to reduce the risk of injury
when placing concrete with booms.
While previous concrete end hoses
reacted to uncontrolled pressure chang-
es in the concrete e.g. in the event of
trapped air or when a blockage was
cleared with strong lateral deflections,
these unpredictable and at times perilous
excess vibrations have now been signif-
icantly reduced with the new, damped
end hose (SH).

It was possible to "tame" the concrete


File under: A 1.00, BP 1.03, A 4.00, BP 4.03

end hose by using a special design of


reinforcing fabric with which the strength
of the deflections could be significantly
reduced in comparison with other end
hoses.

SH End Hose Art.-No.


125/5,5" 3m 480550
In the event of a blockage the SH end
125/5,5" 4m 480549 hose dampens lateral deflections and
100/4,5" 3m 480548 excess vibrations

100/4,5" 4m 476899

Innovation Award BAUMA 2007


by VDMA (German Engineering Federation)

Putzmeister AG
Putzmeister Products and Services Max-Eyth-Str. 10 D-72631 Aichtal
Concrete Pumps Industrial Technology PIT P.O.Box 2152 D-72629 Aichtal
Telebelt Mrtelmaschinen GmbH Dynajet Tel. +49 (7127) 599-0
High Pressure Cleaners Services Concrete Fax +49 (7127) 599-520
Project Division CPD Consulting and Data www.putzmeister.com
Technology Academy E-mail: pmw@pmw.de

BP 3917 GB Right to make technical amendments reserved by Putzmeister AG 2007 All rights reserved Printed in Germany (PM)

Das könnte Ihnen auch gefallen