Our India /Our Sun /Our Green Power/Silent

Power/Econmical Power
Sabco Bijlee Milegi Hum Dekarke Rahenge
People was telling they are
trying to reach sun
We are here who brought
Sun into ground and
Generating power from Sun
easy way to reach Sun or
as Equal
Source of Power Generation andd
Utility
Electric Power Systems Lets us work till dark is away from Each Home use with High
Energy Storage Battery Systems along with Solar Pv Power
Battery Power Generation Transmission Distribution Consumption

M
G

Generation Transmission Distribution Load


Solar Tarrif in India Auction unit Rate
100GWSolar Generation and Calculation
Renewable
Energy
Grid-connected Capacity Indias
(JuneRenewable
2016): GW Intended Nationally Determined Contribution (INDC)
Source Reduce the emissions intensity per unit GDP by 33 to 35
Wind Power 27.15 percent below 2005 by 2030.
Solar 7.80 Increase the share of non-fossil-based power capacity from 30
percent today to about 40 percent by 2030.
Bio Power 4.86 Create an additional carbon sink of 2.5 to 3 billion tons of CO2
Small Hydro 4.30 through additional forest and tree cover.
Waste-to-Energy 0.12
TOTAL 44.24
Off-Grid /Captive Power
(JuneRenewable
2016): GW
Source
Waste-to-Energy, 1.34 India needs as much as $200
Biomass billion to meet its new target
cogeneration, of installing 100 GW of solar
Biomass Gasifiers, power capacity and 60 GW of
Aero-generators,
Majority of Indian projects Open Access Developer
SOLAR adopted crystalline silicon
technology, with an average
supplies to any 3rd party at
negotiated rates.
Indias Solar Potential: 748 GW efficiency of 16-17%. Captive & Group Captive:
Current status of Consumers offtake the majority of
National Solar Mission: manufacturing: the output from the captive & own
100GW by 2022capacity At the start of April 2016, India at least 26% of equity.
break-up: had 1.2GW of cell and 5.6GW of Sites & Parks - Developer
Rooftop Scheme Policy Support:
module production capacity. develops the infrastructure and
: 40GW Photo-Voltaic industry dependent 100% FDI aviarental
charges auto fee
route
fromforusers.
solar
Entrepreneur Scheme on imports of critical raw cell manufacture.
: 20GW materials and components. 10-year tax-holiday for solar projects.
Already planned Low capacity to manufacture Accelerated depreciation @80%
: 10GW silicon material & solar thermal. within first 2 years of commercial
State Policy Opportunity for Manufacture: operation.
New target envisages
: 10GW $100 Concentrator collectors, receivers, Exemption from Open Access Charges,
Public investment in solar
BillionSector crystalline silicon technology Wheeling & Banking Charges etc.
over the : next
10GW 7 years. components etc. Developers get a fixed sum per unit
Private Sector
Fixed targets for grid- Off-grid technologies: Micro grids energy generated in addition to tariff.
connected: 5GWsolar power Business Models in India: No Excise Duty for RE generation
of 150 watts (powering 20
Independent
through the mandatory use
Power Producers Feed-in-tariff: Developers
households) to 5 kilo watt (40sign components.
of Renewable
: 5GW Purchase ahouseholds
PPA at fixed
and tariffs.
commercial use Customs Duty @ 5% for selected
Obligations (RPOs) by Renewable Energy
like water pumps) in villages; components of RE generation power
utilities backed with a Certificates.
lanterns, street lighting; projects.
WIND National Offshore Wind Energy Policy, 2015 (NOWEP)
Guidelines allow for setting up offshore wind farms within
territorial waters that extend up to 200 nautical miles from
Facts: the coastal baselines of India.
The National Institute of Wind Energy NIWE will allocate the blocks to the project developers
(NIWE) has estimated that Indias through an open international competitive bidding process.
installable wind energy potential has been NIWE will give single window clearance.
estimated to be 302 GW with towers of Environmental Impact Assessment, oceanographic surveys,
a height of 100 metres. environmental audit etc. to be done before the blocks of
Policy Support:
India ranks No.4 in terms of installation offshore wind energy can be demarcated.
Raw material used in manufacturing of wind turbine
capacity (27.15 GW as of June 2016) after
generators have been exempted from the Special Additional
China, the US and Germany.
Duty of 4%.
State of Tamil Nadu installed capacity:
No excise duty and Customs duty @ 5% on import of forged
7.63 GW.
steel rings used in the manufacture of bearings used in wind
Indias domestic wind manufacturing
operated electricity generators.
capacity is about 10,000 MW annually.
Accelerated depreciation (AD) @40% (to save income tax)
Wind energy attracted cumulative
and Generation Based Incentive (GBI) Scheme: 50 paise per
investments totalling US$ 3.16 Billion.
kWhr of electricity generated for at least 4 years and up to
New Capacity Installation Target: 60 GW
10 years. Incentive will stop once pay-out reaches INR 1 crore
by 2022.
(US$ 163,000) per MW of capacity. Scheme ends 2017.
Turbine suppliers: Gamesa, Suzlon,
Companies can opt either for AD or GBI, but not both.
Inox, Regen, Wind World, LM Wind and
The tax on coal for the National Clean Energy Fund (NCEF)
Senvion.
doubled to Rs. 400 per ton. NCEF is used for supporting
Off Grid Solar Power Plant
Impact /Solar PV Operated Pumps/Benifit
Dedicated to Nation
India Map of Reseve Water in Ground
India has Installed 90,000 Solar Pumps for
Agriculture https://youtu.be/5yQOD1lBbjg
Consumer become Solar PV Roof Top
Power Generator Example TPDDL Delhi
Power Utility Information in Customer
Tips/App
Technology by Demand
Demand and Supply with Monitoring
POWER FOR ALL HUM BIJLI
BACHAYENGE
Providing 24x7 power to all households, industry,
commercial businesses, agriculture farm holdings, and any
other electricity consuming entity by FY2018-19.
PFA covers the entire spectrum of the power sector, Investment Outlay:
including generation, transmission, distribution, renewables, US$45.2 billion in power
energy conservation and customer initiatives. transmission and
Focus on modernising transmission and distribution distribution business to
infrastructure. achieve its targets under
Set up coalbased 5 new Ultra Mega Power Projects the Power for All initiative.
(UMPPs) with supercritical technology, under the plug and The government has set a
play model, involving investments of approximately USD15.1 goal to add 115,603 MW of
billion.
New Renewable Targets:
power capacity by 2017
Solar: 100GW [20GW from Solar Parks, 40GW from Roof-
and 101,745 MW between
top solar and 40GW from Distributed Generation Projects] 2017 and 2022
Coal Mines Special
by 2022. Provisions Bill, 2015:
Wind: 60 GW
Allocation of coal blocks
International Solar Alliance announced: An
POWER FOR ALL HUM BIJLI
THERMAL

BACHAYENGE 2
Sales; Diesel;
0.004337554

Sales; Gas;
0.115800416

TOTAL INSTALLED
CAPACITY Sales; Coal;
0.87985258

RENEWABLEs
Sales;
Renewables; Sales; Solar;
0.14136079; 0.15781735
14%
Sales; Hydro;
0.141357491 Sales; Waste to
Sales;
; 14% Energy;
Nuclear; 0.002683969
Sales;
0.019068482
Thermal;
; 2%
0.698209938 Sales; Bio Mass;
; 70% 0.112750018

Sales; Wind;
0.627021728

Sales; Small Hydro;


0.099726935
Jab Tak Suraj Rahega hum uski
Energy to use Karenge Aur Desh
ko Green Environment Denge
Need More Information
Write
Mahesh Chandra Manav