Sie sind auf Seite 1von 7

List of DRD of active ECSS Standards

NOTE: At the bottom of this page you find for download a zip-file containing all DRDs

Title of DRD ECSS Annex Date E-DRDs = 143


Addendum: Additional propulsion aspects for ECSS-E-ST-35C Rev.1 Annex K 06 March 2009 M-DRDs = 37
mathematical model description and delivery (MMDD)

Addendum: Specific propulsion aspects for thermal ECSS-E-ST-35C Rev.1 Annex C 06 March 2009 Q-DRDs = 134
analysis
Additional propulsion aspects for mathematical model ECSS-E-ST-35C Rev.1 Annex J 06 March 2009 Total of 314
requirements (MMR)
AIC and FPGA control plan (ACP) ECSS-Q-ST-60-02C Annex A 31 July 2008
Analysis report ECSS-E-ST-10C Annex Q 06 March 2009
AOCS Algorithms and Functional Description ECSS-E-ST-60-30C Annex C 30 August 2013
AOCS Algorithms and Functional Description ECSS-E-ST-60-30C Annex C 30 August 2013
As-built configuration list ECSS-M-ST-40C Rev.1 Annex D 03 March 2000
ASIC and FPGA development plan (ADP) ECSS-Q-ST-60-02C Annex B 31 July 2008
Assembly, integration and test plan (AITP) ECSS-E-ST-10-03C Annex A 01 June 2012
Audit / review report for the measurement equipment ECSS-Q-ST-70-09C Annex B 31 July 2008
of thermo-optical properties of thermal control
materials
Automatic wave soldering process verification report ECSS-Q-ST-70-07C Annex C 16 April 2010

Battery user manual ECSS-E-ST-20C Annex D 31 July 2008


Bioburden control formal system description ECSS-Q-ST-70-58C Annex A 15 November 2008
Calibration and test results ECSS-Q-ST-70-05C Annex A 06 March 2009
Certificate of conformity (CoC) ECSS-Q-ST-20C Rev.1 Annex D 01 March 2013
Certificate of conformity for Micro-VCM ECSS-Q-ST-70-02C Annex E 15 November 2008
Change proposal ECSS-M-ST-40C Rev.1 Annex H 03 March 2000
Change request ECSS-M-ST-40C Rev.1 Annex G 03 March 2000
Cleaning Technique Selection (CTS) for spacecraft ECSS-E-ST-35-06C rev. 1 Annex B 15 November 2008
propulsion components, subsystems and systems
Cleanliness and contamination control plan (C&CCP) ECSS-Q-ST-70-01C Annex B 15 November 2008

Cleanliness Certificate (CC) for spacecraft propulsion ECSS-E-ST-35-06C rev. 1 Annex C 15 November 2008
components, subsystems and systems
Cleanliness requirement specification (CRS) ECSS-Q-ST-70-01C Annex A 15 November 2008
Cleanliness Requirements Analysis (CRA) for ECSS-E-ST-35-06C rev. 1 Annex A 15 November 2008
spacecraft propulsion components, subsystems and
systems
Cleanroom commissioning report ECSS-Q-ST-70-58C Annex D 15 November 2008
Cleanroom commissioning specifications and ECSS-Q-ST-70-58C Annex C 15 November 2008
procedures (Work Proposal)
Common-cause analysis ECSS-Q-ST-30C Annex I 06 March 2009
Communication system analysis document (CSAD) ECSS-E-ST-50C Annex C 31 July 2008
Communication system architectural design ECSS-E-ST-50C Annex E 31 July 2008
document (CSADD)
Communication system baseline definition (CSBD) ECSS-E-ST-50C Annex B 31 July 2008
Communication system detailed design document ECSS-E-ST-50C Annex F 31 July 2008
(CSDDD)
Communication system operations manual (CSOM) ECSS-E-ST-50C Annex H 31 July 2008
Communication system profile document (CSPD) ECSS-E-ST-50C Annex G 31 July 2008
Communication system requirements document ECSS-E-ST-50C Annex A 31 July 2008
(CSRD)
Communication system verification plan (CSVP) ECSS-E-ST-50C Annex D 31 July 2008
Company Price Breakdown Forms ECSS-M-ST-60C Annex D 31 July 2008
Compatibility assessment and applicability ECSS-E-ST-35-10C Annex A 06 March 2009
report for liquid propulsion components,
subsystems and systems (CAAR)
Compatibility Testing for Liquid Propulsion ECSS-E-ST-35-10C Annex B 06 March 2009
Report (CTLP)
Compliance matrix for custom MMIC design ECSS-Q-ST-60-12C Annex B 31 July 2008
Component control plan (CCP) ECSS-Q-ST-60-13C Annex A 21 October 2013
Component control plan (CCP) ECSS-Q-ST-60C Rev.2 Annex A 21 October 2013
Computer aided design model description and ECSS-E-ST-32C rev. 1 Annex A 15 November 2008
delivery (CADMDD)
Configuration item data list ECSS-M-ST-40C Rev.1 Annex C 03 March 2000
Configuration item list ECSS-M-ST-40C Rev.1 Annex B 03 March 2000
Configuration management plan ECSS-M-ST-40C Rev.1 Annex A 03 March 2000
Configuration status accounting reports ECSS-M-ST-40C Rev.1 Annex F 03 March 2000

365289298.xlsx 1 of 7
List of DRD of active ECSS Standards

Title of DRD ECSS Annex Date E-DRDs = 143


Contingency analysis ECSS-Q-ST-30C Annex D 06 March 2009
Contract Change Notice (CCN) ECSS-M-ST-60C Annex O 31 July 2008
Control algorithms specification (CAS) ECSS-E-60A Annex C 14 September 2004
Control system design report (CSDR) ECSS-E-60A Annex B 14 September 2004
Controlled system analysis report (CSAR) ECSS-E-60A Annex D 14 September 2004
Controlled system verification plan (CSVP) ECSS-E-60A Annex E 14 September 2004
Controlled system verification report (CSVR) ECSS-E-60A Annex F 14 September 2004
Coordinate Systems Document (CSD) ECSS-E-ST-10-09C Annex A 31 July 2008
Cost and Manpower Report ECSS-M-ST-60C Annex J 31 July 2008
Cost Breakdown Structure ECSS-M-ST-60C Annex A 31 July 2008
Cost Estimate Report ECSS-M-ST-60C Annex G 31 July 2008
Cost Estimating Plan ECSS-M-ST-60C Annex F 31 July 2008
Critical-item list ECSS-Q-ST-10-04C Annex A 31 July 2008
Customer furnished items and services requirements ECSS-E-ST-70C Annex J 31 July 2008
document (CFISRD)
Customer requirements document (CRD) ECSS-E-ST-70C Annex A 31 July 2008
Customer specification document for threaded ECSS-Q-ST-70-46C Rev.1 Annex A 06 March 2009
fasteners
Data documentation package (DDP) ECSS-E-ST-20-08C Rev.1 Annex G 18 July 2012
Data sheet ECSS-Q-ST-60-02C Annex G 31 July 2008
Declared component list (DCL) ECSS-Q-ST-60C Rev.2 Annex B 21 October 2013
Declared components list (DCL) ECSS-Q-ST-60-13C Annex B 21 October 2013
Declared materials list (DML) ECSS-Q-ST-70C Rev.1 Annex A 15 October 2014
Declared mechanical parts list (DMPL) ECSS-Q-ST-70C Rev.1 Annex B 06 March 2009
Declared process list (DPL) ECSS-Q-ST-70C Rev.1 Annex C 06 March 2009
Dependability plan ECSS-Q-ST-30C Annex C 06 March 2009
Design definition file (DDF) ECSS-E-ST-10C Annex G 06 March 2009
Design Definition File (DDF) for AOCS ECSS-E-ST-60-30C Annex A 30 August 2013
Design Definition File (DDF) for AOCS ECSS-E-ST-60-30C Annex A 30 August 2013
Design justification file (DJF) ECSS-E-ST-10C Annex K 06 March 2009
Design Justification File (DJF) for AOCS ECSS-E-ST-60-30C Annex B 30 August 2013
Design Justification File (DJF) for AOCS ECSS-E-ST-60-30C Annex B 30 August 2013
Design loads (DL) ECSS-E-ST-32C rev. 1 Annex B 15 November 2008
Design package document ECSS-Q-ST-60-12C Annex C 31 July 2008
Design validation plan (DVP) ECSS-Q-ST-60-02C Annex F 31 July 2008
Detail specification (DS) ECSS-Q-ST-60-02C Annex H 31 July 2008
Dimensional stability analysis (DSA) ECSS-E-ST-32C rev. 1 Annex C 15 November 2008
Dry heat bioburden reduction proposal ECSS-Q-ST-70-57C Annex B 30 August 2013
Dry heat bioburden reduction report ECSS-Q-ST-70-57C Annex C 30 August 2013
Dry heat bioburden reduction specification ECSS-Q-ST-70-57C Annex A 30 August 2013
Dynamic analysis report (AR-DY) ECSS-E-ST-35-02C Annex A 08 October 2010
EAC and ETC for Cost Reimbursement ECSS-M-ST-60C Annex M 31 July 2008
EAC for Fixed Price ECSS-M-ST-60C Annex N 31 July 2008
Electrical hazard mitigation plan ECSS-E-ST-20-06C Annex A 31 July 2008
Electromagnetic effects verification plan (EMEVP) ECSS-E-ST-20C Annex B 31 July 2008
Electromagnetic effects verification report (EMEVR) ECSS-E-ST-20C Annex C 31 July 2008
EMC control plan ECSS-E-ST-20C Annex A 31 July 2008
End item data package (EIDP) ECSS-Q-ST-20C Rev.1 Annex B 01 March 2013
Evaluation report of the measurement of thermo- ECSS-Q-ST-70-09C Annex A 31 July 2008
optical properties of thermal control materials
Evaluation test report ECSS-Q-ST-70-10C Annex A 15 November 2008
Experience summary report ECSS-Q-ST-60-02C Annex I 31 July 2008
Failure Detection Identification and Recovery ECSS-Q-ST-30C Annex F 06 March 2009
Fatigue analysis (FA) ECSS-E-ST-32C rev. 1 Annex D 15 November 2008
Feasibility and risk assessment report (FRA) ECSS-Q-ST-60-02C Annex D 31 July 2008
FMEA worksheet ECSS-Q-ST-30-02C Annex B 06 March 2009
FMEA/FMECA report ECSS-Q-ST-30-02C Annex A 06 March 2009
FMECA worksheet ECSS-Q-ST-30-02C Annex C 06 March 2009
Format of the detail specification of a hybrid circuit ECSS-Q-ST-60-05C Rev.1 Annex B 06 March 2009
Fracture control analysis (FCA) ECSS-E-ST-32C rev. 1 Annex E 15 November 2008
Fracture control items lists (PFCIL, FCIL and FLLIL) ECSS-E-ST-32C rev. 1 Annex G 15 November 2008

Fracture control plan ECSS-E-ST-32C rev. 1 Annex F 15 November 2008


Function tree ECSS-E-ST-10C Annex H 06 March 2009
Functional mathematical model (FMM) description ECSS-E-ST-60-20C Rev. 1 Annex A 15 November 2008
Gauging analysis report (AR-G) ECSS-E-ST-35C Rev.1 Annex B 06 March 2009
Geographical Distribution Report ECSS-M-ST-60C Annex E 31 July 2008
HCD process plan ECSS-E-ST-10-11C Annex A 31 July 2008

365289298.xlsx 2 of 7
List of DRD of active ECSS Standards

Title of DRD ECSS Annex Date E-DRDs = 143


HFE analysis and simulation report ECSS-E-ST-10-11C Annex B 31 July 2008
HFE continuous assessment process report ECSS-E-ST-10-11C Annex C 31 July 2008
HFE test report ECSS-E-ST-10-11C Annex D 31 July 2008
HSIA form ECSS-Q-ST-30-02C Annex D 06 March 2009
Hybrid circuit technology identification form (HTIF) ECSS-Q-ST-60-05C Rev.1 Annex A 06 March 2009
Hydrogen peroxide bioburden reduction proposal ECSS-Q-ST-70-56C Annex B 30 August 2013
Hydrogen peroxide bioburden reduction report ECSS-Q-ST-70-56C Annex C 30 August 2013
Hydrogen peroxide bioburden reduction specification ECSS-Q-ST-70-56C Annex A 30 August 2013

Inspection report (IRPT) ECSS-E-ST-10-02C Annex E 06 March 2009


Interface Control Document (ICD) ECSS-E-ST-10-24C Annex B 01 June 2015
Interface Control Document (ICD) ECSS-E-ST-40C Annex E 06 March 2009
Interface Definition Document (IDD) or Single-end ECSS-E-ST-10-24C Annex C 01 June 2015
Interface Control Document
Interface requirement document (IRD) ECSS-E-ST-10C Annex M 06 March 2009
Interface Requirements Document (IRD) ECSS-E-ST-10-24C Annex A 01 June 2015
Internal Supplier's specification ECSS-Q-ST-60-13C Annex C 21 October 2013
Inventory Record ECSS-M-ST-60C Annex I 31 July 2008
Justification document ECSS-Q-ST-60-13C Annex F 21 October 2013
Logbook ECSS-Q-ST-70-18C Annex A 15 November 2008
Logbook ECSS-Q-ST-20C Rev.1 Annex C 01 March 2013
Machine-soldering logbook ECSS-Q-ST-70-07C Annex D 16 April 2010
Maintainability analysis ECSS-Q-ST-30C Annex H 06 March 2009
Material and mechanical part allowables (MMPA) ECSS-E-ST-32C rev. 1 Annex H 15 November 2008
Material Safety Data Sheet (AR-MSDS) ECSS-E-ST-35-02C Annex B 08 October 2010
Materials identification card (MIC) ECSS-Q-ST-70-02C Annex A 15 November 2008
Mathematical model description and delivery (MMDD) ECSS-E-ST-32C rev. 1 Annex I 15 November 2008

Mathematical modelling for propulsion analysis (MM- ECSS-E-ST-35C Rev.1 Annex I 06 March 2009
PA)
Mechanism analytical verification (MAV) ECSS-E-ST-33-01C Annex C 06 March 2009
Mechanism design description (MDD) ECSS-E-ST-33-01C Annex B 06 March 2009
Mechanism user manual (MUM) ECSS-E-ST-33-01C Annex D 06 March 2009
Microbiological examination test report ECSS-Q-ST-70-55C Annex C 15 November 2008
Microbiological examination test specifications and ECSS-Q-ST-70-55C Annex B 15 November 2008
procedures (Work Proposal)
Micro-VCM datasheet ECSS-Q-ST-70-02C Annex C 15 November 2008
Micro-VCM worksheet ECSS-Q-ST-70-02C Annex B 15 November 2008
Milestone Payment Plan ECSS-M-ST-60C Annex H 31 July 2008
Mission analysis report (MAR) ECSS-E-ST-70C Annex B 31 July 2008
Mission description document (MDD) ECSS-E-ST-10C Annex B 06 March 2009
Mission operations concept document (MOCD) ECSS-E-ST-70C Annex C 31 July 2008
Mission operations plan (MOP) ECSS-E-ST-70C Annex G 31 July 2008
Mission radiation environment specification ECSS-Q-ST-60-15C Annex A 01 October 2012
MMIC electrical design specification ECSS-Q-ST-60-12C Annex A 31 July 2008
MMIC lot acceptance specification for user LAT ECSS-Q-ST-60-12C Annex F 31 July 2008
MMIC procurement specification ECSS-Q-ST-60-12C Annex E 31 July 2008
MMIC summary design sheet ECSS-Q-ST-60-12C Annex D 31 July 2008
MMIC visual inspection summary sheet ECSS-Q-ST-60-12C Annex G 31 July 2008
Modal and dynamic response analysis (MDRA) ECSS-E-ST-32C rev. 1 Annex J 15 November 2008
NCR Status List ECSS-Q-ST-10-09C Annex B 15 November 2008
Nonconformance Report ECSS-Q-ST-10-09C Annex A 15 November 2008
Nozzle and discharge flow analysis report (AR-N) ECSS-E-ST-35C Rev.1 Annex E 06 March 2009
OBCP and CBCP for Cost Reimbursement ECSS-M-ST-60C Annex K 31 July 2008
OBCP and CBCP for Fixed Price ECSS-M-ST-60C Annex L 31 July 2008
Offgassing evaluation report ECSS-Q-ST-70-29C Annex A 15 November 2008
Operational validation plan (OVP) ECSS-E-ST-70C Annex F 31 July 2008
Operations anomaly report (OAR) ECSS-E-ST-70C Annex H 31 July 2008
Operations engineering plan (OEP) ECSS-E-ST-70C Annex D 31 July 2008
Operations procedures ECSS-E-ST-70C Annex I 31 July 2008
OTS item evaluation dossier ECSS-Q-ST-20-10C Annex B 08 October 2010
OTS plan ECSS-Q-ST-20-10C Annex A 08 October 2010
Part approval document (PAD) ECSS-Q-ST-60C Rev.2 Annex D 21 October 2013
Particulate contamination monitoring procedure ECSS-Q-ST-70-50C Annex B 04 October 2011
(Work proposal)
Parts approval document ECSS-Q-ST-60-13C Annex D 21 October 2013
PCB Certificate of conformance (CoC) ECSS-Q-ST-70-11C Annex A 15 November 2008
PCB definition dossier ECSS-Q-ST-70-12C Annex A 14 July 2014

365289298.xlsx 3 of 7
List of DRD of active ECSS Standards

Title of DRD ECSS Annex Date E-DRDs = 143


PCB manufacturing dossier ECSS-Q-ST-70-12C Annex B 14 July 2014
PCB manufacturing/assembly process identification ECSS-Q-ST-70-10C Annex C 15 November 2008
document (PID)
Plume analysis report (AR-PI) ECSS-E-ST-35C Rev.1 Annex D 06 March 2009
Process FMECA report ECSS-Q-ST-30-02C Annex E 06 March 2009
Process FMECA worksheet ECSS-Q-ST-30-02C Annex F 06 March 2009
Process identification document (PID) ECSS-E-ST-20-08C Rev.1 Annex F 18 July 2012
Procurement specification ECSS-Q-ST-60C Rev.2 Annex C 21 October 2013
Product Assurance Plan (PAP) ECSS-Q-ST-10C Rev.1 Annex A 15 March 2016
Product conformance report (PCR) ECSS-Q-ST-70-46C Rev.1 Annex B 06 March 2009
Product tree ECSS-M-ST-10C Rev.1 Annex B 03 March 2009
Product user manual (PUM or UM) ECSS-E-ST-10C Annex P 06 March 2009
Progress report ECSS-M-ST-10C Rev.1 Annex E 03 March 2009
Project management plan (PMP) ECSS-M-ST-10C Rev.1 Annex A 03 March 2009
Proposal for mechanical testing of materials ECSS-Q-ST-70-45C Annex B 31 July 2008
Propulsion performance analysis report (AR-P) ECSS-E-ST-35C Rev.1 Annex A 06 March 2009
Propulsion subsystem or system user manual (UM) ECSS-E-ST-35C Rev.1 Annex H 06 March 2009
Propulsion system instrumentation plan ECSS-E-ST-35C Rev.1 Annex L 06 March 2009
Propulsion transients analysis report (AR-Tr) ECSS-E-ST-35C Rev.1 Annex G 06 March 2009
QA plan ECSS-Q-ST-20C Rev.1 Annex A 01 March 2013
Qualification Certificate for Launch Segment ECSS-Q-ST-10C Rev.1 Annex C 15 March 2016
Qualification Status List ECSS-Q-ST-10C Rev.1 Annex B 15 March 2016
Qualification status report ECSS-Q-ST-70-10C Annex D 15 November 2008
Qualification test report ECSS-Q-ST-70-10C Annex B 15 November 2008
Questionnaire on the use of hazardous items and ECSS-Q-ST-20-07C Annex A 01 October 2014
operations
Radiation analysis report ECSS-Q-ST-60-15C Annex B 01 October 2012
Radiation test report ECSS-Q-ST-70-06C Annex C 31 July 2008
Radiation test specifications and procedures (Work ECSS-Q-ST-70-06C Annex B 31 July 2008
proposal)
Red-plague evaluation report ECSS-Q-ST-70-20C Annex A 31 July 2008
Reliability prediction ECSS-Q-ST-30C Annex E 06 March 2009
Relifing report ECSS-Q-ST-60-14C Annex A 15 November 2008
Report of mechanical testing of materials ECSS-Q-ST-70-45C Annex C 31 July 2008
Report on manual soldering of high-reliability ECSS-Q-ST-70-08C Annex A 06 March 2009
electrical connections
Report on particle contamination monitoring ECSS-Q-ST-70-50C Annex C 04 October 2011
Report on visual inspection ECSS-Q-ST-70-50C Annex D 04 October 2011
Request for approval (RFA) ECSS-Q-ST-70C Rev.1 Annex D 06 March 2009
Request for cleanroom commissioning ECSS-Q-ST-70-58C Annex B 15 November 2008
Request for deviation ECSS-M-ST-40C Rev.1 Annex I 03 March 2000
Request for mechanical testing of materials ECSS-Q-ST-70-45C Annex A 31 July 2008
Request for microbiological examination ECSS-Q-ST-70-55C Annex A 15 November 2008
Request for particle contamination monitoring ECSS-Q-ST-70-50C Annex A 04 October 2011
Request for radiation test ECSS-Q-ST-70-06C Annex A 31 July 2008
Request for SCC resistance evaluation ECSS-Q-ST-70-36C Annex A 06 March 2009
Request for sterilization compatibility test ECSS-Q-ST-70-53C Annex A 15 November 2008
Request for thermal cycling test ECSS-Q-ST-70-04C Annex A 15 November 2008
Request for verification of the automatic wave ECSS-Q-ST-70-07C Annex B 16 April 2010
soldering process
Request for waiver ECSS-M-ST-40C Rev.1 Annex J 03 March 2000
Requirements justification file (RJF) ECSS-E-ST-10C Annex O 06 March 2009
Requirements traceability matrix (RTM) ECSS-E-ST-10C Annex N 06 March 2009
Review authority report ECSS-M-ST-10-01C Annex D 15 November 2008
Review item discrepancy (RID) ECSS-M-ST-10-01C Annex B 15 November 2008
Review procedure ECSS-M-ST-10-01C Annex A 15 November 2008
Review team report ECSS-M-ST-10-01C Annex C 15 November 2008
Review-of-design report (RRPT) ECSS-E-ST-10-02C Annex D 06 March 2009
Risk assessment report ECSS-M-ST-80C Annex C 31 July 2008
Risk management plan ECSS-M-ST-80C Annex B 31 July 2008
Risk management policy document ECSS-M-ST-80C Annex A 31 July 2008
Safety analysis report including hazard reports ECSS-Q-ST-40C Annex D 06 March 2009
Safety programme plan ECSS-Q-ST-40C Annex B 06 March 2009
Safety verification tracking log (SVTL) ECSS-Q-ST-40C Annex C 06 March 2009
SCC resistance test specifications and procedures ECSS-Q-ST-70-36C Annex B 06 March 2009
(Work Proposal)
Schedule ECSS-M-ST-60C Annex B 31 July 2008
Schedule Progress Report ECSS-M-ST-60C Annex C 31 July 2008

365289298.xlsx 4 of 7
List of DRD of active ECSS Standards

Title of DRD ECSS Annex Date E-DRDs = 143


Shelf-life material evaluation report ECSS-Q-ST-70-22C Annex A 31 July 2008
SIC and FPGA requirements specification (ARS) ECSS-Q-ST-60-02C Annex C 31 July 2008
Similarity form ECSS-Q-ST-60-05C Rev.1 Annex C 06 March 2009
Sloshing analysis report (AR-S) ECSS-E-ST-35C Rev.1 Annex F 06 March 2009
Software [unit/integration] test plan (SUITP) ECSS-E-ST-40C Annex K 06 March 2009
Software configuration file (SCF) ECSS-M-ST-40C Rev.1 Annex E 03 March 2000
Software design document (SDD) ECSS-E-ST-40C Annex F 06 March 2009
Software development plan (SDP) ECSS-E-ST-40C Annex O 06 March 2009
Software interface requirements document (IRD) ECSS-E-ST-40C Annex C 06 March 2009
Software Maintenance Plan (SMP) ECSS-E-HB-40A Annex C 11 December 2013
Software product assurance milestone report ECSS-Q-ST-80C Annex C 06 March 2009
(SPAMR)
Software product assurance plan (SPAP) ECSS-Q-ST-80C Annex B 06 March 2009
Software release document (SRelD) ECSS-E-ST-40C Annex G 06 March 2009
Software requirements specification (SRS) ECSS-E-ST-40C Annex D 06 March 2009
Software reuse file (SRF) ECSS-E-ST-40C Annex N 06 March 2009
Software review plan (SRevP) ECSS-E-ST-40C Annex P 06 March 2009
Software system specification (SSS) ECSS-E-ST-40C Annex B 06 March 2009
Software User Manual (SUM) ECSS-E-ST-40C Annex H 06 March 2009
Software validation plan (SValP) ECSS-E-ST-40C Annex J 06 March 2009
Software validation specification (SVS) ECSS-E-ST-40C Annex L 06 March 2009
Software verification plan (SVerP) ECSS-E-ST-40C Annex I 06 March 2009
Software verification report (SVR) ECSS-E-ST-40C Annex M 06 March 2009
Solder joint discrepancy log ECSS-Q-ST-70-07C Annex A 16 April 2010
Source control drawing for bare solar cell (SCD BSC) ECSS-E-ST-20-08C Rev.1 Annex C 18 July 2012

Source control drawing for coverglass (SCD CVG) ECSS-E-ST-20-08C Rev.1 Annex D 18 July 2012
Source control drawing for External Protection Diodes ECSS-E-ST-20-08C Rev.1 Annex E 18 July 2012
(SCD EPD)
Source control drawing for photovoltaic assembly ECSS-E-ST-20-08C Rev.1 Annex A 18 July 2012
(SCD PVA)
Source control drawing for solar cell assembly (SCD ECSS-E-ST-20-08C Rev.1 Annex B 18 July 2012
SCA)
Space segment user manual (SSUM) ECSS-E-ST-70C Annex E 31 July 2008
Spacecraft-Earth station interface control document ECSS-E-ST-50-05C Rev.2 Annex A 04 October 2011
Specific mechanism specification (SMS) ECSS-E-ST-33-01C Annex A 06 March 2009
Specification tree ECSS-E-ST-10C Annex J 06 March 2009
Sterilization compatibility test report ECSS-Q-ST-70-53C Annex C 15 November 2008
Sterilization compatibility test specifications and ECSS-Q-ST-70-53C Annex B 15 November 2008
procedures (Work Proposal)
Storage plan (SP) ECSS-Q-ST-20-08C Annex A 01 October 2014
Stress and strength analysis (SSA) ECSS-E-ST-32C rev. 1 Annex K 15 November 2008
Stress-corrosion evaluation form (SCEF) ECSS-Q-ST-70-36C Annex C 06 March 2009
Stress-corrosion test report ECSS-Q-ST-70-37C Annex A 15 November 2008
Structure alignment budget (SAB) ECSS-E-ST-32C rev. 1 Annex L 15 November 2008
Structure buckling (SB) ECSS-E-ST-32C rev. 1 Annex M 15 November 2008
Structure mass summary (SMS) ECSS-E-ST-32C rev. 1 Annex N 15 November 2008
System concept report ECSS-E-ST-10C Annex C 06 March 2009
System engineering plan (SEP) ECSS-E-ST-10C Annex D 06 March 2009
TCS analysis report ECSS-E-ST-31C Annex C 15 November 2008
TCS detailed design description ECSS-E-ST-31C Annex F 15 November 2008
TCS interface control document ECSS-E-ST-31C Annex D 15 November 2008
TCS mathematical model specification ECSS-E-ST-31C Annex A 15 November 2008
TCS thermal balance test specification ECSS-E-ST-31C Annex E 15 November 2008
Technical budget ECSS-E-ST-10C Annex I 06 March 2009
Technical requirements specification (TS) ECSS-E-ST-10-06C Annex A 06 March 2009
Technology matrix ECSS-E-ST-10C Annex F 06 March 2009
Technology plan (TP) ECSS-E-ST-10C Annex E 06 March 2009
Test - analysis correlation (TAC) ECSS-E-ST-32C rev. 1 Annex O 15 November 2008
Test evaluation (TE) ECSS-E-ST-32C rev. 1 Annex P 15 November 2008
Test prediction (TP) ECSS-E-ST-32C rev. 1 Annex Q 15 November 2008
Test procedure (TPRO) ECSS-E-ST-10-03C Annex C 01 June 2012
Test report ECSS-Q-ST-70-21C Annex A 05 February 2010
Test report (TRPT) ECSS-E-ST-10-02C Annex C 06 March 2009
Test result sheet ECSS-Q-ST-70-13C Rev.1 Annex A 05 October 2011
Test specification (TSPE) ECSS-E-ST-10-03C Annex B 01 June 2012
Thermal and geometrical model description ECSS-E-ST-31C Annex B 15 November 2008
Thermal cycling test report ECSS-Q-ST-70-04C Annex C 15 November 2008

365289298.xlsx 5 of 7
List of DRD of active ECSS Standards

Title of DRD ECSS Annex Date E-DRDs = 143


Thermal cycling test specifications and procedures ECSS-Q-ST-70-04C Annex B 15 November 2008
(Work Proposal)
Thermal vacuum outgassing test report ECSS-Q-ST-70-02C Annex D 15 November 2008
Trade-off report ECSS-E-ST-10C Annex L 06 March 2009
User Manual (UM) for AOCS ECSS-E-ST-60-30C Annex E 30 August 2013
User Manual (UM) for AOCS ECSS-E-ST-60-30C Annex E 30 August 2013
Verification control document (VCD) ECSS-E-ST-10-02C Annex B 06 March 2009
Verification plan (VP) ECSS-E-ST-10-02C Annex A 06 March 2009
Verification plan (VP) ECSS-Q-ST-60-02C Annex E 31 July 2008
Verification Plan (VP) for AOCS ECSS-E-ST-60-30C Annex D 30 August 2013
Verification Plan (VP) for AOCS ECSS-E-ST-60-30C Annex D 30 August 2013
Verification report (VRPT) ECSS-E-ST-10-02C Annex F 06 March 2009
Wave soldering process identification document (PID) ECSS-Q-ST-70-07C Annex E 16 April 2010

Welding Procedure Specification (WPS) ECSS-Q-ST-70-39C Annex A 01 May 2015


Welding Verification Test Plan (WVTP) ECSS-Q-ST-70-39C Annex B 01 May 2015
Work breakdown structure (WBS) ECSS-M-ST-10C Rev.1 Annex C 03 March 2009
Work package (WP) description ECSS-M-ST-10C Rev.1 Annex D 03 March 2009
Worst Case Analysis ECSS-Q-ST-30C Annex J 06 March 2009
Zonal analysis ECSS-Q-ST-30C Annex G 06 March 2009

365289298.xlsx 6 of 7
List of DRD of active ECSS Standards

Chang log of DRD list


Issue 1 16-Apr-10 List of DRDs of all published ECSS as of 16 April
Issue 1 revision 1 22-Jun-10 Correction of incorrect Annex references to DRDs of ECSS-E-ST-33-01C.
Issue 2 8-Oct-10 Addition of DRDs from ECSS-E-ST-35-02C and ECSS-Q-ST-20-10C
Issue 3 10-May-11 Addition of DRDs from ECSS-E-ST-35-03C
Issue 4 5-Oct-11 Addition of DRDs from ECSS-E-ST-50-05 Rev1 and ECSS-Q-ST-70-50C and
ECSS-Q-ST-70-13C Rev 1
Issue 5 1-Jun-12 Addition of DRDs from ECSS-E-ST-10-03C (1 June 2012)
Deletion of DRD from ECSS-10-03A (superseded)
Issue 6 18-Jul-12 Replaced reference to newly published ECSS-E-ST-20-08C Rev.1 (18 July
2012)
Issue 7 1-Oct-12 Addition of DRDs from ECSS-Q-ST-60-15C (1 Oct 2012)
Issue 8 1-Mar-13 DRDs from ECSS-Q-ST-20C Rev.1 (1 March 2013) replace the DRDs from
previous version ECSS-Q-ST-20C (15 November 2008)
Issue 8 Rev.1 16-Apr-13 List of DRDs corrected (including deletion of double entries, correction of
issue in case of Revisions, and addition of missing DRDs from E-ST-50C.
Issue 9 30-Aug-13 Addition of the DRDs from ECSS-E-ST-60-30C, ECSS-Q-ST-70-56C, ECSS-
Q-ST-57C.
Issue 10 21-Oct-13 Addition of DRDS from ECSS-Q-ST-60C Rev.2 (superseding ECSS-Q-ST-
60C Rev.1) and ECSS-Q-ST-60-13C
Issue 11 11-Dec-13 Addition of DRD "Software maintenance plan (SMP) from ECSS-E-HB-40A
Issue 12 14-Jul-14 Addition of DRD "PCB definition dossier" and "PCB manufacturing dossier"
form ECSS-Q-ST-70-12C
Issue 13 15-Oct-14 Addtion of DRDs from ECSS-Q-ST-20-07C and ECSS-Q-ST-20-08C.
Update of document references for DRDs from: ECSS-Q-ST-70C Rev.1
Issue 14 1-May-15 Addition of DRDs from ECSS-Q-ST-70-39C
Issue 15 1-Jun-15 Addition of DRDs from ECSS-E-ST-10-24C
Issue 16 24-Aug-15 Additon of the missing DRDs from ECSS-E-ST-35-10C (6 March 2009)
Issue 17 15-Mar-16 Addition of one DRD and replacement of reference to newly published ECSS-
Q-ST-10C Rev.1 (15 March 2016)

365289298.xlsx 7 of 7

Das könnte Ihnen auch gefallen