Beruflich Dokumente
Kultur Dokumente
GANTT CHART
SUBJECT: Humanities 101C World Geography INSTRUCTOR: Mr. Khristopher Ian D. Magboo
No. of WEEK NUMBER
TOPICS Hours
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Introduction, Definition of Geography, Environment, Etymology of Geography 2.0
and Branches
History of Geography and Origin of Geography 1.0
Elements of Geography, Physical Geography 2.0
Human or Cultural Geography 1.0
Introduction to Solar System, Inner Solar System, Terrestrial Planets, Outer 3.0
Solar System, Gaseous/Jovian Planets
Other Members of the Solar System, Meteors, Meteorites, Moon, Comets, 2.0
Asteroids and Pluto.
Centrifugal Force vis--vis gravity of the sun 1.0
The Planet Earth and its Unique features, size, shape and layers of the Earth 1.5
PRELIMINARY EXAMINATION 1.5
Earths revolution, rotation, and axis. Perihelion, aphelion and Seasons of the 3.0
Earth, Lithosphere and Major Landforms
Minor landforms, hydrosphere, ocean, seas and other water forms 3.0
Atmosphere, Layers of the atmosphere, weather and climate 3.0
Rays of the sun, positions of the Earths with respect to the sun, Earths 3.0
solstice and equinox.
Elements of Climate, Factors of Climate, Man and Climate 1.5
MIDTERM EXAMINATION 1.5
Globe: an introduction, evolution of the globe, lines of the globe 3.0
The Earths atmosphere, special parallels and special meridians 3.0
The Grid System, absolute and relative locations, introduction to 3.0
maps.
Importance of Maps, Parts of a map and Importance of Map 1.5
PRE-FINAL EXAMINATION 1.5
The Continent of Asia and Europe 3.0
The Continent of North America and South America 3.0
Oceania, Australia and the Continent of Africa 3.0
The geographical uniqueness of Antarctica, Topics on Climate Change and 1.5
Updates on World Geography
1.5
FINAL EXAMINATION