CONSULTING CIVIL & CHARFORD LODGE

STRUCTURAL ENGINEERS
ROCK HILL
TEL: +44(0) 1527 832307 BROMSGROVE
FAX: +44(0) 1527 832711
email:admin @cdpbroms .co.uk WORCS B61 7LH


125062 Proposed Development on land at
Burbages Lane, Exhall, Coventry
Premium Estates Developments Ltd.



Flood Risk Assessment & Drainage
Strategy

Preparedby: HeatherCeney
Checkedby: JohnBlackhall
Approvedby: JohnBlackhall
Date: 16/04/2012
Reference: 125062FRA

Issue1


125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

Contents

1. Introduction....................................................................................................................................3

2. Backgroundtothesite....................................................................................................................5

3. ProposedDevelopment..................................................................................................................8

4. DrainageStrategy..........................................................................................................................10

5. FloodRiskAssessment..................................................................................................................17

6. Conclusionsandrecommendations..............................................................................................19

7. References....................................................................................................................................20

AppendixA:Supportingdrawings

AppendixB:FloodMapping

AppendixC:SevernTrentWaterLtd.AssetPlans

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 2 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

1. Introduction

ThisFloodRiskAssessment(FRA)isforaproposedresidentialdevelopmentofaroundfortyfour
houseswithdrives,carparkingandgardensonaplotofapproximately1.2hectares,onlandoff
BurbagesLane,ExhallnearCoventry.Thislandiscurrentlygardens.Thesiteislocatedat
approximateGridReference433822,284156.

Theproposeddevelopmentsiteisaccessedviaanewentranceroadtobeconstructedatthe
locationofNo.30BurbagesLane,andthesiteextendsacrosstherearofexistingpropertiesNos.30
to52.ThesiteliestothewestoftheA444andisneartotheCoventryWelshRugbyClub.

Theproposeddevelopmentsiteisirregularinshapeandisboundedtothewestbythegardensof
existingresidentialpropertiesfrontingBurbagesLane.Landimmediatelytotheeastofthe
developmentsiteboundaryisdesignatedasgreenbelt.

Anexistingstream/ditchcourseislocated60metrestotheeastoftheproposeddevelopment
boundary.

ThisFloodRiskAssessmentiscarriedoutinaccordancewithPlanningPolicyStatement25(PPS25),
BS8533:2011,PlanningPolicyStatement25PracticeGuide(December2009),EnvironmentAgency
GuidanceNote1forDevelopmentgreaterthan1hainFloodZone1,andfollowingtheguidancein
CIRIAC624.

TheproposeddevelopmentisclassifiedasMoreVulnerable(PPS25AnnexD).

1.1 Reference Data

Thefollowingdocumentsformpartofthisassessment:

Document Preparedby: Reference/No.

Sitelayoutplan TylerParkesPartnership 93670002

ExistingSewers SevernTrentWater

FloodMapping(Extracted Halcrow B5_Bedworth


fromSFRA)

Atopographicalsurveyhasnotyetbeencarriedoutforthesite.Copiesofdrawingsareincludedin
AppendixA.

ThesiteiswithintheareacoveredbyNorthWarwickshireBoroughCouncilStrategicFloodRisk
AssessmentforLocalDevelopmentFrameworkLevel1Volume1(January2008)preparedby
HalcrowGroupLimited.ThefloodmappingfortheBedworthareaisincludedinAppendixB.

TheEnvironmentAgencywebsiteandStrategicFloodRiskAssessment(SFRA)floodmappingshows
thattheproposeddevelopmentsitelieswithinFloodZone1,atlowriskfromfluvialflooding.

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 3 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

1.2 Climate change

ResearchbytheEnvironmentAgency(EA)showsthatoverthenext80years,theprobabilityof
occurrenceofseverefloodingwillincrease.PPS25setsoutrecommendationsforcontingency
allowancesforclimatechange.Table1summarisestheallowancesforadevelopmentwithadesign
lifehorizonupto2115:

Parameter Allowance

2055to2085 2085to2115

Peakrainfallintensity 20% 30%

Peakriverflow 20% 20%

Table1:PPS25contingencyallowancesforclimatechange

ThePPS25PracticeGuiderecommendsthatalifetimeofaresidentialdevelopmentshouldbetaken
asminimum100years.Thereforeaclimatechangeallowanceof30%onrainfallwillbeincludedin
thedesignforthedevelopment.

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 4 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

2. Background to the site


2.1 General

The1.21hectaresiteisgardensandlandlyingtotherearoftheresidentialpropertiesonBurbages
Lane.Beyondtheeasterndevelopmentboundary,landisdesignatedasGreenBelt.TheRiverSowe
liesaround400metrestotheeastofthesite,beyondtheA444dualcarriageway.

Theexistinglanduseofthedevelopmentsiteisgardens(someovergrown)andtherearealsoa
numberofsheds,bothinuseandderelict,andsomevehicularaccessareaswithhardstandings.

Thereiscurrentlynotopographicalsurveydataavailableforthesite.InspectionofOrdnanceSurvey
Mappingindicatesthattheproposeddevelopmentsitehasanelevationofaround106metres
AboveOrdnanceDatum(AOD)attheproposedroadaccessfromBurbagesLane,fallingtoataround
the100metrecontourlevelneartheeasternboundary.Thegenerallandprofileinthisareashowsa
gradualslopefallingwesttoeastfromBurbagesLaneatthehighpointtowardstheRiverSowe.A
fulltopographicalsurveyforthesitewillbecarriedoutpriortodetaileddesignoftheproposed
developmentanditsdrainagesystem.

Aditchcourse/streamliesapproximately50to60metreseastoftheproposeddevelopment
followingthefieldboundaryline.Thelandbetweenthedevelopmentsiteandditchcourseis
greenbelt,butitisunderstoodthattheDeveloperhasanoptiontopurchaseaplotofland
approximately50x25metresinarea,betweenthedevelopmentsiteandtheditch.

Althoughthereareanumberofshedsandhardsurfacedareasontheexistingsite,forthepurposes
ofthisFloodRiskAssessmentandDrainageStrategy,theexistingsiteisconsideredtobe100%
permeable,asaworstcasescenario.

2.2 Flood data

TheEnvironmentAgencywebsitefloodmappingshowsthatthissiteisclassifiedasZone1andat
lowriskfromfluvialfloodingwithlessthan1in1000annualprobabilityofriverfloodinginanyyear
(<0.1%).AcopyoftheSFRAfloodmapfortheareaisincludedinAppendixB.

2.3 Hydrology

ThenearestmajorsurfacewaterfeatureistheRiverSowewhichliesapproximately400metres
away,totheeastoftheA444.ThefloodplainfortheriverisshownontheSFRAmappingin
AppendixB.Theproposeddevelopmentsiteislocatedonhighground;atitslowestpointthesiteis
elevatedsome8to10metresabovetheriverlevel.

Aditchcourse/streamliesapproximately50to60metreseastofthedevelopmentfollowingthe
fieldboundaryline.Thiswouldappeartoflownorthwardseventuallybecomingatributarytothe
RiverSowe.

AlargegardenpondislocatedtothesouthoftheproposedsiteattherearofNo.54BurbagesLane.

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 5 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

2.4 Ground conditions & ground water

Thereiscurrentlynogroundinvestigationdataavailableforthesite.PublishedBritishGeological
Societydataindicatesthatthesiteislikelytobeunderlainbymudstoneandsandstone.

Groundinvestigationwillbecarriedoutatthesitepriortodetaileddesignofthedevelopmentand
drainage.Percolationtestingwillbecarriedoutasrequired,todeterminewhetherdesignofthe
SuDSfeaturesasinfiltrationdrainageisfeasible.

ForthepurposesofthisFRAanddrainagestrategy,ithasbeenassumedthatnoinfiltrationis
possible.Storagevolumesgiveninthisreportthereforepresenttheworstcasescenario.

2.5 Existing drainage

AdoptedstormandfoulsewersareshownontheSevernTrentWaterLtd.SewerRecordsin
AppendixC.

2.5.1 Foul drainage


AnadoptedcombinedsewerrunsnorthwardsalongtherearofNos.54to30BurbagesLaneas
shownontheplaninAppendixC.(ThiswaspreviouslyaprivatesewerbutwastransferredtoSTWs
ownershipasapublicsewerinMarch2012).OnreachingBurbagesLane,thecombinedsewerflows
northundertheeastsidefootway/vergetomeetthe300diafoulsewerinWheelwrightLane.

InresponsetoaDeveloperEnquiry,SevernTrentWaterLtd.hasstatedthatithasnoconcernswith
thefoulflowfromtheproposeddevelopmentdischargingtotheexistingpubliccombinedsewerat
therearofNos.54to30BurbagesLane.However,STWhasnodataavailableontheinvertlevelsor
conditionofthissewer.CCTVconditionandlevelsurveyswillthereforeberequiredpriortodetailed
designoftheproposedfoulsewerconnection.

2.5.2 Storm drainage


Thereisanexistingadopted225mmdiastormdrainflowingnorthwards,locatedunderBurbages
Lane.Ifdisposalofsurfacewaterbysoakawayortoawatercourseisnotfeasible,STWhasindicated
intheirResponsetoDeveloperEnquiry,thatadischargeof5l/s/hacouldbemadewithaconnection
atmanhole7101oppositetheproposedsiteentrance(SeeAppendixC).

However,giventhetopographyofthesite,whileconnectiontothepublicsewershouldremainan
option,thedrainagestrategydescribedinSection4hasbeendevelopedassumingdischargeviaa
SustainableDrainageSystem(SuDS)totheditchcourselyingtotheeast.

2.6 Strategic Flood Risk Assessment (SFRA)

ThesiteiswithintheareacoveredbyNorthWarwickshireBoroughCouncilStrategicFloodRisk
AssessmentforLocalDevelopmentFrameworkLevel1Volume1(January2008)preparedby
HalcrowGroupLimited.

ThefloodmappingfortheBedworthareaisincludedinAppendixB.ThisshowsFloodZones2and3
(atmediumandhighriskofflooding)followingtherouteoftheRiverSowe,lyingtotheeastofthe
siteandtheA444.TheproposeddevelopmentsiteislocatedwithinFloodZone1,atlowriskof

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 6 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

fluvialflooding.TheSFRAmappingalsoshowsthattherearenorecordedincidentsofsurfacewater
(pluvial)floodingforthedevelopmentsite.

Locationofproposed
developmentsite


ExtractfromNorthWarwickshireSFRAFloodMapping

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 7 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

3. Proposed Development
TheproposeddevelopmentisclassifiedasMoreVulnerable(PPS25AnnexD)andislocatedwithin
FloodZone1.

3.1 Description

Theproposeddevelopmentcomprisesaroundfortyfourdwellingswithaccessroad,drives,car
parkingandgardensasshownontheArchitectssitelayoutdrawing93670002.Thesiteof
approximately1.21hectaresintotalareawasformerlygardens,withsomeoutbuildingsandvehicle
access.

AnewroadjunctionistobeformedwithBurbagesLane.Atthistimeitisassumedthatthenewroad
intothedevelopmentrunningparalleltothenorthernboundarywouldbeadoptedbytheLocal
Authority.Leadingofftheroadtothesouthisanewaccessroad(assumedunadopted)serving
propertiesNos.16to41.

3.2 Impermeable area

Theproposeddevelopmentwillhaveanapproximateimpermeableareaof6015m2measuredfrom
thelayoutondrawing93670002,brokendownasgiveninTable2.Theremainderofthesitewillbe
finishedasgardensandsoftlandscaping.

Area
m2

Roofs 2325
AdoptedRoad 1430
AccessRoad 1400
Drives 860
Total 6015

Table2:Proposedimpermeableareas

Assumingthatalldrivesandroadwaysetc.areconstructedwithimpermeablesurfacing,thenthe
proposeddevelopmentwouldbe50%impermeable.

Duetotheincreaseinimpermeablearea,itisproposedtousepermeablepavementforthedrives
andpossiblythenonadoptedaccessroadrefertosection4fordetails.Constructingthedrivesand
accessaspermeablepavementwouldresultinthedevelopmentbeing31%impermeable.

3.3 Proposed levels

Atopographicalsurveyofthesitehasnotyetbeencarriedout.However,itisanticipatedthatthe
overallsitelevelsandprofilewillbesimilartoexisting.LevelsatthenewroadjunctionatBurbages
Lanearearound106metresAOD,attheeasternboundarylevelsareexpectedtobeataround100
metresAOD.

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 8 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

3.4 Proposed drainage

Duetotheunderlyingmudstoneindicatedbythegeologicalrecords,itisconsideredthatground
conditionsontheproposeddevelopmentsitemaynotbesuitedtodisposalofstormdrainageby
soakaway.Percolationtestingwillbecarriedoutaspartofthegroundinvestigationpriortodetailed
design.Wheredisposalofstormwaterbyinfiltrationispossible,thiswillbeusedtominimisethe
attenuationstoragevolumerequired.

3.4.1 Foul drainage


Itisproposedconnectfouldrainagefromthenewdevelopmenttotheexistingadoptedcombined
sewerofNos.54to30BurbagesLane.Thereiscurrentlynolevelinformationavailableforthis
sewer.However,itisconsideredunlikelytobeanydeeperthan2metresbelowexistingground
level.CCTVconditionandlevelsurveyswillberequiredpriortodetaileddesignoftheproposedfoul
sewerconnection.

Duetothewesttoeastfallacrossthesite,theinvertlevelatpointofconnectionislikelytobetoo
hightoallowconstructionofagravitysystemforthedevelopment,andasmallpumpingstationwill
probablyberequired.

SewersforAdoption6thEditionsetsoutageneralspecificationforapumpingstation.Thetypical
compoundrequiredis8mby10m,accessibletovehicles,andtobelocatednocloserthan15mto
thenearestdwelling.Foradevelopmentof44houses,thereshouldbeadequatestorageprovided
foraround7000litres(7m3)ofsewage.TherearePackagePumpingStationsavailablefromsuppliers
suchasPumpsealandMathewsPumps,forexample,whichcanbecompliantwithSewersfor
Adoption.

EarlydiscussionsshouldbeheldwithSevernTrentWatertoagreethepumpingstationtypeand
location.

3.4.2 Storm Drainage


Twooptionshavebeenconsideredfordisposalofstormdrainage:

A) Dischargeofstormwaterrunofffromthedevelopmenttotheexistingadoptedstormsewer
inBurbagesLane.Thiswillrequireattenuationofstormwaterinpermeablepavementand
attenuationtankpriortorestricteddischargetothesewer.Asforthefouldrainage,a
pumpedsystemmayberequired.
B) Dischargeofstormwaterrunofffromthedevelopmenttotheditchcourselyingtotheeast
ofthesite,viasustainabledrainagefeaturesandanattenuationpondand/orwetlandtobe
constructedontheadditionalplotofgreenbeltlandtotheeast.

Duetothetopographyofthesite,andthepumpingstationrequiredtomakeOptionAfunction,itis
consideredthatOptionBpresentsamoresustainablesolution.Thedrainagestrategyhastherefore
beendevelopedforOptionB.

Attenuation,includingallowanceforclimatechange,willbeprovidedtolimitrunofftothe
equivalentgreenfielddischargerateof5l/s/ha.Stormwaterdrainageisdiscussedfurtherinthe
drainagestrategy(Section4).

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 9 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

ItisproposedthattheSuDSattenuationsystemwilldischargetotheexistingditchcoursewhich
followsthefieldboundarytotheeastofthedevelopmentsite.Itisrecommendedthatthe
Developershoulddeterminetheownershipofthisditchandestablishtherighttoconstructan
outfallatthislocation.

AllsewerconnectionstopublicsewersaresubjecttoagreementwithSevernTrentWaterLimited.

SitedrainageistobedesignedfollowingtheguidanceinSewersforAdoptionandthePPS25Practice
Guide.Sitedrainagewillbedesignedsuchthatthereis:

Noabovegroundfloodingforthe1in30yearevent;and
Nofloodingofbuildingsforthe1in100yearevent,includingallowanceforclimatechange.

4. Drainage Strategy
ThisdrainagestrategyhasbeendevelopedfollowingtherecommendationsinPPS25AnnexFand
theEnvironmentAgencyGuidanceNote1forDevelopmentgreaterthan1hainFloodZone1.Storm
drainagewillbedesignedtomimicexistingsurfacewaterflowsfromthesite,butincorporatean
allowanceforclimatechange.

Sustainabledrainagesystems(SuDS)willbeusedasappropriate.Thedrainagestrategyusesthe
followingprinciples:

Rateofdischargefromsitetomimicgreenfieldrunoffrates,includingallowanceforclimate
change;
Areaofpermeablesurfacingtobemaximised;
SustainableDrainageSystems(SuDS)tobeusedtoattenuatestormwaterrunoff;
Anewpondand/orwetlandareawillbecreatedontheplotofgreenbeltlandtotheeastof
thedevelopment;
Stormwatertodischargetoexistingditchcourseattheeast.

4.1 Sustainable Drainage Systems (SuDS)

SustainableDrainageSystems(SuDS)aredesignedtomanagetheenvironmentalrisksresultingfrom
urbanrunoffandcontributetoenvironmentalenhancement,whereverpossible.Tomimicnatural
catchmentascloselyaspossibletheaimofSuDSistomanagestormwaterinthefollowinghierarchy
oftechniques:

1. Preventionthroughsitelayoutanddesigntopreventrunoffandpollution,and
incorporaterainwaterreuseandharvesting;
2. Sourcecontrolcontrolofrunoffatornearitssource,e.g.permeablepavementsand
soakaway;
3. Sitecontrolmanagementofrunoffbyroutingtopermeableareasorsoakaway;
4. Regionalcontrolmanagementofrunoffbystoragepriortodischargetoawatercourseor
sewer.

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 10 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

TheuseofSuDSprovidesasignificantcontributiontowardsmoresustainabledevelopmentsince
they:

addressenvironmentalimpactsatsource,ratherthandownstream;
attenuatesurfacerunoffrates,reducingtheimpactofurbanisationonflooding;
protectorenhancewaterquality;
canbeengineeredtobesympathetictotheenvironmentalsettingandtheneedsofthelocal
community;
provideopportunitiesforecologicalhabitatcreation;and
canencouragenaturalgroundwaterrecharge.

Table3summarisesSuDSsystemsandtheirsustainabilitycharacteristics:

SuDSsystem Floodreduction Pollution Landscape&


Reduction Wildlifebenefit

Mostsustainable Greenroofs

Basinsandponds

Filterstripsand
swales
Infiltration
devices
Permeable
surfacesand
filterdrains

Leastsustainable Tankedsystems

Table3:SustainabilityofSuDStechniques

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 11 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

Table4showsasummaryofthefeasibilityofdifferentSuDStechniquesfortheproposed
developmentsite:

SuDSTechnique PhysicalConstraints Comments

Unfeasible
Feasible
Greenroofs Requiresflatorminimalslopetoroofs. Notconsideredfeasibleonthistype
Limitedvalueforrunoffattenuationin
ofresidentialdevelopment.
comparisontoothertechniques.

Rainwater Canuseabovegroundorbelow Forreuseintoilets,laundryor


groundstoragetanks
garden.
harvesting

Balancingponds Permanentpondwithstorageabove Pondtobecreatedonadditionalplot


therestinglevelofthepond.Require
oflandtoeastofdevelopmentsite.
sufficientspaceandsuitable
topography.

Soakawaysand Requireinfiltrationratesof1x106m/s Assumesoilsnotsuitablefor


infiltrationtrenches orgreater.Levelofgroundwatertobe infiltrationofallstormrunoff.
consideredwherewatertableknown Tobereassessedfollowingground
tobehigh. investigation.
Infiltrationtobeusedwherepossible
Infiltration Applicableforattenuationand toreducevolumeofattenuation
basins/swales treatmentofsurfacerunoffby storagerequired.
infiltration.Requireslopeofnomore
than410%andcanbeusedas
soakaways.

Permeable Mostefficientonlevelsites.Canbe Foruseondriveways,footwaysand


designedforinfiltrationoras
playareas.
Pavement
reservoir/storagesystem. Impermeablesurfacescanbe
designedtorunoffintopermeable
areas.
Storagecapacitylimitedonsloping
sites.

Noninfiltration Usedascarrierditch. Couldbeusedasconveyancesystem


tooutfalltoditch,withadditionof
swales
cobbleweirstoslowrateofflow.

Filterdrains Usedascarrierdrain,usuallyalongside Notsuitableduetolayoutof


roads,paths,etc.
development.

Underground Usedtoprovidestorageofstorm Couldbelocatedunderaccessroad


water.Outflowusuallyregulatedby
andusedtoprovideadditional
storage
tank/oversizedpipes flowcontroldesign. storagevolume.
Needtobelocatedunderexternal
areassuchasaccessroad,carpark,
landscaping.

Table4SuDSfeasibilitymatrix

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 12 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

Principlesofsustainabledrainagewillbeappliedtotheproposeddevelopmentsitebyusing
permeablepavingwherepossibletominimiseimpermeablearea.Attenuationforstormrunoffis
providedinacoarseaggregatesubbasebeneaththepavementwhichdelaystimeofentrytothe
sewersystem.Itisproposedthatdrivewaysandparkingareasshouldbeconstructedinpermeable
pavement.Permeablesurfacingproductsarealsoavailableforplayareas.

Forthepurposesofthisdrainagestrategy,itisassumedthatthesoilsonthesitearenotsuitablefor
designofinfiltrationdrainage.Whilesomenaturalinfiltrationwilloccurbeneathpermeableareas,
(asoccursnowfortheexistinggreenfieldsite),percolationratessuitablefordesignofsoakaway
systemsmaynotberealisedduetotheunderlyingstrata.(Rateofpercolationintothesubsoilwill
bedeterminedbytestingduringthegroundinvestigation,priortodetaileddesign).

Downpipesfromtheroofswillbeallowedtodischargeontothepermeablepavement.Thestorm
waterwillpercolatethroughthepavementandcoarseaggregatereservoirlayer,delayingtimeof
entryinthesewer.Itisrecommendedthatwaterbuttsareinstalledonthepropertiestoallow
rainwatertobeharvestedforexternalreuse.

Duetotheassumedlowpermeabilityoftheunderlyingsoils,thepermeablepavedareaswillbe
providedwithoverflowpipes.Outletsfromthereservoirbeneathpermeableareaswilldischargeto
astormwatersewersystem,whichwilloutfalldownstreamtoanattenuationpond.Thecoarse
aggregateactsasafilterforthesurfacewaterrunoff,bothslowingtherateofdischargeand
improvingwaterquality.

Areasoflandscapingshouldbedesignedwherepossibletoacceptrunofffromimpermeableareas.

Theattenuationpondwillbedesignedwithapermanentlywetareaandincludewetlandandsemi
dryareastoallowadiversehabitattoestablish.Aroundthepond,thestormwaterstorageareawill
beconstructedtoallowsomenaturalinfiltrationofstormwatertooccur.Theattenuationpond
outflowwouldbeviaaswaleoutfallingtotheditch/stream.Theswalewillalsobeconstructedto
allowsomeinfiltrationthroughastonebed.Aflowcontrolchamberorweirwillbeprovidedto
restrictdischargeintotheditchtotheequivalentgreenfieldrate.

Thefinalvolumeofstoragerequiredwillbedeterminedfollowinggroundinvestigationand
percolationtesting.

4.2 Greenfield Runoff

Stormwaterrunoffforthegreenfieldsitehasbeenestimatedusingthemethodstatedinthe
guidancetodevelopersissuedbySevernTrentWaterLtd.Thisstatesthatpeakstormflowsforthe
proposeddevelopmenttoasewer(30yeardesignstorm)shouldbelimitedtoagreenfieldrunoffof
5litres/sec/hasubjecttoaminimumof5litres/sec.

Sitearea=1.21ha.Thereforetheproposedpeakstormdischargefromthedevelopmentsitetoa
sewerislimitedto6.05l/s.

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 13 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

4.3 Estimate of proposed runoff

RunoffhasbeenestimatedusingtheModifiedRationalMethod(timeofentry5minutes)witha
30%allowanceforclimatechange.Assumingalldrivesetc.areimpermeable,runoffratesforreturn
periodsofupto100yearsareshowninTable5foraproposedimpermeableareaof0.601ha.

ReturnPeriod Runoff

1Year 108.7l/s

10Years 205.9l/s

30Years 252.2l/s

100Years 313.1l/s

Table5:Estimatedrunofffromproposeddevelopment(includingclimatechangeallowance)

Flowcontrolwithattenuationstorageisrequiredtoachieveatotalallowabledischargetothe
ditch/streamequivalenttothe6.05l/sgreenfieldrunoffrate.

Itisproposedtouseapermeablepavingsystem,attenuationpondandwetlandtoprovide
attenuationstorage.Useofpermeablepavingwilldelaytimeofentryandsoreducepeakflowsinto
theattenuationpond.

4.4 Attenuation storage volume

Forthissite,itisproposedtoprovideattenuationstorageforalleventsuptothe1in100year
storm.TheWinDesQuickStorageEstimatehasbeenusedtoestimatetheattenuationstoragewhich
wouldberequiredforthesite,forthe1in100yearevent,includinga30%allowanceforclimate
change.

EstimatedstoragevolumesinTable6havebeencalculatedfortwoscenarios:

A) Allroads,accessanddrivewaysconstructedinimpermeablesurfacing;

B) Drivewaysandaccessconstructedaspermeablepavement,allowingsomenatural
infiltrationintothesubgradefortheseareas,equivalenttotheexistinggreenfieldsite.

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 14 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

Impermeable Return Estimatedstorage


Area(m2) period (incl.Climatechange)

A 6015 Road,roofs,drives. 100 285to391m3


Years

B 3755 Adoptableroad&roofsonly 100 153to216m3


(Drivesandaccesspermeablepavement). Years

Table6:Estimatedattenuationstoragevolumes

Attenuationstorageforthe1in100yearsevent(includingallowanceforclimatechange)willbe
providedforthesitebyacombinationofattenuationpondandwetland,andpermeablepavement.
Forthepurposesofthisdrainagestrategyitisassumedthatstoragecouldbeapportionedas
follows:

SuDSFeature StorageProvision

Attenuationpondandwetlandarea Approximately200to250m3

Permeablepavementtodrivesandaccess Approximately150to180m3

Totalprovision Uptoapproximately400m3

Table7:SuDSStoragevolumes

4.4.1 Permeable Pavement


Thetotalareaofdrivewaysandpavedaccessmeasuredfromthelayoutplanisaround2200m2.A
typicalpermeablepavementconstructionoverthisarea,designedinaccordancewithBS7533
13:2009)withminimum250mmthicknessofcoarsegradedaggregatesubbasereservoir,would
provideavailableattenuationstoragecapacityforuptoaround180m3.However,theeffective
storagecapacityofpermeablepavementonthissitewillbelimitedbytheslopeofthesubgrade
beneaththereservoirlayer,whichshouldbeterracedtobenosteeperthan5%gradient.A
permeablegeotextilewillberequiredbeneaththecoarsegradedaggregatetopreventmigrationof
finesintothereservoirlayer.

Thepermeablepavementwillallowsomenaturalinfiltrationintothesubsoil.Thisdrainagestrategy
assumesthatthepermeablepavementwillnotbedesignedasaninfiltrationdrainagesystem;
althoughnaturalinfiltrationwouldoccur,aswiththeexistingsoils,permeabilityofthegroundmay
notachievetheratesofpercolationnecessaryforaninfiltrationsystem.Thereforeitisassumedthat
dischargepipeswillberequiredfeedingintothestormsewernetworkoutfallingtotheattenuation
pond.

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 15 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

Evenwithareducedstoragevolume,thepermeablepavementprovidesbenefitsinslowingtherate
ofrunoffandincreasingtimeofentryintothepipenetwork,aswellasimprovedwaterquality.If
theareaofpermeablepavementisreduced,thenthepondwillneedtobeincreasedinsizeto
compensate.

ThestoragevolumesinTable6arecalculatedassumingthatnoinfiltrationintothegroundwilloccur
atthepermeablepavement,andsopresentaworstcasescenario.Percolationtestingwillbecarried
outatdetaileddesign,theresultsofwhichmayallowtherequiredstoragevolumetobereduced.

4.4.2 Attenuation Pond

Anattenuationpondisproposedontheplotofgreenbeltlandlyingtotheeastofthedevelopment
site.Thepondwillbedesignedtohaveapermanentlywetarea,butalsoallowforwetlandand/or
semidrystormwaterstorageareastoallowadiversehabitattoestablish.

Thedesignandcapacityofthestoragepondandwetlandareaswilldependonthetopographyof
thesite.(Asurveyisnotcurrentlyavailable).However,apreliminaryassessmentoftheplotofland
indicatesthatapondwithstormwaterstoragevolumeofuptoaround250m3shouldbeachievable.

Thepondshouldbefencedofffromthedevelopment,forsafetyreasons.Gatedmaintenanceaccess
willberequired.Pondsandwetlandareascanalsobedesignedtoprovidepublicamenityandopen
space.Forexample,theareacouldbedesignedasanaturereserve,includingwalkwaysandseating
areas.

ThevolumesinTable6arecalculatedassumingthatnoinfiltrationintothegroundwilloccuratthe
permeablepavementorpond,andsopresentaworstcasescenario.Percolationtestingwillbe
carriedoutatdetaileddesign,theresultsofwhichmayallowtherequiredstoragevolumetobe
reduced.

Theoutflowfromthepond/wetlandwilldischargetotheditchcoursewhichfollowsthefield
boundaryattheeasternedgeoftheplot.Flowcontrolwillbeintroducedintheformofaflow
controlchambere.g.hydrobraketoensurethattotaldischargefromthesystemislimitedtothe
equivalentgreenfieldrunoffrateof6.05l/s.

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 16 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

5. Flood Risk Assessment


Thefollowingsourcesoffloodinghavebeenconsideredforthesite:

Fluvialflooding
Pluvial/surfacewaterflooding

5.1 Fluvial Flooding, reservoirs, canals and other artificial sources

TheproposeddevelopmentisclassedasMoreVulnerabletoPPS25AnnexD.Thesiteisshownas
FloodZone1ontheEAfloodriskmapping,andisthereforeatlowriskfromfluvialfloodingwithan
annualprobabilityoflessthan1in1000.

SinceallbuildingsarelocatedinFloodZone1,theproposeddevelopmentlayoutsatisfiesthePPS25
FloodRiskVulnerabilityandFloodZonecompatibilityrequirements.Accesstoandfromthesiteis
locatedinFloodZone1,atlowriskfromflooding.

5.2 Pluvial flooding

Theproposeddevelopmentsiteisnotindicatedinanareaofhistoricpluvial(surfacewater)flooding
ontheSFRAmappingincludedinAppendixB.

However,thedevelopmentproposalsdoincreasetheimpermeablearea,comparedtoexisting.Itis
proposedtoprovidepermeablepavingtothedrivesandparkingareastominimisetheimpermeable
areaofthesite.

Theslopeofthesite,lyingdownhillfromBurbagesLane,alsoindicatesapotentialforsurfacewater
flooding.Drainagedesignatthenewentranceroadshouldensurethatgulliesordrainagekerbare
positionedtointerceptanyoverlandflowfromBurbagesLane.

Itisproposedtoprovideattenuationforstormwaterrunoff,intheformofapondand/orwetland,
andpermeablepavementtothedrivewaysandaccess,inordertomitigatetheimpactofincreasing
theimpermeableareaofthesiteandallowforfutureclimatechangeinaccordancewithPPS25.This
isdescribedinSection4.

SitedrainageistobedesignedfollowingtheguidanceinSewersforAdoptionandthePPS25Practice
Guide.Sitedrainagewillbedesignedsuchthatthereis:

Noabovegroundfloodingforthe1in30yearevent;and
Nofloodingofbuildingsforthe1in100yearevent,includingallowanceforclimate
change.

Duetotheprovisionofpermeablepavingandattenuationforthesite,itisconsideredthatthe
proposeddevelopmentisatlowriskofpluvialflooding.

5.3 Effect of development on wider catchment

Surfacewaterrunofffromthesiteistobemanagedbypermeablepavementandattenuationwith
controlleddischargetotheditchcourserunningalongthefieldboundarytotheeastofthesite.The

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 17 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

attenuationandflowcontrolwillbedesignedtomimictheexistinggreenfieldconditions,including
allowanceforclimatechange.

Itisthereforeconsideredthattheproposeddevelopmentwillnotincreasetheriskoffluvialor
surfacewaterfloodinginthewidercatchment.Theadditionofrainwaterharvestingintheformof
waterbuttsfortheproperties,wouldalsocontributetothesustainabilityofwatermanagementfor
thesite.

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 18 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

6. Conclusions and recommendations

ThisFloodRiskAssessment(FRA)andDrainageStrategyisfortheproposeddevelopmentofaround
fortyfourhouseswithdrives,carparkingandgardensonaplotofapproximately1.21hectares,on
landatBurbagesLane,Exhall,Coventry.

TheproposeddevelopmentisclassifiedasMoreVulnerabletoPPS25AnnexD.Allproposed
buildingsarelocatedinFloodZone1atlowriskfromfluvialflooding.

SuDSfeatureswillbeincorporatedintothedevelopmentintheformof:

Waterbutts;
Permeablepavingtodrivewaysandaccess;
Pondand/orwetlandwithcontrolleddischarge.

Itisproposedtoprovideattenuationforstormwaterrunoff,intheformofpermeablepavementto
drivesandanattenuationpond.Theattenuationwillmitigatetheimpactofincreasingthe
impermeableareaofthesite,andallowforfutureclimatechangeinaccordancewithPPS25.Atthe
newentranceroad,gulliesordrainagekerbwillbepositionedtointerceptanyoverlandflowfrom
BurbagesLane.Itisthereforeconsideredthatthedevelopmentisatlowriskfrompluvialflooding.

Surfacewaterdischargefromthesitewillberestrictedto6.05l/stomimicthegreenfieldconditions.
Attenuationanddrainagewillbedesignedincludingallowanceforclimatechange.Itistherefore
consideredthattheproposeddevelopmentwillnotincreasetheriskoffluvialorsurfacewater
floodinginthewidercatchment.

ItisproposedthattheSuDSattenuationsystemwilldischargetotheexistingditchcoursewhich
followsthefieldboundarytotheeastofthedevelopmentsite.Itisrecommendedthatthe
Developershoulddeterminetheownershipofthisditchandestablishtherightorobtainconsentto
constructanoutfallatthislocation.

Thefoulsewersystemislikelytorequireasewagepumpingstationinordertoconnecttothe
SevernTrentWaterpublicsewerinBurbagesLane.Itisrecommendedthattherequirementsand
proposedlocationforthepumpingstationarediscussedwithSevernTrentWaterLtd.atanearly
opportunity.

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 19 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

7. References

1. BS8533:2001.Assessingandmanagingfloodriskindevelopmentcodeofpractice,BSI,
October2011.
2. BS753313:2009:Pavementsconstructedwithclay,naturalstoneorconcretepaversPart13:
Guideforthedesignofpermeablepavementsconstructedwithconcretepavingblocksandflags,
naturalstoneslabsandsettsandclaypavers.BSI,March2009.
3. PlanningPolicyStatement25:developmentandFloodRisk,CommunitiesandLocalGovernment,
TSO,March2010.
4. PlanningPolicyStatement25:DevelopmentandFloodRiskPracticeGuide,Communitiesand
LocalGovernment,TSO,December2009.
5. NorthWarwickshireCountyCouncilStrategicFloodRiskAssessmentforLocalDevelopment
FrameworkLevel1Volume1,HalcrowGroupLimited,January2008.
6. SewersforAdoption6thEdition,Wrc,2006.
7. CIRIA697TheSuDSManual.London2007.

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 20 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

Appendix A: Supporting drawings


CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 16/04/2012
SCALED MEASUREMENTS ARE NOT TO BE TAKEN
FROM THIS DRAWING.
ALL MEASUREMENTS AND DIMENSIONS TO BE

SITE PLAN 1:250 SCALE CHECKED ON SITE BY THE BUILDER PRIOR TO


COMMENCEMENT OF WORKS.
ANY DISCREPANCIES TO BE REPORTED TO
THE TYLER PARKES PARTNERSHIP IMMEDIATELY.

PROPOSED NEW BOUNDARY


TREATMENT.
Hawthorn, mixed Forest of Arden species
hedging. Fill in gaps in existing hedgerows
with matching planting.
10
9

8
7

6
5 11

4 12
3 15
2
14
13 11

16
17

41 18 23
22

40 21
20
39 19 24

38
25
37 26
REVISIONS date

36 PROJECT TITLE

27 PROPSED DEVELOPMENT AT

35
BURBAGES LANE, EXHALL,

28 COVENTRY, CV6 6AY

29 CLIENT

PREMIUM ESTATES
DEVELOPMENTS LTD
30
31 DRAWING TITLE
Site Plan/Layout Plan
Location Plan
32
33
PROJECT No.

34 9367
DRAWING No.

9367-00-02
date DECEMBER 2011
scale 1:250, 1:1250
cad-ref 9367-05
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

Appendix B: Flood Mapping

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 16/04/2012
125062BurbagesLane,Exhall,Coventry
FloodRiskAssessment&DrainageStrategy

Appendix C: Severn Trent Water Ltd. Asset Plans

CompleteDesignPartnershipLtd. RegistrationNo.3866200
Issue1 16/04/2012