ANAND ENGINEERING PRODUCTS PRIVATE LIMITED

BEFORE WELDING INSPECTION CHECK LIST


Customer: Check list No:
Tower No: Section ID: Date:
Welder / Welding Operator suitability according to qualified welder
list Weld Joint Thermal chalk /
Inspection
CS No thickness Parent Materials Used WPS Temperature gun Root Gap after tack weld
stage
Welder ID Qualified position Qualified process (mm) available

CS2 A. PA/1G Other GMAW Other Yes No 0-1mm Other


CS3 A. PA/1G Other GMAW Other Yes No 0-1mm Other
CS4 A. PA/1G Other GMAW Other Yes No 0-1mm Other
CS5 A. PA/1G Other GMAW Other Yes No 0-1mm Other
Before Root CS6 A. PA/1G Other GMAW Other Yes No 0-1mm Other
Welding CS7 A. PA/1G Other GMAW Other Yes No 0-1mm Other
CS8 A. PA/1G Other GMAW Other Yes No 0-1mm Other
#CS9 A. PA/1G Other GMAW Other Yes No 0-1mm Other
#CS10 A. PA/1G Other GMAW Other Yes No 0-1mm Other
#CS11 A. PA/1G Other GMAW Other Yes No 0-1mm Other
Before CS1 A. PC/2G Other GMAW Other Yes No 0-1mm Other
Vertical fit
up CS.. A. PC/2G Other GMAW Other Yes No 0-1mm Other

Inspection Shield to wind,rain, Calibration of Ammeter, QC Clearance for QC Approver


CS No Bevel Cleanliness Bevel Shape Consumable
stage low temperature Voltmeter, Wire feeder welding Sign

CS2 OK NOK OK NOK ER70S-6 Other Yes OK NOK OK NOK


CS3 OK NOK OK NOK ER70S-6 Other Yes OK NOK OK NOK
CS4 OK NOK OK NOK ER70S-6 Other Yes OK NOK OK NOK
CS5 OK NOK OK NOK ER70S-6 Other Yes OK NOK OK NOK
Before Root CS6 OK NOK OK NOK ER70S-6 Other Yes OK NOK OK NOK
Welding CS7 OK NOK OK NOK ER70S-6 Other Yes OK NOK OK NOK
CS8 OK NOK OK NOK ER70S-6 Other Yes OK NOK OK NOK
#CS9 OK NOK OK NOK ER70S-6 Other Yes OK NOK OK NOK
#CS10 OK NOK OK NOK ER70S-6 Other Yes OK NOK OK NOK
#CS11 OK NOK OK NOK ER70S-6 Other Yes OK NOK OK NOK
Before CS1 OK NOK OK NOK ER70S-6 Other Yes OK NOK OK NOK
Vertical fit
up CS.. OK NOK OK NOK ER70S-6 Other Yes OK NOK OK NOK
# Make entry in vertical fit up row if so. Page 1