Sie sind auf Seite 1von 10

Client

Gesellschaft fr
ENGINEERING SPECIFICATION Industrieanlagen-
Planung mbH & Co. KG
Flare B-282
Project No.: J-22 Page: 1 of 10
Cost Centre: Project Title: Issue No.: dd 22.05.2009
Sarir gas utilization project
Location: Libya Processed by: Lingner
Building-No.: Job No.: AGOC-002 Approved: Schwarz

ARABIAN GULF OIL COMPANY LIMITED


LIBYA

SARIR Gas Utilization Project

ENGINEERING SPECIFICATION

FLARE

B-282
1995 - GIP Standard Urheberrechtsschutz/Copyright

Origin Checked Checked Subject Area: 11 Vessels / Apparatuses Standard No. E11.02.3.001
dd 02.01.2006
Client
Gesellschaft fr
ENGINEERING SPECIFICATION Industrieanlagen-
Planung mbH & Co. KG
Flare B-282
Project No.: J-22 Page: 2 of 10
Cost Centre: Project Title: Issue No.: dd 22.05.2009
Sarir gas utilization project
Location: Libya Processed by: Lingner
Building-No.: Job No.: AGOC-002 Approved: Schwarz

CONTENTS

1 INTRODUCTION .............................................................................................................................. 3

2 APPLICABLE CODES, STANDARDS AND REGULATIONS ........................................................... 3

3 GENERAL EQUIPMENT SUMMARY................................................................................................ 4

4 OPERATING CONDITIONS ............................................................................................................. 4

5 SCOPE OF SUPPLY ........................................................................................................................ 5

6 EXCLUSIONS .................................................................................................................................. 5

7 DESIGN REQUIREMENTS............................................................................................................... 6

8 INSPECTION AND TESTING REQUIREMENTS .............................................................................. 8

9 GUARANTEES ................................................................................................................................. 8

10 DATA REQUIREMENTS .................................................................................................................. 8


1995 - GIP Standard Urheberrechtsschutz/Copyright

Origin Checked Checked Subject Area: 11 Vessels / Apparatuses Standard No. E11.02.3.001
dd 02.01.2006
Client
Gesellschaft fr
ENGINEERING SPECIFICATION Industrieanlagen-
Planung mbH & Co. KG
Flare B-282
Project No.: J-22 Page: 3 of 10
Cost Centre: Project Title: Issue No.: dd 22.05.2009
Sarir gas utilization project
Location: Libya Processed by: Lingner
Building-No.: Job No.: AGOC-002 Approved: Schwarz

1 INTRODUCTION

1.1 This specification describes the minimum requirements for the design, manufacture,
inspection, testing and delivery of a flare for inclusion in oil production facilities at, onshore
Libya.

1.2 There shall be no deviation from this specification unless agreed in writing by the AGOCO.

1.3 This specification should be read in conjunction with the following attached documents:
i) The Process Flow diagrams (PFDs) and Piping & Instrument Diagrams (P&IDs) which
define the scope of supply.

ii) The data sheets which summarize all design data.

iii) The relevant Engineering Standards

1.4 The VENDOR shall submit a quotation for the package in accordance with the General
Engineering Specifications together with specific information requested in Section 10 of this
specification (Data Requirements).

2 APPLICABLE CODES, STANDARDS AND REGULATIONS


Applicable codes and standards to be used in the manufacture and testing including any
modifications, substitutions or additions as indicated in this specification shall be as follows.
The standard shall be that ruling at the date of the contract.

2.1 Mechanical Codes an Standards


API 537 Flare Details for General Refinery and Petrochemical Service

API RP 521 Guide for Pressure Relieving and De Pressuring

ASME VIII Div 1 Pressure Vessels or alternative


1995 - GIP Standard Urheberrechtsschutz/Copyright

PED Pressure Equipment Directive

2.2 The Applicable NOC General Engineering Specification GESas stated in the
Technical Conditions of the contract.

2.3 Project Specification

J22-005-0-GIP-RBD-001 Basis of Design Sarir Gas Utilization Project

Origin Checked Checked Subject Area: 11 Vessels / Apparatuses Standard No. E11.02.3.001
dd 02.01.2006
Client
Gesellschaft fr
ENGINEERING SPECIFICATION Industrieanlagen-
Planung mbH & Co. KG
Flare B-282
Project No.: J-22 Page: 4 of 10
Cost Centre: Project Title: Issue No.: dd 22.05.2009
Sarir gas utilization project
Location: Libya Processed by: Lingner
Building-No.: Job No.: AGOC-002 Approved: Schwarz

3 GENERAL EQUIPMENT SUMMARY

3.1 1 x 100 % duty ground flare set including burner, pilot burner, ignition device, controls is
required for the Sarir oil Field production facilities. The flare shall be pre assembled and, if
possible, skid mounted for minimization of the construction on site.

3.2 Flare duty requirements may be found on the attached data sheet.

3.3 The flare set will be controlled and monitored from the AGOCO control system located in
the control room. Local panels mounted in the flare area will house all the necessary
instruments and transmitters to provide signals for the control system to monitor and control
the operation of the flare set. These local panels, instruments and transmitters are in
VENDORS scope of supply.

4 OPERATING CONDITIONS

4.1 Environmental Conditions


The flare set and local panels will all be installed in a desert environment on-shore.

See J22-005-0-GIP-RBD-001 Basis of Design Sarir Gas Utilization Project for further
details of environmental conditions.

4.2 Fluid/Gas Composition


See flare data sheet.

4.3 Utilities

See flare data sheet.

4.4 Process
The flare will mainly be fed from the HC-Condensate Blow Down Drum D-275 and several
other smaller sources. The condensate will mostly evaporate, but the flare fed stream will
not be completely free from liquids. The flare tip has to be designed for flare gas with liquid
1995 - GIP Standard Urheberrechtsschutz/Copyright

droplets.

Origin Checked Checked Subject Area: 11 Vessels / Apparatuses Standard No. E11.02.3.001
dd 02.01.2006
Client
Gesellschaft fr
ENGINEERING SPECIFICATION Industrieanlagen-
Planung mbH & Co. KG
Flare B-282
Project No.: J-22 Page: 5 of 10
Cost Centre: Project Title: Issue No.: dd 22.05.2009
Sarir gas utilization project
Location: Libya Processed by: Lingner
Building-No.: Job No.: AGOC-002 Approved: Schwarz

5 SCOPE OF SUPPLY

5.1 This will include but not be limited to the following.

5.1.1 One ground flare set with distribution pipes and multi tip burner

5.1.2 One set pilot burners with flame detectors and igniters.

5.1.3 One ignition panel.

5.1.4 One local control panel for pilot gas

5.1.5 One local control panel for seal gas

5.1.6 One set interconnecting piping, wiring and cabling.

5.1.7 Complete set of spare parts for


- Installation and Commissioning
- 2 years operation

5.1.8 One Set of special tools (if required).

6 EXCLUSIONS

The following are specifically excluded from the VENDORs scope of supply but supplied by
CONTRACTOR.

Cable between flare package and LV switchboards.

Cable between flare package and overall process control system.

Process pipework outside of package limits.


1995 - GIP Standard Urheberrechtsschutz/Copyright

Holding down bolts for skids, panels etc.

Origin Checked Checked Subject Area: 11 Vessels / Apparatuses Standard No. E11.02.3.001
dd 02.01.2006
Client
Gesellschaft fr
ENGINEERING SPECIFICATION Industrieanlagen-
Planung mbH & Co. KG
Flare B-282
Project No.: J-22 Page: 6 of 10
Cost Centre: Project Title: Issue No.: dd 22.05.2009
Sarir gas utilization project
Location: Libya Processed by: Lingner
Building-No.: Job No.: AGOC-002 Approved: Schwarz

7 DESIGN REQUIREMENTS

7.1 General

7.1.1 The flare packages shall consist of a flare tube with multi-tip burner, pilot burners with flame
monitoring and ignition device. In addition each set shall be provided with an instrument,
purge gas and ignition panel to be skid-mounted.

7.1.2 The VENDOR shall specify all restraints on the operating range of the flare unit, e.g. volume
flow, liquid content etc.

7.1.3 All process and auxiliary pipework shall be in accordance with project engineering
standards

7.2 Flare Design

7.2.1 Any support frames, tools etc., required to carry out routine maintenance shall be included
by the VENDOR.

7.2.2 Particular attention in the burner selection shall be given to ensuring that liquid content of
the evaporated condensate flow can be handled without destruction.

7.3 Instrumentation

7.3.1 All instrumentation shall conform to the relevant project engineering specifications
(Instrumentation). All skid mounted instrumentation shall be either wired to or installed in the
skids local instrument panel.

7.3.2 All instruments shall be suitable for installation into a zone 2, IIA

7.3.3 All instruments shall provide local indication, those providing signals for remote monitoring
and control of the package shall provide the following outputs:

Digital volt free contracts


1995 - GIP Standard Urheberrechtsschutz/Copyright

Analogue 4-20 mA (24VDC loop power from DCS)

7.3.4 A local instrument panel shall be provided on the flare skid to house any transmitters and/or
amplifiers required and to act as an interface panel for termination of all package mounted
instrumentation. Since the package will be installed in a safe area, although all instruments
must be suitable for Zone 2, the local instrument panel may be an industrial enclosure to IP
56, in accordance with IP code of practice part 1, 3.8.3 C, so long as only non-sparking
elements and wiring is employed.

7.3.5 VENDOR shall recommend any required instrumentation or controls which may be
necessary for safe and reliable operation of the equipment.

Origin Checked Checked Subject Area: 11 Vessels / Apparatuses Standard No. E11.02.3.001
dd 02.01.2006
Client
Gesellschaft fr
ENGINEERING SPECIFICATION Industrieanlagen-
Planung mbH & Co. KG
Flare B-282
Project No.: J-22 Page: 7 of 10
Cost Centre: Project Title: Issue No.: dd 22.05.2009
Sarir gas utilization project
Location: Libya Processed by: Lingner
Building-No.: Job No.: AGOC-002 Approved: Schwarz

7.4 Noise Control

7.4.1 Noise Limits

The equipment supplied shall meet the noise limits stated in GES A.04 (Equipment Noise
Levels) with the equipment operating under rated conditions.

All equipment shall be designed to minimize the noise generated at source rather than by
the use of additional noise suppression devices. If however, such devices are necessary to
achieve the noise level specified, they shall be designed and constructed to last the life or
the unit without deterioration in performance.

The VENDOR shall advise if the measured noise contains very narrow band or pure tone
components.

A pure tone is present in the noise when a component in a given octave band is within 10
dB of the total level in the chosen octave band.

7.4.2 Guarantees

The VENDOR shall guarantee the noise levels given in his quotation and safe operation of
the flare system. Final acceptance testing will be carried out on site.

In the event of the Vendor failing to meet the guaranteed noise levels any remedial work
shall be made with the approval of the AGOCO and at the expense of the
VENDOR/CONTRACTOR.
1995 - GIP Standard Urheberrechtsschutz/Copyright

Origin Checked Checked Subject Area: 11 Vessels / Apparatuses Standard No. E11.02.3.001
dd 02.01.2006
Client
Gesellschaft fr
ENGINEERING SPECIFICATION Industrieanlagen-
Planung mbH & Co. KG
Flare B-282
Project No.: J-22 Page: 8 of 10
Cost Centre: Project Title: Issue No.: dd 22.05.2009
Sarir gas utilization project
Location: Libya Processed by: Lingner
Building-No.: Job No.: AGOC-002 Approved: Schwarz

8 INSPECTION AND TESTING REQUIREMENTS

8.1 Codes and Standards

Inspection and testing of the flare package shall be in accordance with the following were
relevant:

Relevant Pressure Parts Design Code

GES S.06 (Skid Assembly)

GES A 03 (Package Units Layout, Spacing & Assembly)

Additional testing conditions are defined below.

8.2 Testing

8.2.1 During the contract stage the Vendor shall submit for approval a test dossier detailing all
functional and performance tests to be carried out, the method proposed for carrying out
these tests and the applicable acceptance limits and the test programs.

8.2.2 Each control panel shall be subjected to a witnessed full functional test in the panel SUB-
SUPPLIERS works.

9 GUARANTEES

9.1 The equipment shall be guaranteed for satisfactory performance at all operating conditions
specified in this specification and the data sheets.

9.2 All equipment and components parts shall be guaranteed by the VENDOR against defective
materials, design and workmanship for a 12 month period dating from completion of
commissioning and successful performance test.
1995 - GIP Standard Urheberrechtsschutz/Copyright

10 DATA REQUIREMENTS

10.1 Data Required with Tender

10.1.1 General

The minimum requirement for VENDOR documentation is contained in the attached data
requirement schedule. The VENDOR shall complete these data sheets and indicate his
delivery schedule.

10.1.2 Drawings

Outline General Arrangement Drawing of the packages.


Origin Checked Checked Subject Area: 11 Vessels / Apparatuses Standard No. E11.02.3.001
dd 02.01.2006
Client
Gesellschaft fr
ENGINEERING SPECIFICATION Industrieanlagen-
Planung mbH & Co. KG
Flare B-282
Project No.: J-22 Page: 9 of 10
Cost Centre: Project Title: Issue No.: dd 22.05.2009
Sarir gas utilization project
Location: Libya Processed by: Lingner
Building-No.: Job No.: AGOC-002 Approved: Schwarz
10.1.3 Package Data

The following must be supplied for the flare.

a) Completed Data Sheets.

b) Confirmation of scope of supply including detailed material and painting/ lining


specifications.

c) Overall dimensions of packages.

d) All restraints on the operating range of the flare shall stated.

e) Full list of package instrumentation for monitoring and control.

f) Package control requirements for incorporation into AGOCO control system.

g) Package weight data

shipping (to include packing)

installed dry

operational

h) Full set of technical literature

i) Confirmation of compliance of the engineering specifications and standards referred to


in Section 2 of this document.

10.1.4 Nominated SUB-SUPPLIERS

a) The VENDOR is to detail their SUB-SUPPLIERS for the major items of equipment and
the country of origin.

b) Two or more alternatives for each SUB-SUPPLIERS will be acceptable.


1995 - GIP Standard Urheberrechtsschutz/Copyright

c) SUB-SUPPLIERS should have a proven record for this type of work.


References may be required.

10.1.5 VENDOR References

VENDOR to provide a reference list of their flares for this type of application.

i) Under construction and/or awaiting installation/commissioning.

ii) Operational

Origin Checked Checked Subject Area: 11 Vessels / Apparatuses Standard No. E11.02.3.001
dd 02.01.2006
Client
Gesellschaft fr
ENGINEERING SPECIFICATION Industrieanlagen-
Planung mbH & Co. KG
Flare B-282
Project No.: J-22 Page: 10 of 10
Cost Centre: Project Title: Issue No.: dd 22.05.2009
Sarir gas utilization project
Location: Libya Processed by: Lingner
Building-No.: Job No.: AGOC-002 Approved: Schwarz

10.2 Submissions after Order

10.2.1 SUPPLIERS Document and Drawing Register (SDDR)

Data to be submitted by VENDOR after award of any order are defined in the Suppliers
Document and Drawing Register (SDDR).
1995 - GIP Standard Urheberrechtsschutz/Copyright

Origin Checked Checked Subject Area: 11 Vessels / Apparatuses Standard No. E11.02.3.001
dd 02.01.2006